MEANING FEATURES OUTCOME WORKS LIMITATIONS MEASURES ETC...
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MGNREGA

By: Sanjam Kanwar

IX-E

MG-NREGA

(MAHATMA GANDHI -NATIONAL RURAL

EMPLOYMENT GURANTEE ACT.)

Page 2: MGNREGA

The Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA) is an Indian law introduced on 5th september’2005,  that aims to guarantee the 'right to work' and ensure livelihood security in rural areas by providing at least 100 days of guaranteed wage employment in a financial year to every household whose adult members volunteer to do unskilled manual work.

What is MGNREGA?

Page 3: MGNREGA

OBJECTIVE!

Page 4: MGNREGA

root democracy

a. Strong social safety net for the vulnerable groups by providing a fall-back employment source, when other employment alternatives are scarce or inadequate

b. Growth engine for sustainable development of an agricultural economy. Through the process of providing employment on works that address causes of chronic poverty such as drought, deforestation and soil erosion, the Act seeks to strengthen the natural resource base of rural livelihood and create durable assets in rural areas. Effectively implemented, NREGA has the potential to transform the geography of poverty

c. Empowerment of rural poor through the processes of a rights-based Law

d. New ways of doing business, as a model of governance reform anchored on the principles of transparency and grass root democracy

Page 5: MGNREGA

SAILENT FEATURES OF

MGNREGA

Page 6: MGNREGA

i) Adult members of a rural household willing to participate, apply for registration either orally or in written to Gram Panchayat and after verfication they’ll be provided with a Job Card within 15 days(must be) with proper photographs of the members willing, free of cost!

ii)  Employment will be given within 15 days of application for work, if it is not then daily unemployment allowance as per the Act, has to be paid liability of payment of unemployment allowance is of the States.

iii) Work should ordinarily be provided within 5 km radius of the village. In case work is provided beyond 5 km, extra wages of 10% are payable to meet additional transportation and living expenses.

iv) Wages are to be paid according to the Minimum Wages Act 1948 for agricultural laborers in the State, unless the Centre notifies a wage rate which will not be less than Rs. 60/ per day. Equal wages will be provided to both men and women.

v) Wages are to be paid according to piece rate or daily rate. Disbursement of wages has to be done on weekly basis and not beyond a fortnight in any case.

Page 7: MGNREGA

.

vi) At least one-third beneficiaries shall be women who have registered and requested work under the scheme.

vii) Work site facilities such as crèche, drinking water, shade have to be provided.

viii) Permissible works predominantly include water and soil conservation, forestation and land development works. No contractors and machinery is allowed.

ix) A 60:40 wage and material ratio has to be maintained.

 x) The Central Government bears the 100 percent wage cost of unskilled manual labor and 75 percent of the material cost including the wages of skilled and semi skilled workers

Page 8: MGNREGA

Application..

Page 9: MGNREGA

3Adult members of a rural household, willing to do unskilled manual work, may apply for registration in writing or orally to the local Gram Panchayat.

After verification by gram panchayat, they issue a job card which bear the photograph of all the adult member of household.

Job Card should be issued within 15 days of application. Job Card holder may submit a written application for employment to the Gram Panchayat

Gram Panchayat will issue a receipt of the written application, which give guaranteed job within 15 days.

If job is not given within 15 days then daily unemployment allowance as per the Act, has to be paid.

Work should be within 5 km radius of the village. If not then extra wages of 10% should be given.

Wages should not be less than RS.60/day and it is different for different states. 

Page 10: MGNREGA

TYPES OF WORK UNDER MGNREGA..

Page 11: MGNREGA

1.Flood control and protection works including drainage in water logged areas.

2. Rural connectivity to provide all weather access .

3. Water conservation and Water harvesting 4..Drought proofing(A-forestation and tree

plantation).5.Irrigation canals.6.Provision of irrigation facility to land owned by

SC/ST/beneficiaries under Indira Aawas-Yozna .7.Renovation of traditional water bodies De-silting

of tanks .8.Land development

Page 12: MGNREGA

OUTCOME

Page 13: MGNREGA
Page 14: MGNREGA
Page 15: MGNREGA

 

Maximizing Work Opportunities: Livelihood Security : Under NREGA ,in 2008-09 4.5 crore households were provided employment and 216.01 crore persondays were generated. In FY 2009-10 upto July, 2.53 crore households were provided work and 87.09 crore persondays were generated.

 Inclusive Growth: NREGA has provided employment particularly for marginalized groups. The participation percentages were 55% (SC/ST) in 2008-09 and 53% (SC/ST) upto July, 2009. Women workforce participation has also surpassed the statutory minimum requirement of 33 per cent. In FY 08-09, women participation was 48%, which has increased to 52% upto in 2009-10 (upto July, 09).

Augmenting household income, savings and investment: 

Post-NREGA, there has been a revision of minimum wages across the country in last three years, and the average daily wage rate has increased from Rs. 75 to Rs 87 in 2009-10 (upto July, 2009)

Page 16: MGNREGA

Financial Inclusion: Over 7.33 crore NREGA bank and post office accounts have been opened so far. These accounts have helped bring the rural poor under the organized banking sector. This will not only infuse integrity in wage payment, but also bring the most vulnerable people in rural India into formal banking and credit system.

Regenerating Natural Resources: Under NREGA water and soil conservations, plantation and afforestation has been given priority. Works relating to drought proofing and flood protection are aimed to provide resistance to climate shocks and natural disasters.

Drought mitigation: NREGA has the potential to diminish the adverse impact of drought by placing purchasing power in the hands of the peoples. Advisories were issued to all 11 drought affected states to ensure that adequate funds and shelf of project have been made available to the Districts.

Page 17: MGNREGA

LIMITATIONS

Page 18: MGNREGA

 Registration problems in terms of caste discrimination. Uniform distribution of job cards is a time consuming process and leads to dissatisfaction. Illegal charges levied on people for application forms. Non-issuance of receipts to applicants. Unavailability of necessary facilities at the work places. Improper maintenance of attendance of the workers. Payments of wages delayed. Measurement of work done by the workers a major problem. Inadequate number of officials for the scheme. Delay in appointments of officials in the villages.Another issue is that of fake muster rolls & bills being generated

Page 19: MGNREGA

Measures to Improve

MGNREGA

Page 20: MGNREGA

i. In some states where the programme has been a great failure till now , the center can take the responsibility of implementation.

ii. There must be a nodal agency as a watchdog to overview performance of programme.

iii. Emphasis should not be only on the employment generation, rather it must focus on permanent asset creation.

iv. The projects must be decided on the basis of suggestions given by local people as far as possible.

v. Instead of 100 days of work per household, it should provide 100 days of work per adult individual.

Page 21: MGNREGA

Hope My Efforts were