MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual Report Section 10 of Public Act 24 of 1995, being MCL 207.810, requires an annual report of the activities of the Michigan Economic Growth Authority (MEGA) to the Michigan Legislature. Pursuant to this requirement, attached is the Fiscal Year 2015 report. If you have any questions regarding the information in this report, please contact our Office of Legislative Affairs at 517.335.1847. Attachment cc: Ellen Jeffries, Director, Senate Fiscal Agency Mary Ann Cleary, Director, House Fiscal Agency
55

MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Jun 07, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

MEMORANDUM

DATE: October 1, 2015

TO: Members of the Michigan Legislature

FROM: Steve ArwoodCEO

SUBJECT: FY 2015 MEGA Annual Report

Section 10 of Public Act 24 of 1995, being MCL 207.810, requires an annual report of

the activities of the Michigan Economic Growth Authority (MEGA) to the Michigan

Legislature. Pursuant to this requirement, attached is the Fiscal Year 2015 report.

If you have any questions regarding the information in this report, please contact our

Office of Legislative Affairs at 517.335.1847.

Attachment

cc: Ellen Jeffries, Director, Senate Fiscal Agency Mary Ann Cleary, Director, House Fiscal Agency

Page 2: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

MEGA FY 2015 Report to the Michigan Legislature

Narrative

As required by Public Act 24 of 1995, as amended, and PA122 of 1941, as amended, below are statements

that address the reporting requirements for the Michigan Economic Growth Authority (MEGA) fiscal year

(FY) 2015 beginning October1, 2014 and ending September 30, 2015.

With the repeal of the Michigan Business Tax (MBT) and the transfer of the MEGA to the Michigan Strategic

Fund by Executive Order 2012-09, there were no MEGA agreements executed in FY 2015, and with the

repeal no authority exists to award new tax credits against the MBT.

In the FY 2015 reporting year, the MEGA issued 192 tax credit certificates. All MEGA Annual Certificate

Applications supporting documentation are reviewed for compliance prior to approval. After being reviewed,

approved, and issued a tax credit certificate, the company is responsible for attaching the signed MEGA

Tax Credit Certificate to its MBT filing to obtain a credit or refund, depending on its tax liability, from the

Michigan Department of Treasury.

As in previous years, companies were asked to include their job creation numbers even if they did not meet

the MEGA requirements and did not receive a tax credit certificate. The “Did Not Qualify” (DNQ) notation

on the MEGA Total Jobs & Investment Reported for Each Year report that is attached signifies that the

company filed a DNQ form and reported their job creation number but was ineligible for a credit certificate.

This information is submitted by the company voluntarily. The amount of capital investment made by each

company is reported voluntarily for the majority of MEGAs and is a statutory requirement for MEGA

Retention credits.

Companies that have received a standard credit and a retention credit for one project are noted in the

MEGA Total Jobs & Investment Reported for Each Year report in the same tax year. It is possible for a

company to collect a Retention credit and not the Standard credit, but it is not administratively possible for

a company to collect on the Standard credit and not the Retention credit. Companies that have received

both credits are reported in one year on two separate lines, showing the job creation on one line and the

job retention on the next line.

Although the MEGA program is a tax year program, job creation and job retention data found in the reporting

is for a company’s tax year, which varies among companies, rather than Michigan’s fiscal year. The jobs

reported for a particular year are the total jobs created and/or maintained for that tax year. Many companies

receive extensions to file their MBT forms; thus Business Compliance staff may receive an Annual

Certificate Application for a MEGA tax credit up to four years after the company’s actual tax year has ended.

No new MEGAs were approved in FY 2015. Therefore, this report does not contain information regarding

corporation directors and officers of similar positions within limited liability companies, or fees, donations or

other payments as this information was collected and reported in past annual reports for newly approved

MEGAs.

Page 3: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Below is a synopsis of the program measurements:

Jobs created/maintained (excludes retention jobs) in 2013: 21,162

Jobs created/maintained (excludes retention jobs) in 2014: 12,282

Jobs created/maintained (excludes retention jobs) in 2015: 235

Required capital investment under the retention portion of the program:

Capital investment in 2013: $2,103,977,594

Capital investment in 2014: $ 28,561,309

Total of all capital investment, including required retention reporting (see above) and that submitted

voluntarily:

Total capital investment in 2013: $2,951,986,395

Total capital investment in 2014: $ 163,122,065

Total capital investment in 2015: $ 209,157

Page 4: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

Advanced Integrated Tooling Solutions, LP Chesterfield Township 616 2010 Approved 131 - $4,973,953

2011 Approved 207 - $5,107,259

2012 Approved 234 - $1,060,540

2013 Approved 237 - $493,933

2014 Approved 200 - $1,837,150

Johnson Technology, Inc. Muskegon 549 2010 Did Not Qualify 40 - -

2011 Approved 83 - $33,252,193

Models & Tools, Inc. Shelby Township 508 2010 Approved 52 - $3,263,425

2011 Approved 70 - $3,388,661

Skilled Aerospace Division Traverse City 604 2010 Approved 16 - $3,377,224

2011 Approved 26 - $1,092,180

A123 Systems, LLC Romulus 566 2010 Approved 186 - $156,155,136

2011 Approved 471 - $38,190,021

2012 Approved 511 - $10,028,300

ALTe Auburn Hills 622 2011 Approved 20 - $2,343,842

2012 Approved 27 - $127,177

General Motors Subsystems Mfg LLC Detroit 521 2011 Did Not Qualify - 72 -

2012 Approved - 100 $40,041,585

2013 Did Not Qualify - 78 -

LG Chem Michigan, Inc. Holland 569 2013 Approved 34 - $291,525,403

2014 Approved 75 - $2,058,679

Magna Electronics Holly 598 2011 Approved 115 - -

2012 Approved 50 - -

2013 Approved 50 - -

Magna Holdings of America, Inc. Auburn Hills 642 2011 Approved 259 - -

2012 Approved 442 - -

2013 Approved 472 - -

2014 Approved 509 - -

soulbrain MI Northville 615 2011 Approved 18 - -

XALT Energy, LLC Midland 568 2012 Approved 128 - $57,431,398

2013 Approved 89 - -

2014 Approved 101 - -

MEGA Total Jobs & Investment Reported for Each Year

Aerospace

Alternative Energy - Advanced Energy Storage

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 1 of 52

Page 5: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Adaptive Materials, Inc Ann Arbor 381 2008 Approved 22 - -

