Top Banner
metro.net State Route 710 Environmental Study Summer 2012 Bulletin 13-0206rb ©2012 lacmta Open Houses The Open Houses were held to provide a SR-710 Study overview and update, inform stakeholders of the Environmental Review process, and present the twelve (12) alternatives developed by Metro’s technical team. The meetings were held throughout the Study area in El Sereno, Eagle Rock, La Cañada Flintridge, El Monte, South Pasadena, Alhambra, and Pasadena. Over 400 individuals attended the Open Houses including community members, 24 elected o;cials, and the media. A total of 890 comments were received and reviewed by the Study team. What You Shared Your input included a wide range of commentary concerning freight and goods movement, air quality, pollution, noise, suggestions for outreach, specific input of each alternative, property values, community culture, environmental justice, and local street improvement. Community Open Houses: Discussion of Alternatives Recommended for EIR/EIS Join us to learn more about the Recommended Alternatives and tell us what you think. Thursday, October 18th, 2012 6pm – 8pm El Sereno Senior Center 4818 Klamath Pl Los Angeles, CA 90032 Saturday, October 20th, 2012 10am – 12pm Maranatha High School 169 S Saint John Av Pasadena, CA 91105 Future Plans These recommended set of alternatives will be carried into the EIR/EIS, which begins this fall and is expected to be completed and available for public review in the fall of 2013. We will continue to host informational sessions based on your comments, conduct community meetings, and provide you with updated information about how you and your community can continue to engage in the SR-710 Study. Community Open House, May 2012 Your continued participation is important! With your participation, the technical teams at Metro and Caltrans can better serve the needs of you and your community. Help us spread the word about this study that seeks to improve mobility and reduce congestion. Attend an event and let us know what you think. Learn more with the new SR-710 interactive tool. Visit the project webpage, metro.net/sr710study, to engage and provide comments about the SR-710 Study. Contact Us: 855.4sr.7100 (855.477.7100) metro.net/sr710study facebook.com / sr710study twitter.com/sr710study
4

metro.net State Route 710 Environmental Studymedia.metro.net/.../images/130206_sr710_gap_engspn.pdf · metro.net State Route 710 Environmental Study Summer 2012 Bulletin 13-0206 rb

Aug 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: metro.net State Route 710 Environmental Studymedia.metro.net/.../images/130206_sr710_gap_engspn.pdf · metro.net State Route 710 Environmental Study Summer 2012 Bulletin 13-0206 rb

metro.net

State Route 710 Environmental Study Summer 2012 Bulletin

13-0

206r

b ©

2012

lac

mta

Open Houses

The Open Houses were held to provide a SR-710 Study overview and update, inform stakeholders of the Environmental Review process, and present the twelve (12) alternatives developed by Metro’s technical team. The meetings were held throughout the Study area in El Sereno, Eagle Rock, La Cañada Flintridge, El Monte, South Pasadena, Alhambra, and Pasadena. Over 400 individuals attended the Open Houses including community members, 24 elected o;cials, and the media. A total of 890 comments were received and reviewed by the Study team.

What You Shared

Your input included a wide range of commentary concerning freight and goods movement, air quality, pollution, noise, suggestions for outreach, specific input of each alternative, property values, community culture, environmental justice, and local street improvement.

Community Open Houses: Discussion of Alternatives Recommended for EIR/EIS

Join us to learn more about the Recommended Alternatives and tell us what you think.

Thursday, October 18th, 2012 6pm – 8pm El Sereno Senior Center 4818 Klamath Pl Los Angeles, CA 90032

Saturday, October 20th, 2012 10am – 12pm

Maranatha High School 169 S Saint John Av Pasadena, CA 91105

Future Plans

These recommended set of alternatives will be carried into the EIR/EIS, which begins this fall and is expected to be completed and available for public review in the fall of 2013. We will continue to host informational sessions based on your comments, conduct community meetings, and provide you with updated information about how you and your community can continue to engage in the SR-710 Study.

Community Open House, May 2012

Your continued participation is important!

With your participation, the technical teams at Metro and Caltrans can better serve the needs of you and your community. Help us spread the word about this study that seeks to improve mobility and reduce congestion. Attend an event and let us know what you think.

Learn more with the new SR-710 interactive tool.

