Top Banner
METODE PENAMPANG (Pemodelan dan Evaluasi Cadangan)
16

Metode Penampang

Dec 21, 2015

Download

Documents

Dhany Zulfiqar

Metode penampang dibuat berdasarkan data titik bor pada software Surpac. Presentasi Mata kuliah pemodelan dan evaluasi Cadangan.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Metode Penampang

METODE PENAMPANG(Pemodelan dan Evaluasi Cadangan)

Page 2: Metode Penampang

Peta titik bor 3 Dimensi

Page 3: Metode Penampang

Section 1

Page 4: Metode Penampang

Perhitungan Section 1

HoleFrom To Depth %Ni

D x %Ni

Average Hole

Hle Width W x D W x D x%Ni Average

%Ni(m) (m) D (m) (%) (%) W (m) (m2) (%m2)

H113173 4 1 1.97 1.97

1.79 2525 49.25

1.75

4 5 1 1.31 1.31 25 32.755 6 1 2.09 2.09 25 52.25

Subtotal 3 5.37 75 134.25H11517 4 5 1 1.52 1.52 1.65 25 25 38

5 6 1 1.78 1.78 25 44.5Subtotal 2 3.3 50 82.5

H11617 0 0 0 0 0 0 25 0 0Subtotal 0 0 0 0

H11717 0 0 0 0 0 0 25 0 0Subtotal 0 0 0 0

H11817 0 0 0 0 0 0 25 0 0Subtotal 0 0 0 0

H11917 1 2 1 1.83 1.83 1.83 25 25 45.75Subtotal 1 1.83 25 45.75

Total 150 262.5

Page 5: Metode Penampang

Section 2

Page 6: Metode Penampang

Perhitungan Section 2

HoleFrom To Depth %Ni

D x %NiAverage

HoleHle

Width W x D W x D x%NiAverage %Ni

(m) (m) D (m) (%) (%) W (m) (m2) (%m2)

H114163 4 1 1.51 1.51

1.79 2525 37.75

1.831818182

4 5 1 2.19 2.19 25 54.755 6 1 1.67 1.67 25 41.75

Subtotal 3 5.37 75 134.25H11516 0 1 1 1.55 1.55 1.77 25 25 38.75

1 2 1 1.99 1.99 25 49.75Subtotal 2 3.54 50 88.5

H11616 0 0 0 0 0 0 25 0 0Subtotal 0 0 0 0

H11716 0 0 0 0 0 0 25 0 0Subtotal 0 0 0 0

H11816 0 0 0 0 0 0 25 0 0Subtotal 0 0 0 0

H11916 0 1 1 1.94 1.94 1.87 25 25 48.5 1 2 1 1.85 1.85 25 46.25 2 3 1 2.01 2.01 25 50.25 3 4 1 2.04 2.04 25 51 4 5 1 1.67 1.67 25 41.75 5 6 1 1.73 1.73 25 43.25

Subtotal 6 11.24 150 281Total 275 503.75

Page 7: Metode Penampang

Section 3

Page 8: Metode Penampang

Perhitungan Section 3

HoleFrom To Depth %Ni

D x %Ni

Average Hole

Hle Width W x D W x D x%Ni Average

%Ni(m) (m) D (m) (%) (%) W (m) (m2) (%m2)

H11415 0 0 0 0 0 0 25 0 0

2.203333333

Subtotal 0 0 0 0H11515 0 0 0 0 0 0 25 0 0

Subtotal 0 0 0 0 2 3 1 1.8 1.8 25 45 3 4 1 2.89 2.89 25 72.25 4 5 1 3.66 3.66 25 91.5 5 6 1 2.64 2.64 25 66 6 7 1 1.87 1.87 25 46.75 7 8 1 1.77 1.77 25 44.25

H11615 8 9 1 1.5 1.5 2.304286 25 25 37.5

Subtotal 7 16.13 175 403.25H11715 2 3 1 1.66 1.66 0 25 25 41.5

Subtotal 1 1.66 25 41.5H11815 0 0 0 0 0 0 25 0 0

Subtotal 0 0 0 0H11915 5 6 1 2.04 2.04 2.04 25 25 51

Subtotal 1 2.04 25 51Total 225 495.75

Page 9: Metode Penampang

Section 4

Page 10: Metode Penampang

Perhitungan Section 4

HoleFrom To Depth %Ni

D x %Ni

Average Hole

Hle Width W x D W x D x%Ni Average

%Ni(m) (m) D (m) (%) (%) W (m) (m2) (%m2)

H11414

0 1 1 1.56 1.56

1.816 25

25 39

2.045263158

1 2 1 1.77 1.77 25 44.252 3 1 2.2 2.2 25 553 4 1 2.01 2.01 25 50.254 5 1 1.54 1.54 25 38.5

