    OBRA:

    PROPIETARIO : MUNICIPLIDAD DIST. DE CHURCAMPA MODALIDAD: CONTRATAREGION : HUANCAVELICA REVISADO POR :

    PROV : CHURCAMPA

    DIST : PAUCARBAMBA LOCALIDAD : PAUCARBAMBA FECHA: JUNIO 2012

    N

    VECES LARGO ANCHO ALTO

    01 CREACION DE CAMPO DEPORTIVO

    01.01 CAMPO DEPORTIVO CON CESPED ARTIFICIAL01.01.01 OBRAS PROVICIONALES

    01.01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 M und 1 1.00 1.0001.01.01.02 CASETA DE GUARDIANIA Y DEPOSITO glb 1 1.00 1.00

    01.01.02 TRABAJOS PRELIMINARES

    01.01.02.01 LIMPIEZA DE TERRNO MANUAL m2 1 41.00 32.00 1,312.00 1,312.0001.01.02.02 TRAZO, NIVELACION Y REPLANTEO m2 1 32.40 23.40 758.16 758.16

    01.01.03 MOVIMIENTOS DE TIERRAS01.01.03.01 CAMPO DEPORTIVO

    01.01.03.01.01 CORTE SUPER. EN TERRENO NORMAL PARA CAMPO DEPOR. DE H=0.15 CM m3 1 30.00 20.00 0.15 90.00 90.0001.01.03.01.02 NIVELACION Y APISONADO FINAL DEL TERRENO C/MAQUINARIA m2 1 32.40 23.40 758.16 758.16

    01.01.03.01.03 RELLENO CON MATERIAL GRANULAR E=15 CM C/MAQUINARIA m3 1 28.00 20.00 0.15 84.00 84.0001.01.03.02 VEREDAS

    01.01.03.02.01 CORTE SUPER. EN TERRENO NORMAL PARA VEREDA m3 2 32.40 1.30 0.33 27.80 38.362 20.00 0.80 0.33 10.56

    01.01.03.02.02 EXCAVACION DE ZANJA EN UA DE VEREDA m3 2 32.40 0.15 0.40 3.89 6.292 20.00 0.15 0.40 2.40

    01.01.03.02.03 RELLENO DE SUB-BASE MAT. SELECCIONADO COMPACTADO EN VEREDA C/MAQ. m3 2 32.40 1.10 0.10 7.13 9.53

    2 20.00 0.60 0.10 2.4001.01.03.02.04 RELLENO DE BASE MATERIAL SELECCIONADO COMPACTADO EN VEREDA C/MAQ. m3 2 32.40 1.10 0.10 7.13 9.53

    2 20.00 0.60 0.10 2.4001.01.03.03 CUNETAS

    01.01.03.03.01 EXCAVACION PARA CUNETAS m3 2 29.40 0.40 0.35 8.23 14.312 21.70 0.40 0.35 6.08

    01.01.03.04 DADOS

    01.01.03.04.01 EXCAVACION PARA DADO DE CONCRETO m3 8 0.40 0.40 0.40 0.51 0.5101.01.03.04.02 EXCAVACION PARA BASE DE CONCRETO EN POSTE DE ALUMBRADO m3 4 0.40 0.40 0.80 0.51 0.5101.01.03.04.03 ELIMINACION DE MATERIAL EXCEDENTE + 25 % DE ESPONJAMIENTO m3 1 149.98 187.4701.01.04 OBRAS DE CONCRETO SIMPLE

    01.01.04.01 CAMPO DEPORTIVO

    01.01.04.01.01 CAPA ASFALTICA PARA CAMPO DEPORTIVO E= 5 CM C/MAQUINARIA m2 1 30.00 20.00 600.00 600.0001.01.04.02 VEREDAS

    01.01.04.02.01 ENCONFRADO Y DESENCOFRADO PARA PAOS EN VEREDA m2 22 1.70 0.15 5.61 39.93

    4 31.40 0.15 18.8416 1.20 0.15 2.884 21.00 0.15 12.60

    01.01.04.02.02 CONCRETO EN VEREDA FC'=175 KG/CM2 m3 2 31.40 1.50 0.15 14.13 26.72

    2 21.00 1.00 0.15 6.30Ua Larga 2 32.40 0.15 0.40 3.89Ua Corta 2 20.00 0.15 0.40 2.40

    01.01.04.03 CUNETAS

    01.01.04.03.01 ENCONFRADO Y DESENCOFRADO PARA CUNETAS m2 4 31.40 0.25 31.40 52.404 21.00 0.25 21.00

    01.01.04.03.02 CONCRETO EN CUNETAS FC'=175 KG/CM2 m3 2 31.40 0.40 0.10 2.51 9.43

    4 31.40 0.10 0.25 3.142 21.00 0.40 0.10 1.684 21.00 0.10 0.25 2.10

    01.01.04.04 DADOS

    01.01.04.04.01 CONCRETO FC'=175 KG/CM2 EN DADOS DE ARCO METALICO m3 8 0.40 0.40 0.40 0.51 0.5101.01.04.04.02 BASE DE CONCRETO FC'=210 KG/CM2 PARA POSTE DE ILUMINACION m3 4 0.40 0.40 0.80 0.51 0.51

    COLOCADO DE PLANCHA METALICA 0.15 x 0.15 m x 2mm und 8 1.00 8.00 8.00

    01.01.05 REVOQUES ENLUCIDOS Y MOLDURAS

    PARCIAL TOTAL

    CREACION DEL CAMPO DEPORTIVO EN LA LOCALIDAD DE PAUCARBAMBA, DISTRITO DE

    PAUCARBAMBA, PROVINCIA DE CHURCAMPA-HUANCAVELICA.