2009 Approved 25 - -

2010 Approved 21 - $2,092,298

2011 Approved 25 - $904,146

2012 Approved 25 - $940,385

Cobasys, LLC Orion Township 241 2005.1 Approved 24 - -

2005.2 Approved 43 - -

2006 Approved 62 - -

2007 Approved 83 - -

2008 Approved 62 - -

Hemlock Semiconductor Corporation Hemlock 259 2006 Approved 56 - -

2007 Approved 60 - -

2008 Approved 60 - -

2009 Approved 60 - -

2010 Approved 60 - -

2011 Approved 60 - -

2012 Approved 59 - -

2013 Approved 60 - -

2014 Approved 60 - -

Hemlock Semiconductor Corporation Hemlock 306 2007 Approved 117 - -

2008 Approved 148 - -

2009 Approved 150 - -

2010 Approved 150 - -

2011 Approved 149 - -

2012 Approved 150 - -

2013 Approved 150 - -

2014 Approved 150 - -

LG Chem Power Inc Troy 290 2005 Approved 5 - -

2006 Approved 7 - -

2007 Approved 15 - -

2008 Approved 42 - -

2009 Approved 54 - -

2010.1 Approved 67 - $2,568,388

2010.2 Approved 63 - -

Alternative Energy - Other

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 2 of 52

Page 6: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2011 Approved 78 - $4,484,275

2012 Approved 79 - $2,877,144

2013 Approved 80 - $1,279,591

Sakti3, Inc. Ann Arbor 416 2009 Approved 8 - $3,590,542

2010 Approved 10 - $191,212

2011 Approved 18 - $337,587

2012 Approved 24 - $712,745

United Solar Ovonic Corporation Auburn Hills 288 2006 Approved 139 - -

2007.1 Approved 229 - -

2007.2 Approved 228 - -

2008 Approved 247 - -

2010 Approved 138 - -

2011 Approved 121 - -

United Solar Ovonic, LLC Greenville 312 2008 Approved 171 - $209,327,205

2009 Approved 277 - -

2010 Approved 123 - -

2011 Approved 258 - -

Hemlock Semiconductor Corporation Hemlock 365 2008 Approved 76 - -

2009 Approved 225 - -

2010 Approved 270 - -

2011 Approved 269 - -

2012 Approved 269 - -

2013 Approved 225 - -

2014 Approved 270 - -

Hemlock Semiconductor Corporation Hemlock 495 2011 Approved 137 - -

2012 Approved 152 - -

2013 Did Not Qualify - - -

2014 Approved 7 - -

The Dow Chemical Company Midland 623 2011 Approved 481 - $111,677,336

2012 Approved 678 - $123,182,080

2013 Approved 356 - $167,585,203

Cascade Engineering, Inc. Grand Rapids 664 2011 Approved 19 - $645,202

2012.1 Approved 50 - $61,503

Alternate Energy - Solar

Alternate Energy - Wind

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 3 of 52

Page 7: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2012.2 Approved 71 - $491,736

2013 Approved 72 - $1,198,441

Danotek Motion Technologies, LLC Canton 456 2009 Approved 8 - $2,580,252

2010 Approved 14 - $2,371,909

2011 Approved 37 - $921,746

Dokka Fasteners, Incorporated Auburn Hills 698 2011 Approved 27 - $8,328,170

2012 Approved 35 - $12,204,008

2013 Approved 29 - $79,196

2014 Approved 33 - $74,131

Energetx Composites, LLC Holland 553 2011 Approved 24 - -

2012.1 Approved 32 - -

2012.2 Approved 53 - -

Acument Global Technologies Sterling Heights 714 2011 Approved 50 - $5,285,595

2012 Approved 93 - $2,289,722

2013 Approved 112 - -

2014 Approved 97 - -

Affinia Group Inc. Ann Arbor 266 2007 Approved 65 - -

Akebono Brake Corporation Farmington Hills 589 2010 Approved 59 - $1,157,883

2011 Approved 83 - $3,401,931

Alphi Manufacturing, Inc. Jonesville 246 2005 Approved 26 - -

2006 Approved 72 - -

2007 Approved 60 - -

American Axle & Manufacturing, Inc. Three Rivers 107 2002 Approved 233 - -

2003 Approved 233 - -

2004 Approved 205 - -

ArvinMeritor Automotive, Inc. Detroit 092 2001 Approved 166 - -

2002 Approved 157 - -

2003 Approved 166 - -

2004 Approved 166 - -

2005 Approved 166 - -

2006.1 Approved 157 - -

2006.2 Approved 172 - -

2007.1 Approved 123 - -

2007.2 Approved 125 - -

Automotive - Manufacturing

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 4 of 52

Page 8: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Asama Coldwater Manufacturing, Inc. Coldwater 019 1998 Approved 164 - -

