Top Banner
Michigan Accelerated Rail Service Passenger & Freight Director Kirk T. Steudle, P.E. Michigan Department of Transportation Faster, Better, Cheaper, Safer, Smarter October 14, 2011
18

MI Accelerated Rail Service (2)

Sep 12, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MI Accelerated Rail Service (2)

MichiganAccelerated Rail Service

Passenger & Freight

Director Kirk T. Steudle, P.E. Michigan Department of Transportation

Faster, Better, Cheaper, Safer, Smarter

October 14, 2011

Page 2: MI Accelerated Rail Service (2)

Michigan Accelerated Rail Service

• Our commitment • What we are doing

– Faster– Better– Cheaper– Safer – Smarter

• Other related projects

Page 3: MI Accelerated Rail Service (2)

Michigan’s Current System

Page 4: MI Accelerated Rail Service (2)

Ridership and Revenue (FY 1995-2010)

Page 5: MI Accelerated Rail Service (2)

Federal Commitment Chicago-Detroit/Pontiac Corridor

Improvement Federal State Local TotalTroy Station $ 8.5 M $ 0 M $ 0 M $ 8.5 MDearborn Station $ 28.2 M $ 0 M $ 0 M $ 28.2 MBattle Creek Station $ 3.6 M $ 0 M $ 0 M $ 3.6 MJackson Station $ 1.0 M $ 0 M $ 0 M $ 1.0 MAnn Arbor Station – PE/NEPA $ 2.8 M $ 0 M $ 0.7 M $ 3.5 MWest Detroit Connection Track $ 9.4 M $ 8.9 M $ 0 M $ 18.3 MKalamazoo-Dearborn – Acquisition/Corridor

Enhancement/Professional Services $346.5 M $18.75M $18.75M $384.0MCorridor Investment Plan – Environmental

Clearance $ 3.2 M $ 0.2M $ 0.6 M $ 4.0 MEnglewood Flyover (Illinois) $133.0 M $ 0M $ 0 M $133.0MGateway Projects (Indiana) $ 71.4 M $ 0M $ 0 M $ 71.4 MHSR Porter, IN to New Buffalo (Amtrak) $ 32.9 M $ 0M $ 0 M $ 32.9 M

Total Corridor Investment $640.5 M $ 27.85M $ 20.05M $688.4M

Midwest Next Generation Train EquipmentProcurement (Michigan share TBD) $268.2 M $ 0 M $ 0 M $268.2M

Page 6: MI Accelerated Rail Service (2)

Passenger & Freight

• Success for Michigan is growth in both areas

• Passenger service– Additional frequencies– Increased ridership / additional revenue

• Freight service– Expand customers– Increased volume – growing economy

Page 7: MI Accelerated Rail Service (2)

Faster Rail Service

• Reduce trip times– 110 MPH maximum passenger service– 79 MPH maximum freight service

• Dedicated passenger alignment between Chicago Union Station and Porter, IN

• Passenger focused ownership between Porter, IN and Dearborn (Nearly 80% of the corridor)

• High performance high horse power locomotives• Freight will benefit from capacity improvements

Page 8: MI Accelerated Rail Service (2)

Current Projects:West Detroit Connection Track

Page 9: MI Accelerated Rail Service (2)

Better Rail Service• New modern equipment

– Larger windows– Modern comfortable seats

• Better reliability– Arrive and depart on schedule– Longer term more frequencies

• Station – Renovations– New construction

Page 10: MI Accelerated Rail Service (2)

Current Projects:Michigan Stations

Page 11: MI Accelerated Rail Service (2)

Cheaper Rail Service

• Increased ridership will increase revenue & reduce operating cost

• Increase corridor length to address PRIIA Sec 209

• Increased freight traffic will help Michigan economy & provide more revenue to maintain the railroad

Page 12: MI Accelerated Rail Service (2)

MidwestVIA RailEmpireKeystoneOther Rail Lines

Ohio HubMidwestVIA RailEmpireKeystoneOther Rail Lines

Ohio Hub

MDOT VisionCorridor Investment Plan

Potential International Connectivity

Page 13: MI Accelerated Rail Service (2)

Safer Rail Service

• New technology will improve safety at grade crossings and along the railroad

• New passenger equipment will meet today's safety standards

• Moving more freight by rail is safer than moving it on the highways

Page 14: MI Accelerated Rail Service (2)

Denton Road Retractable Barrier Test Project

Page 15: MI Accelerated Rail Service (2)

Smarter Rail Service

• New train control technology (ITCS)

• Wi-Fi service will be available on board

Page 16: MI Accelerated Rail Service (2)

MDOT Commitment to Amtrak’s Ownership - ITCS

Page 17: MI Accelerated Rail Service (2)

Other Passenger Rail Projects

Ann Arbor – Detroit Regional Rail Demonstration

Howell to Ann Arbor Regional Rail Demonstration

Woodward Avenue Light Rail Project

Page 18: MI Accelerated Rail Service (2)

Thank you!