PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD PARUQUE BAJO - RED OTUZCO - JULCAN" ELEMENTO Nº DE PIEZA LONGITUD PUNTOS CANTIDAD CANTIDAD Y EJE VECES PIEZAS LONGITUD ANCHO ITEM DESCRIPCION EJE EJE M M PZA M PTO GLB UND 01 ALIMENTACION A SERVICIOS 01.01 SALIDA DE AGUA FRIA - PVC 1.00 14.00 01.02 TUBERIA PVC CLASE 10 - DE 1/2" 1.00 60.00 60.00 01.04 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" 1.00 8.00 8.00 01.05 CAJA PARA VALVULAS EN NICHO DE MAYOLICA 1.00 8.00 8.00 02 SISTEMA DE DESAGUE 02.01 SALIDAS DE DESAGUE EN PVC 1.00 11.00 02.02 SALIDAS DE PVC SAL PARA VENTILACION DE 2" 1.00 6.00 6.00 02.03 TUBERIA DE PVC SAL 2" 1.00 16.20 02.04 REGISTRO DE BRONCE ROSCADO DE 4" (INC. SALIDA) 1.00 1.00 02.05 TUBERIA DE PVC SAL 4" 1.00 39.50 39.50 02.06 SUMIDERO DE BRONCE 2" (INC. SALIDA) 1.00 5.00 5.00 02.07 CANALETA DE FIERRO GALVANIZADO 1.00 21.20 02.08 TUBERIA DE BAJADA PVC SAL 3" - PARA AGUA DE LLUVIA 1.00 12.15 12.15 02.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE CONCRETO 1.00 8.00 8.00 03 APARATOS Y ACCESORIOS SANITARIOS 03.01 INODORO DE LOSA BLANCA TANQUE BAJO, INCLUYE ACCESORIOS 4.00 03.02 LAVATORIO DE LOZA BLANCA INC. GRIFERIA Y ACC. DE DESAGUE 5.00 03.03 LAVADERO DE ACERO INOXIDABLE DE UNA POZA C/ESCURRIDERA 1.00 03.04 DUCHA SIMPLE DE 1/2" 2.00 ENTRE HOJA DE METRADOS INSTALACIONES SANITARIAS CONCEPTO Y LOCALIZACION DIMENSIONES RESULTADOS
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD PARUQUE BAJO - RED OTUZCO - JULCAN"
ELEMENTO Nº DE PIEZA LONGITUD PUNTOS CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO
ITEM DESCRIPCION EJE EJE M M PZA M PTO GLB UND
01 ALIMENTACION A SERVICIOS01.01 SALIDA DE AGUA FRIA - PVC 1.00 14.00
1 y 7 A K 2.00 14.60 0.50 0.85 14.60 12.412 A B 1.00 2.45 0.50 0.85 1.23 1.04
DESMONTAGE DE VIGAS Y VIGUETAS DE MADERA EN TECHO
DESMONTAJE CIELO RASO DE CAÑA CON TORTA DE BARRO + YESO =2"
EXCAVACION PARA CIMIENTOS HASTA 1.40 MT TERRENO NORMAL
ENTRE
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD PARUQUE BAJO - RED OTUZCO - JULCAN"
HOJA DE METRADOS ESTRUCTURAS
CONCEPTO Y LOCALIZACION DIMENSIONES RESULTADOS
3 H I 1.00 0.98 0.50 0.85 0.49 0.414 A H 1.00 11.50 0.60 0.85 6.90 5.874 J K 1.00 3.10 0.40 0.85 1.24 1.055 A E 1.00 6.48 0.50 0.85 3.24 2.756 C D 1.00 0.75 0.50 0.85 0.38 0.326 E H 1.00 5.30 0.50 0.85 2.65 2.25
A y k 1 7 2.00 7.00 0.50 0.85 7.00 5.95