1999 Approved 216 - -

2000 Approved 272 - -

2001 Approved 293 - -

2002 Approved 300 - -

2003 Approved 300 - -

2004 Approved 300 - -

2005 Approved 288 - -

2006 Approved 300 - -

ASIMCO Camshaft Specialties Grand Haven 034 1998 Approved 98 - -

1999 Approved 140 - -

2000 Approved 146 - -

2001 Approved 117 - -

Auto Alliance International, Inc Flat Rock 180 2004 Approved 1,389 - -

2004 Approved - 1,961 $547,000,000

2005 Approved 1,389 - -

2005 Approved - 1,961 -

2006 Approved 1,121 - -

2006 Approved - 1,961 -

2007 Approved 1,073 - -

2007 Approved - 1,961 -

2008 Approved 972 - -

2008 Approved - 1,961 -

2009 Approved 88 - -

2009 Approved - 1,961 -

2010 Approved 75 - -

2010 Approved - 2,165 -

Avon Automotive Cadillac 328 2007 Approved - 414 $283,377

Axle Alliance Redford Township 173 2004 Approved 126 - -

2008 Approved 78 - -

2011 Approved 85 - -

2012 Approved 108 - -

2013 Approved 177 - -

Behr America, Inc Troy 095 2002 Approved 83 - -

2003 Approved 92 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 5 of 52

Page 9: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2004 Approved 105 - -

2005 Approved 105 - -

2006 Approved 105 - -

2007 Approved 105 - -

2008 Approved 105 - -

2009 Approved 105 - -

2010 Approved 105 - $931,466

2011 Approved 142 - $51,437

Behr-Hella Thermocontrol, Inc. Wixom 406 2009 Approved 7 - -

2010 Approved 22 - -

Benteler Automotive Corporation Auburn Hills 737 2012 Approved 234 - $427,974

2013 Approved 201 - $340,257

2014 Approved 312 - $11,571,993

BMW Hybrid Technology Corporation Troy 357 2006 Approved 51 - -

2007 Approved 59 - -

2008 Approved 55 - -

BorgWarner, Inc. Auburn Hills 214 2005 Approved 90 - -

214 2006 Approved 85 - -

214 2007 Did Not Qualify 69 - -

Bosal Warren 040 1999 Approved 110 - -

2000 Approved 110 - -

2001 Approved 110 - -

2002 Approved 110 - -

2003 Approved 110 - -

Brembo North America Homer, Inc Homer 433 2009 Approved - 101 $11,309,183

2010 Approved 68 - -

2010 Approved - 105 $5,470,961

2011 Approved 110 - -

2011 Approved - 106 $10,828,084

2012 Approved 144 - -

2012 Approved - 107 $11,223,567

2013 Approved 239 - -

2013 Approved - 104 $50,119,768

2014 Approved 337 - -

Brose North America, Inc. Auburn Hills 187 2005 Approved 138 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 6 of 52

Page 10: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2006 Approved 119 - -

2007 Approved 157 - -

2008 Approved 191 - -

2009 Approved 172 - $840,891

2010 Approved 192 - $1,959,192

2011 Approved 232 - $1,741,701

2012 Approved 248 - $1,274,902

2013 Approved 277 - -

Caparo Vehicle Components, Inc. Novi 608 2010 Approved - 131 $8,184,288

608 2011 Approved - 133 $131,402

Changan US R&D Center, Inc Plymouth 726 2012 Approved 18 - $224,386

2013 Approved 20 - $141,026

2014 Approved 29 - $1,852,709

Chrysler Group LLC Auburn Hills 356 2006 Approved 204 - -

2007.1 Approved 219 - -

2007.2 Approved 246 - -

2008 Approved 227 - -

2009 Approved 45 - -

Chrysler Group LLC Trenton 366 2010 Did Not Qualify - 328 -

2011 Approved - 484 $55,821,956

Chrysler Group LLC Detroit 394 2010 Approved - 243 $319,030,210

2011 Approved - 356 $20,559,274

Chrysler LLC Sterling Heights 273 2007 Approved - 5,123 $487,253,000

Chrysler LLC Sterling Heights 273 2008.1 Approved - 4,567 -

Chrysler LLC Sterling Heights 273 2008.2 Approved - 3,420 -

Chrysler LLC Sterling Heights 273 2010 Approved - 2,692 -

Chrysler LLC Sterling Heights 273 2011 Approved - 3,870 $101,587,233

Delphi Corporation Troy 106 2002 Approved 600 - -

2003 Approved 600 - -

2004 Approved 600 - -

2005 Approved 600 - -

2006 Approved 500 - -

2007 Approved 456 - -

2008 Approved 387 - -

2009 Approved 239 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 7 of 52

Page 11: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Delphi Corporation Troy 364 2010 Approved - 925 $21,800,000

2011 Approved - 896 -

2012 Approved - 1,085 -

2013 Approved - 1,090 -

Detroit Chassis, LLC Detroit 069 2000 Approved 226 - -

2001.1 Approved 88 - -

2001.2 Approved 78 - -

Detroit Diesel Corporation Detroit 657 2011 Approved - 1,013 $74,720,834

2012 Approved - 1,522 $50,827,848

2013 Approved - 1,697 $45,982,886

Detroit Manufacturing Systems, LLC Detroit 775 2013 Approved 564 - $21,597,053

EcoMotors International Allen Park 421 2010 Approved 6 - $317,042

2011 Approved 21 - $374,721

2012 Approved 32 - $63,668

2013 Approved 22 - $16,816

2014 Approved 32 - -

Engineered Machined Products, Inc. Escanaba 053 1999 Approved 78 - -

2000 Approved 98 - -

2001 Approved 128 - -

2002 Approved 151 - -

2003 Approved 139 - -

2004 Approved 175 - -

2005 Approved 175 - -

2006 Approved 175 - -

2007 Approved 141 - -

2008 Approved 121 - -

2009 Did Not Qualify - - -

2010 Approved 82 - $992,582

2011 Approved 115 - $2,082,941

2012 Approved 93 - $1,562,197

2013 Approved 84 - -

2014 Approved 75 - -

Engineered Plastic Components St. Clair 483 2010 Approved 52 - -

2011 Approved 79 - -

Faurecia Interior Systems Inc. Fraser 277 2006 Approved 181 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 8 of 52