    HOJA DE METRADO

    ITEM DESPECIFICACION UNID.MEDIDAS

  • 7/23/2019 METRADOMODIFIC 28

    2/13

    01.01.05.01 FROTACHADO Y PULIDO EN VEREDA m2 2 32.40 1.70 110.16 158.16

    2 20.00 1.20 48.0001.01.06 OTROS

    01.01.06.01 ENGRAMADO DE GRASS SINTETICO E= 5cm m2 1 30.00 20.00 600.00 600.0001.01.06.02 DEMARCADO DE CAMPO DE FULBITO COLOR BLANCO E = 0.05 M ml 1 159.75 159.75 204.95

    2 22.60 45.20

    01.01.06.04 HABILITACION DE REJILLA METALICA PARA CUNETA ml 1 106.20 106.20 106.2001.01.06.05 COLOCADO DE POSTE ROLLIZO DE EUCALIPTO L = 7.15 m c/u und 4 4.00 4.00

    PLACA RECORDATORIA glb 1 1.00 1.00

    01.01.07 EQUIPAMIENTO

    01.01.07.01 ARCOS METALICOS TUBO GALVANIZADO DE 2" und 2 2.00 2.0001.01.08 JUNTAS

    01.01.08.01 RELLENO DE JUNTAS DE DILATACION CON BREA ASFALTICA PARA VEREDAS m 22 1.70 37.40 56.6016 1.20 19.20

    01.01.09 ENSAYOS DENSIDAD DE CAMPO

    01.01.09.01 ENSAYO PROCTOR (COMPACTACION DE SUELO) und 2 2.00 2.00

    01.01.09.02 PRUEBA DE RESISTENACIA DEL CONCRETO und 6 6.00 6.0001.02 SISTEMA ELECTRICO E ILUMINACION

    01.02.01 PARAPETO DE CONCRETO

    01.02.01.01 ENCONFRADO Y DESENCOFRADO PARA PARAPETO m2 1 1.40 1.30 1.82 1.8201.02.01.02 CONCRETO SIMPLE FC'=100 KG/CM2 EN PARAPETO m3 1 0.40 0.30 1.30 0.16 0.16

    01.02.02 INSTALCION DE ILUMINACION01.02.02.01 COLOCADO DE LLAVE TERMOMAGNETICA INDUSTRIAL TICINO und 1 1.00 1.00

    01.02.02.02 TUBO PVC SEL DE 1/2" ml 1 112.85 112.85 112.8501.02.02.03 CABLE DE ALUMBRADO THHN 14 AWG - MADECO ml 1 141.45 141.45 141.4501.02.02.04 PLACA METALICA DE LA BASE 0.35 x 0.35 x 12 mm und 4 4.00 4.0001.02.02.05 PERNO DE ANCLAJE CON TUERCA DE 7/8" NC. INC. PIEZAS und 16 16.00 16.00

    01.02.02.06 FLEJE DIAMETRO 3/8" ml 23 22.80 22.8001.02.02.07 PLANCHA DE REFUERZO TRIANGULAR DE 12mm und 16 16.00 16.0001.02.02.08 PUESTA DE TUBO DE ACERO GALVANIZADO DE 5" x 3.6 mm ml 4 4.35 17.40 17.40

    01.02.02.09 PUESTA DE TUBO DE ACERO GALVANIZADO DE 4" x 3.6 mm ml 4 2.80 11.20 11.2001.02.02.10 INSTALACION DE LUMINARIA H SRC 515 PHILIPS und 4 4.00 4.00

    01.02.03 POZO A TIERRA

    01.02.03.01 POZO A TIERRA glb 1 1.00 1.00

    01.03 SISTEMA DRENAJE01.03.01 MOVIMIENTOS DE TIERRAS

    01.03.01.01 EXCAVACION DE ZANJA PARA DRENAJE m3 4 25.70 0.45 0.43 19.89 23.703 4.70 0.45 0.60 3.81

    01.03.01.02 EXCAVACION PARA CAJA COLECTORA m3 8 0.50 0.50 0.85 1.70 1.70

    01.03.01.03 RELLENO CAMA DE APOYO CON ARENA FINA E=5 CM ZANJA PARA DRENAJE m2 4 21.00 0.45 37.80 44.153 4.70 0.45 6.35

    01.03.01.04 RELLENO CON ARCILLA IMPERMEABILIZANTE E=8 CM ZANJA PARA DRENAJE m2 4 21.00 0.45 37.80 37.8001.03.01.05 RELLENO CON MAT. SELECC. GRAVA 3/4" E=20 CM Z ANJA PARA DRENAJE C/MA m3 4 21.00 0.45 0.20 7.56 10.23

    3 4.50 0.45 0.44 2.6701.03.01.06 RELLENO CON MAT. SELECC. GRAVA 1/4" E=10 CM Z ANJA PARA DRENAJE C/MA m2 4 21.00 0.45 37.80 37.8001.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE + 25 % DE ESPONJAMIENTO m3 1 31.75 31.75

    01.03.02 OBRAS DE CONCRETO SIMPLE

    01.03.02.01 ENCOFRADO Y DESENCOFRADO PARA CAJA COLECTORA m2 8 1.20 0.75 7.20 7.2001.03.02.02 CONCRETO EN CAJA COLECTORA FC'=175 KG/CM2 m3 8 0.50 0.50 0.10 0.20 1.40