Visit the project webpage, metro.net/sr710study, to engage and provide comments about the SR-710 Study.

Contact Us:

855.4sr.7100 (855.477.7100)

metro.net/sr710study

facebook.com/sr710study

twitter.com/sr710study

Page 2: metro.net State Route 710 Environmental Studymedia.metro.net/.../images/130206_sr710_gap_engspn.pdf · metro.net State Route 710 Environmental Study Summer 2012 Bulletin 13-0206 rb

What is being considered?

Several alternatives are being considered including a no-build option, TSM/TDM, highway, freeway, and BRT/LRT concepts.

no build conceptRefers to not building anything within the study area, except for what is already being planned by local jurisdictions and/or included in the Southern California Association of Governments’ Regional Transportation Plan.

tsm (transportation systems management) conceptStrategies are designed to maximize e;ciency of the existing transportation system to improve capacity and reduce the e=ects of bottlenecks. Examples include: > Increasing transit service > Improving tra;c signal coordination > Installing traveler information systems > Improving intersections > Improving local streets > Introducing advanced technologies (e.g., Intelligent Transportation System, Guided Electric Vehicle Technology, Inherently Low Emissions Vehicles, Dual Mode Systems, Automated vehicle systems)

tdm (transportation demand management) Strategies are designed to reduce the demand in peak tra;c periods by: > Shifting vehicle trips to o=-peak tra;c hours > Encouraging ride sharing > Promoting use of public transit > Eliminating trips (e.g. telecommuting)

highway concepts Improving surface streets to serve a higher-capacity for both local and regional travel.

freeway concepts Extending the 710 freeway via: > Underground tunnel options > At-grade/depressed surface freeway option

lrt/brt conceptBuilding a new public transit system that includes: > Light Rail Transit (LRT, similar to the Metro Gold Line in East Los Angeles through Pasadena) and; > Bus Rapid Transit (BRT, similar to the Metro Orange Line in the San Fernando Valley)

What is the SR-710 Study?

The State Route 710 (SR-710) environmental study evaluates transportation options to improve mobility and relieve congestion in the area between State Route 2, Interstates 5, 10, 210, and 605 in Northeast Los Angeles and San Gabriel Valley. The study considers a range of multi-modal alternatives and their proposed e=ects to the surrounding communities.

Why is the SR-710 Study needed?

> The transportation network within the study area does not adequately handle the demand for regional and local travel. > Travel speeds on freeways are low, delay is high and travel times are unpredictable. > Local streets are a=ected by excess freeway traffic causing increased congestion and low speeds. > Without changes to the transportation system or demand patterns, the transit system will continue to operate at unacceptable levels. Operations will deteriorate as population growth and future traffic demands increase.

What is the SR-710 Study timeline?

where we’ve been…In the spring of 2011, the public participated in a series of meetings that resulted in a scoping process to identify a range of multimodal alternatives that would be analyzed throughout the Environmental Review Process. In addition to the scopping process, the technical teams at Metro and Caltrans incorporated the feedback from the Open Houses into their analysis and developed a set of multimodal initial alternatives, as follows:

> Seven (7) BRT alternatives > Five (5) LRT alternatives > Eleven (11) Freeway alternatives > Thirteen (13) local Highway alternatives > Three (3) TSM/TDM alternatives > One (1) No-build alternative

where we’re going…In the spring of 2012, the initial set of alternatives were narrowed down to 12, which were presented at the seven Open Houses in May. These include:

> Two (2) BRT alternatives > Two (2) LRT alternatives > Four (4) freeway concepts > Three (3) tunnel alternatives > One (1) at-grade/depressed surface alternative > Two (2) highway concepts > Two (2) TSM/TDM concepts > One (1) No-build concept

Community Open House, May 2012

210

210

2

60

1010

5

10

710

110

605

210

2

134

HACIENDA HEIGHTS

MONROVIA

EL MONTE

TEMPLE CITY

IRWINDALE

BALDWIN PARK

BRADBURYAZUZA

WEST COVINA

ARCADIA

SIERRAMADRE

MONTEREY PARK

ROSEMEAD

SOUTHEL MONTE

ALHAMBRA

SAN GABRIEL

SAN MARINO

PASADENA

SOUTHPASADENA

ALTADENA

LA PUENTE

LOS ANGELES

EASTLOS ANGELES

GLENDALE

LA CAÑADANORTH LOS ANGELES COUNTY

GATEWAY CITIES

SR-710 Study Area

With the SR-710 Study underway, we’re closer than ever to shaping the future of transportation and mobility in your community.