ELEMENTO Nº DE PESO TOTAL AREA VOLUMEN CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO ALTURA FIERRO
ITEM DESCRIPCION EJE EJE M M M KG/ML KG M2 M3 GLB UND
03.03 RELLENO MANUAL CON MATERIAL PROPIO 12.521 y 7 A K 2.00 14.60 0.25 0.15 1.10
2 A B 1.00 2.45 0.35 0.15 0.133 H I 1.00 0.98 0.35 0.15 0.054 A H 1.00 11.50 0.35 0.15 0.604 J K 1.00 3.10 0.40 0.15 0.195 A E 1.00 6.48 0.50 0.15 0.496 C D 1.00 0.75 0.35 0.15 0.046 E H 1.00 5.30 0.35 0.15 0.28
04.02 CIMIENTO CORRIDO C:H 1:10 + 30% P.G. 35.621 y 7 A K 2.00 14.60 0.50 0.60 8.76
2 A B 1.00 2.45 0.50 0.60 0.743 H I 1.00 0.98 0.50 0.60 0.294 A H 1.00 11.50 0.60 0.60 4.144 J K 1.00 3.10 0.40 0.60 0.745 A E 1.00 6.48 0.50 0.60 1.946 C D 1.00 0.75 0.50 0.60 0.236 E H 1.00 5.30 0.50 0.60 1.59
1 A K 1.00 18.55 0.25 0.55 2.592 A B 1.00 2.25 0.15 0.55 0.193 H I 1.00 1.20 0.15 0.55 0.104 A H 1.00 12.85 0.25 0.55 1.775 A E 1.00 2.85 0.15 0.55 0.246 C D 1.00 3.15 0.15 0.55 0.267 A K 1.00 17.05 0.25 0.55 2.34
A y K 1 7 2.00 8.95 0.25 0.55 2.46B 4 5 1.00 0.60 0.15 0.55 0.05C 1 7 1.00 6.75 0.25 0.55 0.93
D y E 5 7 2.00 3.00 0.15 0.55 0.50
DIMENSIONES RESULTADOS
SOBRECIMIENTOS CORRIDO CONCRETO C:H 1:8 + 25% PM
ENTRE
CONCEPTO Y LOCALIZACION
INTERIORES Y EXTERIORES
F 1 7 1.00 6.75 0.25 0.55 0.93G 6 7 1.00 2.30 0.15 0.55 0.19H 1 3 1.00 4.63 0.25 0.55 0.64I A B 1.00 3.18 0.15 0.55 0.26J D E 1.00 6.95 0.25 0.55 0.96
ELEMENTO Nº DE PESO TOTAL AREA VOLUMEN CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO ALTURA FIERRO
ITEM DESCRIPCION EJE EJE M M M KG/ML KG M2 M3 GLB UND
04.04 SOBRE CIMIENTO ENCOFRADO Y DESENCOFRADO 124.25
1 A K 2.00 18.55 0.55 20.412 A B 2.00 2.25 0.55 2.483 H I 2.00 1.20 0.55 1.324 A H 2.00 12.85 0.55 14.145 A E 2.00 2.85 0.55 3.146 C D 2.00 3.15 0.55 3.477 A K 2.00 17.05 0.55 18.76
A y K 1 7 4.00 8.95 0.55 19.69B 4 5 2.00 0.60 0.55 0.66C 1 7 2.00 6.75 0.55 7.43
D y E 5 7 4.00 3.00 0.55 6.60F 1 7 2.00 6.75 0.55 7.43G 6 7 2.00 2.30 0.55 2.53H 1 3 2.00 4.63 0.55 5.09I A B 2.00 3.18 0.55 3.49J D E 2.00 6.95 0.55 7.65
V-1 1 y 7 2.00 20.20 0.25 0.20 2.02V-1 4 A H 1.00 11.10 0.25 0.20 0.56V-2 4 H J 1.00 3.85 0.25 0.20 0.19V-1 4 J K 1.00 3.75 0.25 0.20 0.19V-1 A a K 6.00 9.25 0.25 0.20 2.78
VA-1 3 H I 1.00 1.35 0.15 0.20 0.04VA-1 5 A E 1.00 6.30 0.15 0.20 0.19VA-1 6 E H 1.00 4.80 0.15 0.20 0.14VA-1 D y E 2.00 3.10 0.15 0.20 0.19VA-1 G 6 7 1.00 2.40 0.15 0.20 0.07VA-1 I 1 3 1.00 3.30 0.15 0.20 0.10