    8 2.00 0.10 0.75 1.2001.03.03 TUBOS Y ACCESORIOS

    01.03.03.01 TUBO CON ORIFICIO DE 4" ml 4 21.00 84.00 97.503 4.50 13.50

    01.03.03.02 GEOMENBRANA DE PVC ml 4 21.00 84.00 97.50

    3 4.50 13.5001.04 MEDIDAS DE MITIGACION

    01.04.01 CAMPO DEPORTIVO CON CESPED ARTIFICIAL glb 1 1.00 1.00

    01.05 FLETE

    01.05.01 FLETE TERRESTRE glb 1 1.00 1.0002 CERCO PERIMETRICO

    02.01 TRABAJOS PRELIMINARES

    02.01.01 LIMPIEZA DE TERRNO MANUAL m2 1 146.00 0.25 36.50 36.5002.01.02 TRAZO, NIVELACION Y REPLANTEO m2 1 146.00 0.25 36.50 36.5002.02 MOVIMIENTO DE TIERRAS

    02.02.01 EXCAVACION PARA ZAPATAS m3 6 0.55 0.55 0.90 1.63 1.63

  • 7/23/2019 METRADOMODIFIC 28

    3/13

    02.02.02 EXCAVACION PARA DADO DE CONCRETO m3 67 0.50 0.50 0.70 11.73 11.73

    02.02.03 RELLENO EN ZAPATAS CON MATERIAL PROPIO m3 6 2.20 0.35 0.20 0.92 0.9202.02.04 RELLENO EN DADOS CON MATERIAL PROPIO m3 67 2.00 0.08 0.20 2.14 2.1402.02.05 ELIMINACION DE MATERIAL EXCEDENTE + 25 % DE ESPONJAMIENTO m3 1 11.31 11.3102.03 OBRAS DE CONCRETO CIMPLE

    02.03.01 CONCRETO 1:10 E = 10 PARA SOLADO DE ZAPATA m2 6 0.55 0.55 1.82 1.82

    02.03.02 CONCRETO 1:10. E = 10 CM PARA SOLADO DE DADO m2 67 0.50 0.50 16.75 16.7502.03.03 ENCOFRADO Y DESENCOFRADO PARA DADO DE CONCRETO m2 67 1.20 0.10 8.04 8.0402.03.05 CONCRETO EN DADOS FC'=175 KG/CM2 m3 67 0.50 0.50 0.50 8.38 10.18

    67 0.30 0.30 0.30 1.8102.03.06 CONCRETO EN PISO PUERTA DE INGRESO FC'=140 KG/CM2 E= 5 cm m2 1 3.50 2.25 7.88 7.8802.04 OBRAS DE CONCRETO ARMADO

    02.04.01 ZAPATA

    02.04.01.01 CONCRETO EN ZAPATAS FC'=175 KG/CM2 m3 6 0.55 0.55 0.60 1.09 1.0902.04.01.02 HABILITACION DE ACERO PARA ZAPATA F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 23.76

    Longitudinal 1/2" 6 4.00 0.50 0.99 11.88Transversal 1/2" 6 4.00 0.50 0.99 11.88

    02.04.02 COLUMNA

    02.04.02.01 ENCOFRADO Y DESENCOFRADO PARA COLUMNA m2 6 1.00 2.75 16.50 16.5002.04.02.02 HABILITACION DE ACERO P ARA COLUMNA F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 146.94

    1/2" 6 4.00 3.69 0.99 87.673/8" 6 21.00 0.84 0.56 59.27

    02.04.02.03 CONCRETO PARA COLUMNAS FC'=210 KG/CM2 m3 6 0.25 0.25 2.75 1.03 1.0302.05 REVOQUES ENLUCIDOS Y MOLDURAS

    02.05.01 TARRAJEO EN COLUMNAS m2 6 1.00 2.75 16.50 16.5002.05.02 TARRAJEO EN DADOS DE CONCRETO m2 67 0.30 0.30 6.03 14.07

    67 1.20 0.10 8.0402.06 CARPINTERIA METALICA

    02.06.01 PUERTA METALICA und 1 1.00 1.00

    02.06.02 HABITACION Y COLOCADO DE TUBO CIRCULAR GALVANIZADO 3" x 1.54 mm ml 68 3.78 257.04 257.0402.06.03 HABITACION Y COLOCADO DE PERFIL 11/2" x 11/2" x 2mm ml 64 9.40 601.60 601.6002.06.04 HABITACION Y COLOCADO DE MALLA OLIMPICA # 12 m2 64 2.20 2.25 316.80 316.8002.06.05 COLOCADO DE PLANCHA METALICA 0.30 x 0.30 m und 69 69.00 69.00

    02.06.06 ALAMBRE GALVANIZADO # 16 PARA PROTECCION DE CERCO PERIMETRICO kg N VECES CAN. LONG. 7.533 1.00 148.00 59.00 7.53

    02.07 PINTURA

    02.07.01 PINTURA ESMALTE EN PUERTA METALICA DE CERCO PERIMETRICO m2 1 2.95 2.50 7.38 7.3802.07.02 PINTURA ESMALTE EN TUBO CRICULAR DE CERCO PERIMETRICO ml 67 3.78 253.26 253.2602.07.03 PINTURA ESMALTE EN PERFILES DE CERCO PERIMETRICO ml 62 9.40 582.80 582.80