Page 3: metro.net State Route 710 Environmental Studymedia.metro.net/.../images/130206_sr710_gap_engspn.pdf · metro.net State Route 710 Environmental Study Summer 2012 Bulletin 13-0206 rb

metro.net

Estudio Ambiental de la Ruta Estatal 710 Boletín de verano de 2012

13-0

206r

b ©

2012

lac

mta

Reuniones comunitarias

Las reuniones comunitarias se organizaron para proveer la visión general y una actualización del Estudio de la SR-710, informar el público del proceso de Revisión Ambiental y presentar las doce (12) alternativas desarrolladas por el equipo técnico de Metro. Las reuniones se montaron dentro del área de estudio en El Sereno, Eagle Rock, La Cañada Flintridge, El Monte, South Pasadena, Alhambra y Pasadena. Más de 400 personas asistieron las reuniones comunitarias incluyendo miembros de la comunidad, 24 funcionarios electos y la prensa. Un total de 890 comentarios fueron recibidos y revisados por el equipo del Estudio.

Lo que compartió usted

Sus comentarios incluyeron un espectro amplio de temas como el transporte de carga, la calidad de aire, la polución, el ruido, sugerencias para alcance comunitario, ideas específicas para cada alternativa, los valores de propiedades, la cultura de la comunidad, la justicia ambiental y el mejoramiento de las calles locales.

Discusión de las alternativas recomendadas para el EIR/EIS: Reuniones comunitarias

Venga a aprender más sobre las alternativas recomendadas y díganos lo que piensa.

Jueves, 18 de octubre de 2012 6pm – 8pm

El Sereno Senior Center 4818 Klamath PlLos Ángeles, CA 90032

Sábado, 20 de octubre de 2012 10am – 12pm

Maranatha High School169 S Saint John AvPasadena, CA 91105

Donde vamos

Este grupo de alternativas recomendado se llevará al EIR/EIS, el cual comenzará este otoño y se espera completar y hacerse disponible para revisión pública en el otoño de 2013. Continuaremos a organizar sesiones informativas basadas en sus comentarios, montar reuniones comunitarias y proveerle con información sobre cómo usted y su comunidad pueden continuar a dedicarse en el Estudio de la SR-710.

Reunión comunitaria, mayo de 2012

¡Por qué su participación continua es importante!

Con su participación, los equipos técnicos de Metro y Caltrans pueden servir mejor sus necesidades y las de la comunidad. Ayúdenos a correr la voz sobre este estudio que pretende mejorar la movilidad y reducir la congestión.

Aprenda más con la herramienta interactiva nueva.

Visite la página del proyecto, metro.net/sr710study, para participar y proveer comentarios acerca del Estudio de la SR-710.

Contáctenos:

855.4sr.7100 (855.477.7100)

metro.net/sr710study

facebook.com/sr710study

twitter.com/sr710study

Page 4: metro.net State Route 710 Environmental Studymedia.metro.net/.../images/130206_sr710_gap_engspn.pdf · metro.net State Route 710 Environmental Study Summer 2012 Bulletin 13-0206 rb

210

210

2

60

1010

5

10

710

110

605

210

2

134

HACIENDA HEIGHTS

MONROVIA

EL MONTE

TEMPLE CITY

IRWINDALE

BALDWIN PARK

BRADBURYAZUZA

WEST COVINA

ARCADIA

SIERRAMADRE

MONTEREY PARK

ROSEMEAD

SOUTHEL MONTE

ALHAMBRA

SAN GABRIEL

SAN MARINO

PASADENA

SOUTHPASADENA

ALTADENA

LA PUENTE

LOS ANGELES

EASTLOS ANGELES

GLENDALE

LA CAÑADANORTH LOS ANGELES COUNTY

GATEWAY CITIES

¿Qué se está considerando?