VOLADO 12.00 0.60 0.25 0.25 0.45
05.03.02ENCOFRADO Y DESENCOFRADO PARA VIGAS 60.68V-1 1 y 7 2.00 20.20 0.20 8.08V-1 1 y 7 2.00 18.70 0.20 7.48V-1 4 A H 2.00 11.10 0.20 4.44
ENTRE
CONCEPTO Y LOCALIZACION DIMENSIONES RESULTADOS
V-2 4 H J 2.00 3.85 0.20 1.54V-1 4 J K 2.00 3.75 0.20 1.50V-1 A a K 2.00 10.00 0.20 4.00V-1 A a K 10.00 9.25 0.20 18.50
VA-1 3 H I 2.00 1.35 0.20 0.54VA-1 5 A E 2.00 6.30 0.20 2.52VA-1 6 E H 2.00 4.80 0.20 1.92
ELEMENTO Nº DE PESO TOTAL AREA VOLUMEN CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO ALTURA FIERRO
ITEM DESCRIPCION EJE EJE M M M KG/ML KG M2 M3 GLB UND
VA-1 D y E 4.00 3.10 0.20 2.48VA-1 G 6 7 2.00 2.40 0.20 0.96VA-1 I 1 3 2.00 3.30 0.20 1.32
DESMONTAJE CIELO RASO DE CAÑA CON TORTA DE BARRO+YESO =2"
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD PARUQUE BAJO - RED OTUZCO - JULCAN"
CONCEPTO Y LOCALIZACION DIMENSIONES RESULTADOS
ENTRE
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 7.20 M
TRANSPORTE DE HERRAMIENTAS, EQUIPO Y P/MATERIALES A OBRA
ELEMENTO Nº DE PESO TOTAL AREA VOLUMEN CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO ALTURA FIERRO
ITEM DESCRIPCION EJE EJE M M M KG/ML KG M2 M3 GLB UND
03 MOVIMIENTO DE TIERRAS03.01 72.08 64.87
1 y 7 A K 2.00 20.20 0.50 0.90 20.20 18.182 A B 1.00 2.45 0.50 0.90 1.23 1.103 H I 1.00 0.88 0.50 0.90 0.44 0.394 A H 1.00 15.70 0.60 0.90 9.42 8.484 J K 1.00 3.50 0.40 0.90 1.40 1.265 A E 1.00 6.48 0.50 0.90 3.24 2.916 C D 1.00 0.75 0.50 0.90 0.38 0.346 E H 1.00 5.30 0.50 0.90 2.65 2.39
03.03 RELLENO MANUAL CON MATERIAL PROPIO 2.401 y 7 A K 2.00 20.20 0.25 0.05 0.51
2 A B 1.00 2.45 0.35 0.05 0.043 H I 1.00 0.88 0.35 0.05 0.024 A H 1.00 15.70 0.35 0.05 0.274 J K 1.00 3.50 0.40 0.05 0.075 A E 1.00 6.48 0.50 0.05 0.166 C D 1.00 0.75 0.35 0.05 0.016 E H 1.00 5.30 0.35 0.05 0.09
AREA IGUAL A PARTIDA 02.05 1.00 216.39 1.00 216.39
ENTRE
ELIMINACION DE MATERIAL EXCEDENTE ACARREADOTOTAL DEMOLICIONES MAS EXCAVACION MENOS RELLENO POR FACTOR ESPONJAMIENTO = 1.1
AFIRMADO DE 4" COMPACTADO PARA PISOS INTERIORES Y EXTERIORES NORMAL
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO Y VEREDAS
CONCEPTO Y LOCALIZACION DIMENSIONES RESULTADOS
ELEMENTO Nº DE PESO TOTAL AREA VOLUMEN CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO ALTURA FIERRO
ITEM DESCRIPCION EJE EJE M M M KG/ML KG M2 M3 GLB UND
04 OBRAS DE CONCRETO SIMPLE04.01 50.46