    02.07.04 PINTURA ESMALTE EN MALLA OLIMPICA DE CERCO PERIMETRICO m2 62 2.20 2.25 306.90 306.90

    02.08 PROTECCION DE CERCO PERIMETRICO Y TECHO DE CAMPO DEPORTIVO

    02.08.01 MALLA NYLON ALTA TENACIDAD # 8 m2 1 40.50 31.50 1,275.75 1,275.75

    02.09 MEDIDAS DE MITIGACION

    02.09.01 CERCO PERIMETRICO glb 1 1.00 1.00

    02.10 FLETE

    02.10.01 FLETE TERRESTRE glb 1 1.00 1.00

    03 GRADERIA

    03.01 TRABAJOS PRELIMINARES

    03.01.01 LIMPIEZA DE TERRNO MANUAL m2 1 33.90 1.90 64.41 64.4103.01.02 TRAZO, NIVELACION Y REPLANTEO m2 1 33.90 1.90 64.41 64.41

    03.02 MOVIMIENTO DE TIERRAS

    03.02.01 ZAPATAS

    03.02.01.01 EXCAVACION PARA ZAPATAS m3 5.22

    Zapata 01 6 0.60 0.60 0.87 1.88Zapata 02 6 0.80 0.80 0.87 3.34

    03.02.02 CIMIENTOS CORRIDOS

    03.02.02.01 EXCAVACION PARA CIMIENTO CORRIDO m3 1 33.87 0.30 0.60 6.10 6.13Excavacion para garda menor 2 0.25 0.50 0.15 0.04

    03.02.02.02 RELLENO EN CIMIENTO CORRIDO Y ZAPATA CON MATERIAL PROPIO m3 3.70

    METROS/KG

  • 7/23/2019 METRADOMODIFIC 28

    4/13

    Zapata 01 12 0.60 0.23 0.30 0.5012 0.15 0.15 0.30 0.08

    Zapata 02 12 0.80 0.33 0.30 0.9512 0.25 0.15 0.30 0.14

    Cimiento corrido 1 33.87 0.20 0.30 2.03

    03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE + 25 % DE ESPONJAMIENTO m3 1 10.49 10.49

    03.03 OBRAS DE CONCRETO SIMPLE

    03.03.01 CONCRETO 1:10 PARA SOLADO EN E = 7 CM m2 6.00Zapata 01 6 0.60 0.60 2.16Zapata 02 6 0.80 0.80 3.84

    03.04 OBRAS DE CONCRETO ARMADO

    03.04.01 ZAPATAS

    03.04.01.01 CONCRETO FC'=175 KG/CM2 EN ZAPATA m3 3.00

    Zapata 01 6 0.60 0.60 0.50 1.08Zapata 02 6 0.80 0.80 0.50 1.92

    03.05.01.02 HABILITACION DE ACERO PARA ZAPATAS F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 70.69Zapata 01 1/2" 6 8.00 0.55 0.99 26.14

    Zapata 02 1/2" 6 10.00 0.75 0.99 44.55

    03.04.01 PORTICO DE GRADERIA

    03.04.01.01 COLUMNA

    03.04.01.01.01 ENCOFRADO Y DESENCOFRADO PARA COLUMNA m2 31.19Columna 01 y 02 24 0.50 1.65 19.80

    24 0.25 1.65 9.90

    03.04.01.01.02 HABILITACION DE ACERO PARA COLUMNA F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 192.87

    Columna 01 1/2" 6 4.00 2.42 0.99 57.503/8" 6 14.00 0.77 0.56 36.22

    Columna 02 1/2" 6 4.00 2.49 0.99 59.163/8" 6 14.00 0.85 0.56 39.98

    03.04.01.01.03 CONCRETO FC'=175 KG/CM2 PARA COLUMNA m3 12 0.30 0.15 1.55 0.84 0.84

    03.04.01.02 GRADAS

    03.04.01.02.01 ENCOFRADO Y DESENCOFRADO PARA GRADAS m2 194.02Gradas 1 33.87 0.80 27.10

    1 33.89 0.70 23.722 0.10 0.80 0.162 33.87 0.55 37.262 0.40 0.10 0.084 33.87 0.55 74.514 0.10 0.55 0.221 33.87 0.40 13.552 0.50 0.10 0.102 33.87 0.10 6.771 0.10 0.10 0.01

    Gradas menores 2 0.50 0.40 0.40

    4 0.25 0.40 0.402 0.50 0.25 0.254 0.25 0.25 0.25

    03.04.01.02.01 CONCRETO FC'=175 KG/CM2 PARA GRADAS m3 14.22

    1 33.87 0.30 0.30 3.051 33.87 0.10 0.75 2.543 33.87 0.40 0.10 4.062 33.87 0.10 0.55 3.731 33.87 0.10 0.20 0.68

    Gradas menores 2 0.50 0.25 0.40 0.102 0.50 0.25 0.24 0.06

    03.04.01.02.02 HABILITACION ACERO PARA GRADAS F 'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 2,805.16LONGITUDINALES 1/2" 1 31.00 52.52 0.99 1,611.84

    TRANSVERSALES 1/2" 1 227.00 1.35 0.99 303.39

  • 7/23/2019 METRADOMODIFIC 28

    5/13

    1/2" 2 227.00 0.83 0.99 373.051/2" 2 227.00 0.75 0.99 337.101/2" 1 227.00 0.80 0.99 179.78

    HABILITACION ACERO PARA VIGA DE GRADERIA F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 327.29

    Acero longitudinales 1/2" 3 4.00 11.30 0.99 134.24

    Estribos 1/4" 3 65.00 1.00 0.99 193.05

    03.05 REVESTIMIENTOS

    03.05.01 FROTACHADO Y PULIDO EN VEREDA m2 1 33.87 1.35 45.72 143.533 33.87 0.45 45.723 33.87 0.50 50.814 0.58 0.55 1.28

    03.06 MEDIDAS DE MITIGACION

    03.06.01 GRADERIA glb 1 1.00 1.00

    03.07 FLETE

    03.07.01 FLETE TERRESTRE glb 1 1.00 1.00

    04 SERVICIOS HIGIENICOS

    04.01 TRABAJOS PRELIMINARES

    04.01.01 LIMPIEZA DE TERRNO MANUAL m2 1 7.80 4.10 31.98 31.9804.01.02 TRAZO, NIVELACION Y REPLANTEO m2 1 7.80 4.10 31.98 31.98