Page 12: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2007 Approved 260 - -

2008 Approved 271 - -

2009 Did Not Qualify - - -

2010 Approved 196 - $3,231,605

2011 Approved 445 - $5,940,069

Faurecia North America Auburn Hills 195 2005 Approved 159 - -

2006 Approved 136 - -

2007 Approved 109 - -

2008 Approved 181 - -

Federal Mogul Corporation Southfield 265 2005 Approved - 1,866 $9,073,133

2006 Approved - 1,866 -

2007 Approved - 1,627 -

2008 Approved - 1,599 -

2009 Approved - 1,296 -

2010 Approved - 1,331 $14,435,000

2011 Approved - 1,400 $0

2012 Approved - 1,437 $0

2013 Approved - 1,446 $0

2014 Approved - 1,446 -

FEV North America, Inc. Auburn Hills 351 2008 Did Not Qualify 59 - -

FEV North America, Inc. Auburn Hills 351 2009 Did Not Qualify 16 - -

FEV North America, Inc. Auburn Hills 351 2010 Did Not Qualify - - -

FEV North America, Inc. Auburn Hills 351 2011 Approved 31 - -

Fiat Chrysler Automobiles US LLC Sterling Heights 692 2012 Approved - 18,034 $1,803,442,255

2013 Approved - 20,000 $747,153,353

Ford Motor Company Dearborn 129 2004 Approved - 2,315 -

2005 Approved - 2,763 -

2006 Approved - 2,594 -

2007 Approved - 2,863 -

2008 Approved - 2,925 -

2009 Approved - 3,080 -

2010 Approved - 3,262 -

Ford Motor Company Wayne 221 2005 Approved - 6,692 $250,000,000

2006 Approved - 2,216 -

2007 Approved - 789 -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 9 of 52

Page 13: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2009 Approved - 2,662 -

2010 Approved - 3,193 -

Ford Motor Company Dearborn 324 2007 Approved - 13,724 -

2008 Approved - 12,208 -

2009 Approved - 10,651 -

2010 Approved - 8,757 -

Gemini Group, Inc. Bad Axe 735 2011 Approved - 564 $21,634,480

2012 Approved 80 - -

2012 Approved - 555 $16,404,535

2013 Approved 66 - -

2013 Approved - 559 $13,022,018

2014 Approved 187 - -

2014 Approved - 555 $19,793,006

General Motors LLC Lansing 083 2001 Approved - 688 $513,589,800

2002 Approved - 980 -

2003 Approved - 1,441 -

2004 Approved - 1,865 -

2005 Approved - 1,871 -

2006 Approved - 1,597 -

2007 Approved - 1,462 -

2008 Approved - 2,041 -

2009.1 Approved - 873 -

2009.2 Approved - 1,290 -

General Motors LLC Lansing 112 2005 Approved - 666 $543,787,148

2006 Approved - 2,273 -

2007 Approved - 2,800 -

2008 Approved - 2,800 -

2009.1 Approved - 1,316 -

2009.2 Approved - 2,376 -

General Motors LLC Lake Orion 186 2005 Approved - 2,288 $257,100,000

2006 Approved - 2,288 -

2007 Approved - 2,288 -

2008 Approved - 2,288 -

2009.1 Approved - 1,602 -

2009.2 Approved - 1,334 -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 10 of 52

Page 14: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

General Motors LLC Ypsilanti 191 2006 Approved - 626 $250,000,000

2007 Approved - 850 -

2008 Approved - 850 -

2009.1 Approved - 850 -

2009.2 Approved - 516 -

General Motors LLC Warren 227 2006 Approved - 1,065 $290,297,000

2007 Approved - 1,138 -

2008 Approved - 1,145 -

2009.1 Approved - 603 -

2009.2 Approved - 570 -

General Motors LLC Flint 264 2006 Approved - 2,678 $400,000,000

2007 Approved - 2,834 -

2008 Approved - 2,862 -

2009.1 Approved - 1,368 -

2009.2 Approved - 2,063 -

General Motors LLC Troy 355 2006 Approved - 80 -

2007 Approved - 103 -

2008 Approved - 120 -

2009.1 Approved - 106 -

2009.2 Approved - 28 -

General Motors LLC Detroit 362 2008 Approved - 880 $253,104,458

2009.1 Approved - 725 -

2009.2 Approved - 715 -

General Motors LLC Detroit 595 2010 Approved - 19,380 $968,995,489

2011 Approved - 30,336 $681,903,537

2012 Approved - 31,667 $869,136,438

2013 Approved - 32,412 $959,406,796

Gentex Corporation Zeeland 193 2006 Approved 393 - -

2007 Approved 562 - -

2008 Approved 611 - -

2009 Approved 284 - -

2010 Approved 638 - -

2011 Approved 625 - -

2012 Approved 618 - -

2013 Approved 631 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 11 of 52

Page 15: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Gestamp Mason, LLC. Mason 033 2002 Approved 150 - -

2003 Approved 150 - -

2004 Approved 154 - -

2005 Approved 157 - -

2006 Approved 167 - -

2007 Approved 172 - -

2008 Approved 193 - -

2009 Approved 162 - $7,375,791

2010 Approved 194 - $1,992,875

2011 Approved 235 - $20,536,828

2012 Approved 251 - $35,578,422

2013 Approved 284 - -

2014 Approved 307 - -

Gibbs Technologies, Limited Auburn Hills 434 2009 Approved 59 - -

2010 Approved 60 - -

2011 Approved 56 - $501,378

2012.1 Approved 61 - $504,120

2012.2 Approved 66 - $410,533

2013 Approved 62 - $356,721

Global Engine Manufacturing Alliance LLC Dundee 200 2005 Approved 156 - -

2006 Approved 198 - -

2007 Approved 195 - -

2008 Approved 198 - -

2009 Approved 220 - -

2010 Approved 243 - $13,218,100

2011 Approved 208 - $0

Global Engine Manufacturing Alliance LLC Dundee 593 2010 Approved 65 - -

2011 Approved 193 - $113,346,165

Grupo Antolin Michigan Marlette 203 2004 Approved 107 - -

2005 Approved 197 - -

2006 Approved 186 - -

2007 Approved 185 - -

2008 Approved 178 - -

2009 Approved 120 - -

2010 Approved 128 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 12 of 52

Page 16: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2011 Approved 197 - -