Varias alternativas se están considerando incluyendo una opción de no construir, TSM/TDM, carretera, autopista y conceptos de BRT/LRT (de>nido más abajo).

concepto “no construir” Mantiene que nada se construirá dentro del área de estudio, con las excepciones de lo que ya ha sido planeado por las jurisdicciones locales y/o incluido en el Plan del Transporte Regional de la Asociación de Gobiernos del Sur de California.

concepto tsm (administración de sistemas de transporte)

Estrategias se diseñan para maximizar la e>cacia del sistema de transporte existente para mejorar la capacidad y reducir los efectos de los embotellamientos. Ejemplos incluyen:

> Aumentar el servicio de transporte > Mejorar la coordinación de los semáforos > Instalar sistemas para proveer viajeros con información > Mejorar intersecciones > Mejorar calles locales > Introducir tecnologías avanzadas (e.g., sistema de transporte inteligente, tecnología de vehículos eléctricos guiados, vehículos inherentemente de bajas emisiones, sistemas de modo dual, sistemas de vehículos automáticos)

concepto tdm (manejo de demanda para el transporte)Estrategias se diseñan para reducir la demanda durante periodos de trá>co en las horas pico a través de lo siguiente:

> Moviendo viajes de vehículos a otras horas con menos tráfico > Fomentando viajes compartidos > Promoviendo el uso del transporte público > Eliminando viajes (e.g., trabajo a distancia)

conceptos de carreteraMejorando las superficies de las calles para servir mejor una capacidad más alta para viajes locales y regionales.

conceptos de autopistaExtendiendo la autopista 710 a través de:

> Opciones de túneles subterráneos > Opción de autopista a nivel/superficie hundida

concepto de lrt/brtConstruyendo un sistema de transporte público que incluye:

> Transporte de tren ligero (LRT, parecido a Metro Gold Line que corre desde el Este de Los Ángeles hasta Pasadena) > Transporte rápido de autobús (BRT, parecido a Metro Orange Line en el Valle de San Fernando)

¿Qué es el Estudio de la Ruta Estatal 710?

El estudio ambiental de la Ruta Estatal 710 (SR-710) evalúa las opciones de transportación para mejorar la movilidad y aliviar la congestión en el área entre la Ruta Estatal 2 y las autopistas 5, 10, 210 y 605 en el noreste de Los Ángeles y el Valle de San Gabriel. El estudio considera un espectro amplio de alternativas multimodales y sus efectos propuestos en las comunidades a sus alrededores.

¿Por qué se necesita el Estudio de la SR-710?

> La red de transportación dentro del área de estudio no soporta adecuadamente la demanda de viajes regionales y locales. > Las velocidades en las carreteras son bajas, la demora es alta y la duración de viajes es imprevisible. > Calles locales son afectadas por un exceso de tráfico de las carreteras, causando más congestión y velocidades bajas. > Si no se hacen cambios al sistema de transportación o el patrón de tráfico, el sistema de transporte seguirá funcionando a niveles inaceptables. Operaciones se deteriorarán en cuanto la población y las demandas futuras del tráfico crecerán.

Área del Estudio de la SR-710

Reunión comunitaria, mayo de 2012

Cronología del Estudio de la SR-710

donde hemos estado…En la primavera de 2011, el público participó en una serie de reuniones, lo cual resultó en un proceso de alcance para identificar un espectro de alternativas multimodales que se analizarán a través del Proceso de Revisión Ambiental. Además del proceso de alcance, los equipos técnicos de Metro y Caltrans incorporaron los comentarios de las reuniones comunitarias en sus análisis y crearon un grupo de alternativas multimodales inicial de:

> Siete (7) alternativas de BRT > Cinco (5) alternativas de LRT > Once (11) alternativas de autopista > Trece (13) alternativas de carreteras locales > Tres (3) alternativas de TSM/TDM > Una (1) alternativa de “no construir”

hacia donde vamos…En la primavera de 2012, el grupo de alternativas inicial se descartó a 12 alternativas, las cuales se presentaron en siete reuniones comunitarias que se montaron en mayo. Estas incluyen:

> Dos (2) alternativas de BRT > Dos (2) alternativas de LRT > Cuatro (4) conceptos de autopista > Tres (3) alternativas de túnel > Una (1) alternativa a nivel/superficie hundida > Dos (2) conceptos de carretera > Dos (2) conceptos de TSM/TDM > Un (1) concepto de “no construir”

Con el estudio de la Ruta Estatal 710 en marcha, estamos más cerca que nunca de transformar el futuro de transportación y movilidad en su comunidad.