FORMATOHOJA DE METRADOS
OBRA : PROP. : FECHA :
Part.DESCRIPCINUndN
DEVECESCANTMEDIDASPARCIALTOTALNLARGOANCHOALTO01.00.00PRIMER
PISO
1.00OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01.01CASETA DE
OBRA Y ALMACEN DE OBRA Glb111101.01.02DEMOLICIN DE ESTRUCTURA
EXISTENTEGlb111101.01.03LIMPIEZA DE TERRENO EN FORMA
MANUALm21120.755.00103.75103.7501.01.04TRAZO,NIVELES Y
REPLANTEOm21120.755.00103.75103.7501.01.03CONTROL DE NIVELES Y
TRAZADO DURANTE OBRAm21120.755.00103.75103.75
03.00.00MOVIMIENTO DE TIERRAS106.23
03.02.02EXCAVACIONES SIMPLESm3106.23ZAPATAS68.63Eje G-GZ-1
121.501.502.009.00Eje F-FZ-2 121.501.502.009.00Eje E-EZ-2
121.501.502.009.00Entre ejes E y DZ-3110.800.800.800.51Eje
D-DZ-3130.800.800.801.54Eje D-DZ-1 121.501.502.009.00Entre ejes D y
CZ-3110.800.800.800.51Eje C-CZ-2
121.501.502.009.00Z-3110.800.800.800.51Entre Ejes C y
BZ-3110.800.800.800.51Eje B-BZ-2
121.501.502.009.00Z-3120.800.800.801.02Entre Ejes B y
AZ-3110.800.800.800.51Eje
A-AZ-1121.501.502.009.00Z-3110.800.800.800.51
CIMIENTOS23.73Eje G-GEntre ejes 1 y 2112.000.401.100.88Eje
F-FEntre ejes 1 y 2112.000.401.100.88Eje E-EEntre ejes 1 y
2112.000.401.100.88Eje D-DEntre ejes 1 y 2112.000.401.100.88entre
ejes D y C111.450.401.100.64Eje C-CEntre ejes 1 y
2112.000.401.100.88entre ejes C y B111.150.401.100.51Eje B-BEntre
ejes 1 y 2112.000.401.100.88Eje A-AEntre ejes 1 y
2112.000.401.100.88
Eje 1-1Entre ejes G y F110.500.401.100.22Entre ejes F y
E111.150.401.100.51Entre ejes E y
D110.900.401.100.40111.050.401.100.46Entre ejes D y
C110.350.401.100.15Entre ejes C y B112.350.401.101.03Entre ejes B y
A112.200.401.100.97Entre Ejes 1 y 2 (Entre ejes F y
E)111.150.400.700.32Entre Ejes 1 y 2 (Entre ejes B y
A)111.650.400.700.46
Eje 2-2Entre ejes G y F110.500.401.100.22Entre ejes F y
E111.150.401.100.51Entre ejes E y D112.700.401.101.19Entre ejes D y
C110.350.401.100.15Entre ejes C y B112.350.401.101.03Entre ejes B y
A112.200.401.100.97111.050.401.100.46111.150.401.100.51110.350.401.100.15113.250.401.101.43112.900.401.101.28
Escalera120.900.501.000.90
CORTE X-X3.11Entre ejes E y D1113.800.2253.11
EXCAVACION PARA CISTERNA V=3.00 m3m310.76Cisterna
112.301.301.805.38
EXCAVACION PARA CISTERNA V=3.00 m3 (APROVECHAMIENTO DE
LLUVIAS)m3Cisterna112.301.301.805.38
03.02.03RELLENO CON MATERIAL
PROPIOm331.31ZAPATAS27.29Z-1161.251.251.2011.25Z-2181.251.251.2015.00Z-31100.800.650.201.04
CIMIENTOS4.02Eje G-GEntre ejes 1 y 2112.000.0850.17Eje F-FEntre
ejes 1 y 2112.000.100.20Eje E-EEntre ejes 1 y 2112.000.0850.17Eje
D-DEntre ejes 1 y 2112.000.0850.17Eje C-CEntre ejes 1 y
2112.000.100.20Eje B-BEntre ejes 1 y 2112.000.100.20Entre ejes B y
AEntre ejes 1 y 2110.900.0250.02Eje A-AEntre ejes 1 y
2112.000.0850.17
Eje 1-1Entre ejes G y F110.500.0850.04Entre ejes F y
E111.150.0850.10Entre ejes E y D110.900.0850.08111.050.0850.09Entre
ejes D y C111.700.0850.14Entre ejes C y B112.350.0850.20Entre ejes
B y A112.200.0850.19Entre Ejes 1 y 2 (Entre ejes F y
E)111.150.0250.03Entre Ejes 1 y 2 (Entre ejes B y
A)111.650.0250.04Entre ejes D y C110.350.0850.03Entre ejes C y
B112.350.0850.20Entre ejes B y A112.200.0850.19
Eje 2-2Entre ejes G y F110.500.0850.04Entre ejes F y
E111.150.0850.10Entre ejes E y D112.700.0850.23Entre ejes D y
C111.700.0850.14Entre ejes C y B112.350.0850.20Entre ejes B y
A112.200.0850.19111.050.0850.09111.150.0850.10110.350.0850.03113.250.0850.28112.900.0850.25
03.02.04ELIMINACIN DE MATERIAL EXCEDENTE
m31.25174.9293.6593.65
03.02.05NIVELACIN INTERIOR Y APISONADO m279.89SALA COCINA
COMEDOR1115.7115.71SS.HH
112.952.95Veredas1112.2412.24Cocina1112.4412.44SS.HH
112.452.45Depsito112.702.70Restaurante, Caf o
Jugueria1129.4029.40Entrada a Escalera112.002.00
01.04.00OBRAS DE CONCRETO SIMPLE
01.04.01SOLADO DE CONCRETO F'c =100 KG/CM2m237.90Ver Formato
Concreto Simple
01.04.02CONCRETO F'c=175 KG/CM2 EN FALSO PISOm272.56Ver Formato
Concreto Simple
01.04.03CONCRETO CICLOPEO F'c=140 KG/CM2 +30% PM EN CIMIENTO
CORRIDOm321.13Ver Formato Concreto Simple
01.04.04CONCRETO CICLOPEO F'c=140 KG/CM2+ 25% PM PARA
SOBRECIMIENTOm33.96Ver Formato Concreto Simple
01.04.05ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOm230.00Ver
Formato Concreto Simple
01.04.05CONCRETO FC= 175 KG/CM2 m22.44Ver Formato Concreto
Simple
01.05.00OBRAS DE CONCRETO ARMADO
SOTANO01.05.01ZAPATAS01.05.01.01CONCRETO F'c = 210 KG/CM2 EN
ZAPATAS m3ERROR:#REF!Ver Formato Concreto Armado
01.05.01.02ACERO DE REFUERZO Fy=4200 KG/CM2 EN ZAPATAS
KgERROR:#REF!Ver Formato Acero
01.05.01.03ENCOFRADO Y DESENCOFRADO PARA ZAPATASm2ERROR:#REF!Ver
Formato Concreto Armado
01.05.02VIGAS DE CIMENTACIN01.05.02.01CONCRETO F'c=210 KG/CM2 EN
VIGAS DE CIMENTACINm3ERROR:#REF!Ver Formato Concreto Armado
01.05.02.02ACERO DE REFUERZO Fy=4200 KG/CM2 EN VIGAS DE
CIMENTACIONKg915.08Ver Formato Acero
01.05.02.03ENCOFRADO Y DESENCOFRADO PARA VIGA DE
CIMENTACINm2ERROR:#REF!Ver Formato Concreto Armado
01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210 KG/CM2 EN COLUMNAS
m3ERROR:#REF!Ver Formato Concreto Armado
01.05.04.03ACERO DE REFUERZO Fy=4200 KG/CM2 EN
COLUMNASKgERROR:#REF!Ver Formato Acero
01.05.04.04ENCOFRADO Y DESENCOFRADO NORMAL EN
COLUMNASm2ERROR:#REF!Ver Formato Concreto Armado
01.05.04PLACAS01.05.04.01CONCRETO F'c=210 KG/CM2 EN
PLACASm3ERROR:#REF!Ver Formato Concreto Armado
01.05.04.03ACERO DE REFUERZO Fy=4200 KG/CM2 EN
PLACASKgERROR:#REF!Ver Formato Acero
01.05.04.04ENCOFRADO Y DESENCOFRADO NORMAL EN
PLACASm2ERROR:#REF!Ver Formato Concreto Armado
01.05.05VIGASVIGAS PRINCIPALES01.05.05.01CONCRETO F'c=210 KG/CM2
EN VIGASm3ERROR:#REF!Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKgERROR:#REF!Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN
VIGASm2ERROR:#REF!Ver Formato Concreto Armado
VIGAS SECUNDARIAS01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGASm3ERROR:#REF!Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKgERROR:#REF!Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN
VIGASm2ERROR:#REF!Ver Formato Concreto Armado
VIGAS DE BORDE01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGASm3ERROR:#REF!Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKgERROR:#REF!Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN
VIGASm2ERROR:#REF!Ver Formato Concreto Armado
01.05.06LOSA ALIGERADA01.05.06.01CONCRETO F'c=210 KG/CM2 EN LOSA
ALIGERADA m3ERROR:#REF!Ver Formato Concreto Armado
01.05.07.02ACERO DE REFUERZOFy=4200 KG/CM2 EN LOSA
ALIGERADAKgERROR:#REF!Ver Formato Acero
01.05.06.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA
ALIGERADAm2ERROR:#REF!Ver Formato Concreto Armado
01.05.06.04LADRILLO PARA TECHO DE .15 x.30
x.30UnidERROR:#REF!
01.05.08ESCALERA01.05.08.01CONCRETO F'c=210 KG/CM2 EN
ESCALERASm3ERROR:#REF!Ver Formato Concreto Armado
01.05.08.02ACERO DE REFUERZOFy=4200 KG/CM2 EN
ESCALERASKgERROR:#REF!Ver Formato Acero
01.05.07.03ENCOFRADO Y DESENCOFRADO NORMAL EN
ESCALERASm2ERROR:#REF!Ver Formato Concreto Armado
PRIMER PISO01.05.01ZAPATAS01.05.01.01CONCRETO F'c = 210 KG/CM2
EN ZAPATAS m322.10Ver Formato Concreto Armado
01.05.01.02ACERO DE REFUERZO Fy=4200 KG/CM2 EN ZAPATAS
Kg314.70Ver Formato Acero
01.05.01.03ENCOFRADO Y DESENCOFRADO PARA ZAPATASm20.00Ver
Formato Concreto Armado
01.05.02VIGAS DE CIMENTACIN01.05.02.01CONCRETO F'c=210 KG/CM2 EN
VIGAS DE CIMENTACINm36.45Ver Formato Concreto Armado
01.05.02.02ACERO DE REFUERZO Fy=4200 KG/CM2 EN VIGAS DE
CIMENTACIONKg0.00Ver Formato Acero
01.05.02.03ENCOFRADO Y DESENCOFRADO PARA VIGA DE
CIMENTACINm251.60Ver Formato Concreto Armado
01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210 KG/CM2 EN COLUMNAS
m35.59Ver Formato Concreto Armado
01.05.04.03ACERO DE REFUERZO Fy=4200 KG/CM2 EN
COLUMNASKg1549.45Ver Formato Acero
01.05.04.04ENCOFRADO Y DESENCOFRADO NORMAL EN
COLUMNASm2100.04Ver Formato Concreto Armado
01.05.05VIGASVIGAS PRINCIPALES01.05.05.01CONCRETO F'c=210 KG/CM2
EN VIGASm33.50Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg509.66Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm237.24Ver
Formato Concreto Armado
VIGAS SECUNDARIAS01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGASm32.42Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg528.51Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm228.80Ver
Formato Concreto Armado
VIGAS DE BORDE01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGASm30.65Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg44.07Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm211.91Ver
Formato Concreto Armado
01.05.06LOSA ALIGERADA01.05.06.01CONCRETO F'c=210 KG/CM2 EN LOSA
ALIGERADA m39.90Ver Formato Concreto Armado
01.05.07.02ACERO DE REFUERZOFy=4200 KG/CM2 EN LOSA
ALIGERADAKg551.22Ver Formato Acero
01.05.06.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA
ALIGERADAm268.85Ver Formato Concreto Armado
01.05.06.04LADRILLO PARA TECHO DE .15 x.30
x.30Unid573.560484
01.05.08ESCALERA01.05.08.01CONCRETO F'c=210 KG/CM2 EN
ESCALERASm33.90Ver Formato Concreto Armado
01.05.08.02ACERO DE REFUERZOFy=4200 KG/CM2 EN
ESCALERASKg229.66Ver Formato Acero
01.05.07.03ENCOFRADO Y DESENCOFRADO NORMAL EN
ESCALERASm222.74Ver Formato Concreto Armado
SEGUNDO PISO01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210 KG/CM2
EN COLUMNAS m33.82Ver Formato Concreto Armado
01.05.04.03ACERO DE REFUERZO Fy=4200 KG/CM2 EN
COLUMNASKg978.95Ver Formato Acero
01.05.04.04ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm268.32Ver
Formato Concreto Armado
01.05.05VIGASVIGAS PRINCIPALES01.05.05.01CONCRETO F'c=210 KG/CM2
EN VIGASm33.50Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg509.66Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm237.24Ver
Formato Concreto Armado
VIGAS SECUNDARIAS01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGASm32.42Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg528.51Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm228.80Ver
Formato Concreto Armado
VIGAS DE BORDE01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGASm30.65Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg44.07Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm211.91Ver
Formato Concreto Armado
01.05.06LOSA ALIGERADA01.05.06.01CONCRETO F'c=210 KG/CM2 EN LOSA
ALIGERADA m30.00Ver Formato Concreto Armado
01.05.07.02ACERO DE REFUERZOFy=4200 KG/CM2 EN LOSA
ALIGERADAKg551.22Ver Formato Acero
01.05.06.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA
ALIGERADAm20.00Ver Formato Concreto Armado
01.05.06.04LADRILLO PARA TECHO DE .15 x.30 x.30Unid0
01.05.08ESCALERA01.05.08.01CONCRETO F'c=210 KG/CM2 EN
ESCALERASm32.99Ver Formato Concreto Armado
01.05.08.02ACERO DE REFUERZOFy=4200 KG/CM2 EN
ESCALERASKg212.45Ver Formato Acero
01.05.07.03ENCOFRADO Y DESENCOFRADO NORMAL EN
ESCALERASm222.74Ver Formato Concreto Armado
TERCER PISO01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210 KG/CM2 EN
COLUMNAS m34.07Ver Formato Concreto Armado
01.05.04.03ACERO DE REFUERZO Fy=4200 KG/CM2 EN
COLUMNASKg978.95Ver Formato Acero
01.05.04.04ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm272.42Ver
Formato Concreto Armado
01.05.05VIGASVIGAS PRINCIPALES01.05.05.01CONCRETO F'c=210 KG/CM2
EN VIGASm3ERROR:#REF!Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg291.87Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN
VIGASm2ERROR:#REF!Ver Formato Concreto Armado
VIGAS SECUNDARIAS01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGASm3ERROR:#REF!Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg284.13Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN
VIGASm2ERROR:#REF!Ver Formato Concreto Armado
VIGAS DE BORDE01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGASm30.65Ver Formato Concreto Armado
01.05.06.02ACERO Fy=4200 KG/CM2 EN VIGASKg44.07Ver Formato
Acero
01.05.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm211.91Ver
Formato Concreto Armado
01.05.06LOSA ALIGERADA01.05.06.01CONCRETO F'c=210 KG/CM2 EN LOSA
ALIGERADA m30.00Ver Formato Concreto Armado
01.05.07.02ACERO DE REFUERZOFy=4200 KG/CM2 EN LOSA
ALIGERADAKg285.27Ver Formato Acero
01.05.06.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA
ALIGERADAm20.00Ver Formato Concreto Armado
01.05.06.04LADRILLO PARA TECHO DE .15 x.30 x.30Unid0
01.05.08ESCALERA01.05.08.01CONCRETO F'c=210 KG/CM2 EN
ESCALERASm32.99Ver Formato Concreto Armado
01.05.08.02ACERO DE REFUERZOFy=4200 KG/CM2 EN
ESCALERASKg212.45Ver Formato Acero
01.05.07.03ENCOFRADO Y DESENCOFRADO NORMAL EN
ESCALERASm222.74Ver Formato Concreto Armado
AZOTEA01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210 KG/CM2 EN
COLUMNAS m31.61Ver Formato Concreto Armado
01.05.04.03ACERO DE REFUERZO Fy=4200 KG/CM2 EN
COLUMNASKg396.84Ver Formato Acero
01.05.04.04ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm226.88Ver
Formato Concreto Armado
09.00.00MUROS Y TABIQUES DE ALBAILERAVer Formato Muros
SOTANO09.01.00MURO DE SOGA LADRILLO CORRIENTE DE
ARCILLAm2ERROR:#REF!