    04.02 MOVIMIENTO DE TIERRAS

    04.02.01 ZAPATAS

    04.02.01.01 EXCAVACION PARA ZAPATAS m3 6 0.70 0.70 1.07 3.15 3.1504.02.01.02 RELLENO EN ZAPATAS CON MATERIAL PROPIO m3 6 0.70 0.70 0.45 1.32 1.32

    04.02.02 CIMIENTOS CORRIDOS

    04.02.02.01 EXCAVACION PARA CIMIENTO CORRIDO m3 5.09Eje 1 - 1 1 5.84 0.35 0.55 1.12Eje 2 - 2 1 5.80 0.35 0.55 1.12Eje A - A y C - C 2 2.05 0.35 0.55 0.79Eje B - B 1 2.44 0.35 0.55 0.47Entre Eje A - A y B - B 3 1.65 0.35 0.55 0.95Entre Eje B - B y C - C 2 1.65 0.35 0.55 0.64

    04.02.02.02 RELLENO EN CIMIENTOS CORRIDOS CON MATERIAL PROPIO m3 2 19.43 0.10 0.10 0.39 0.39

    04.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE + 25 % D E ESPONJAMIENTO m3 8.15 8.1504.03 OBRAS DE CONCRETO SIMPLE

    04.03.01 ZAPATAS

    04.03.01.01 CONCRETO 1:10 PARA SOLADO EN E = 7 CM m2 6 0.70 0.70 2.94 2.9404.03.02 CIMIENTOS CORRIDOS

    04.03.02.01 CONCRETO EN CIMIENTO CORRIDO FC'=175 KG/CM2 + 30% P.G m3 4.16Eje 1 - 1 1 5.84 0.35 0.45 0.92Eje 2 - 2 1 5.80 0.35 0.45 0.91Eje A - A y C - C 2 2.05 0.35 0.45 0.65Eje B - B 1 2.44 0.35 0.45 0.38Entre Eje A - A y B - B 3 1.65 0.35 0.45 0.78Entre Eje B - B y C - C 2 1.65 0.35 0.45 0.52

    04.03.03 SOBRE CIMIENTOS

    04.03.03.01 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS m2 14.21Eje 1 - 1 2 5.84 0.25 2.92

    Eje 2 - 2 2 5.80 0.25 2.90Eje A - A y C - C 4 2.05 0.25 2.05Eje B - B 2 2.44 0.25 1.22Entre Eje A - A y B - B 6 1.65 0.25 2.48Entre Eje B - B y C - C 4 1.65 0.25 1.65Urinario 2 1.65 0.30 0.99

    04.03.03.02 CONCRETO EN SOBRECIMIENTO 1:10 + 20% P.M. m3 0.97Eje 1 - 1 1 4.04 0.15 0.25 0.15Eje 2 - 2 1 5.80 0.15 0.25 0.22Eje A - A y C - C 2 2.05 0.15 0.25 0.15Eje B - B 1 2.44 0.15 0.25 0.09Entre Eje A - A y B - B 3 1.65 0.15 0.25 0.19Entre Eje B - B y C - C 2 1.65 0.15 0.25 0.12Urinario 1 1.65 0.10 0.30 0.05

    04.04 OBRAS DE CONCRETO ARMADO

    04.04.01 ZAPATAS

  • 7/23/2019 METRADOMODIFIC 28

    6/13

    04.04.01.01 HABILITACION DE ACERO PARA ZAPATAS F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 28.51

    1/2" 6 8.00 0.60 0.99 28.51

    04.04.01.02 CONCRETO FC'=175 KG/CM2 EN ZAPATA m3 6 0.70 0.70 0.55 1.62 1.6204.04.02 COLUMNAS

    04.04.02.01 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 3 0.50 2.45 3.68 8.07

    3 0.50 2.93 4.4004.04.02.02 HABILITACION DE ACERO PARA COLUMNA F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 161.20

    1/2" 3 4.00 3.73 0.99 44.313/8" 3 22.00 0.85 0.56 31.421/2" 3 4.00 4.31 0.99 51.203/8" 3 24.00 0.85 0.56 34.27

    04.04.02.03 CONCRETO EN COLUMNAS FC'=210 KG/CM2 m3 3 0.25 0.25 2.90 0.54 1.183 0.25 0.25 3.38 0.63

    04.04.03 VIGAS

    04.04.03.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 12.33

    Eje 2 - 2 1 7.45 0.25 1.861 6.80 0.25 1.701 6.80 0.10 0.68

    Eje 1 - 1 1 7.51 0.25 1.881 6.76 0.25 1.69

    1 6.76 0.10 0.68Eje A - A y C - C 2 3.00 0.20 1.20

    2 2.60 0.20 1.042 2.60 0.05 0.26

    Eje B - B 2 3.00 0.20 1.201 2.90 0.05 0.15

    04.04.03.02 HABILITACION DE ACERO PARA VIGAS F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 158.81Eje 2 - 2 1/2" 1 4.00 7.65 0.99 30.29

    3/8" 1 1.00 8.45 0.56 4.731/4" 1 41.00 0.86 0.50 17.63

    Eje 1 - 1 1/2" 1 4.00 7.73 0.99 30.613/8" 1 1.00 8.45 0.56 4.731/4" 1 41.00 0.86 0.50 17.63

