MICE TECHNICAL UPDATE & ISIS/RAL PLANS
25

MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Dec 27, 2015

Download

Documents

Damon Banks
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

MICE

TECHNICAL UPDATE &ISIS/RAL PLANS

Page 2: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Belgium

Italy

Japan

The Netherlands

Russian Federation

Switzerland

UK

USA

Acknowledge

Page 3: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

RAL & ISISIS

ISHarwell

RAL

Page 4: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Plant….Control room…Electronics….

Location

Page 5: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

ISIS Ring

Page 6: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Experimental Hall

Hall:

L = 47 m W = 12 m H = 8 m

S = 564 m2 V = 4512 m3

Two overhead cranes (8 tonnes each)

Page 7: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Mice Hall

Existing Area & Beam Line

-- is still there - as seen in Summer

-- Beam Line used to end of year

Page 8: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Mice Layout

Page 9: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Technical Update & Issues

•Beam Line•RF System•Absorbers•Magnets & Cryogenics•Detectors

•Infrastructure & Layout

•RAL & ISIS Perspectives•Programme•Expected Progress

Page 10: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

MICE Layout

Page 11: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Beam Line• P < 400 MeV/c• Rejection of protons and pions <10%• few muons per s

• Two solutions:– solenoid

» cryogenics availability » release by PSI

– quadrupoles

Page 12: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Purity

Page 13: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Performance

Rate depends on muon momentum:e.g. at 200 MeV/c3000 / ms for solenoid~300 /ms in quadrupole

(assumed a Ti wire target: 1cm long and 4mm Ø)

Purity should be better than 90% against scattered protons

1.E-09

1.E-08

1.E-07

1.E-06

1.E-05

1.E-04

1.E-03

1.E-02

0 100 200 300 400 500 600

p

Page 14: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

RF System

Cooling Channel Envelope

AbsorberTuning Bellows

RF Cavity Cavities

Raft

Solenoid Magnet

1 MW per cavity

8MW total

Low Duty Factor

1-2 ms1-10 Hz

average power~1kW/Hz

Page 15: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

~

RF Drive

TH116 TH781 RS2058EX SPS

7651EX RAL

LEVEL CONTROL

SOURCE

OTHER DRIVE CHAIN

10mW4kW40kW400kW4MW

DRIVE TO 4 CAVITIES VIA PHASE SHIFTERS AND 70db COUPLERS POWER SPLITTERS AND CIRCULATORS

40 kV 20 kV 12kV 5kV

R.A. Church RAL

- a possible scheme

Page 16: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Absorber I• Liquid Hydrogen – Major safety issue

– ISIS Liquid Hydrogen Moderator

Page 17: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

-beam

Detector 1 Absorber 1 Detector 2Absorber 2 Absorber 3 RF 1 RF 2

Vacuum LH2 He Detector gas

-beam

Detector 1

Absorber 1

Detector 2

Absorber 2 Absorber 3

RF 1 RF 2

-beam

Detector 1 Absorber 1 Detector 2Absorber 2 Absorber 3 RF 1 RF 2

Absorber II

Page 18: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Absorber III

Page 19: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Absorber IV

Page 20: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Magnets & CryogenicsPrinciple Issues

– Fringe Fields– Cryogenic Requirements

Blue contours:10 mT

Orange:0.5 mT

Page 21: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Detectors

Issues:SiFi - Large cyro cooling needed for VLPCsTPG – HV & flamable gas (next to Lig.H cell)

Page 22: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Infrastructure

Plant: Electrical PowerCooling PowerCryogenic SystemHydrogen Delivery & Handling

Installationphased build of the experiment

Page 23: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

ISIS PerspectiveCritical Issues: Beam Line

Long ShutdownBreak into ISIS Synchrotron from MICE HallHave Shielding available+Have Stands available

Competes with other ISIS projects• 300 A upgrade*• Second Target Station*• RFQ Installation• delivery of contracted neutron amp.hours

* work in synch. vault +2nd target station – friend or foe?

Page 24: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

ISIS Schedule

Page 25: MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.

Expected Progress

Proposal submitted expect the review to take place Mid Feb till May (?)

- international review panel

MICE is part of the UK’s Science road map- but funds are not yet allocated

Internal Review green light following international rp