PRIMER PISO09.01.00MURO DE SOGA LADRILLO CORRIENTE DE
ARCILLAm2ERROR:#REF!
SEGUNDO PISO09.01.00MURO DE SOGA LADRILLO CORRIENTE DE
ARCILLAm2ERROR:#REF!
TERCER PISO09.01.00MURO DE SOGA LADRILLO CORRIENTE DE
ARCILLAm2ERROR:#REF!
AZOTEA09.01.00MURO DE SOGA LADRILLO CORRIENTE DE
ARCILLAm2ERROR:#REF!
10.00.00REVOQUES, ENLUCIDOS Y MOLDURASVer Formato Tarrajeo
Muros
SOTANO10.02.00ERROR:#REF!m2ERROR:#REF!10.03.00ERROR:#REF!mlERROR:#REF!10.05.00ERROR:#REF!mlERROR:#REF!10.06.00ERROR:#REF!mlERROR:#REF!
PRIMER
PISO10.01.00ERROR:#REF!m2ERROR:#REF!10.02.00ERROR:#REF!m2ERROR:#REF!10.03.00ERROR:#REF!mlERROR:#REF!10.05.00ERROR:#REF!mlERROR:#REF!10.06.00ERROR:#REF!mlERROR:#REF!
SEGUNDO
PISO10.01.00ERROR:#REF!m2ERROR:#REF!10.02.00ERROR:#REF!m2ERROR:#REF!10.03.00ERROR:#REF!mlERROR:#REF!10.05.00ERROR:#REF!mlERROR:#REF!10.06.00ERROR:#REF!mlERROR:#REF!
TERCER
PISO10.01.00ERROR:#REF!m2ERROR:#REF!10.02.00ERROR:#REF!m2ERROR:#REF!10.03.00ERROR:#REF!mlERROR:#REF!10.05.00ERROR:#REF!mlERROR:#REF!10.06.00ERROR:#REF!mlERROR:#REF!
AZOTEA10.02.00ERROR:#REF!m2ERROR:#REF!10.03.00ERROR:#REF!mlERROR:#REF!10.06.00ERROR:#REF!mlERROR:#REF!
01.08.00CIELORRASOS01.08.01CIELORRASO CON MEZCLA DE
CEMENTO-ARENAm2274.35CIELORRASO
INTERIORSOTANO45.431117.3117.311114.6314.631113.4813.48PRIMER
NIVEL85.761124.6224.621111.1511.151117.3117.311116.8616.861111.8211.82114.004.00SEGUNDO
NIVEL85.761124.6224.621111.1511.151117.3117.311116.8616.861111.8211.82114.004.00TERCER
NIVEL57.421140.7640.761116.6516.65
01.09.00PISOS Y
PAVIMENTOS01.09.01CONTRAPISOSm2297.19SOTANO50.631136.5336.531112.5212.52111.581.58PRIMER
PISO91.30HABITACION1121.2121.21SS.HH112.942.94PATIO1119.3019.30COCINA1112.1512.15SS.HH112.452.45DEPOSITO112.702.70RESTAURANTE
CAF O JUGUERIA1128.7728.77ENTRADA111.791.79SEGUNDO
PISO98.48HABITACION1121.2121.21SS.HH112.942.94AREA
LIBRE1110.5110.51COCINA1112.1512.15SS.HH112.452.45DEPOSITO111.761.76SPA,
CENTRO DE MASAJES1142.1742.17VOLADIZO115.295.29TERCER
PISOHABITACION1121.2121.21SS.HH112.942.94AREA
LIBRE1110.5110.51COCINA1112.1512.15SS.HH112.452.45DEPOSITO111.761.76CENTRO
DE MEDICINA
NATURAL1142.1742.17VOLADIZO115.295.29AZOTEA56.78AZOTEA1156.7856.78
01.09.02PISO CERAMICOPARA SSHHm216.17PRIMER PISOSS.HH
1112.942.94SS.HH 2112.452.45SEGUNDO PISOSS.HH 4112.942.94SS.HH
5112.452.45TERCER PISOSS.HH 7112.942.94SS.HH 8112.452.45
ESCALERAm237.26SOTANO A PRIMER
PISO8.51290.900.182.84290.900.254.05111.800.901.62PRIMER PISO A
SEGUNDO PISO8.51290.900.182.84290.900.254.05111.800.901.62SEGUNDO
PISO A TERCER
PISO10.13290.900.182.84290.900.254.05211.800.903.24TERCER PISO A
AZOTEA10.13290.900.182.84290.900.254.05211.800.903.24
01.09.03PISO DE PORCELANATOm2252.79PRIMER
PISO66.62HABITACION1121.2121.21COCINA1112.1512.15DEPOSITO112.702.70RESTAURANTE
CAF O JUGUERIA1128.7728.77ENTRADA111.791.79SEGUNDO
PISO93.09HABITACION1121.2121.21AREA
LIBRE1110.5110.51COCINA1112.1512.15DEPOSITO111.761.76SPA, CENTRO DE
MASAJES1142.1742.17VOLADIZO115.295.29TERCER
PISO93.09HABITACION1121.2121.21AREA
LIBRE1110.5110.51COCINA1112.1512.15DEPOSITO111.761.76CENTRO DE
MEDICINA NATURAL1142.1742.17VOLADIZO115.295.29
01.09.04CONTRAPISO
PULIDOm250.63SOTANO1136.5336.531112.5212.52111.581.58
01.11.00ZCALOS01.11.01ZCALO DE CEMENTO
PULIDOm23.41SOTANO3.41SOTANO1134.080.103.41
ZCALO DE CERMICOm229.49PRIMER
PISO9.74HABITACION1118.700.101.87SS.HH
1116.980.100.70PATIO1115.530.101.55COCINA1111.540.101.15SS.HH
2116.060.100.61DEPOSITO117.050.100.71RESTAURANTE CAF O
JUGUERIA1119.180.101.92ESCALERA - ENTRADA1112.310.101.23
SEGUNDO PISO9.88HABITACION1118.700.101.87SS.HH
1116.980.100.70ESPACIO LIBRE1113.740.101.37SS.HH
2116.060.100.61DEPOSITO113.990.100.40SPA, CENTRO DE
MASAJES1135.770.103.58ESCALERA1113.510.101.35
TERCER PISO9.88HABITACION1118.700.101.87SS.HH
1116.980.100.70ESPACIO LIBRE1113.740.101.37SS.HH
2116.060.100.61DEPOSITO113.990.100.40CENTRO DE MEDICINA
NATURAL1135.770.103.58ESCALERA1113.510.101.35
01.12.00CARPINTERA DE MADERAPRIMER PISO01.12.01PUERTASund7DE
MADERA MACIZAP-1 (H = 2.10)111.00P-2 (H = 2.10)212.00P-3 (H =
2.10)212.00P-4 (H = 2.10)111.00P-5 (H = 2.60)111.00
01.12.01VENTANASund3DE MADERA CON VIDRIO DE
6mmV-1111.00VA-1212.00
SEGUNDO PISO01.12.01PUERTASund5DE MADERA MACIZAP-2 (H =
2.10)313.00P-3 (H = 2.10)212.00
01.12.01VENTANASund5DE MADERA CON VIDRIO DE
6mmV-2111.00V-3111.00V-4111.00VA-1212.00
TERCER PISO01.12.01PUERTASund5DE MADERA MACIZAP-2 (H =
2.10)313.00P-3 (H = 2.10)212.00
01.12.01VENTANASund5DE MADERA CON VIDRIO DE
6mmV-2111.00V-3111.00V-4111.00VA-1212.00
AZOTEA01.12.01PUERTASund1DE MADERA MACIZAP-2 (H =
2.10)111.00
01.12.01VENTANASund2DE MADERA CON VIDRIO DE
6mmV-3111.00V-4111.00
01.13.00CARPINTERA DE METLICA Y HERRERIA
01.13.02BARANDASml33.61SEGUNDO
PISO1114.2914.29AZOTEA1119.3319.33
01.13.03ESCALERASml50.40DE SOTANO A PRIMER PISO1112.6012.60DE
PRIMER PISO A SEGUNDO PISO1112.6012.60DE SEGUNDO PISO A
TERCERPISO1112.6012.60DE TERCER PISO A LA AZOTEA1112.6012.60
01.14.00CERRAJERA
PRIMER PISO01.14.01BISAGRA ALUMINIZADA Unid27
P-1 (H = 2.10)144.00P-2 (H = 2.10)236.00P-3 (H = 2.10)236.00P-4
(H = 2.10)133.00P-5 (H = 2.60)140.00V-1144.00VA-1224.00
01.14.02CERRADURA PARA PUERTA Unid7
P-1 (H = 2.10)111.00P-2 (H = 2.10)212.00P-3 (H = 2.10)212.00P-4
(H = 2.10)111.00P-5 (H = 2.60)111.00
01.14.03PICAPORTES DE SOBREPONERUnid4
V-1122.00VA-1212.00
SEGUNDO PISO01.14.01BISAGRA ALUMINIZADA Unid31
P-2 (H = 2.10)339.00P-3 (H = 2.10)236.00
V-2144.00V-3144.00V-4144.00VA-1224.00
01.14.02CERRADURA PARA PUERTA Unid5
P-2 (H = 2.10)313.00P-3 (H = 2.10)212.00
01.14.03PICAPORTES DE SOBREPONERUnid8
V-2122.00V-3122.00V-4122.00VA-1212.00
TERCER PISO01.14.01BISAGRA ALUMINIZADA Unid31
P-2 (H = 2.10)339.00P-3 (H = 2.10)236.00
V-2144.00V-3144.00V-4144.00VA-1224.00
01.14.02CERRADURA PARA PUERTA Unid5
P-2 (H = 2.10)313.00P-3 (H = 2.10)212.00
01.14.03PICAPORTES DE SOBREPONERUnid8
V-2122.00V-3122.00V-4122.00VA-1212.00
AZOTEA01.14.01BISAGRA ALUMINIZADA Unid7
P-2 (H = 2.10)133.00
V-314V-4144.00
01.14.02CERRADURA PARA PUERTA Unid3
P-2 (H = 2.10)133.00
01.14.03PICAPORTES DE SOBREPONERUnid4
V-3122.00V-4122.00
01.15.00VIDRIOS, CRISTALES Y SIMILARESm236.51
PRIMER PISO6.58Vidrio de 6mm de
espesorV-1121.551.805.58VA-1211.000.501.00
SEGUNDO PISO11.36Vidrio de 6mm de
espesorV-2111.651.903.14V-3112.001.903.80V-4111.801.903.42VA-1211.000.501.00
TERCER PISO11.36Vidrio de 6mm de
espesorV-2111.651.903.14V-3112.001.903.80V-4111.801.903.42VA-1211.000.501.00
AZOTEA7.22Vidrio de 6mm de
espesorV-3112.001.903.80V-4111.801.903.42
01.14.05TECHOS01.14.05.01VIGUETAS DE MADERA (2" x 5")ml0.00
01.14.05.02CORREAS DE MADERAml0.00
01.14.05.03COBERTURA LIVIANAm2110.00
01.14.06CISTERNAund212.002.00
01.14.07TANQUE ELEVADOund212.002.00
22.00.00PINTURAVer Formato Tarrajeo Muros
SOTANO22.01.00ERROR:#REF!m2ERROR:#REF!22.02.00ERROR:#REF!m2ERROR:#REF!22.03.00ERROR:#REF!m2ERROR:#REF!22.04.00ERROR:#REF!m2ERROR:#REF!
PRIMER
PISO22.01.00ERROR:#REF!m2ERROR:#REF!22.02.00ERROR:#REF!m2ERROR:#REF!22.03.00ERROR:#REF!m2ERROR:#REF!22.04.00ERROR:#REF!m2ERROR:#REF!
SEGUNDO
PISO22.01.00ERROR:#REF!m2ERROR:#REF!22.02.00ERROR:#REF!m2ERROR:#REF!22.03.00ERROR:#REF!m2ERROR:#REF!22.04.00ERROR:#REF!m2ERROR:#REF!
TERCER
PISO22.01.00ERROR:#REF!m2ERROR:#REF!22.02.00ERROR:#REF!m2ERROR:#REF!22.03.00ERROR:#REF!m2ERROR:#REF!22.04.00ERROR:#REF!m2ERROR:#REF!
AZOTEA22.01.00ERROR:#REF!m2ERROR:#REF!22.02.00ERROR:#REF!m2ERROR:#REF!