    Eje A - A y C - C 1/2" 2 4.00 3.13 0.99 24.791/4" 2 16.00 0.64 0.50 10.24

    Eje B - B 1/2" 1 4.00 3.13 0.99 12.391/4" 1 18.00 0.64 0.50 5.76

    04.04.03.03 CONCRETO EN VIGAS FC'=210 KG/CM2 m3 1.11Eje 2 - 2 1 7.45 0.20 0.25 0.37Eje 1 - 1 1 7.51 0.20 0.25 0.38Eje A - A y C - C 2 3.00 0.20 0.20 0.24Eje B - B 1 3.00 0.20 0.20 0.12

    04.05 MUROS Y TABIQUES DE ALBAILERIA

    04.05.01 MUROS

    04.05.01.01 MURO TIPO SOGA m2 67.71Eje 2 - 2 1 4.91 2.15 10.56Eje 1 - 1 1 2.34 2.63 6.15

    1 1.50 2.13 3.201 1.43 2.63 3.761 1.50 2.13 3.20

    Eje A - A y C - C 2 2.50 2.43 12.15Eje B - B 2 2.89 2.35 13.58Entre Eje A - A y B - B 3 1.55 1.95 9.07Entre Eje B - B y C - C 2 1.55 1.95 6.05

    04.06 REVOQUES Y ENLUCIDOS

    04.06.01 TARRAJEO EN MUROS

    04.06.01.01 TARRAJEO INTERIOR CON MORTERO 1:5 x 1.5 cm (INCLUYE COLUMNAS EMPOTR m2 88.87Eje 2 - 2 1 4.15 2.30 9.55Eje 1 - 1 1 2.34 2.78 6.51

    1 1.50 2.28 3.421 1.43 2.78 3.981 1.50 2.28 3.42

    Eje A - A y C - C 2 2.50 2.58 12.90Eje B - B 2 2.89 2.50 14.45Entre Eje A - A y B - B 3 3.30 2.10 20.79

    Entre Eje B - B y C - C 2 3.30 2.10 13.86

  • 7/23/2019 METRADOMODIFIC 28

    7/13

    04.06.01.02 DERRAMES E=15 cm (MORTERO 1:5) ml 20.70

    Derrames en Puertas 2 2.10 4.205 2.30 11.50

    Derrames en Ventanas 2 2.50 5.0004.06.01.03 TARRAJEO EXTERIOR CON MORTERO 1:5 x1.5 cm (INC. COLUMNAS ENPOTRADAS m2 #REF!

    Eje 2 - 2 1 4.91 2.45 12.03

    Eje 1 - 1 1 2.34 2.93 6.861 1.50 2.43 3.651 1.43 2.93 4.191 1.50 2.43 3.65

    Eje A - A y C - C 2 2.50 2.73 13.65Eje A - A y C - C , COLUMNAS 2 0.50 2.45 2.45

    2 0.50 2.93 2.93Eje B - B, COLUMNAS 1 0.25 2.45 0.61

    04.06.02 TARRAJEO EN COLUMNAS

    04.06.02.01 TARRAJEO DE SUPERFICIES COLUMNAS INDEPENDIENTES (EN INTERIOR) m2 4.64Eje A - A y C - C 2 0.35 2.30 1.61

    2 0.27 2.78 1.50Eje B - B 1 0.30 2.30 0.69

    1 0.30 2.78 0.83

    04.06.03 TARRAJEO EN VIGAS04.06.03.01 TARRAJEO DE SUPERFICIES VIGAS INDEPENDIENTES (EN INTERIORES) m2 3.44

    Eje 2 - 2 1 6.80 0.15 1.022 0.90 0.25 0.45

    Eje 1 - 1 1 6.76 0.15 1.01Eje A - A y C - C 2 2.60 0.10 0.52Eje B - B 1 2.90 0.15 0.44

    04.06.03.02 TARRAJEO DE SUPERFICIES VIGAS INDEPENDIENTES (EN EXTERIORES) m2 1.95Eje 2 - 2 1 7.45 0.05 0.37Eje 1 - 1 1 7.51 0.05 0.38Eje B - B 2 3.00 0.20 1.20

    04.07 OBRAS DE ARTE

    04.07.01 ENCHAPE DE FACHADA ELIPTICA DE S.H. CON PIEDRA LAJA m2 1 5.35

    04.08 CIELORRASOS04.08.01 TARRAJEO DE SUPERFICIES VIGAS INDEPENDIENTES (EN EXTERIORES) m2 31.98

    S.H. VARONES 1 3.00 2.85 8.55S.H. MUJERES 1 4.00 2.85 11.40VOLADISO 1 7.82 0.60 4.69

    1 7.82 0.35 2.741 7.82 0.30 2.351 7.82 0.15 1.172 3.00 0.18 1.08

    04.09 PISOS Y PAVIMENTOS

    04.09.01 FALSO PISO

    04.09.01.01 CONCRETO F'c = 100 KG/CM2 m2 21.00

    S.H. VARONES 1 3.00 3.00 9.00S.H. MUJERES 1 3.00 4.00 12.00

    04.09.02 ACABADO DE PISO

    04.09.02.01 ENCHAPE DE PISO CON CERAMICO CALESTE PISCINA 30 x 30 CM m2 21.00S.H. VARONES 1 3.00 3.00 9.00S.H. MUJERES 1 3.00 4.00 12.00