Subtotal 5 9.08 125 227H11514 3 4 1 1.86 1.86 2.1675 25 25 46.5

4 5 1 3.1 3.1 25 77.5 5 6 1 1.88 1.88 25 47 6 7 1 1.83 1.83 25 45.75

Subtotal 4 8.67 100 216.75H11614 1 2 1 2.54 2.54 2.254 25 25 63.5

2 3 1 2.91 2.91 25 72.75 3 4 1 2.2 2.2 25 55 4 5 1 1.92 1.92 25 48 5 6 1 2.81 2.81 25 70.25 6 7 1 1.93 1.93 25 48.25 7 8 1 1.92 1.92 25 48 8 9 1 1.97 1.97 25 49.25 9 10 1 2.28 2.28 25 57 10 11 1 2.06 2.06 25 51.5

Subtotal 10 22.54 250 563.5

Page 11: Metode Penampang

Sambungan Section 4…..H1171

4 4 5 1 2.77 2.77 2.2975 25 25 69.25

5 6 1 2.16 2.16 25 54 6 7 1 2.53 2.53 25 63.25 7 8 1 2.93 2.93 25 73.25 8 9 1 2.54 2.54 25 63.5 9 10 1 2.41 2.41 25 60.25 10 11 1 1.09 1.09 25 27.25 11 12 1 1.95 1.95 25 48.75

Subtotal 8 18.38 200 459.5H1181

4 2 3 1 1.91 1.91 1.701111 25 25 47.75

3 4 1 2.12 2.12 25 53 4 5 1 1.48 1.48 25 37 5 6 1 1.33 1.33 25 33.25 6 7 1 1.7 1.7 25 42.5 7 8 1 1.9 1.9 25 47.5 8 9 1 1.34 1.34 25 33.5 9 10 1 1.67 1.67 25 41.75 10 11 1 1.86 1.86 25 46.5

Subtotal 9 15.31 225 382.75H1191

4 6 7 1 2.04 2.04 1.87 25 25 51

7 8 1 1.7 1.7 25 42.5Subtotal 2 3.74 50 93.5

Total 950 1943

Page 12: Metode Penampang

Section 5

Page 13: Metode Penampang

Perhitungan Section 5

HoleFrom To Depth %Ni

D x %Ni

Average Hole

Hle Width W x D W x D x%Ni Average

%Ni(m) (m) D (m) (%) (%) W (m) (m2) (%m2)

H11413 5 6 1 2.24 2.24 2.24 25 25 56

1.897241379

Subtotal 1 2.24 25 56H11513 7 8 1 1.53 1.53 1.515 25 25 38.25

8 9 1 1.5 1.5 25 37.5Subtotal 2 3.03 50 75.75

H11613 5 6 1 1.68 1.68 1.8 25 25 42 6 7 1 1.97 1.97 25 49.25 7 8 1 1.61 1.61 25 40.25 8 9 1 1.87 1.87 25 46.75 9 10 1 1.87 1.87 25 46.75

Subtotal 5 9 125 225

H11713 0 1 1 2.17 2.17 1.835556 25 25 54.25

1 2 1 2.59 2.59 25 64.75 2 3 1 2.42 2.42 25 60.5 3 4 1 2.25 2.25 25 56.25 4 5 1 1.91 1.91 25 47.75 5 6 1 0.93 0.93 25 23.25 6 7 1 0.99 0.99 25 24.75 7 8 1 1.76 1.76 25 44 8 9 1 1.5 1.5 25 37.5

Subtotal 9 16.52 225 413

Page 14: Metode Penampang

Sambungan Section 5…..H11813 4 5 1 3.05 3.05 0 25 25 76.25

Subtotal 1 3.05 25 76.25

H11913 4 5 1 1.65 1.65 1.925455 25 25 41.25

5 6 1 1.95 1.95 25 48.75

6 7 1 2.97 2.97 25 74.25

7 8 1 2.4 2.4 25 60

8 9 1 2.08 2.08 25 52

9 10 1 2.46 2.46 25 61.5

10 11 1 1.9 1.9 25 47.5

11 12 1 1.69 1.69 25 42.25

12 13 1 1.3 1.3 25 32.5

13 14 1 1.25 1.25 25 31.25

14 15 1 1.53 1.53 25 38.25

Subtotal 11 21.18 275 529.5

Total 725 1375.5

Area conversion factor (50)(50)

2500 ft3/ln2

Tonnage factor 14,0 ft3/ton Total tonnage 415291,07Average grade 56,63%

Page 15: Metode Penampang
Page 16: Metode Penampang