23.00.00VARIOS, LIMPIEZA, JARDINERIA
23.01.00LIMPIEZA PERMANENTE DE OBRAGlb111123.02.00LIMPIEZA
FINALGlb111123.03.00LIMPIEZA DE VIDRIOSm236.5223.03.01PRIMER
PISO116.586.5823.03.02SEGUNDO PISO1111.3611.3623.03.03TERCER
PISO1111.3611.3623.03.04AZOTEA117.227.2223.04.00ENCERADO DE
PISOSm2252.8023.04.01PRIMER PISO1166.6266.6223.04.02SEGUNDO
PISO1193.0993.0923.04.03TERCER PISO1193.0993.09
01.17.00INSTALACIONES SANITARIAS
PRIMER PISO01.17.01APARATOS Y ACCESORIOS
SANITARIOS01.17.01.01SUMINISTRO DE APARATOS
SANITARIOS01.17.01.01.01LAVATORIO De pedestalund1222
01.17.01.01.02INODORO Tanque Bajound1222
01.17.01.01.03LAVADEROS DE COCINADe acero inoxidableund1111
01.17.01.01.03DUCHASDuchasund1222
01.17.01.02SUMINISTRO DE
ACCESORIOS01.17.01.02.01JABONERASund122201.17.01.02.02TOALLERASund122201.17.01.02.03PAPELERASund122201.17.01.02.04GANCHOSund122201.17.01.02.05BARRAS
PARA CORTINASund122201.17.01.02.06ESPEJOSund1222
01.17.01.03INSTALACION DE APARATOS
SANITARIOSund177701.17.01.04INSTALACION DE ACCESORIOSund1121212
01.17.02SISTEMA DE AGUA FRIA01.17.02.01SALIDA DE AGUA
FRIApto.177701.17.02.02REDES DE DISTRIBUCION01.17.02.02.01TUBERIA
DE PVC 1/2"ml1117.1617.1617.1601.17.02.02.02TUBERIA DE PVC
3/4"ml1125.2525.2525.2501.17.02.02.03TUBERIA DE PVC
1"ml116.406.406.4001.17.02.03ACCESORIOS DE REDES DE
AGUA01.17.02.03.01UNIONESund188.008.0001.17.02.03.02CODOSund13232.0032.0001.17.02.03.03TEESund188.008.0001.17.02.04VALVULAS01.17.02.04.01DE
COMPUERTA (1/2")und144.004.0001.17.02.04.02GENERAL
(1")und111.001.0001.17.02.04.03CHECK (BY PASS 1")und111.001.00
01.17.03SISTEMA DE DRENAJE PLUVIAL01.17.03.01RED DE
RECOLECCION01.17.03.01.01DE PVC
3"ml1159.4059.400459.4001.17.03.02ACCESORIOS01.17.03.02.01CODOS 3"
X 90und188.008.0001.17.03.02.02CODOS 3" X
45und144.004.0001.17.03.02.03YEESund177.007.0001.17.03.02.03SUMIDEROS
3"und111.001.00
01.17.04DESAGUE Y VENTILACION01.17.04.01SALIDA DE
DESAGUEPTO.177701.17.04.03REDES COLECTORAS01.17.04.03.01TUBERIAS DE
PVC 2ml1116.2116.2116.2101.17.04.03.03TUBERIAS DE PVC
4ml1129.8029.8029.8001.17.04.04ACCESORIOS DE REDES
COLECTORAS01.17.04.04.01CODOS01.17.04.04.01.01DE 4"X45und122.002DE
4"X90und122.002DE 2"X45und111.001DE
2"X90und188.00801.17.04.04.02YEES01.17.04.04.02.01DE 4"und155.005DE
2"und111.001DE 4" A 2"und144.00401.17.04.05CAMARAS DE
INSPECCION01.17.04.05.01CAJAS DE REGISTRO 12"x24"
und122.00201.17.04.06INSTALACIONES ESPECIALES01.17.04.06.01TRAMPAS
DE GRASAund111.00101.17.04.07VARIOS01.17.04.07.01SUMIDEROSDE
2"und144.00401.17.04.07.02REGISTROS01.17.04.07.02.01DE
4"und122.00201.17.04.07.03SOMBREROS DE VENTILACIONund122.002
SEGUNDO PISO01.17.01APARATOS Y ACCESORIOS
SANITARIOS01.17.01.01SUMINISTRO DE APARATOS
SANITARIOS01.17.01.01.01LAVATORIO De pedestalund1222
01.17.01.01.02INODORO Tanque Bajound1222
01.17.01.01.03DUCHASDuchasund1222
01.17.01.02SUMINISTRO DE
ACCESORIOS01.17.01.02.01JABONERASund122201.17.01.02.02TOALLERASund122201.17.01.02.03PAPELERASund122201.17.01.02.04GANCHOSund122201.17.01.02.05BARRAS
PARA CORTINASund122201.17.01.02.06ESPEJOSund1222
01.17.01.03INSTALACION DE APARATOS
SANITARIOSund166601.17.01.04INSTALACION DE ACCESORIOSund1121212
01.17.02SISTEMA DE AGUA FRIA01.17.02.01SALIDA DE AGUA
FRIApto.166601.17.02.02REDES DE DISTRIBUCION01.17.02.02.01TUBERIA
DE PVC 1/2"ml1113.6813.6813.6801.17.02.02.02TUBERIA DE PVC
3/4"ml1117.6117.614317.6101.17.02.02.03TUBERIA DE PVC
1"ml116.406.406.4001.17.02.03ACCESORIOS DE REDES DE
AGUA01.17.02.03.01UNIONESund144.004.0001.17.02.03.02CODOSund12020.0020.0001.17.02.03.03TEESund166.006.0001.17.02.04VALVULAS01.17.02.04.01DE
COMPUERTA (1/2")und122.002.00
01.17.03SISTEMA DE DRENAJE PLUVIAL01.17.03.01RED DE
RECOLECCION01.17.03.01.01DE PVC
3"ml1125.6825.677225.677201.17.03.02ACCESORIOS01.17.03.02.01CODOS
3" X 90und1999
01.17.04DESAGUE Y VENTILACION01.17.04.01SALIDA DE
DESAGUEPTO.166601.17.04.03REDES COLECTORAS01.17.04.03.01TUBERIAS DE
PVC 2ml1117.2917.2917.2901.17.04.03.03TUBERIAS DE PVC
4ml118.678.678.6701.17.04.04ACCESORIOS DE REDES
COLECTORAS01.17.04.04.01CODOS01.17.04.04.01.01DE 2"X45und122.002DE
2"X90und155.00501.17.04.04.02YEES01.17.04.04.02.01DE 4"und122.002DE
2"und133.003DE 4" A
2"und144.00401.17.04.07VARIOS01.17.04.07.01SUMIDEROSDE
2"und144.00401.17.04.07.02REGISTROS01.17.04.07.02.01DE
4"und122.00201.17.04.07.03SOMBREROS DE VENTILACIONund122.002
TERCER PISO01.17.01APARATOS Y ACCESORIOS
SANITARIOS01.17.01.01SUMINISTRO DE APARATOS
SANITARIOS01.17.01.01.01LAVATORIO De pedestalund1222
01.17.01.01.02INODORO Tanque Bajound1222
01.17.01.01.03DUCHASDuchasund1222
01.17.01.02SUMINISTRO DE
ACCESORIOS01.17.01.02.01JABONERASund122201.17.01.02.02TOALLERASund122201.17.01.02.03PAPELERASund122201.17.01.02.04GANCHOSund122201.17.01.02.05BARRAS
PARA CORTINASund122201.17.01.02.06ESPEJOSund1222
01.17.01.03INSTALACION DE APARATOS
SANITARIOSund166601.17.01.04INSTALACION DE ACCESORIOSund1121212
01.17.02SISTEMA DE AGUA FRIA01.17.02.01SALIDA DE AGUA
FRIApto.166601.17.02.02REDES DE DISTRIBUCION01.17.02.02.01TUBERIA
DE PVC 1/2"ml1113.6813.6813.6801.17.02.02.02TUBERIA DE PVC
3/4"ml1124.1224.122624.1201.17.02.02.03TUBERIA DE PVC
1"ml119.609.609.6001.17.02.03ACCESORIOS DE REDES DE
AGUA01.17.02.03.01UNIONESund144.004.0001.17.02.03.02CODOSund12424.0024.0001.17.02.03.03TEESund177.007.0001.17.02.04VALVULAS01.17.02.04.01DE
COMPUERTA (1/2")und122.002.00
01.17.03SISTEMA DE DRENAJE PLUVIAL01.17.03.01RED DE
RECOLECCION01.17.03.01.01DE PVC 3"ml1122.4022.422.4
01.17.04DESAGUE Y VENTILACION01.17.04.01SALIDA DE
DESAGUEPTO.166601.17.04.03REDES COLECTORAS01.17.04.03.01TUBERIAS DE
PVC 2ml1117.2917.2917.2901.17.04.03.03TUBERIAS DE PVC
4ml112.272.26522.265201.17.04.04ACCESORIOS DE REDES
COLECTORAS01.17.04.04.01CODOSDE 4"X90und122.002DE 2"X45und122.002DE
2"X90und144.00401.17.04.04.02YEESDE 2"und144.004DE 4" A
2"und144.00401.17.04.07VARIOS01.17.04.07.01SUMIDEROSDE
2"und144.00401.17.04.07.02REGISTROS01.17.04.07.02.01DE
4"und122.00201.17.04.07.03SOMBREROS DE VENTILACIONund122.002
AZOTEA01.17.02SISTEMA DE AGUA FRIA01.17.02.02REDES DE
DISTRIBUCION01.17.02.02.02TUBERIA DE PVC
3/4"ml112.362.362.3601.17.02.03ACCESORIOS DE REDES DE
AGUA01.17.02.03.02CODOSund155.005.0001.17.02.03.03TEESund111.001.00
01.17.03SISTEMA DE DRENAJE PLUVIAL01.17.03.01RED DE
RECOLECCION01.17.03.01.01DE PVC
3"ml1114.9814.9814.9801.17.03.01.02ALERO CONTROL
PLUVIALml117.1101.17.03.02ACCESORIOS01.17.03.02.01CODOS 3" X
90und1666
TECHO01.17.03SISTEMA DE DRENAJE PLUVIAL01.17.03.01RED DE
RECOLECCION01.17.03.01.02ALERO CONTROL
PLUVIALml130.5001.17.03.02ACCESORIOS01.17.03.02.01CODOS 3" X
90und1444
01.18.00INSTALACIONES ELECTRICAS
PRIMER PISO34.01.00SALIDAS PARA ALUMBRADOS34.01.01SALIDA DE
TECHO (CENTROS)pto17117.0017.0034.01.02SALIDA PARA
SPOT-LIGHTpto414.004.00
34.02.00SALIDAS PARA INTERRUPTORES34.02.01INTERRUPTOR BIPOLAR
SIMPLEpto515.005.0034.02.02INTERRUPTOR BIPOLAR
DOBLEpto414.004.0034.02.02INTERRUPTOR BIPOLAR
TRIPLEpto212.002.00
34.03.00SALIDA PARA TOMACORRIENTES22.0034.03.02BIPOLARES
DOBLESpto22122.00
34.04.00SALIDA PARA TELEFONOS2.0034.04.01INTERNO (DE
INTERCOMUNICADORES)Unid212.00
34.05.00SALIDA PARA ANTENAS2.0034.05.01DE
TELEVISIONUnid212.00
5.2.2CANALIZACIONES, CONDUCTOS O TUBERIAS5.2.2.1TUBERIA
EMPOTRADAILUMINACIONml102.65TG - BAJA A TD1114.754.75TG - SUBE A
TD3113.603.60TG - SUBE A TD4116.806.80TD2 - a113.003.00a -
Sa113.103.10a - b114.854.85b - b112.352.35b - Sb113.303.30b -
c113.353.35c - d114.154.15d - 2S (c,d)114.054.05d - e114.504.50e -
2S (d,e)114.054.052S (d,e) - d113.153.15d - e113.503.50e -
Se113.003.00e - f113.653.65f - Sf114.504.50f - g113.003.00g -
Sg113.653.65g - h112.902.90h - Sh113.153.15d - c112.802.80c -
Sc113.003.00c - b112.052.05b - Sb112.352.35b - a113.353.35a -
Sa113.703.70a - TD2113.053.05
TOMACORRIENTESml83.55TD2 - A112.902.90A - B114.204.20B
-C115.605.60C - D115.155.15D - E115.005.00E - F114.854.85F -
G114.204.20TD2 - H114.954.95H - I115.255.25I - J112.852.85J -
K112.952.95K - L113.603.60L - M114.354.35M - N112.902.90N -
O114.854.85O - P112.602.60P - Q113.453.45Q - R115.305.30R
-S114.454.45S - T114.154.15
Telfonoml27.25112.600.453.50116.300.457.20115.150.456.05119.600.4510.5
Televisin10.85ml113.451.456.35111.601.454.5
TG A MEDIDORml113.853.853.85TG A POZO A TIERRAml114.004.004.00TG
- TD1ml1119.6019.6019.60TG - TD2ml115.905.905.90TD1 A POZO A
TIERRAml116.056.056.05
CISTERNAml53.65TG A CISTERNA (TB)ml1115.7015.7015.70INTERIOR DE
CISTERNAml119.909.909.90CISTERNA A TANQUE
ELEVADOml1128.0528.0528.05
5.2.3CONDUCTORES Y CABLES DE ENERGIA EN
TUBERIAS5.2.3.1CONDUCTORES EN TUBERIASILUMINACIONml307.95TG - BAJA
A TD1134.7514.25TG - SUBE A TD3133.6010.80TG - SUBE A
TD4136.8020.40TD2 - a133.009.00a - Sa133.109.30a - b134.8514.55b -
b132.357.05b - Sb133.309.90b - c133.3510.05c - d134.1512.45d - 2S
(c,d)134.0512.15d - e134.5013.50e - 2S (d,e)134.0512.152S (d,e) -
d133.159.45d - e133.5010.50e - Se133.009.00e - f133.6510.95f -
Sf134.5013.50f - g133.009.00g - Sg133.6510.95g - h132.908.70h -
Sh133.159.45d - c132.808.40c - Sc133.009.00c - b132.056.15b -
Sb132.357.05b - a133.3510.05a - Sa133.7011.10a - TD2133.059.15
TOMACORRIENTES250.65TD2 - A132.908.70A - B134.2012.60B
-C135.6016.80C - D135.1515.45D - E135.0015.00E - F134.8514.55F -
G134.2012.60TD2 - H134.9514.85H - I135.2515.75I - J132.858.55J -
K132.958.85K - L133.6010.80L - M134.3513.05M - N132.908.70N -
O134.8514.55O - P132.607.80P - Q133.4510.35Q - R135.3015.90R
-S134.4513.35S - T134.1512.45
Telfonoml27.25112.600.453.50116.300.457.20115.150.456.05119.600.4510.5
Televisin42.1ml113.451.456.35111.601.454.5114.901.457.8114.751.457.651112.901.4515.8
TG A MEDIDORml133.8511.5511.55TG A POZO A
TIERRAml134.0012.0012.00TG - TD1ml1319.6058.8058.80TG -
TD2ml135.9017.7017.70TD1 A POZO A TIERRAml136.0518.1518.15
CISTERNAml160.95TG A CISTERNA (TB)ml1315.7047.1047.10INTERIOR DE
CISTERNAml139.9029.7029.70CISTERNA A TANQUE
ELEVADOml1328.0584.1584.15
34.09.00TABLEROS DE DISTRIBUCION3.0034.09.01TABLERO
GENERALUnid111.0034.09.02TABLERO DE DISTRIBUCIN
2Unid122.0034.09.02TABLERO CISTERNAUnid111.00
34.10.00DISPOSITIVO DE MANIOBRA Y PROTECCION5.0034.10.01LLAVES
DE INTERRUPCION MONOFASICAUnid515.00
34.11.00INSTALACION DEL SISTEMA PUESTA A TIERRA34.11.01POZO
PUESTA A TIERRAund212.002.00
34.12.00ARTEFACTOS34.12.01ARTEFACTO ADOSADO A TECHO C/1LAMP.
COMPACTA DE 50WATTS Y BRAZO R.(MOD.E-25-JOSFEL.-O
SIMILARund17117.0017.0034.12.02ARTEFACTO ADOSADO A PARED C/LAMP.