    04.10 ZOCALOS Y CONTRAZOCALOS

    04.10.01 CONTRAZOCALOS

    04.10.01.01 CONTRAZOCALOS EN EXTERIOR CEMENTO Y ARENA FINA EN S.H. ml 1 5.56 5.56 13.011 7.45 7.45

    04.10.01.02 CONTRAZOCALOS EN INTERIOR CERAMICO 10 x 30 CM EN S.H. ml 20.28

    Eje 1 -1 1 6.00 6.00Eje A - A y C - C 2 3.00 6.00Eje B - B 2 1.59 3.18Entre Eje A - A y B - B 3 0.40 1.20

    1 1.55 1.55Entre Eje B - B y C - C 2 0.40 0.80

    1 1.55 1.55

    04.10.02 ZOCALOS

    AREA IREGULAR

    5.35

  • 7/23/2019 METRADOMODIFIC 28

    8/13

    04.10.02.01 ZOCALO DE CERAMICO COLOR CELESTE PISCINA DE 20 X30 cm m2 23.40

    S.H. VARONES ENCHAPE DE PISO CON CERAMICO 20 x 30 CM 2 3.90 1.20 9.36S.H. MUJERES ENCHAPE DE PISO CON CERAMICO 20 x 30 CM 3 3.90 1.20 14.04

    04.11 TECHOS Y CUBIERTAS

    04.11.01 LOSA DE CONCRETO ARMADO

    04.11.01.01 ENCOFRADO Y DESENCOFRADO EN LOSA m2 33.73

    Base de Losa Interior 1 7.00 3.10 21.70Volado 1 7.82 0.60 4.69

    1 7.82 0.45 3.522 3.00 0.18 1.08

    Vigueta 1 7.82 0.35 2.7404.11.01.02 HABILITACION DE ACERO PARA LOSA F'y = 4200 KG/CM2 DE 60 kg N VECES CAN. LONG. PESO/KG 380.72

    Lado Largo 1/2" 1 26.00 7.80 0.99 200.77Lado Corto 1/2" 1 39.00 4.09 0.99 157.91Vigueta 3/8" 1 2.00 7.72 0.99 15.29

    1/4" 1 30.00 0.45 0.50 6.75

    04.11.01.03 CONCRETO EN LOSA FC'=210 KG/CM2 m3 1 7.22 3.70 0.15 4.01 4.24Vigueta 1 7.72 0.15 0.20 0.23

    04.12 CARPINTERIA DE MADERA

    04.12.01 PUERTA

    04.12.01.01 HABILITACION DE PUERTA APANELADA UNA HOJA und 2 2.00 2.00HABILITACION DE PUERTA APANELADA 2.10 x 0.60 DE UNA HOJA und 5 5.00 5.00

    04.12.02 VENTANA

    04.12.02.01 HABILITACION DE VENTANA MADERA ROBLE m2 2 1.50 0.50 1.50 1.5004.13 VIDRIOS, CRISTALES Y SIMILARES

    04.13.01 COLCADO DE VIDRIO SEMIDOBLE NACIONAL P2 2 1.50 10.70 0.50 16.05 16.05

    04.14 CERRAJERIA

    04.14.01 BISAGRA CAPUCHINA DE 4" x 4" und 21 21.00 21.0004.14.02 CERRADURA FORTE PESADA PARA PUERTA PRINCIPAL und 2 2.00 2.00

    04.14.03 CERROJO PARA PUERTA INTERIOR DE S.H und 5 5.00 5.0004.14.04 CERRADURA PARA VENTANA DE MADERA ROBLE und 2 2.00 2.0004.15 PINTURA

    04.15.01 PINTURA EN MUROS

    04.15.01.01 PINTURA LATEX INTERIOR A DOS MANOS EN MUROS m2 78.75Eje 2 - 2 1 4.15 1.10 4.57

    Eje 1 - 1 1 2.34 2.68 6.271 1.50 2.18 3.271 1.43 2.68 3.831 1.50 2.18 3.27

    Eje A - A y C - C 2 2.50 2.48 12.40Eje B - B 2 2.89 2.10 12.14Entre Eje A - A y B - B 3 3.30 2.00 19.80Entre Eje B - B y C - C 2 3.30 2.00 13.20

    04.15.01.02 PIRTURA LATEX A DOS MANOS EN DERRAMES ml 20.70

    Puertas 2 2.10 4.205 2.30 11.50

    Ventanas 2 2.50 5.0004.15.01.03 PINTURA LATEX EXTERIOR A DOS MANOS EN MUROS m2 50.74

    Eje 2 - 2 1 4.91 2.45 12.03Eje 1 - 1 1 2.34 2.93 6.86

    1 1.50 2.43 3.651 1.43 2.93 4.191 1.50 2.43 3.65

    Eje A - A y C - C 2 2.50 2.73 13.65Eje A - A y C - C, COLUMNAS 2 0.50 2.45 2.45

    2 0.50 2.93 2.93Eje B - B, COLUMNAS 1 0.25 2.45 0.61

    1 0.25 2.93 0.73

    04.15.02 PINTURA EN COLUMNAS

    04.15.02.01 PINTURA LATEX INTERIOR A DOS MANOS EN COLUMNAS m2 4.45Eje A - A y C - C 2 0.35 2.20 1.54

    2 0.27 2.68 1.45Eje B - B 1 0.30 2.20 0.66

    1 0.30 2.68 0.80

    04.15.03 PINTURA EN VIGAS

  • 7/23/2019 METRADOMODIFIC 28

    9/13

    04.15.03.01 PINTURA LATEX INTERIOR A DOS MANOS EN VIGAS m2 3.44

    Eje 2 - 2 1 6.80 0.15 1.022 0.90 0.25 0.45

    Eje 1 - 1 1 6.76 0.15 1.01Eje A - A y C - C 2 2.60 0.10 0.52Eje B - B 1 2.90 0.15 0.44