2012 Approved 275 - -

2013 Approved 278 - -

Grupo Antolin Michigan Marlette 258 2006 Approved 13 - -

Hi-Lex Controls, Inc. Litchfield 028 1997 Approved 98 - -

1998 Approved 155 - -

1999 Approved 197 - -

2000 Approved 197 - -

2001 Approved 197 - -

2002 Approved 197 - -

2003 Approved 197 - -

2004 Approved 197 - -

2005 Approved 197 - -

2006 Approved 196 - -

Hi-Lex Controls, Incorporated Hudson 142 2003 Approved 113 - -

2004 Approved 162 - -

2005 Approved 128 - -

2006 Approved 132 - -

2007 Approved 139 - -

2008.1 Approved 83 - -

2008.2 Approved 85 - -

Hyundai-Kia America Technical Center, Inc. Superior Township 213 2006 Approved 76 - -

2007 Approved 86 - -

2008 Approved 100 - -

2009 Approved 104 - -

2010 Approved 94 - $28,780,817

2011 Approved 104 - $67,090,489

2012 Approved 121 - $34,636,582

2013 Approved 113 - $37,275,668

2014 Approved 112 - $32,740,608

IAV Automotive Engineering, Inc. Northville 372 2008 Approved 28 - -

Inalfa Roof Systems Holly 201 2005 Approved 146 - -

2006 Approved 133 - -

Inergy Automotive Systems USA, LLC Adrian 001 1997 Approved 150 - -

1998 Approved 207 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 13 of 52

Page 17: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

1999 Approved 215 - -

2000.1 Approved 225 - -

2000.2 Approved 212 - -

2001 Approved 198 - -

2002 Approved 167 - -

2003 Approved 185 - -

2004 Approved 191 - -

2005 Approved 190 - -

2006 Approved 158 - -

2007 Approved 163 - -

2008 Approved 157 - $9,675,739

International Automotive Components Dearborn 397 2010 Approved - 1,708 -

2011 Approved - 2,118 $29,755,825

2012 Approved - 2,244 $16,904,262

2013 Approved - 2,399 $14,181,259

Inteva Products, LLC Troy 670 2011 Approved 15 - $3,056,266

2012 Approved 25 - -

JAC Products, Inc. Saline 682 2011 Approved 68 - $2,270,985

2012 Approved 97 - -

2013 Approved 74 - -

Johnson Controls Interior Mfg, LLC Monroe 206 2004 Approved 153 - -

2005 Approved 305 - -

2006 Approved 643 - -

Johnson Controls Interiors Manufacturing Romulus 177 2003 Approved 280 - -

2004 Approved 400 - -

2005 Approved 400 - -

2006 Approved 400 - -

Johnson Controls, Inc Rockwood 089 2001 Approved 115 - -

2003 Approved 115 - -

2004 Approved 115 - -

Katcon Usa, Inc. Auburn Hills 618 2011 Did Not Qualify 3 - -

Kolbenschmidt Pierburg Auburn Hills 370 2008 Approved 8 - $4,686,518

2009 Approved 7 - $7,797,323

2010 Approved 13 - -

2011 Approved 19 - $588,189

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 14 of 52

Page 18: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2012 Approved 27 - -

Kostal of America, Inc. Troy 358 2008 Approved 26 - -

2009 Approved 19 - -

2010 Approved 25 - -

2011 Approved 26 - -

2012 Approved 26 - -

2013 Approved 50 - -

2014 Approved 75 - -

Lacks Enterprises, Inc. Grand Rapids 245 2006 Approved 135 - -

2007 Approved 100 - -

Lear Corporation Plymouth 181 2005 Approved 25 - -

2006 Approved 28 - -

Lear Corporation Roscommon 605 2010 Did Not Qualify 3 - -

2010 Approved - 521 $11,747,433

2011 Approved 201 - -

2011 Approved - 677 $2,484,417

2012 Approved 222 - -

2012 Approved - 706 $3,439,138

2013 Approved 293 - -

2013 Approved - 646 $2,998,477

Link Engineering Company Dearborn 673 2011 Approved 5 - $6,638,365

Magna Electronics Holly 764 2012 Approved 57 - -

2013 Approved 121 - -

Magna International of America, Mimco Inc. Troy 766 2012 Approved 169 - -

2013 Approved 349 - -

2014 Approved 580 - -

Magnesium Products of America, Inc. Eaton Rapids 076 2000 Approved 90 - -

2001 Approved 91 - -

2002 Approved 91 - -

2003 Approved 91 - -

2004 Approved 89 - -

2005 Approved 77 - -

2006 Approved 75 - -

2007 Approved 81 - -

2008 Approved 77 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 15 of 52

Page 19: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Mando America Corporation Plymouth 464 2010 Approved 6 - -

2011 Approved 14 - -

2012 Approved 21 - -

Martinrea Industries, Incorporated Clare 013 1997 Approved 106 - -

1998 Approved 221 - -

1999 Approved 308 - -

2000 Approved 142 - -

Martinrea Jonesville LLC Jonesville 572 2011 Approved 111 - -

2011 Approved - 108 $21,140,181

2012 Approved 107 - -

2012 Approved - 161 -

2013 Approved 103 - -

2013 Approved - 104 -

MBtech Autodie LLC Grand Rapids 363 2008 Approved - 203 -

2009 Approved - 204 $1,903,891

2010 Approved - 259 $466,583

2011 Approved - 227 $8,196,650

2012 Approved - 257 $13,848,702

2013 Approved - 278 $8,957,488

Mitsubishi Heavy Industries Climate Control Sterling Heights 225 2005 Approved 8 - -