BRAQUETTEund414.004.0034.12.03COLOCACION DE ARTEFACTOS DE
ALUMBRADOpza17117.0017.00414.004.0034.12.04LUZ DE
EMERGENCIAund111.001.00
SEGUNDO PISO34.01.00SALIDAS PARA ALUMBRADOS34.01.01SALIDA DE
TECHO (CENTROS)pto14114.0014.0034.01.02SALIDA PARA
SPOT-LIGHTpto414.004.00
34.02.00SALIDAS PARA INTERRUPTORES34.02.01INTERRUPTOR BIPOLAR
SIMPLEpto111.001.0034.02.02INTERRUPTOR BIPOLAR
DOBLEpto717.007.00
34.03.00SALIDA PARA TOMACORRIENTES14.0034.03.02BIPOLARES
DOBLESpto14114.00
34.04.00SALIDA PARA TELEFONOS1.0034.04.01INTERNO (DE
INTERCOMUNICADORES)Unid111.00
34.05.00SALIDA PARA ANTENAS1.0034.05.01DE
TELEVISIONUnid111.00
5.2.2CANALIZACIONES, CONDUCTOS O TUBERIAS5.2.2.1TUBERIA
EMPOTRADAILUMINACIONml94.50LLEGA DE TG - TD3112.202.20TD3 -
a113.003.00a - Sa113.103.10a - a115.155.15a - b112.902.90b -
b112.552.55b - Sb113.303.30b - c113.353.35c - d113.153.15d - 2S
(c,d)113.753.75d - e116.056.05e - Se113.503.50TD3 - a113.053.05a -
Sa113.703.70a - b113.403.40b - Sb112.552.55b - c111.901.90c
-Sc113.003.00c - d112.802.80d - Sd113.603.60d - e114.654.65e -
Se113.003.00e - f113.653.65f - Sf114.504.50f - g113.003.00g -
Sg113.653.65g - h112.902.90h - Sh113.153.15
TOMACORRIENTE77.35TD3 - A112.902.90A - B114.204.20B
-C115.605.60C - D115.105.10D - E115.005.00E - F114.854.85F -
G113.553.55G - H113.203.20TD3 - I114.954.95I - J114.454.45J -
K112.352.35K - L112.952.95L - M114.404.40M - N114.104.10N -
O114.004.00O - P112.552.55P - Q113.453.45Q - R115.305.30R
-S114.454.45S - T114.154.15
Telfonoml10.7112.600.453.50116.300.457.20
Televisinml18.65113.451.456.35111.601.454.5114.901.457.8
5.2.3CONDUCTORES Y CABLES DE ENERGIA EN
TUBERIAS5.2.3.1CONDUCTORES EN TUBERIASILUMINACIONml283.50LLEGA DE
TG - TD3132.206.60TD3 - a133.009.00a - Sa133.109.30a -
a135.1515.45a - b132.908.70b - b132.557.65b - Sb133.309.90b -
c133.3510.05c - d133.159.45d - 2S (c,d)133.7511.25d - e136.0518.15e
- Se133.5010.50TD3 - a133.059.15a - Sa133.7011.10a - b133.4010.20b
- Sb132.557.65b - c131.905.70c -Sc133.009.00c - d132.808.40d -
Sd133.6010.80d - e134.6513.95e - Se133.009.00e - f133.6510.95f -
Sf134.5013.50f - g133.009.00g - Sg133.6510.95g - h132.908.70h -
Sh133.159.45
TOMACORRIENTE244.50TD3 - A132.908.70A - B134.2012.60B
-C135.6016.80C - D135.1015.30D - E135.0015.00E - F134.8514.55F -
G133.5510.65G - H133.209.60TD3 - I134.9514.85I - J134.4513.35J -
K132.357.05K - L132.958.85L - M134.4013.20M - N134.1012.30N -
O134.0012.00O - P132.557.65P - Q133.4510.35Q - R135.3015.90R
-S134.4513.35S - T134.1512.45
Telfonoml10.7112.600.453.50116.300.457.20
Televisinml18.65113.451.456.35111.601.454.5114.901.457.8
34.09.00TABLEROS DE DISTRIBUCION1.0034.09.02TABLERO DE
DISTRIBUCIN 3Unid111.00
34.10.00DISPOSITIVO DE MANIOBRA Y PROTECCION6.0034.10.01LLAVES
DE INTERRUPCION MONOFASICAUnid616.00
34.12.00ARTEFACTOS34.12.01ARTEFACTO ADOSADO A TECHO C/1LAMP.
COMPACTA DE 50WATTS Y BRAZO R.(MOD.E-25-JOSFEL.-O
SIMILARund14114.0014.0034.12.02ARTEFACTO ADOSADO A PARED C/LAMP.
BRAQUETTEund414.004.0034.12.03COLOCACION DE ARTEFACTOS DE
ALUMBRADOpza14114.0014.00414.004.0034.12.04LUZ DE
EMERGENCIAund111.001.00
TERCER PISO34.01.00SALIDAS PARA ALUMBRADOS34.01.01SALIDA DE
TECHO (CENTROS)pto14114.0014.0034.01.02SALIDA PARA
SPOT-LIGHTpto414.004.00
34.02.00SALIDAS PARA INTERRUPTORES34.02.01INTERRUPTOR BIPOLAR
SIMPLEpto111.001.0034.02.02INTERRUPTOR BIPOLAR
DOBLEpto717.007.00
34.03.00SALIDA PARA TOMACORRIENTES14.0034.03.02BIPOLARES
DOBLESpto14114.00
34.04.00SALIDA PARA TELEFONOS1.0034.04.01INTERNO (DE
INTERCOMUNICADORES)Unid111.00
34.05.00SALIDA PARA ANTENAS1.0034.05.01DE
TELEVISIONUnid111.00
5.2.2CANALIZACIONES, CONDUCTOS O TUBERIAS5.2.2.1TUBERIA
EMPOTRADAILUMINACIONml94.50LLEGA DE TG - TD4112.202.20TD4 -
a113.003.00a - Sa113.103.10a - i115.155.15i - b112.902.90b -
b112.552.55b - Sb113.303.30b - c113.353.35c - d113.153.15d - 2S
(c,d)113.753.75d - e116.056.05e - Se113.503.50TD4 - a113.053.05a -
Sa113.703.70a - b113.403.40b - Sb112.552.55b - c111.901.90c -
Sc113.003.00c - d112.802.80d - Sd113.603.60d - e114.654.65e -
Se113.003.00e - f113.653.65f - Sf114.504.50f - g113.003.00g -
Sg113.653.65g - h112.902.90h - Sh113.153.15
TOMACORRIENTETD4 - A112.902.90A - B116.686.68B -C115.105.10C -
D115.005.00D - E114.854.85E - F113.553.55F - G113.203.20TD4 -
H114.954.95H - I114.454.45I - J112.402.40J - K112.952.95K -
L114.404.40L - M114.104.10M - N113.953.95N - O112.552.55O -
P113.503.50P - Q115.305.30Q - R114.454.45R -S114.154.15
Telfonoml10.7112.600.453.50116.300.457.20
Televisinml18.65113.451.456.35111.601.454.5114.901.457.8
5.2.3CONDUCTORES Y CABLES DE ENERGIA EN
TUBERIAS5.2.3.1CONDUCTORES EN TUBERIASILUMINACIONml283.50LLEGA DE
TG - TD4132.206.60TD4 - a133.009.00a - Sa133.109.30a -
i135.1515.45i - b132.908.70b - b132.557.65b - Sb133.309.90b -
c133.3510.05c - d133.159.45d - 2S (c,d)133.7511.25d - e136.0518.15e
- Se133.5010.50TD4 - a133.059.15a - Sa133.7011.10a - b133.4010.20b
- Sb132.557.65b - c131.905.70c - Sc133.009.00c - d132.808.40d -
Sd133.6010.80d - e134.6513.95e - Se133.009.00e - f133.6510.95f -
Sf134.5013.50f - g133.009.00g - Sg133.6510.95g - h132.908.70h -
Sh133.159.45
TOMACORRIENTETD4 - A132.908.70A - B136.6820.04B -C135.1015.30C -
D135.0015.00D - E134.8514.55E - F133.5510.65F - G133.209.60TD4 -
H134.9514.85H - I134.4513.35I - J132.407.20J - K132.958.85K -
L134.4013.20L - M134.1012.30M - N133.9511.85N - O132.557.65O -
P133.5010.50P - Q135.3015.90Q - R134.4513.35R -S134.1512.45
Telfonoml27.25112.600.453.50116.300.457.20115.150.456.05119.600.4510.5
Televisinml42.1113.451.456.35111.601.454.5114.901.457.8114.751.457.651112.901.4515.8
34.09.00TABLEROS DE DISTRIBUCION1.0034.09.02TABLERO DE
DISTRIBUCIN 4Unid111.00
34.10.00DISPOSITIVO DE MANIOBRA Y PROTECCION6.0034.10.01LLAVES
DE INTERRUPCION MONOFASICAUnid616.00
34.12.00ARTEFACTOS34.12.01ARTEFACTO ADOSADO A TECHO C/1LAMP.
COMPACTA DE 50WATTS Y BRAZO R.(MOD.E-25-JOSFEL.-O
SIMILARund14114.0014.0034.12.02ARTEFACTO ADOSADO A PARED C/LAMP.
BRAQUETTEund414.004.0034.12.03COLOCACION DE ARTEFACTOS DE
ALUMBRADOpza14114.0014.00414.004.0034.12.04LUZ DE
EMERGENCIAund111.001.00
AZOTEA34.01.00SALIDAS PARA ALUMBRADOS34.01.01SALIDA DE TECHO
(CENTROS)pto515.005.00
34.02.00SALIDAS PARA INTERRUPTORES34.02.01INTERRUPTOR BIPOLAR
SIMPLEpto111.001.0034.02.02INTERRUPTOR BIPOLAR
TRIPLEpto111.001.00
34.03.00SALIDA PARA TOMACORRIENTES5.0034.03.02BIPOLARES
DOBLESpto515.00
34.04.00SALIDA PARA TELEFONOS1.0034.04.01INTERNO (DE
INTERCOMUNICADORES)Unid111.00
34.05.00SALIDA PARA ANTENAS1.0034.05.01DE
TELEVISIONUnid111.00
5.2.2CANALIZACIONES, CONDUCTOS O TUBERIAS5.2.2.1TUBERIA
EMPOTRADAILUMINACIONml42.45LLEGA DE TG - TD51112.9012.90TD5 -
a112.352.35a - 3S(a,b,c)113.503.50a - b114.104.10b -
c113.603.60llega conmutacion .- caja de pase114.304.30cada de pase
- e113.503.50caja de pase - S3e113.603.60e - e114.604.60
TOMACORRIENTE18.45TD5 - T114.604.60T - T112.202.20T -
T113.203.20T - T114.754.75T - T113.703.70
Telfonoml3.5112.600.453.50
Televisinml6.35113.451.456.35
5.2.3CONDUCTORES Y CABLES DE ENERGIA EN
TUBERIAS5.2.3.1CONDUCTORES EN TUBERIAS
ILUMINACIONml127.35LLEGA DE TG - TD51312.9038.70TD5 -
a132.357.05a - 3S(a,b,c)133.5010.50a - b134.1012.30b -
c133.6010.80llega conmutacion .- caja de pase134.3012.90cada de
pase - e133.5010.50caja de pase - S3e133.6010.80e -
e134.6013.80
TOMACORRIENTE55.35TD5 - T134.6013.80T - T132.206.60T -
T133.209.60T - T134.7514.25T - T133.7011.10
Telfonoml3.5112.600.453.50
Televisinml6.35113.451.456.35
34.09.00TABLEROS DE DISTRIBUCION1.0034.09.02TABLERO DE
DISTRIBUCIN 5Unid111.00
34.10.00DISPOSITIVO DE MANIOBRA Y PROTECCION4.0034.10.01LLAVES
DE INTERRUPCION MONOFASICAUnid414.00
34.12.00ARTEFACTOS34.12.01ARTEFACTO ADOSADO A TECHO C/1LAMP.
COMPACTA DE 50WATTS Y BRAZO R.(MOD.E-25-JOSFEL.-O
SIMILARund515.005.0034.12.03COLOCACION DE ARTEFACTOS DE
ALUMBRADOpza515.005.0034.12.04LUZ DE EMERGENCIAund111.001.00
C.SIMPLEHOJA DE METRADOS DE CONCRETO ENCOFRADO Y
DESENCOFRADOOBRA :PROP. : FECHA :
Part. NELEMENTOCONCRETOENCOFRADODESCRIPCINMETRADOTOTAL
m3METRADOTOTAL m2N Vec.CANT.LAHN Vec.CANT.LA(H)01.04.00OBRAS DE
CONCRETO SIMPLE
01.04.01SOLADO DE CONCRETO FC' =100 KG/CM2m237.90
Z-1 h= 1.85 m161.501.5013.50Z-2 h= 1.85 m181.501.5018.00Z-3 h=
1.85 m1100.800.806.40
01.04.02CONCRETO F'c=175 KG/CM2 EN FALSO PISOm272.56
PRIMER
PISO72.56113.273.27113.723.721117.3917.39117.567.561120.5020.50116.986.98112.782.78115.365.36115.005.00Pasadizo1137.002.00m274.001118.901.00m218.90116.502.07m213.46
01.04.03CONCRETO CICLOPEO 140 KG/CM2 +30% PM EN CIMIENTO
CORRIDOm321.13
EJE G-G, EJE F-F, EJE E-E, EJE D-D, EJE C-C, EJE B-B, EJE
A-AEntre Eje 1-1 y Eje 2-27.001.004.500.400.607.56ENTRE EJE B-B Y
A-AEntre Eje 1-1 y Eje 2-21.001.000.900.400.600.22Entre ejes D y
C1.001.000.350.400.600.08Entre ejes C y
B1.001.002.350.400.600.56Entre ejes B y
A1.001.002.200.400.600.53
EJE 1-1 Y EJE 2-2Entre Eje G-G y Eje
F-F2.001.002.400.400.601.15Entre Eje F-F y Eje
E-E2.001.002.400.400.601.15Entre Eje E-E y Eje
D-D2.001.004.200.400.602.02Entre Eje D-D y Eje
C-C2.001.002.350.400.601.13Entre Eje C-C y Eje
B-B2.001.003.600.400.601.73Entre Eje B-B y Eje
A-A2.001.004.050.400.601.94ENTRE EJE 1-1 Y EJE 2-2Entre Eje F-F y
Eje E-E1.001.002.400.400.600.58Entre Eje B-B y Eje
A-A1.001.001.650.400.600.401.001.001.050.400.600.251.001.001.150.400.600.281.001.000.350.400.600.081.001.003.250.400.600.781.001.002.900.400.600.70
01.04.04CONCRETO CICLOPEO FC'=140 KG/CM2+ 25% PM EN
SOBRECIMIENTO3.9630.00
EJE G-G, EJE E-E, EJE D-D, EJE A-AEntre Eje 1-1 y Eje
2-24.001.004.500.150.350.952.001.004.500.353.15ENTRE EJE B-B Y
A-AEntre Eje 1-1 y Eje
2-21.001.000.900.150.350.052.001.000.900.350.63Entre ejes D y
C1.001.000.350.150.350.022.001.000.350.350.25Entre ejes C y
B1.001.002.350.150.350.122.001.002.350.351.65Entre ejes B y
A1.001.002.200.150.350.122.001.002.200.351.54
EJE 1-1 Y EJE 2-2Entre Eje G-G y Eje
F-F2.001.002.400.150.350.252.001.002.400.351.68Entre Eje F-F y Eje
E-E2.001.002.400.150.350.252.001.002.400.351.68Entre Eje E-E y Eje
D-D2.001.004.200.150.350.442.001.004.200.352.94Entre Eje D-D y Eje
C-C2.001.002.350.150.350.252.001.002.350.351.65Entre Eje C-C y Eje
B-B2.001.003.600.150.350.382.001.003.600.352.52Entre Eje B-B y Eje
A-A2.001.004.050.150.350.432.001.004.050.352.84ENTRE EJE 1-1 Y EJE
2-2Entre Eje F-F y Eje
E-E1.001.002.750.150.350.142.001.002.750.351.93Entre Eje B-B y Eje
A-A1.001.002.100.150.350.112.001.002.100.351.471.001.001.050.150.350.062.001.001.050.350.741.001.001.150.150.350.062.001.001.150.350.811.001.000.350.150.350.022.001.000.350.350.251.001.003.250.150.350.172.001.003.250.352.281.001.002.900.150.350.152.001.002.900.352.03
01.04.05CONCRETO FC= 175 KG/CM2 m32.44PARA
VEREDA1.001.0014.010.091.28PARA LAVADERO DE
COCINA1.001.001.290.901.16
C.ARMADOHOJA DE METRADOS DE CONCRETOENCOFRADO Y DESENCOFRADO
OBRA :PROP. : FECHA :
Part. NELEMENTOCONCRETOENCOFRADODESCRIPCINMETRADOTOTAL
m3METRADOTOTAL m2N Vec.CANT.LAHN Vec.CANT.LA(H)
01.05.00OBRAS DE CONCRETO ARMADOPRIMER
PISO01.05.01ZAPATAS01.05.01.01CONCRETO F'c = 210 KG/CM2 EN ZAPATAS
m322.10
Z-1161.501.500.68.10Z-2181.501.500.610.80Z-31100.800.800.53.20
01.05.02VIGAS DE CIMENTACIN01.05.02.01CONCRETO F'c=210 KG/CM2 EN
VIGAS DE CIMENTACINm36.4551.60
Eje G-G114.500.250.400.45214.500.403.60Eje
F-F114.500.250.400.45214.500.403.60Eje
E-E114.500.250.400.45214.500.403.60Eje
D-D114.500.250.400.45214.500.403.60Eje
C-C114.500.250.400.45214.500.403.60Eje
B-B114.500.250.400.45214.500.403.60Eje
A-A114.500.250.400.45214.500.403.60
Eje 1-11116.500.250.401.652116.500.4013.20Eje
2-21116.500.250.401.652116.500.4013.20
01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210 KG/CM2 EN COLUMNAS
M35.59100.04
Eje G-GC-1120.250.254.100.51121.004.108.20
Eje F-FC-1120.250.254.100.51121.004.108.20
Eje
E-EC-1120.250.254.100.51121.004.108.20C-2120.250.154.100.31120.804.106.56
Entre Eje E-E y Eje D-DC-2110.250.154.100.15110.804.103.28
Eje
D-DC-2130.250.154.100.46130.804.109.84C-1120.250.254.100.51121.004.108.20Entre