1 y 7 A K 2.00 20.20 0.50 0.70 14.142 A B 1.00 2.45 0.50 0.70 0.863 H I 1.00 0.88 0.50 0.70 0.314 A H 1.00 15.70 0.60 0.70 6.594 J K 1.00 3.50 0.40 0.70 0.985 A E 1.00 6.48 0.50 0.70 2.276 C D 1.00 0.75 0.50 0.70 0.266 E H 1.00 5.30 0.50 0.70 1.86
1 A K 1.00 18.55 0.25 0.35 1.652 A B 1.00 2.25 0.15 0.35 0.123 H I 1.00 1.20 0.15 0.35 0.064 A H 1.00 12.85 0.25 0.35 1.125 A E 1.00 2.85 0.15 0.35 0.156 C D 1.00 3.15 0.15 0.35 0.177 A K 1.00 17.05 0.25 0.35 1.49
A y K 1 7 2.00 8.95 0.25 0.35 1.57B 4 5 1.00 0.60 0.15 0.35 0.03C 1 7 1.00 6.75 0.25 0.35 0.59
D y E 5 7 2.00 3.00 0.15 0.35 0.32F 1 7 1.00 6.75 0.25 0.35 0.59G 6 7 1.00 2.30 0.15 0.35 0.12H 1 3 1.00 4.63 0.25 0.35 0.40I A B 1.00 3.18 0.15 0.35 0.17J D E 1.00 6.95 0.25 0.35 0.61
ELEMENTO Nº DE PESO TOTAL AREA VOLUMEN CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO ALTURA FIERRO
ITEM DESCRIPCION EJE EJE M M M KG/ML KG M2 M3 GLB UND
04.03 79.07
1 A K 2.00 18.55 0.35 12.992 A B 2.00 2.25 0.35 1.583 H I 2.00 1.20 0.35 0.844 A H 2.00 12.85 0.35 9.005 A E 2.00 2.85 0.35 2.006 C D 2.00 3.15 0.35 2.217 A K 2.00 17.05 0.35 11.94
A y K 1 7 4.00 8.95 0.35 12.53B 4 5 2.00 0.60 0.35 0.42C 1 7 2.00 6.75 0.35 4.73
D y E 5 7 4.00 3.00 0.35 4.20F 1 7 2.00 6.75 0.35 4.73G 6 7 2.00 2.30 0.35 1.61H 1 3 2.00 4.63 0.35 3.24I A B 2.00 3.18 0.35 2.22J D E 2.00 6.95 0.35 4.87
04.04 FALSO PISO: MEZCLA 1:8 e=4" 173.63SALA DE PARTOS 1.00 3.80 4.60 17.48SALA DE PARTOS -1.00 2.50 0.15 -0.38
INMUNIZACIONES UND. DEL NIÑO 1.00 3.55 4.60 16.33CONSULT. DE LA MUJER 1.00 3.75 4.60 17.25
SSHH. CONSULT. DE LA MUJER 1.00 1.00 3.30 3.30CAJA ADMISION ARCHIVOS 1.00 2.70 3.30 8.91
V-1 1 y 7 2.00 20.20 0.25 0.20 2.02V-1 4 A H 1.00 11.10 0.25 0.20 0.56V-2 4 H J 1.00 3.85 0.25 0.20 0.19V-1 4 J K 1.00 3.75 0.25 0.20 0.19V-1 A a K 6.00 9.25 0.25 0.20 2.78
VA-1 3 H I 1.00 1.35 0.15 0.20 0.04VA-1 5 A E 1.00 6.30 0.15 0.20 0.19VA-1 6 E H 1.00 4.80 0.15 0.20 0.14VA-1 D y E 2.00 3.10 0.15 0.20 0.19
0.005
CONCEPTO Y LOCALIZACION DIMENSIONES RESULTADOS
ENTRE
ELEMENTO Nº DE PESO TOTAL AREA VOLUMEN CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO ALTURA FIERRO
ITEM DESCRIPCION EJE EJE M M M KG/ML KG M2 M3 GLB UND
VA-1 G 6 7 1.00 2.40 0.15 0.20 0.07VA-1 I 1 3 1.00 3.30 0.15 0.20 0.10
VOLADO 12.00 0.60 0.25 0.25 0.45