Mobis North America, LLC Detroit 587 2011 Approved 200 - $6,005,960

2012 Approved 197 - $9,785,353

2013 Approved 199 - $7,643,370

Molex Incorporated Auburn Hills 007 1996 Approved 97 - -

1997 Approved 107 - -

1998 Approved 200 - -

1999 Approved 213 - -

2000 Approved 207 - -

2001 Approved 162 - -

2002 Approved 81 - -

MS Industries Inc. Fowlerville 400 2010 Approved 53 - $20,805,280

2011 Approved 74 - $3,756,460

Neapco Holdings, LLC Belleville 392 2009 Approved 167 - -

2010 Approved 174 - $2,212,981

2011 Approved 175 - $3,418,732

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 16 of 52

Page 20: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2012 Approved 198 - $14,747,171

2013 Approved 287 - $11,450,413

2014 Approved 355 - $26,744,825

Nexteer Automotive Corporation Saginaw 594 2011 Approved - 2,430 $426,000,000

2012 Approved - 2,740 $110,484,179

2013 Approved - 2,865 $115,122,730

Nicholas Plastics, Inc. Allendale 252 2006 Approved 83 - -

Nissan North America, Inc. Farmington Hills 171 2003 Approved 183 - -

2004 Approved 313 - -

2005 Approved 390 - -

2006 Approved 344 - -

2007.1 Approved 300 - -

2007.2 Approved 303 - -

2008 Approved 300 - -

2009 Approved 339 - -

2010 Approved 327 - -

2011.1 Approved 249 - -

2011.2 Approved 248 - -

2012 Approved 296 - -

2013 Approved 365 - -

Otto Bock Polyurethane Technologies Inc. Rochester Hills 715 2012 Approved 19 - $3,491,855

Paragon Metals, Inc. Quincy 408 2008 Approved 37 - -

2009 Approved 52 - $488,737

2010 Approved 51 - $1,129,905

2011 Approved 68 - $1,560,376

2012 Approved 94 - $157,409

2013 Approved 122 - $5,661,572

2014 Approved 216 - $313,686

Petri, Inc. Port Huron 026 1997 Approved 90 - -

1998 Approved 124 - -

1999 Approved 100 - -

POM Group, Inc Auburn Hills 139 2001 Approved 16 - -

2002 Approved 18 - -

2003 Approved 8 - -

R.L. Polk Company Southfield 169 2002 Approved 100 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 17 of 52

Page 21: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2003 Approved 104 - -

2004 Approved 130 - -

2005 Approved 130 - -

2006 Approved 126 - -

2007.1 Approved 127 - -

2007.2 Approved 136 - -

2008 Approved 134 - -

2009 Approved 77 - $23,675,716

Ralco Industries, Inc. Auburn Hills 558 2011 Approved - 54 $5,270,627

2012 Approved - 56 $907,075

2013 Approved - 54 $3,368,623

2014 Approved - 50 $2,572,012

Recticel N.A., L.L.C. Clarkston 156 2004 Approved 131 - -

2005 Approved 151 - -

2006 Approved 84 - -

2007 Approved 75 - -

Robert Bosch LLC Farmington Hills 056 1999 Approved 134 - -

2000 Approved 282 - -

2001 Approved 405 - -

2002 Approved 475 - -

2003 Approved 475 - -

2004 Approved 358 - -

2005 Approved 313 - -

2006 Approved 140 - -

SAF-Holland USA, Inc. Muskegon 049 1998 Approved 105 - -

1999.1 Approved 130 - -

1999.2 Approved 138 - -

2000 Approved 132 - -

Saturn Electronics & Engineering Coopersville 251 2006 Approved 8 - -

2007 Approved 10 - -

Sellner - Behr Corporation Comstock Park 099 2001 Approved 131 - -

099 2002 Approved 133 - -

Shape Corporation Grand Haven 021 1998 Approved 183 - -

1999 Approved 291 - -

2000 Approved 345 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 18 of 52

Page 22: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2001 Approved 393 - -

2002 Approved 400 - -

2003 Approved 400 - -

2004 Approved 400 - -

2005 Approved 391 - -

2006 Approved 398 - -

2007 Approved 462 - $2,277,362

2008 Approved 436 - $4,658,824

2009 Approved 288 - $164,469

2010 Approved 365 - $1,301,783

2011 Approved 404 - $288,287

2012 Approved 420 - -

2013 Approved 472 - -

2014 Approved 549 - -

Spartan Motors, Inc. Charlotte 240 2006 Approved 128 - -

2007 Approved 359 - -

2008 Approved 391 - -

2009 Approved 260 - -

2010 Approved 211 - $1,920,482

2011 Approved 142 - $1,713,791

2012 Approved 85 - $4,451,071

2013 Approved 95 - $477,189

2014 Approved 117 - $1,313,364

Spicer Heavy Axle & Brake Inc. Kalamazoo 055 2000 Approved 139 - -

2001 Approved 115 - -

2002 Approved 124 - -

2003 Approved 153 - -

2004 Approved 155 - -

2005 Approved 151 - -

2006 Approved 116 - -

2007 Approved 123 - -

2008 Approved 116 - -

Tk Holdings Inc. Auburn Hills 646 2011 Approved 7 - $10,286,576

2012.1 Approved 44 - -

2012.2 Approved 60 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 19 of 52

Page 23: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Tower Automotive Plymouth, Inc. Plymouth 006 1996 Approved 149 - -