Eje D-D y Eje C-CC-2110.250.154.100.15110.804.103.28Eje
C-CC-1120.250.254.100.51121.004.108.20C-2110.250.154.100.15110.804.103.28Entre
Eje C-C y Eje B-BC-2110.250.154.100.15110.804.103.28Eje
B-BC-1120.250.254.100.51121.004.108.20C-2120.250.154.100.31120.804.106.56Entre
Eje B-B y Eje A-AC-2110.250.154.100.15110.804.103.28Eje
A-AC-1120.250.254.100.51121.004.108.20C-2110.250.154.100.15110.804.103.28
01.05.05VIGAS01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGAS6.5777.95
VIGAS PRINCIPALESm33.5037.24VP(.25X.40) -
1615.000.250.403.00625.000.4024.00614.500.256.75620.250.401.20
VP(.25X.40) -
2115.000.250.400.50125.000.404.00112.650.250.66111.700.250.43120.250.400.20
VIGAS SECUNDARIAS (V.S. ..25X.30)m32.4228.80EJE
1-11120.050.250.301.501221.000.3012.60112.400.250.60112.400.250.60111.800.250.45112.200.250.55112.350.250.59113.600.250.90114.050.251.01111.000.250.25120.250.300.15
EJE
2-21112.250.250.300.921213.250.307.95111.000.250.25113.600.250.90112.350.250.59114.050.251.01111.000.250.25120.250.300.15
VIGAS DE BORDE (V.B .15x.20)m30.6511.91(V.B .15x.20)
ENTRE EJE E-E Y EJE
D-D214.500.150.200.27224.500.203.60214.500.151.35ENTRE EJE B-B Y
EJE A-A111.700.150.200.05121.700.200.68111.700.150.26ENTRE EJE 1-1
Y EJE
2-2114.050.150.200.12124.050.201.62114.050.150.61112.400.150.200.07122.400.200.96112.400.150.36VOLADIZO114.500.150.200.14124.500.201.80114.500.150.68
01.05.06LOSA ALIGERADA01.05.06.01CONCRETO F'c=210 KG/CM2 EN LOSA
ALIGERADAm39.9068.85
A113.830.200.77113.833.83B115.170.201.03115.175.17C111.320.200.26111.321.32D1111.350.202.271111.3511.35E1113.410.202.681113.4113.41F113.830.200.77113.833.83G111.530.200.31111.531.53H111.140.200.23111.141.14I114.510.200.90114.514.51J1111.370.202.271111.3711.37K1111.400.202.281111.4011.40
SUMATORIA AREAS68.8513.77
CONTENIDO LADRILLO573.560574VOLUMEN LADRILLO3.872VOLUMEN
CONCRETO9.90
01.05.08ESCALERA01.05.08.01CONCRETO F'c=210 KG/CM2 EN
ESCALERAS3.9022.74
ESCALERA PRINCIPAL1.8710.03Tramo
I110.900.900.500.41110.900.900.81112.150.900.150.29120.900.200.36140.900.250.180.16122.150.150.6510.50.900.250.180.02190.900.181.42110.901.150.200.21111.150.901.04121.150.200.46
Tramo
II110.901.150.200.21111.950.901.76111.950.900.150.26121.950.150.59140.900.250.180.16180.900.181.26110.900.900.200.16111.150.901.04111.150.200.23110.090.900.08120.900.200.36
ESCALERA SECUNDARIA2.0312.70Tramo
I111.001.000.500.50111.001.001.00111.901.000.150.29121.000.200.40131.000.250.180.13121.900.150.57111.001.000.200.20171.000.181.23111.001.001.00121.000.200.40
Descanso111.680.180.29112.501.002.50211.050.180.37111.300.180.23111.250.180.22111.000.200.20
Tramo
II111.901.000.150.29121.000.200.40131.000.250.180.13121.900.150.57111.001.000.200.20171.000.181.23111.001.001.00121.000.200.40111.001.001.00
SEGUNDO PISO01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210 KG/CM2
EN COLUMNAS 3.8268.32
Eje G-GC-1120.250.252.800.35121.002.805.60
Eje F-FC-1120.250.252.800.35121.002.805.60
Eje
E-EC-1120.250.252.800.35121.002.805.60C-2120.250.152.800.21120.802.804.48
Entre Eje E-E y Eje D-DC-2110.250.152.800.11110.802.802.24
Eje
D-DC-2130.250.152.800.32130.802.806.72C-1120.250.252.800.35121.002.805.60Entre
Eje D-D y Eje C-CC-2110.250.152.800.11110.802.802.24Eje
C-CC-1120.250.252.800.35121.002.805.60C-2110.250.152.800.11110.802.802.24Entre
Eje C-C y Eje B-BC-2110.250.152.800.11110.802.802.24Eje
B-BC-1120.250.252.800.35121.002.805.60C-2120.250.152.800.21120.802.804.48Entre
Eje B-B y Eje A-AC-2110.250.152.800.11110.802.802.24Eje
A-AC-1120.250.252.800.35121.002.805.60C-2110.250.152.800.11110.802.802.24
01.05.05VIGAS01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGAS6.5777.95
VIGAS PRINCIPALESm33.5037.24VP(.25X.40) -
1615.000.250.403.00625.000.4024.00614.500.256.75620.250.401.20
VP(.25X.40) -
2115.000.250.400.50125.000.404.00112.650.250.66111.700.250.43120.250.400.20
VIGAS SECUNDARIAS (V.S. ..25X.30)m32.4228.80EJE
1-11120.050.250.301.501221.000.3012.60112.400.250.60112.400.250.60111.800.250.45112.200.250.55112.350.250.59113.600.250.90114.050.251.01111.000.250.25120.250.300.15
EJE
2-21112.250.250.300.921213.250.307.95111.000.250.25113.600.250.90112.350.250.59114.050.251.01111.000.250.25120.250.300.15
VIGAS DE BORDE (V.B .15x.20)m30.6511.91(V.B .15x.20)
ENTRE EJE E-E Y EJE
D-D214.500.150.200.27224.500.203.60214.500.151.35ENTRE EJE B-B Y
EJE A-A111.700.150.200.05121.700.200.68111.700.150.26ENTRE EJE 1-1
Y EJE
2-2114.050.150.200.12124.050.201.62114.050.150.61112.400.150.200.07122.400.200.96112.400.150.36VOLADIZO114.500.150.200.14124.500.201.80114.500.150.68
01.05.06LOSA ALIGERADA01.05.06.01CONCRETO F'c=210 KG/CM2 EN LOSA
ALIGERADAm39.9068.85
A113.830.200.77113.833.83B115.170.201.03115.175.17C111.320.200.26111.321.32D1111.350.202.271111.3511.35E1113.410.202.681113.4113.41F113.830.200.77113.833.83G111.530.200.31111.531.53H111.140.200.23111.141.14I114.510.200.90114.514.51J1111.370.202.271111.3711.37K1111.400.202.281111.4011.40
SUMATORIA AREAS68.8513.77
CONTENIDO LADRILLO573.560574VOLUMEN LADRILLO3.872VOLUMEN
CONCRETO9.90
01.05.08ESCALERA01.05.08.01CONCRETO F'c=210 KG/CM2 EN
ESCALERAS2.9922.74
ESCALERA PRINCIPAL1.4610.03Tramo
I112.150.900.150.29110.900.900.81140.900.250.180.16120.900.200.3610.50.900.250.180.02122.150.150.65110.901.150.200.21190.900.181.42111.150.901.04121.150.200.46
Tramo
II110.901.150.200.21111.950.901.76111.950.900.150.26121.950.150.59140.900.250.180.16180.900.181.26110.900.900.200.16111.150.901.04111.150.200.23110.090.900.08120.900.200.36
ESCALERA SECUNDARIA1.5312.70Tramo
I111.901.000.150.29111.001.001.00131.000.250.180.13121.000.200.40111.001.000.200.20121.900.150.57171.000.181.23111.001.001.00121.000.200.40
Descanso111.680.180.29112.501.002.50211.050.180.37111.300.180.23111.250.180.22111.000.200.20
Tramo
II111.901.000.150.29121.000.200.40131.000.250.180.13121.900.150.57111.001.000.200.20171.000.181.23111.001.001.00121.000.200.40111.001.001.00
TERCER PISO01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210 KG/CM2 EN
COLUMNAS 4.0772.42
Eje G-GC-1120.250.254.850.61121.004.859.70
Eje F-FC-1120.250.252.800.35121.002.805.60
Eje
E-EC-1120.250.252.800.35121.002.805.60C-2120.250.152.800.21120.802.804.48
Entre Eje E-E y Eje D-DC-2110.250.152.800.11110.802.802.24
Eje
D-DC-2130.250.152.800.32130.802.806.72C-1120.250.252.800.35121.002.805.60Entre
Eje D-D y Eje C-CC-2110.250.152.800.11110.802.802.24Eje
C-CC-1120.250.252.800.35121.002.805.60C-2110.250.152.800.11110.802.802.24Entre
Eje C-C y Eje B-BC-2110.250.152.800.11110.802.802.24Eje
B-BC-1120.250.252.800.35121.002.805.60C-2120.250.152.800.21120.802.804.48Entre
Eje B-B y Eje A-AC-2110.250.152.800.11110.802.802.24Eje
A-AC-1120.250.252.800.35121.002.805.60C-2110.250.152.800.11110.802.802.24
01.05.05VIGAS01.05.05.01CONCRETO F'c=210 KG/CM2 EN
VIGAS4.5655.37
VIGAS PRINCIPALES2.0021.26VP(.25X.40) -
1315.000.250.401.50325.000.4012.00314.500.253.38320.250.400.60
VP(.25X.40) -
2115.000.250.400.50125.000.404.00112.650.250.66111.700.250.43120.250.400.20
VIGAS SECUNDARIAS (V.S. ..25X.30)1.9122.20EJE
1-11113.250.250.300.991213.250.307.95111.000.250.25113.600.250.90112.350.250.59114.050.251.01111.000.250.25120.250.300.15
EJE
2-21112.250.250.300.921213.250.307.95111.000.250.25113.600.250.90112.350.250.59114.050.251.01111.000.250.25120.250.300.15
VIGAS DE BORDE (V.B .15x.20)m30.6511.91(V.B .15x.20)
ENTRE EJE E-E Y EJE
D-D214.500.150.200.27224.500.203.60214.500.151.35ENTRE EJE B-B Y
EJE A-A111.700.150.200.05121.700.200.68111.700.150.26ENTRE EJE 1-1
Y EJE
2-2114.050.150.200.12124.050.201.62114.050.150.61112.400.150.200.07122.400.200.96112.400.150.36VOLADIZO114.500.150.200.14124.500.201.80114.500.150.68
01.05.06LOSA ALIGERADA01.05.06.01CONCRETO F'c=210 KG/CM2 EN LOSA
ALIGERADAm36.6846.43
A113.830.200.77113.833.83B1110.800.202.161110.8010.80C111.320.200.26111.321.32D1116.150.203.231116.1516.15E1110.530.202.111110.5310.53F113.830.200.77113.833.83
SUMATORIA AREAS46.439.29
CONTENIDO LADRILLO386.796387VOLUMEN LADRILLO2.611VOLUMEN
CONCRETO6.68
01.05.08ESCALERA01.05.08.01CONCRETO F'c=210 KG/CM2 EN
ESCALERAS2.9922.74
ESCALERA PRINCIPAL1.4610.03Tramo
I112.150.900.150.29110.900.900.81140.900.250.180.16120.900.200.3610.50.900.250.180.02122.150.150.65110.901.150.200.21190.900.181.42111.150.901.04121.150.200.46
Tramo
II110.901.150.200.21111.950.901.76111.950.900.150.26121.950.150.59140.900.250.180.16180.900.181.26110.900.900.200.16111.150.901.04111.150.200.23110.090.900.08120.900.200.36
ESCALERA SECUNDARIA1.5312.70Tramo
I111.901.000.150.29111.001.001.00131.000.250.180.13121.000.200.40111.001.000.200.20121.900.150.57171.000.181.23111.001.001.00121.000.200.40
Descanso111.680.180.29112.501.002.50211.050.180.37111.300.180.23111.250.180.22111.000.200.20
Tramo
II111.901.000.150.29121.000.200.40131.000.250.180.13121.900.150.57111.001.000.200.20171.000.181.23111.001.001.00121.000.200.40111.001.001.00
111.150.200.23AZOTEA01.05.04COLUMNAS01.05.04.01CONCRETO F'c=210
KG/CM2 EN COLUMNAS 1.6126.88
Eje
D-DC-2120.250.152.800.21120.802.804.48C-1120.250.252.800.35121.002.805.60Eje
C-CC-1120.250.252.800.35121.002.805.60
Eje B-BC-1120.250.252.800.35121.002.805.60
Eje A-AC-1120.250.252.800.35121.002.805.60
ACERO HOJA DE METRADOS DE ACERO
OBRA :PROP. : FECHA :
CDIGO DE PARTIDADESCRIPCIONCANTIDADN VECESACEROPESO PARCIAL
(KG)PESO TOTAL (KG)LONG. (m)PESO/ML (kg)LONGITUD TOTAL (m) 1/4"
3/8" 1/2" 5/8" 5/8" 3/4" 1"N1601.05.01ZAPATAS01.05.01.02ACERO DE
REFUERZO Fy=4200 KG/CM2 EN ZAPATAS 314.70
PRIMER PISO 314.70Z - 1 1.501/214.006.001.350.994 113.40
112.72
Z - 2 1.501/214.008.001.350.994 151.20 150.29
Z - 3 0.801/28.0010.000.650.994 52.00 51.69
01.05.02VIGAS DE CIMENTACINKG 915.0801.05.02.02ACERO DE REFUERZO
Fy=4200 KG/CM2 EN VIGAS DE CIMENTACION PRIMER PISO915.08Eje D-D,
Eje C-C, Eje B-B y Eje A-A 4.9 0.250.25L= 5.41/23.004.005.400.994
64.80 64.41
1/22.004.004.700.994 37.60 37.374.7
0.30.3L= 5.41/23.004.005.400.994 64.80 64.414.8
0.25 0.40.4L= 1.43/828.004.001.400.560 156.80 87.81 0.25
Eje 1-1 y Eje 2-2 10.9 0.250.25L= 11.401/23.002.0011.400.994
68.40 67.99
1/22.002.0010.700.994 42.80 42.5410.7
0.30.3L= 11.401/23.002.0011.400.994 68.40 67.9910.8
0.25 0.40.4L= 1.403/864.002.001.400.560 179.20 100.35 0.25
Eje G-G, Eje F-F Y Eje E-E 4.9 0.250.25L=
5.41/23.003.005.400.994 48.60 48.31
1/22.003.004.700.994 28.20 28.034.7
0.30.3L= 5.41/23.003.005.400.994 48.60 48.314.8
0.25 0.40.4L= 1.43/828.003.001.400.560 117.60 65.86 0.25 N165%
PESO3.0028.58 Eje 1-1 y Eje 2-2 5.45 0.250.25L=
5.951/23.002.005.950.994 35.70 35.49
1/22.002.005.250.994 21.00 20.875.25
0.30.3L= 5.951/23.002.005.950.994 35.70 35.495.35
0.25 0.40.4L= 1.403/836.002.001.400.560 100.80 56.45 0.25 N165%
PESO2.0014.83
01.05.04COLUMNAS 3,904.1901.05.04.03ACERO DE REFUERZO Fy=4200
KG/CM2 EN COLUMNAS
PRIMER PISO1549.45BAJO NFP C-1 0.25 2.055/86.0014.002.051.552
172.20172.20 267.250.250.253/813.0014.001.100.560 200.20 112.11
0.250.25
C-2 0.15 1/24.0013.002.050.994 106.60
105.962.050.250.253/813.0013.000.900.560 152.10 85.18
0.250.15 SOBRE NFP C-1 0.25 3.205/86.0014.003.201.552
268.80268.80 417.180.250.253/820.0014.001.100.560 308.00 172.48
0.25
C-2 0.15 3.205/84.0013.003.201.552 166.40166.40
258.250.250.253/820.0013.000.900.560 234.00 131.04
0.15
SEGUNDO PISO978.95C-1 0.25 3.205/86.0014.003.201.552
268.80268.80 417.180.250.253/820.0014.001.100.560 308.00 172.48
0.25
C-2 0.15 3.205/84.0013.003.201.552 166.40166.40
258.250.250.253/820.0013.000.900.560 234.00 131.04
0.15
TERCER PISO978.95C-1 0.25 3.205/86.0014.003.201.552 268.80268.80
417.180.250.253/820.0014.001.100.560 308.00 172.48
0.25
C-2 0.15 3.205/84.0013.003.201.552 166.40166.40
258.250.250.253/820.0013.000.900.560 234.00 131.04
0.15
AZOTEA396.84C-1 0.25 3.205/86.008.003.201.552 153.60153.60
238.390.250.253/820.008.001.100.560 176.00 98.56
0.25
C-2 0.15 3.205/84.002.003.201.552 25.6025.60
39.730.250.253/820.002.000.900.560 36.00 20.16
0.15
01.05.05VIGAS 01.05.05.01ACERO FY=4200 KG/CM2 EN
VIGAS01.05.05.01VIGAS PRICIPALESKGERROR:#REF!