05.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS 60.68V-1 1 y 7 2.00 20.20 0.20 8.08V-1 1 y 7 2.00 18.70 0.20 7.48V-1 4 A H 2.00 11.10 0.20 4.44V-2 4 H J 2.00 3.85 0.20 1.54V-1 4 J K 2.00 3.75 0.20 1.50V-1 A a K 2.00 10.00 0.20 4.00V-1 A a K 10.00 9.25 0.20 18.50
VA-1 3 H I 2.00 1.35 0.20 0.54VA-1 5 A E 2.00 6.30 0.20 2.52VA-1 6 E H 2.00 4.80 0.20 1.92VA-1 D y E 4.00 3.10 0.20 2.48VA-1 G 6 7 2.00 2.40 0.20 0.96VA-1 I 1 3 2.00 3.30 0.20 1.32
02.03 TARRAJEO PRIMARIO CONTRAZOCALOS Y ENCHAPES 93.60SALA DE PARTOS A 1.00 4.45 1.50 6.68
SALA DE PARTOS - LAVAMANOS CIRUJANO C 1.00 6.20 1.50 9.30SSHH PUERPERIO - LAVAMANOS CIRUJANO - PERSONAL D 1.00 4.65 1.50 6.98
SSHH PERSONAL - PERSONAL D 1.00 1.00 2.10 2.10SSHH PERSONAL - PUBLICO E 1.00 5.50 1.50 8.25SSHH PUBLICO - BOTADERO F 1.00 4.80 1.50 7.20
BOTADERO G 1.00 2.40 1.50 3.60SSHH CONSULTORIO DE LA MUJER H 1.00 2.50 1.50 3.75SSHH CONSULTORIO DE LA MUJER I 1.00 1.00 2.10 2.10SSHH CONSULTORIO DE LA MUJER I 1.00 2.30 1.50 3.45
MEDICINA GENERAL J 1.00 2.00 1.50 3.00SALA DE PARTOS - SSHH CONSULTORIO DE LA MUJER 1 4.80 1.00 1.50 7.20
SALA DE PARTOS 2 5.15 1.00 1.50 7.73SSHH CONSULTORIO DE LA MUJER 3 1.00 1.00 1.50 1.50
SALA DE PARTOS 4 1.00 2.80 1.50 4.20LAVAMANOS CIRUJANO - SSHH PUERPERIO 5 1.00 0.30 1.50 0.45
03.02 SARDINEL EN DUCHA REVESTIDA CON MAYOLICA 1.00 3.15 3.15
04 CONTRAZOCALOS04.01 CONTRAZOCALO DE CEMENTO PULIDO H=0.30 M E=1.5 CM 19.00
PARTE FRONTAL CENTRO DE SALUD 7 1.00 19.00 19.00
05 ZOCALO Y ENCHAPES05.01 ENCHAPE CON MAYOLICA DE COLOR DE 0.20 x 0.30 CM DE PRIMERA 93.60
SALA DE PARTOS A 1.00 4.45 1.50 6.68SALA DE PARTOS - LAVAMANOS CIRUJANO C 1.00 6.20 1.50 9.30
SSHH PUERPERIO - LAVAMANOS CIRUJANO - PERSONAL D 1.00 4.65 1.50 6.98SSHH PERSONAL - PERSONAL D 1.00 1.00 2.10 2.10
SSHH PERSONAL - PUBLICO E 1.00 5.50 1.50 8.25SSHH PUBLICO - BOTADERO F 1.00 4.80 1.50 7.20
BOTADERO G 1.00 2.40 1.50 3.60SSHH CONSULTORIO DE LA MUJER H 1.00 2.50 1.50 3.75SSHH CONSULTORIO DE LA MUJER I 1.00 1.00 2.10 2.10SSHH CONSULTORIO DE LA MUJER I 1.00 2.30 1.50 3.45
MEDICINA GENERAL J 1.00 2.00 1.50 3.00
ENTRE
RESULTADOSCONCEPTO Y LOCALIZACION DIMENSIONES
ELEMENTO Nº DE LONGITUD AREA CANTIDAD CANTIDAD CANTIDAD
Y EJE VECES PIEZAS LONGITUD ANCHO ALTURA
ITEM DESCRIPCION EJE EJE M M M M M2 P2 UND PZA
SALA DE PARTOS - SSHH CONSULTORIO DE LA MUJER 1 4.80 1.00 1.50 7.20SALA DE PARTOS 2 5.15 1.00 1.50 7.73
SSHH CONSULTORIO DE LA MUJER 3 1.00 1.00 1.50 1.50SALA DE PARTOS 4 1.00 2.80 1.50 4.20