    04.15.03.02 PINTURA LATEX EXTERIOR A DOS MANOS EN COLUMNAS m2 1.95Eje 2 - 2 1 7.45 0.05 0.37Eje 1 - 1 1 7.51 0.05 0.38Eje B - B 2 3.00 0.20 1.20

    04.16 APARATOS Y ACCESORIOS SANITARIOS

    04.16.01

    LAVADERO BLANCO und 1 2.00 2.00 2.0004.16.01.01 INODORO TANQUE BAJO und 1 5.00 5.00 5.0004.16.01.02 COLOCADO DE APARATO SANITARIO und 1 6.00 6.00 6.0004.16.01.03 COLOCADO DE ACCESORIOS SANITARIO und 1 7.00 7.00 7.00

    04.16.02 LAVATORIO

    04.16.02.01 LAVADERO GRANITO DE DOS POZAS 1.20 X 0.60 m PRE FABRICADO und 1 2.00 2.00 2.0004.16.02.02 COLOCADO DE APARATO SANITARIO LAVADERO und 1 2.00 2.00 2.00

    04.16.02.03 COLOCADO DE ACCESORIOS SANITARIO LAVADERO und 1 2.00 2.00 2.0004.17 INSTALACIONES SANITARIAS

    04.17.01 SISTEMA DE DESAGUE04.17.01.01 REDES DE DISTRIBUCION

    04.17.01.01.01 Tuberia de PVC 2" ml 1 10.10 10.10 10.1004.17.01.01.02 Tuberia de PVC 4" ml 1 22.12 22.12 22.1204.17.01.01.03 Tuberia de bajada aguas pluviales 3" ml 1 27.41 27.41 27.4104.17.01.02 ACCESORIOS DE REDES

    04.17.01.02.01 Codo 45 de 2" PVC und 1 1.00 1.0004.17.01.02.02 Codo 90 de 2" PVC und 7 7.00 7.0004.17.01.02.03 Yee de 2" PVC und 1 1.00 1.00

    04.17.01.02.04 Codo 90 de 3" PVC und 2 2.00 2.0004.17.01.02.05 Codo 45 de 3" PVC und 1 1.00 1.0004.17.01.02.06 Codo 45 de 4" PVC und 1 1.00 1.0004.17.01.02.07 Tee de 4" PVC und 4 4.00 4.00

    04.17.01.02.08 Yee de 3" PVC und 1 1.00 1.0004.17.01.02.09 Yee de 4" reduccion a 2" PVC und 3 3.00 3.00

    04.17.01.03 ADITAMENTOS VARIOS04.17.01.03.01 Sumidero de bronce cromado 2" und 1 2.00 2.00 2.00

    04.17.01.03.02 Registro de bronce roscado de piso cromado 4" und 1 2.00 2.00 2.0004.17.01.04 CAJA DE REGISTRO04.17.01.04.01 Cajas de registro de albaileria 12" x 24" Tapa FF und 1 1.00 1.00

    04.17.02 SISTEMA DE AGUA FRIA

    04.17.02.01 SALIDAD DE AGUA POTABLE

    04.17.02.01.01 Salida de agua fria en PVC SAP 1/2" pto 10 1.00 10.00 10.0004.17.02.02 REDES DE DISTRIBUCION

    04.17.02.02.01 Tuberia PVC agua 1/2" ml 1 28.60 28.60 28.6004.17.02.03 ACCESORIOS DE REDES

    04.17.02.03.01 Codo de 1/2" PVC und 5 5.00 5.00

    04.17.02.03.02 Tee de 1/2" PVC und 11 11.00 11.0004.17.02.04 LLAVES DE VALBULA

    04.17.02.04.01 Valvula de compuerta de bronce 1/2" pza 1 1.00 1.00

    04.17.02.04.02 Grifo cromado 1/2" pza 5 5.00 5.0004.18 INSTALACIONES ELECTRICAS

    04.18.01 SALIDA DE ELECTRICIDAD FUERZA

    04.18.01.01 SALIDA DE TECHO (CENTRO) pto 2 2.00 2.0004.18.01.02 SALIDA PARA INTERRUPTOR SIMPLE (PVC) pto 2 2.00 2.00

    04.18.02 CANALIZACIN Y/O TUBERAS

    04.18.02.01 TUBERA DE PVC SAP DE 3/4" P/INST.ELECT. ml 1 18.00 18.00 18.0004.18.03 CONDUCTORES Y/OCABLES04.18.03.02 CABLE EL CTRICO TW 1 X 4.00 mm2 ( AWG # 12 ) ml 1 18.00 18.00 18.0004.18.04 TABLEROS YCUCHILLAS04.18.04.01 LLAVE TERMOMAGNETICA INDUSTRIAL TICINO und 1 1.00 1.0004.18.05 ARTEFACTOS ELCTRICOS

    04.18.05.01 FOCO AHORRADOR DE 50 W und 2 2.00 2.0004.19 MEDIDAS DE MITIGACION

    04.19.01 SERVICIOS HIGIENICOS glb 1 1.00 1.00

  • 7/23/2019 METRADOMODIFIC 28

    10/13

    04.20 FLETE

    04.20.01 FLETE TERRESTRE glb 1 1.00 1.00

    05 CAPACITACION

    05.01.01 CAPACITACION A LA POBLACION EN TEMA DE DEPORTE glb 1 1.00 1.00

  • 7/23/2019 METRADOMODIFIC 28

    11/13

  • 7/23/2019 METRADOMODIFIC 28

    12/13

  • 7/23/2019 METRADOMODIFIC 28

    13/13

    2095.75