PRIMER PISO 509.66 VP(.25X.40) - 1 4.9 0.250.25L=
5.45/82.006.005.401.552 64.8064.80100.57 0.34.80.3L=
5.45/82.006.005.401.552 64.8064.80100.57 3.221/22.006.003.220.994
38.64 38.41
1.65 0.251/22.006.001.900.994 22.80 22.66
1.270.251/22.006.001.520.994 18.24 18.13 0.25
0.40.43/833.006.001.400.560 277.20 155.23 0.25 VP(.25X.40) - 2 4.9
0.250.25L= 5.45/82.001.005.401.552 10.8010.8016.76 0.34.80.3L=
5.45/82.001.005.401.552 10.8010.8016.76 1.381/22.001.001.380.994
2.76 2.74
1.891/22.001.001.890.994 3.78 3.76
1.221/22.001.001.220.994 2.44 2.43
1.03 0.251/22.001.001.280.994 2.56 2.54
0.580.251/22.001.000.830.994 1.66 1.65 0.25
0.40.43/835.001.001.400.560 49.00 27.44 0.25
SEGUNDO PISO 509.66 VP(.25X.40) - 1 4.9 0.250.25L=
5.45/82.006.005.401.552 64.8064.80100.57 0.34.80.3L=
5.45/82.006.005.401.552 64.8064.80100.57 3.221/22.006.003.220.994
38.64 38.41
1.65 0.251/22.006.001.900.994 22.80 22.66
1.270.251/22.006.001.520.994 18.24 18.13 0.25
0.40.43/833.006.001.400.560 277.20 155.23 0.25
VP(.25X.40) - 2 4.9 0.250.25L= 5.45/82.001.005.401.552
10.8010.8016.76 0.34.80.3L= 5.45/82.001.005.401.552 10.8010.8016.76
1.381/22.001.001.380.994 2.76 2.74
1.891/22.001.001.890.994 3.78 3.76
1.221/22.001.001.220.994 2.44 2.43
1.03 0.251/22.001.001.280.994 2.56 2.54
0.580.251/22.001.000.830.994 1.66 1.65 0.25
0.40.43/835.001.001.400.560 49.00 27.44 0.25
TERCER PISO 291.87 VP(.25X.40) - 1 4.9 0.250.25L=
5.45/82.003.005.401.552 32.4032.4050.28 0.34.80.3L=
5.45/82.003.005.401.552 32.4032.4050.28 3.221/22.003.003.220.994
19.32 19.20
1.65 0.251/22.003.001.900.994 11.40 11.33
1.270.251/22.003.001.520.994 9.12 9.07 0.25
0.40.43/833.003.001.400.560 138.60 77.62 0.25 VP(.25X.40) - 2 4.9
0.250.25L= 5.45/82.001.005.401.552 10.8010.8016.76 0.34.80.3L=
5.45/82.001.005.401.552 10.8010.8016.76 1.381/22.001.001.380.994
2.76 2.74
1.891/22.001.001.890.994 3.78 3.76
1.221/22.001.001.220.994 2.44 2.43
1.03 0.251/22.001.001.280.994 2.56 2.54
0.580.251/22.001.000.830.994 1.66 1.65 0.25
0.40.43/835.001.001.400.560 49.00 27.44 0.25
01.05.05.01VIGAS SECUNDARIASKGERROR:#REF!
PRIMER PISO528.51EJE 1-121.55 0.20.2L=
21.955/82.001.0021.951.552 43.9043.9068.13 0.221.650.2L=
22.055/82.001.0022.051.552 44.1044.1068.44 0.3
0.250.253/8190.001.001.200.560 228.00 127.68 0.3
EJE 2-221.55 0.20.2L= 21.955/82.001.0021.951.552 43.9043.9068.13
0.221.650.2L= 22.055/82.001.0022.051.552 44.1044.1068.44 0.3
0.250.253/8190.001.001.200.560 228.00 127.68 0.3
SEGUNDO PISO528.51
EJE 1-121.55 0.20.2L= 21.955/82.001.0021.951.552 43.9043.9068.13
0.221.650.2L= 22.055/82.001.0022.051.552 44.1044.1068.44 0.3
0.250.253/8190.001.001.200.560 228.00 127.68 0.3
EJE 2-221.55 0.20.2L= 21.955/82.001.0021.951.552 43.9043.9068.13
0.221.650.2L= 22.055/82.001.0022.051.552 44.1044.1068.44 0.3
0.250.253/8190.001.001.200.560 228.00 127.68 0.3
TERCER PISO284.13
EJE 1-1 Y EJE 2-212.8 0.20.2L= 13.205/82.002.0013.201.552
52.8052.8081.95 0.212.90.2L= 13.305/82.002.0013.301.552
53.2053.2082.57 0.3 0.250.253/889.002.001.200.560 213.60 119.62
0.3
01.05.05.01VIGAS DE BORDEKGERROR:#REF!
PRIMER PISO44.07
ENTRE EJE E-E Y EJE D-D4.3 0.20.2L= 4.73/81.001.004.700.5604.70
2.63 0.24.40.2L= 4.83/81.001.004.800.560 4.80 2.69 0.15
0.20.21/418.001.000.800.56014.40 8.06 0.15
ENTRE EJE B-B Y EJE A-A1.5 0.20.2L= 1.93/81.001.001.900.5601.90
1.06 0.21.60.2L= 2.003/81.001.002.000.560 2.00 1.12 0.15
0.20.21/47.001.000.800.5605.60 3.14 0.15
ENTRE EJE 1-1 Y EJE 2-23.85 0.20.2L=
4.253/81.001.004.250.5604.25 2.38 0.23.950.2L=
4.353/81.001.004.350.560 4.35 2.44 0.15
0.20.21/416.001.000.800.56012.80 7.17 0.15
VOLADIZO4.3 0.20.2L= 4.73/81.001.004.700.5604.70 2.63
0.24.40.2L= 4.83/81.001.004.800.560 4.80 2.69 0.15
0.20.21/418.001.000.800.56014.40 8.06 0.15
SEGUNDO PISO44.07
ENTRE EJE E-E Y EJE D-D4.3 0.20.2L= 4.73/81.001.004.700.5604.70
2.63 0.24.40.2L= 4.83/81.001.004.800.560 4.80 2.69 0.15
0.20.21/418.001.000.800.56014.40 8.06 0.15
ENTRE EJE B-B Y EJE A-A1.5 0.20.2L= 1.93/81.001.001.900.5601.90
1.06 0.21.60.2L= 2.003/81.001.002.000.560 2.00 1.12 0.15
0.20.21/47.001.000.800.5605.60 3.14 0.15
ENTRE EJE 1-1 Y EJE 2-23.85 0.20.2L=
4.253/81.001.004.250.5604.25 2.38 0.23.950.2L=
4.353/81.001.004.350.560 4.35 2.44 0.15
0.20.21/416.001.000.800.56012.80 7.17 0.15
VOLADIZO4.3 0.20.2L= 4.73/81.001.004.700.5604.70 2.63
0.24.40.2L= 4.83/81.001.004.800.560 4.80 2.69 0.15
0.20.21/418.001.000.800.56014.40 8.06 0.15
TERCER PISO44.07
ENTRE EJE E-E Y EJE D-D4.3 0.20.2L= 4.73/81.001.004.700.5604.70
2.63 0.24.40.2L= 4.83/81.001.004.800.560 4.80 2.69 0.15
0.20.21/418.001.000.800.56014.40 8.06 0.15
ENTRE EJE B-B Y EJE A-A1.5 0.20.2L= 1.93/81.001.001.900.5601.90
1.06 0.21.60.2L= 2.003/81.001.002.000.560 2.00 1.12 0.15
0.20.21/47.001.000.800.5605.60 3.14 0.15
ENTRE EJE 1-1 Y EJE 2-23.85 0.20.2L=
4.253/81.001.004.250.5604.25 2.38 0.23.950.2L=
4.353/81.001.004.350.560 4.35 2.44 0.15
0.20.21/416.001.000.800.56012.80 7.17 0.15
VOLADIZO4.3 0.20.2L= 4.73/81.001.004.700.5604.70 2.63
0.24.40.2L= 4.83/81.001.004.800.560 4.80 2.69 0.15
0.20.21/418.001.000.800.56014.40 8.06 0.15
01.05.06LOSA ALIGERADA01.05.07.02ACERO DE REFUERZOFy=4200 KG/CM2
EN LOSA ALIGERADAKG 1,387.71
PRIMER PISO 551.2221.6 0.070.07L= 21.741/22.001.0021.740.994
43.48 43.225/82.001.0021.741.552 43.4843.48 67.48
0.80.071/22.001.000.870.994 1.74 1.73 0.072.55
1/22.001.002.620.994 5.24 5.21 2.451/22.001.002.450.994 4.90
4.87
2.351/22.001.002.350.994 4.70 4.67
1.611/22.001.002.550.994 5.10 5.07
2.11/22.001.002.100.994 4.20 4.17
1.651/22.001.001.650.994 3.30 3.28
2 0.070.07L= 2.141/24.001.002.140.994 8.56 8.51
0.072.050.07L= 2.191/24.001.002.190.994 8.76 8.71
8.75 0.070.07L= 8.891/24.001.008.890.994 35.56
35.355/84.001.008.891.552 35.5635.56 55.19
2.10.071/24.001.002.170.994 8.68 8.63 0.071.4
1/24.001.001.470.994 5.88 5.84 2.351/24.001.002.350.994 9.40
9.34
6.5 0.070.07L= 6.641/28.001.006.640.994 53.12
52.805/88.001.006.641.552 53.1253.12 82.44
0.80.071/28.001.000.870.994 6.96 6.92 0.072.1
1/28.001.002.170.994 17.36 17.26 1.651/28.001.001.650.994 13.20
13.12
ACERO DE TEMPERATURA AST 1/4
@25cm5.251/427.001.005.250.250141.75 35.441/44.001.001.550.2506.20
1.55
5.251/436.001.005.250.250189.00 47.251/45.001.001.550.2507.75
1.941/422.001.002.900.25063.80 15.951/49.001.002.350.25021.15
5.29
SEGUNDO PISO 551.22
21.6 0.070.07L= 21.741/22.001.0021.740.994 43.48
43.225/82.001.0021.741.552 43.4843.48 67.48
0.80.071/22.001.000.870.994 1.74 1.73 0.072.55
1/22.001.002.620.994 5.24 5.21 2.451/22.001.002.450.994 4.90
4.87
2.351/22.001.002.350.994 4.70 4.67
1.611/22.001.002.550.994 5.10 5.07
2.11/22.001.002.100.994 4.20 4.17
1.651/22.001.001.650.994 3.30 3.28
2 0.070.07L= 2.141/24.001.002.140.994 8.56 8.51
0.072.050.07L= 2.191/24.001.002.190.994 8.76 8.71
8.75 0.070.07L= 8.891/24.001.008.890.994 35.56
35.355/84.001.008.891.552 35.5635.56 55.19
2.10.071/24.001.002.170.994 8.68 8.63 0.071.4
1/24.001.001.470.994 5.88 5.84 2.351/24.001.002.350.994 9.40
9.34
6.5 0.070.07L= 6.641/28.001.006.640.994 53.12
52.805/88.001.006.641.552 53.1253.12 82.44
0.80.071/28.001.000.870.994 6.96 6.92 0.072.1
1/28.001.002.170.994 17.36 17.26 1.651/28.001.001.650.994 13.20
13.12
ACERO DE TEMPERATURA AST 1/4
@25cm5.251/427.001.005.250.250141.75 35.441/44.001.001.550.2506.20
1.55
5.251/436.001.005.250.250189.00 47.251/45.001.001.550.2507.75
1.941/422.001.002.900.25063.80 15.951/49.001.002.350.25021.15
5.29
TERCER PISO 285.2712.85 0.070.07L= 12.991/22.001.0012.990.994
25.98 25.825/82.001.0012.991.552 25.9825.98 40.32
2.10.071/22.001.002.170.994 4.34 4.31 0.072.55
1/22.001.002.620.994 5.24 5.21 2.451/22.001.002.450.994 4.90
4.87
2.351/22.001.002.350.994 4.70 4.67
2 0.070.07L= 2.141/24.001.002.140.994 8.56 8.51
0.072.050.07L= 2.191/24.001.002.190.994 8.76 8.71
8.75 0.070.07L= 8.891/24.001.008.890.994 35.56
35.355/84.001.008.891.552 35.5635.56 55.19
2.10.071/24.001.002.170.994 8.68 8.63 0.071.4
1/24.001.001.470.994 5.88 5.84 2.351/24.001.002.350.994 9.40
9.34
ACERO DE TEMPERATURA AST 1/4
@25cm5.251/436.001.005.250.250189.00
47.251/422.001.002.900.25063.80
15.951/49.001.002.350.25021.155.29
01.05.08ESCALERA01.05.08.01ACERO DE REFUERZOFy=4200 KG/CM2 EN
ESCALERASm3 1,194.67
ESCALERA PRINCIPAL654.57
PRIMER A SEGUNDO PISO229.66Tramo I 1/27.001.002.180.994 15.26
15.171/27.001.002.240.994 15.68 15.593/811.001.000.850.560 9.35
5.241/27.001.002.100.994 14.70 14.61
1/27.001.002.150.994 15.05 14.963/810.001.000.850.560 8.50
4.761/27.001.001.850.994 12.95 12.87 1/27.001.004.820.994 33.74
33.543/823.001.000.850.560 19.55 10.95 Tramo II
1/27.001.002.150.994 15.05 14.963/810.001.000.850.560 8.50
4.761/27.001.002.000.994 13.97 13.88
1/27.001.001.900.994 13.30 13.223/86.001.000.850.560 5.10
2.861/27.001.001.700.994 11.90 11.83 1/27.001.004.380.994 30.66
30.483/821.001.000.850.560 17.85 10.00SEGUNDO A TERCER
PISO212.45Tramo I 1/27.001.002.180.994 15.26
15.173/85.001.000.850.560 4.25 2.381/27.001.001.750.994 12.25
12.18N 1642.001.000.300.016 12.600.20
1/27.001.002.150.994 15.05 14.963/812.001.000.850.560 10.20
5.711/27.001.001.850.994 12.95 12.87N 1691.001.000.300.016
27.300.44 1/27.001.004.820.994 33.74 33.543/823.001.000.850.560
19.55 10.95N 16161.001.000.300.016 48.300.77 Tramo II
1/27.001.002.150.994 15.05 14.963/810.001.000.850.560 8.50
4.761/27.001.002.000.994 13.97 13.88N 1677.001.000.300.016
23.100.37
1/27.001.001.900.994 13.30 13.223/86.001.000.850.560 5.10
2.861/27.001.001.700.994 11.90 11.83N 1649.001.000.300.016
14.700.24 1/27.001.004.380.994 30.66 30.483/821.001.000.850.560
17.85 10.00N 16147.001.000.300.016 44.100.71TERCER PISO A
AZOTEA212.45Tramo I 1/27.001.002.180.994 15.26
15.173/85.001.000.850.560 4.25 2.381/27.001.001.750.994 12.25
12.18N 1642.001.000.300.016 12.600.20
1/27.001.002.150.994 15.05 14.963/812.001.000.850.560 10.20
5.711/27.001.001.850.994 12.95 12.87N 1691.001.000.300.016
27.300.44 1/27.001.004.820.994 33.74 33.543/823.001.000.850.560
19.55 10.95N 16161.001.000.300.016 48.300.77 Tramo II