1997 Approved 247 - -

1998 Approved 75 - -

1999 Approved 247 - -

2000 Approved 247 - -

2001 Approved 247 - -

2002 Approved 247 - -

2003 Approved 247 - -

2004 Approved 247 - -

2005 Approved 243 - -

Toyoda Gosei North America Corporation Troy 234 2005 Approved 8 - -

2006 Did Not Qualify 22 - -

Toyota Motor Engineering & Manufacturing Ann Arbor 282 2009 Approved 231 - $136,956,476

2010 Approved 327 - $1,949,711

2011 Approved 308 - $3,009,288

2012 Approved 360 - $3,623,977

TRW Automotive Inc Livonia 190 2004 Approved 165 - -

2005 Approved 165 - -

2006 Approved 165 - -

2007 Approved 165 - -

2008 Approved 165 - -

2009 Did Not Qualify - - -

2010 Did Not Qualify - - -

2011 Did Not Qualify 20 - -

US Farathane Corporation Auburn Hills 607 2011 Approved 256 - -

2011 Approved - 510 $26,744,456

2012 Approved 474 - -

2012 Approved - 510 $20,892,333

2013 Approved 865 - -

2013 Approved - 464 $22,276,826

Venchurs Inc. Adrian 425 2009 Did Not Qualify - - -

2010 Did Not Qualify 10 - -

2011 Did Not Qualify 6 - -

Ventra Evart, LLC Evart 354 2007 Did Not Qualify - 424 -

2008 Did Not Qualify - 340 -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 20 of 52

Page 24: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Vitec, LLC Detroit 029 1999 Approved 128 - -

2000 Approved 107 - -

Webasto Roof Systems Inc. Rochester Hills 557 2010 Did Not Qualify - - -

Approved - 146 $2,522,893

Did Not Qualify 50 - -

Approved - 149 -

Webasto-Edscha Cabrio USA, Inc. Plymouth 222 2006 Approved 162 - -

2007 Approved 203 - -

2008 Approved 144 - -

2009 Did Not Qualify - - -

2010 Did Not Qualify - - -

2011 Approved 83 - $10,119,321

2012 Approved 81 - $4,747,878

Witzenmann Usa, LLC Troy 653 2012 Approved 75 - $10,201,543

2013 Approved 125 - $8,332,731

Yanfeng (USA) Automotive Trim Systems Harrison Township 694 2012 Approved 69 - $4,748,357

2013 Approved 189 - $1,216,490

ZF Group NAO Northville 179 2004 Approved 26 - -

2005 Did Not Qualify - - -

2006.1 Approved 35 - -

2006.2 Approved 12 - -

2007.1 Approved 25 - -

2007.2 Approved 9 - -

2008 Approved 42 - -

2009 Approved 28 - $2,390,591

2010 Approved 34 - $2,605,693

2011 Approved 57 - $2,758,077

2012 Approved 94 - $813,155

2013 Approved 115 - -

ZF Group NAO Northville 494 2011 Approved 378 - $33,600,617

2012 Approved 493 - -

2013 Approved 475 - $32,265,307

AVL Powertrain Engineering, Inc. Plymouth 321 2007 Approved 84 - -

2008 Approved 125 - -

Automotive - R&D Testing

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 21 of 52

Page 25: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2009 Approved 73 - $2,695,299

2010 Approved 66 - $1,931,604

2011 Approved 116 - $2,130,283

2012 Approved 130 - $1,919,760

2013 Approved 131 - $1,919,760

Continental Automotive Systems Auburn Hills 564 2010 Approved 72 - -

2010 Approved - 119 $64,485,631

2011 Approved 83 - -

2011 Approved - 225 $199,378

2012 Approved 126 - -

2012 Approved - 224 -

Health Care Services Incorporated Detroit 471 2009 Approved 57 - $1,125,178

2010 Approved 65 - $104,047

2011 Approved 100 - $464,022

Kelly Services, Inc. Troy 450 2009 Did Not Qualify - - -

2010 Did Not Qualify - - -

2011 Did Not Qualify - - -

Pulte Homes Corporation Bloomfield Hills 488 2010 Did Not Qualify 35 - -

Quicken Loans, Inc. Troy 231 2004 Approved 161 - -

2005 Approved 331 - -

2006 Approved 518 - -

Reino Linen Service of Michigan Brownstown 480 2009 Did Not Qualify - - -

2010 Did Not Qualify 37 - -

2011 Approved 83 - $10,651,137

Rlptechnologies, Inc. Farmington Hills 235 2004 Approved 16 - -

2005 Approved 27 - -

2006 Approved 26 - -

2007.1 Approved 18 - -

AT&T Inc. Michigan Detroit 279 2005 Approved - 872 $29,858,060

2006 Approved - 1,032 -

2007 Approved - 1,008 -

2008 Approved - 785 -

2009 Approved - 894 -

Business Services

Call Center

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 22 of 52

Page 26: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2010 Approved - 883 -

2011 Approved - 908 -

Comcast Corporation Sterling Heights 299 2007 Approved 194 - -

2008 Approved 190 - -

2009 Approved 269 - -

2010 Approved 199 - $319,436

2011 Approved 203 - -

Morley Companies, Inc. Saginaw 476 2009 Approved 332 - -

2010 Approved 349 - $6,801,396

2011 Approved 350 - -

2012.1 Approved 335 - $107,109

2012.2 Approved 346 - $4,732,422

2013 Approved 347 - -

Morley Companies, Inc. Saginaw 600 2011 Approved 147 - $7,814,686

2012.1 Approved 96 - -

2012.2 Approved 205 - -

2013 Approved 183 - -

2014 Approved 324 - -

priceline.com Wyoming 431 2009 Approved 70 - $2,393,728

2010 Approved 151 - $3,179,077

2011 Approved 272 - $2,747,856

2012.1 Approved 308 - -

2012.2 Approved 473 - -

SBC Internet Services Detroit 468 2009 Approved 172 - $1,843,726

2010 Approved 196 - -

2011 Approved 120 - $0

Systems in Motion, LLC Ann Arbor 578 2010 Approved 51 - $546,575

2011 Did Not Qualify 45 - -

2012 Approved 67 - $290,238

2013 Approved 92 - $583,349

The Minacs Group (USA) Inc. Farmington Hills 633 2012.1 Approved 140 - $1,729,215