1/27.001.002.150.994 15.05 14.963/810.001.000.850.560 8.50
4.761/27.001.002.000.994 13.97 13.88N 1677.001.000.300.016
23.100.37
1/27.001.001.900.994 13.30 13.223/86.001.000.850.560 5.10
2.861/27.001.001.700.994 11.90 11.83N 1649.001.000.300.016
14.700.24 1/27.001.004.380.994 30.66 30.483/821.001.000.850.560
17.85 10.00N 16147.001.000.300.016 44.100.71ESCALERA
SECUNDARIA540.11
PRIMER A SEGUNDO PISO190.34Tramo I 1/27.001.002.180.994 15.26
15.171/27.001.001.990.994 13.93 13.853/811.001.000.850.560 9.35
5.241/27.001.002.100.994 14.70 14.61
1/27.001.002.150.994 15.05 14.963/810.001.000.850.560 8.50
4.761/27.001.001.850.994 12.95 12.87 1/27.001.001.900.994 13.30
13.223/823.001.000.850.560 19.55 10.95 Tramo II
1/27.001.002.150.994 15.05 14.963/810.001.000.850.560 8.50
4.761/27.001.002.000.994 13.97 13.88
1/27.001.001.900.994 13.30 13.223/86.001.000.850.560 5.10
2.861/27.001.001.700.994 11.90 11.83 1/27.001.001.900.994 13.30
13.223/821.001.000.850.560 17.85 10.00SEGUNDO A TERCER
PISO174.88Tramo I 1/27.001.002.180.994 15.26
15.173/85.001.000.850.560 4.25 2.381/27.001.001.750.994 12.25
12.18N 1642.001.000.300.016 12.600.20
1/27.001.002.150.994 15.05 14.963/812.001.000.850.560 10.20
5.711/27.001.001.850.994 12.95 12.87N 1691.001.000.300.016
27.300.44 1/27.001.001.900.994 13.30 13.223/823.001.000.850.560
19.55 10.95N 16161.001.000.300.016 48.300.77 Tramo II
1/27.001.002.150.994 15.05 14.963/810.001.000.850.560 8.50
4.761/27.001.002.000.994 13.97 13.88N 1677.001.000.300.016
23.100.37
1/27.001.001.900.994 13.30 13.223/86.001.000.850.560 5.10
2.861/27.001.001.700.994 11.90 11.83N 1649.001.000.300.016
14.700.24 1/27.001.001.900.994 13.30 13.223/821.001.000.850.560
17.85 10.00N 16147.001.000.300.016 44.100.71TERCER PISO A
AZOTEA174.88Tramo I 1/27.001.002.180.994 15.26
15.173/85.001.000.850.560 4.25 2.381/27.001.001.750.994 12.25
12.18N 1642.001.000.300.016 12.600.20
1/27.001.002.150.994 15.05 14.963/812.001.000.850.560 10.20
5.711/27.001.001.850.994 12.95 12.87N 1691.001.000.300.016
27.300.44 1/27.001.001.900.994 13.30 13.223/823.001.000.850.560
19.55 10.95N 16161.001.000.300.016 48.300.77 Tramo II
1/27.001.002.150.994 15.05 14.963/810.001.000.850.560 8.50
4.761/27.001.002.000.994 13.97 13.88N 1677.001.000.300.016
23.100.37
1/27.001.001.900.994 13.30 13.223/86.001.000.850.560 5.10
2.861/27.001.001.700.994 11.90 11.83N 1649.001.000.300.016
14.700.24 1/27.001.001.900.994 13.30 13.223/821.001.000.850.560
17.85 10.00N 16147.001.000.300.016 44.100.71
MUROS (2)HOJA DE METRADOS OBRA : 09.00.00 FECHA :
ITEMDESCRIPCIONUND.NUMERO CANT.DIMENSIONESPARCIALNUMERO
CANT.VANOS O DISMINUCIONESPARCIALTOTALDE VECESLARGO ANCHOALTODE
VECESLARGO ANCHOALTO
02.00.00PRIMER PISO09.00.00MUROS Y TABIQUES DE
ALBAILERIA09.01.00MURO DE SOGA LADRILLO CORRIENTE DE
ARCILLAm2216.68Eje G-G (entre 1 y 2)114.502.6511.9311.93Eje F-F
(entre 1 y 2)111.002.652.65-110.702.10-1.471.18Eje E-E (entre 1 y
2)114.502.6511.93-111.002.10-2.10-111.000.50-0.509.33Eje D-D (entre
1 y 2)113.452.809.66-111.451.80-2.616.55-111.000.50-0.50Entre ejes
D y C111.803.005.40-110.702.10-1.473.93Eje C-C (entre 1 y
2)111.002.802.802.80Eje B-B (entre 1 y 2)111.702.804.764.76Eje A-A
(entre 1 y 2)111.852.805.18-111.202.10-2.522.66
Eje 1-1 (entre G y F)112.402.756.606.60Eje 1-1 (entre F y
E)112.402.756.606.60Eje 1-1 (entre E y
D)111.502.754.134.13111.852.755.095.09Eje 1-1 (entre D y
C)113.602.9010.4410.44Eje 1-1 (entre C y B)112.252.906.536.53Eje
1-1 (entre B y A)114.052.9011.7511.75Entre ejes 1 y 2 (entre D y
C)111.553.004.654.65Entre ejes 1 y 2 (entre B y
A)114.153.0012.4512.45Entre ejes 1 y 2 (entre F y
E)112.752.857.847.84Entre ejes 1 y 2 (entre D y
C)112.153.006.456.45Entre ejes 1 y 2 (entre D y
C)110.703.002.102.10Entre ejes 1 y 2 (entre B y
A)112.253.006.756.75Eje 2-2 (entre G y F)112.402.756.606.60Eje 2-2
(entre F y E)112.402.756.606.60Eje 2-2 (entre E y
D)113.602.759.909.90Eje 2-2 (entre D y C)113.602.9010.4410.44Eje
2-2 (entre C y B)112.252.906.536.53Eje 2-2 (entre B y
A)114.052.9011.7511.75Entre ejes 1 y 2118.753.0026.2526.25Eje
E-E113.453.1010.70112.351.904.474.13111.002.102.10
03.00.00SEGUNDO PISO09.00.00MUROS Y TABIQUES DE
ALBAILERIA09.01.00MURO DE SOGA LADRILLO CORRIENTE DE
ARCILLAm2188.75Eje G-G (entre 1 y 2)114.502.8012.6012.60Eje F-F
(entre 1 y 2)111.002.802.80-110.702.10-1.471.33Eje E-E (entre 1 y
2)114.502.8012.60-111.002.10-2.10-111.000.50-0.5010.00Entre ejes E
y D113.453.0010.35-111.651.90-3.147.22
Eje D-D (entre 1 y 2)111.002.802.80-111.000.50-0.502.30Entre
ejes D y C111.103.003.30-110.702.10-1.471.83Eje C-C (entre 1 y
2)111.002.802.802.80Eje B-B (entre 1 y
2)111.702.804.764.76Voladizo114.703.0014.10-112.001.90-3.80-111.801.90-3.426.88Eje
1-1 (entre G y F)112.402.906.966.96Eje 1-1 (entre F y
E)112.402.906.966.96Eje 1-1 (entre E y
D)111.500.901.351.35111.450.901.311.31111.002.902.902.90Eje 1-1
(entre D y C)113.602.9010.4410.44Eje 1-1 (entre C y
B)112.252.906.536.53Eje 1-1 (entre B y
A)114.052.9011.7511.75Voladizo 111.002.902.902.90Entre ejes 1 y 2
(entre B y Voladizo)115.153.0015.45-111.002.10-2.1013.35Entre ejes
1 y 2 (entre F y E)112.753.008.258.25Entre ejes 1 y 2 (entre E y
D)111.003.003.003.00Entre ejes 1 y 2 (entre D y
C)112.453.007.357.35110.853.002.552.55Eje 2-2 (entre G y
F)112.402.906.966.96Eje 2-2 (entre F y E)112.402.906.966.96Eje 2-2
(entre E y D)114.200.903.783.78Eje 2-2 (entre D y
C)113.602.9010.4410.44Eje 2-2 (entre C y B)112.252.906.536.53Eje
2-2 (entre B y A)114.052.9011.7511.75Voladizo
111.002.902.902.90Entre Eje E-E y Eje
D-D113.453.1010.70113.451.906.564.14
04.00.00TERCER PISO09.00.00MUROS Y TABIQUES DE
ALBAILERIA09.01.00MURO DE SOGA LADRILLO CORRIENTE DE
ARCILLAm2188.75Eje G-G (entre 1 y 2)114.502.8012.6012.60Eje F-F
(entre 1 y 2)111.002.802.80-110.702.10-1.471.33Eje E-E (entre 1 y
2)114.502.8012.60-111.002.10-2.10-111.000.50-0.5010.00Entre ejes E
y D113.453.0010.35-111.651.90-3.147.22
Eje D-D (entre 1 y 2)111.002.802.80-111.000.50-0.502.30Entre
ejes D y C111.103.003.30-110.702.10-1.471.83Eje C-C (entre 1 y
2)111.002.802.802.80Eje B-B (entre 1 y
2)111.702.804.764.76Voladizo114.703.0014.10-112.001.90-3.80-111.801.90-3.426.88
Eje 1-1 (entre G y F)112.402.906.966.96Eje 1-1 (entre F y
E)112.402.906.966.96Eje 1-1 (entre E y
D)111.500.901.351.35111.450.901.311.31111.002.902.902.90Eje 1-1
(entre D y C)113.602.9010.4410.44Eje 1-1 (entre C y
B)112.252.906.536.53Eje 1-1 (entre B y
A)114.052.9011.7511.75Voladizo 111.002.902.902.90Entre ejes 1 y 2
(entre B y Voladizo)115.153.0015.45-111.002.10-2.1013.35Entre ejes
1 y 2 (entre F y E)112.753.008.258.25Entre ejes 1 y 2 (entre E y
D)111.003.003.003.00Entre ejes 1 y 2 (entre D y
C)112.453.007.357.35110.853.002.552.55Eje 2-2 (entre G y
F)112.402.906.966.96Eje 2-2 (entre F y E)112.402.906.966.96Eje 2-2
(entre E y D)114.200.903.783.78Eje 2-2 (entre D y
C)113.602.9010.4410.44Eje 2-2 (entre C y B)112.252.906.536.53Eje
2-2 (entre B y A)114.052.9011.7511.75Voladizo
111.002.902.902.90Entre Eje E-E y Eje
D-D113.453.1010.70113.451.906.564.14
05.00.00AZOTEA09.00.00MUROS Y TABIQUES DE ALBAILERIA09.01.00MURO
DE SOGA LADRILLO CORRIENTE DE
ARCILLAm261.19Voladizo114.700.904.234.23Eje B-B (entre 1 y
2)111.703.005.105.10Voladizo112.000.901.80112.703.008.10-111.801.90-3.426.48
Voladizo111.000.900.900.90Eje 1-1 (entre D y
C)112.250.902.032.03Eje 1-1 (entre C y B)113.600.903.243.24Eje 1-1
(entre B y A)114.050.903.653.65Voladizo 111.000.900.900.90Entre
ejes 1 y 2 (entre B y
Voladizo)115.153.0015.45-111.002.10-2.1013.35Voladizo111.000.900.900.90Eje
2-2 (entre D y C)112.250.902.032.03Eje 2-2 (entre C y
B)113.600.903.243.24Eje 2-2 (entre B y
A)114.053.0012.1512.15Voladizo 111.003.003.003.00
TARRAJEO DE MUROS (2)HOJA DE METRADOS OBRA :PROP. : FECHA :
ITEMDESCRIPCIONUND.NUMERO CANT.DIMENSIONESPARCIALNUMERO
CANT.VANOS O DISMINUCIONESPARCIALTOTALDE VECESLARGO ANCHOALTODE
VECESLARGO ANCHOALTO
02.00.00PRIMER PISO10.00.00REVOQUES, ENLUCIDOS Y
MOLDADURAS10.01.00TARRAJEO PRIMARIO RAYADOm218.6018.60SS.HH
Habitacin110.401.200.48111.101.801.98211.601.203.84211.001.803.60
SS.HH RESTAURANT, CAF O
JUGUERIA110.401.200.48111.101.801.98211.251.203.00210.901.803.24
10.02.00TARRAJEO EN MUROS INTERIORES C:A 1:5 E= 1.5
CMm2318.4410.02.01MURO INTERIORESEje G-G (entre 1 y
2)114.502.8012.6012.60Eje F-F (entre 1 y
2)211.102.806.16-210.702.10-2.94-110.401.20-0.482.74Eje E-E (entre
1 y
2)214.702.8026.32-211.002.10-4.20-211.000.50-1.00-111.001.80-1.8019.32Eje
D-D (entre 1 y
2)213.452.8019.32-211.451.80-5.2213.10-211.000.50-1.00Entre ejes D
y C211.953.0011.70-210.702.10-2.94-110.301.20-0.368.40Eje C-C
(entre 1 y 2)111.102.803.083.08110.852.802.382.38Eje B-B (entre 1 y
2)111.952.805.465.46111.702.804.764.76Eje A-A (entre 1 y
2)111.702.804.76-111.202.10-2.522.24112.102.805.88-111.202.10-2.523.36
Eje 1-1 (entre G y F)112.402.906.966.96Eje 1-1 (entre F y
E)112.402.906.966.96Eje 1-1 (entre E y D)114.202.9012.1812.18Eje
1-1 (entre D y C)112.252.906.536.53Eje 1-1 (entre C y
B)113.602.9010.4410.44Eje 1-1 (entre B y
A)114.052.9011.7511.75Entre ejes 1 y 2 (entre D y
C)111.803.005.405.40111.653.004.954.95Entre ejes 1 y 2 (entre B y
A)114.553.0013.6513.65114.253.0012.7512.75Entre ejes 1 y 2 (entre F
y E)212.753.0016.50-111.601.20-1.92-111.001.80-1.8012.78Entre ejes
1 y 2 (entre D y
C)212.153.0012.90-111.251.20-1.50-110.901.80-1.629.78Entre ejes 1 y
2 (entre D y C)110.853.002.552.55110.703.002.102.10Entre ejes 1 y 2
(entre B y A)212.253.0013.5013.50Eje 2-2 (entre G y
F)112.402.906.966.96Eje 2-2 (entre F y
E)112.402.906.96-111.601.20-1.92-111.001.80-1.803.24Eje 2-2 (entre
E y D)114.202.9012.1812.18Eje 2-2 (entre D y
C)112.252.906.53-111.251.20-1.50-110.901.80-1.623.41Eje 2-2 (entre
C y B)113.602.9010.4410.44Eje 2-2 (entre B y
A)114.052.9011.7511.75Entre ejes 1 y 2128.753.0052.5052.50Eje
E-E123.453.1021.39212.351.908.938.26211.002.104.20
10.03.00TARRAJEO EN SUPERFICIE DE ARISTAS EN COLUMNAS C:A
1:5ml61.6061.60C-12212.8061.60
10.05.00TARRAJEO DE SUPERFICIE DE ARISTAS EN VIGAS C:A
1:5ml99.8099.8010.05.01VIGAS PRINCIPALES58.50Eje G-G (entre 1 y
2)114.504.50Eje F-F (entre 1 y 2)214.509.00Eje E-E (entre 1 y
2)214.509.00Eje D-D (entre 1 y 2)214.509.00Eje C-C (entre 1 y
2)214.509.00Eje B-B (entre 1 y 2)214.509.00Eje A-A (entre 1 y
2)214.509.00
10.05.02VIGAS SECUNDARIAS41.30Eje 1-1 (entre G y F)112.402.40Eje
1-1 (entre F y E)112.402.40Eje 1-1 (entre E y D)113.603.60Eje 1-1
(entre D y C)113.603.60Eje 1-1 (entre C y B)113.603.60Eje 1-1
(entre B y A)114.054.05Voladizo111.001.00Eje 2-2 (entre G y
F)112.402.40Eje 2-2 (entre F y E)112.402.40Eje 2-2 (entre E y
D)113.603.60Eje 2-2 (entre D y C)113.603.60Eje 2-2 (entre C y
B)113.603.60Eje 2-2 (entre B y A)114.054.05Voladizo111.001.00
10.06.00VESTIDURAS DE DERRAME EN PUERTAS, VENTANAS Y
VANOSml60.6060.60Muros213.006.00P-1212.104.20111.201.20P-2222.108.40121.002.00P-3222.108.40120.701.40P-4212.605.20112.402.40V-1211.803.60212.354.70V-2211.903.80211.653.30VA-1220.502.00221.004.00
22.00.00PINTURA 22.01.00PINTURA EN MUROS INTERIORES Y DERRAMES
C/LATEX 2 MANOS CON IMPRIMANTEm2320.2422.01.01Interiores
Eje G-G (entre 1 y 2)114.502.8012.6012.60Eje F-F (entre 1 y
2)211.102.806.16-210.702.10-2.94-110.401.20-0.482.74Eje E-E (entre
1 y
2)214.702.8026.32-211.002.10-4.20-211.000.50-1.00-111.001.80-1.8019.32Eje
D-D (entre 1 y
2)213.452.8019.32-211.451.80-5.2213.10-211.000.50-1.00Entre ejes D
y C211.953.0011.70-210.702.10-2.94-110.301.20-0.368.40Eje C-C
(entre 1 y 2)111.102.803.083.08110.852.802.382.38Eje B-B (entre 1 y
2)111.952.805.465.46111.702.804.764.76Eje A-A (entre 1 y
2)111.702.804.76-111.202.10-2.522.24112.102.805.88-111.202.10-2.523.36
Eje 1-1 (entre G y F)112.402.906.966.96Eje 1-1 (entre F y
E)112.402.906.966.96Eje 1-1 (entre E y D)114.202.9012.1812.18Eje
1-1 (entre D y C)112.252.906.536.53Eje 1-1 (entre C y
B)113.602.9010.4410.44Eje 1-1 (entre B y
A)114.052.9011.7511.75Entre ejes 1 y 2 (entre D y
C)111.803.005.405.40111.653.004.954.95Entre ejes 1 y 2 (entre B y
A)114.553.0013.6513.65114.253.0012.7512.75Entre ejes 1 y 2 (entre F
y E)212.753.0016.50-111.601.20-1.92-111.001.80-1.8012.78Entre ejes
1 y 2 (entre D y
C)212.153.0012.90-111.251.20-1.50-110.901.80-1.629.78Entre ejes 1 y
2 (entre D y C)110.853.002.552.55110.703.002.102.10Entre ejes 1 y 2
(entre B y A)212.253.0013.5013.50Eje 2-2 (entre G y
F)112.402.906.966.96Eje 2-2 (entre F y
E)112.402.906.96-111.601.20-1.92-111.001.80-1.803.24Eje 2-2 (entre
E y D)114.202.9012.1812.18Eje 2-2 (entre D y
C)112.252.906.53-111.251.20-1.50-110.901.80-1.623.41Eje 2-2 (entre
C y B)113.602.9010.4410.44Eje 2-2 (entre B y
A)114.052.9011.7511.75Entre ejes 1 y 2128.753.0052.5052.50Eje
E-E123.453.1021.39212.351.908.938.26211.002.104.20
22.01.03Derrames410.153.001.801.80
22.02.00PINTURA EN COLUMNAS C/LATEX 2 MANOS CON
IMPRIMANTEm214.0014.00C-1810.202.804.48310.452.803.78110.652.801.82110.402.801.12410.252.802.80
22.03.00PINTURA EN VIGAS C/LATEX 2 MANOS CON
IMPRIMANTEm226.4826.4822.03.01VIGAS PRINCIPALES16.88Eje G-G (entre
1 y 2)114.500.301.35Eje F-F (entre 1 y 2)114.500.652.93Eje E-E
(entre 1 y 2)114.500.502.25Eje D-D (entre 1 y 2)114.500.502.25Eje
C-C (entre 1 y 2)114.500.652.93Eje B-B (entre 1 y
2)114.500.652.93Eje A-A (entre 1 y 2)114.500.502.25
22.03.02VIGAS SECUNDARIAS9.60Eje 1-1 (entre G y
F)112.400.200.48Eje 1-1 (entre F y E)112.400.200.48Eje 1-1 (entre E
y D)114.200.200.84Eje 1-1 (entre D y C)113.600.200.72Eje 1-1 (entre
C y B)113.600.200.72Eje 1-1 (entre B y
A)114.050.200.81Voladizo111.000.750.75Eje 2-2 (entre G y
F)112.400.200.48Eje 2-2 (entre F y E)112.400.200.48Eje 2-2 (entre E
y D)114.200.200.84Eje 2-2 (entre D y C)113.600.200.72Eje 2-2 (entre
C y B)113.600.200.72Eje 2-2 (entre B y
A)114.050.200.81Voladizo111.000.750.75
22.04.00PINTURA EN CIELORRASO C/LATEX 2 MANOS CON
IMPRIMANTEm267.9667.96SALA COCINA COMEDOR1117.3917.39SS.HH
1112.912.91COCINA117.567.56SS.HH. 2112.572.57RESTAURANT
CAF1120.5020.50PASADIZO116.986.98DEPOSITO112.782.78ENTRADA112.272.27Voladizo115.005.00
03.00.00SEGUNDO PISO10.00.00REVOQUES, ENLUCIDOS Y
MOLDURAS10.01.00TARRAJEO PRIMARIO RAYADOm218.6018.60SS.HH
Habitacin110.401.200.48111.101.801.98211.601.203.84211.001.803.60
SS.HH SPA, CENTRO DE
MASAJES110.401.200.48111.101.801.98211.251.203.00210.901.803.24
10.02.00TARRAJEO EN MUROS INTERIORES Y EXTERIORES C:A 1:5 E= 1.5
CMm2392.8910.02.01MURO INTERIORES231.26Eje G-G (entre 1 y
2)114.502.8012.6012.60Eje F-F (entre 1 y
2)211.102.806.16-210.702.10-2.94-110.401.20-0.482.74Eje E-E (entre
1 y
2)214.702.8026.32-211.002.10-4.20-211.000.50-1.00-111.001.80-1.8019.32Entre
ejes E y D113.453.0010.35-111.651.90-3.147.22Eje D-D (entre 1 y
2)111.002.802.80-111.001.80-1.80-111.000.50-0.500.50Entre ejes D y
C111.253.003.75-110.702.10-1.472.28111.103.003.30-110.401.20-0.48-110.702.10-1.471.35Eje
C-C (entre 1 y 2)111.252.803.503.50111.002.802.802.80Eje B-B (entre
1 y
2)111.952.805.465.46111.702.804.764.76Voladizo114.703.0014.10-112.001.90-3.80-111.801.90-3.426.88
Eje 1-1 (entre G y F)112.402.906.966.96Eje 1-1 (entre F y
E)112.402.906.966.96Eje 1-1 (entre E y
D)111.750.901.581.58111.450.901.311.31111.002.902.902.90Eje 1-1
(entre D y C)112.252.906.536.53Eje 1-1 (entre C y
B)113.602.9010.4410.44Eje 1-1 (entre B y
A)114.052.9011.7511.75Voladizo 110.852.902.472.47Entre ejes 1 y 2
(entre E y D)112.350.902.122.12Entre ejes 1 y 2 (entre B y
Voladizo)115.403.0016.20-111.002.10-2.1014.10115.253.0015.75-111.002.10-2.1013.65Entre
ejes 1 y 2 (entre F y
E)212.753.0016.50-111.601.20-1.92-111.001.80-1.8012.78Entre ejes 1
y 2 (entre E y D)111.103.003.303.30Entre ejes 1 y 2 (entre D y
C)112.203.006.606.60112.153.006.45-111.251.20-1.50-110.901.80-1.623.33110.853.002.552.55110.703.002.102.10Eje
2-2 (entre G y F)112.402.906.966.96Eje 2-2 (entre F y
E)112.402.906.96-111.601.20-1.92-111.001.80-1.803.24Eje 2-2 (entre
E y D)110.850.900.770.77Eje 2-2 (entre D y
C)112.252.906.53-111.251.20-1.50Eje 2-2 (entre C y
B)113.602.9010.4410.44Eje 2-2 (entre B y
A)114.052.9011.7511.75Voladizo 110.852.902.472.47Entre Eje E-E y
Eje D-D123.453.1021.39113.451.906.5614.84
|10.02.02MURO EXTERIORES161.64Eje G-G (entre 1 y
2)115.003.2016.0016.00Entre ejes E y
D113.400.903.063.06112.403.007.20-111.651.90-3.144.07Eje D-D (entre
1 y
2)111.252.803.50-111.000.50-0.503.00Voladizo115.003.0015.00-112.001.90-3.80-111.801.90-3.427.78Eje
1-1 (entre G y F)112.783.208.908.90Eje 1-1 (entre F y
E)112.783.208.908.90Eje 1-1 (entre E y
D)111.751.101.931.93111.451.101.601.60111.133.203.623.62Eje 1-1
(entre D y C)112.643.208.458.45Eje 1-1 (entre C y
B)113.853.2012.3212.32Eje 1-1 (entre B y
A)114.303.2013.7613.76Voladizo111.133.203.623.62Entre ejes 1 y 2
(entre E y D)112.200.901.981.98Eje 2-2 (entre G y
F)112.783.208.908.90Eje 2-2 (entre F y E)112.783.208.908.90Eje 2-2
(entre E y D)111.130.901.021.02213.200.905.765.76Eje 2-2 (entre D y
C)112.633.208.428.42Eje 2-2 (entre C y B)113.853.2012.3212.32Eje
2-2 (entre B y A)114.303.2013.7613.76Voladizo111.133.203.623.62
10.03.00TARRAJEO EN SUPERFICIE DE ARISTAS EN COLUMNAS C:A
1:5ml61.6061.60C-12212.8061.60
10.05.00TARRAJEO EN SUPERFICIE DE ARISTAS EN VIGAS C:A
1:5ml107.00107.0010.05.01VIGAS PRINCIPALES58.50Eje G-G (entre 1 y
2)114.504.50Eje F-F (entre 1 y 2)214.509.00Eje E-E (entre 1 y
2)214.509.00Eje D-D (entre 1 y 2)214.509.00Eje C-C (entre 1 y
2)214.509.00Eje B-B (entre 1 y 2)214.509.00Eje A-A (entre 1 y
2)214.509.00
10.05.02VIGAS SECUNDARIAS48.50Eje 1-1 (entre G y F)112.402.40Eje
1-1 (entre F y E)112.402.40Eje 1-1 (entre E y D)213.607.20Eje 1-1
(entre D y C)113.603.60Eje 1-1 (entre C y B)113.603.60Eje 1-1
(entre B y A)114.054.05Voladizo111.001.00Eje 2-2 (entre G y
F)112.402.40Eje 2-2 (entre F y E)112.402.40Eje 2-2 (entre E y
D)213.607.20Eje 2-2 (entre D y C)113.603.60Eje 2-2 (entre C y
B)113.603.60Eje 2-2 (entre B y A)114.054.05Voladizo111.001.00
10.06.00VESTIDURAS DE DERRAME EN PUERTAS, VENTANAS Y
VANOSml60.5060.50Muros213.006.00P-2212.104.20121.002.00P-3222.108.40120.701.40V-2221.907.60221.656.60V-3211.903.80213.456.90V-4211.903.80211.903.80VA-1220.502.00221.004.00
22.00.00PINTURA 22.01.00PINTURA EN MUROS INTERIORES Y EXTERIORES
C/LATEX 2 MANOS CON IMPRIMANTEm2380.7022.01.01Interiores217.43Eje
G-G (entre 1 y 2)114.502.8012.6012.60Eje F-F (entre 1 y
2)211.102.806.16-210.702.10-2.94-110.401.20-0.482.74Eje E-E (entre
1 y
2)214.702.8026.32-211.002.10-4.20-211.000.50-1.00-111.001.80-1.8019.32Entre
ejes E y D113.550.903.203.20Entre ejes E y
D113.453.0010.35-111.002.10-2.10-111.651.90-3.145.12111.203.003.60-111.002.10-2.101.50Eje
D-D (entre 1 y
2)111.002.802.80-111.001.80-1.80-111.000.50-0.500.50Entre ejes D y
C111.253.003.75-110.702.10-1.472.28111.103.003.30-110.401.20-0.48-110.702.10-1.471.35Eje
C-C (entre 1 y 2)111.252.803.503.50111.002.802.802.80Eje B-B (entre
1 y
2)111.952.805.465.46111.702.804.764.76Voladizo114.703.0014.10-112.001.90-3.80-111.801.90-3.426.88
Eje 1-1 (entre G y F)112.402.906.966.96Eje 1-1 (entre F y
E)112.402.906.966.96111.002.902.902.90Eje 1-1 (entre D y
C)112.252.906.536.53Eje 1-1 (entre C y B)113.602.9010.4410.44Eje
1-1 (entre B y A)114.052.9011.7511.75Voladizo
110.852.902.472.47Entre ejes 1 y 2 (entre B y
Voladizo)115.403.0016.20-111.002.10-2.1014.10115.253.0015.75-111.002.10-2.1013.65Entre
ejes 1 y 2 (entre F y
E)212.753.0016.50-111.601.20-1.92-111.001.80-1.8012.78Entre ejes 1
y 2 (entre E y D)111.103.003.303.30Entre ejes 1 y 2 (entre D y
C)112.203.006.606.60112.153.006.45-111.251.20-1.50-110.901.80-1.623.33110.853.002.552.55110.703.002.102.10Eje
2-2 (entre G y F)112.402.906.966.96Eje 2-2 (entre F y
E)112.402.906.96-111.601.20-1.92-111.001.80-1.803.24Eje 2-2 (entre
E y D)110.850.900.770.77Eje 2-2 (entre D y
C)112.252.906.53-111.251.20-1.50-110.901.80-1.623.41Eje 2-2 (entre
C y B)113.602.9010.4410.44Eje 2-2 (entre B y
A)114.052.9011.7511.75Voladizo 110.852.902.472.47
22.01.02Exteriores159.99Eje G-G (entre 1 y
2)115.003.2016.0016.00112.403.007.20-111.651.90-3.144.07Eje D-D
(entre 1 y
2)111.252.803.50-111.000.50-0.503.00Voladizo115.003.0015.00-