2012.2 Approved 108 - $702,120

2013 Approved 397 - $3,600,866

2014 Approved 580 - $2,489,129

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 23 of 52

Page 27: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

ADCO Products Michigan Center 625 2011 Approved 86 - $4,158,292

2012 Approved 81 - $4,470,076

2013.1 Approved 97 - $1,135,766

2013.2 Approved 88 - -

2014 Approved 84 - $1,396,257

BASF Corporation Wyandotte 338 2007 Approved 62 - -

2008 Approved 83 - -

2011 Approved 61 - -

2012 Approved 70 - -

2013 Approved 81 - -

2014 Approved 192 - -

Chemetall US, Inc. Romulus 725 2013 Approved - 77 $1,722,118

Metalloid Corporation Sturgis 734 2012 Approved 16 - $23,362

2013 Approved 19 - $78,423

2014 Approved 18 - $107,994

Wacker Chemical Corporation Adrian 606 2011 Approved - 148 $10,436,995

Axletech International, LLC Troy 612 2011 Approved - 135 $4,024,651

Century Incorporated Traverse City 686 2011 Approved 19 - $4,691,345

Consolidated Resource Imaging, LLC Grand Rapids 591 2010 Approved 9 - $2,454,712

2011 Approved 17 - $1,197,613

2012 Approved 20 - $18,772

2013 Approved 18 - $179,985

2014 Did Not Qualify 17 - $605,901

General Dynamics Land Systems Sterling Heights 407 2008 Approved 144 - -

2009 Approved 203 - $1,336,500

2010 Approved 73 - $13,020,021

Quantum Signal, LLC Saline 671 2011 Approved 5 - $918,993

Testek Inc. Wixom 454 2009 Approved 5 - -

2010 Approved 6 - $1,596

2011 Approved 9 - $30,799

2012 Approved 21 - $36,916

Waltonen Engineering Warren 667 2010 Approved 20 - $2,526,338

2011 Did Not Qualify - - -

Chemicals

Defense/Military

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 24 of 52

Page 28: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Wolverine World Wide, Incorporated Big Rapids 571 2010 Approved 101 - -

2011 Approved 96 - -

Advanced Photonix, Inc. Ann Arbor 308 2007 Approved 16 - -

2008.1 Approved 30 - -

2008.2 Approved 37 - -

2009 Approved 39 - -

2010 Approved 41 - -

2011 Approved 42 - $1,090,542

2012.1 Approved 60 - $528,799

2012.2 Approved 52 - -

2013 Approved 45 - $646,855

2014 Approved 38 - $290,101

2015 Approved 34 - $209,157

Aeroflex Ann Arbor 639 2012.1 Approved 26 - $2,128,857

2012.2 Approved 29 - $311,493

Dow Corning Corporation Auburn 216 2007 Approved 35 - -

2008 Approved 33 - -

2010 Approved 35 - $194,184

2011 Approved 44 - $5,147,662

2012 Approved 97 - $28,532,946

2013 Approved 135 - $30,651,792

2014 Approved 176 - $15,622,900

ECD Ovonics Rochester Hills 128 2002 Approved 22 - -

2003 Approved 23 - -

GE Aviation Grand Rapids 205 2004 Approved 70 - -

2005 Approved 120 - -

2006 Approved 120 - -

2007.1 Approved 118 - -

2007.2 Approved 119 - -

GE Aviation Grand Rapids 296 2005 Approved 12 - -

Gentex Corporation Zeeland 769 2013 Approved 650 - -

PCB Load & Torque (a PCB Group Company) Farmington Hills 554 2010 Approved 20 - $1,164,673

2011 Approved 25 - -

SoundOff Signal Hudsonville 525 2010 Approved 8 - $2,358,636

Electronics

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 25 of 52

Page 29: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2011 Approved 20 - $2,168,303

2012 Approved 39 - $3,239,384

Asset Acceptance Corporation Warren 546 2010 Did Not Qualify 69 - -

Auto-Owners Insurance Lansing 585 2014 Approved 318 - $5,552,211

Chrysler Group LLC Auburn Hills 091 2002 Approved 228 - -

2003 Approved 318 - -

2004 Approved 352 - -

2005 Approved 390 - -

2006 Approved 389 - -

2007.1 Approved 294 - -

2007.2 Approved 377 - -

Credit Acceptance Corporation Southfield 385 2008 Approved 61 - -

Farmers Group, Inc. Caledonia 577 2011 Approved 346 - -

2012 Approved 730 - -

2013 Approved 699 - -

2014 Approved 810 - -

Flagstar Bank, Fsb Troy 081 2001 Approved 442 - -

2002 Approved 442 - -

2003 Approved 706 - -

2004 Approved 464 - -

2005 Approved 327 - -

2006 Approved 675 - -

2007 Approved 771 - -

2008 Approved 1,018 - -

2009 Approved 1,156 - -

2010 Approved 946 - -

2011 Approved 1,039 - -

2012 Approved 1,387 - -

2013 Approved 1,388 - -

2014 Approved 699 - -

Global Futures & Forex, Ltd. Ada 530 2010 Approved 18 - -

2010 Approved - 136 $12,072,566

2011 Approved 20 - -

2011 Approved - 135 -

Financial Services

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 26 of 52

Page 30: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Hagerty Insurance Agency, Inc. Traverse City 479 2009 Approved 32 - -

2010 Approved 28 - $424,123

2011 Approved 41 - $7,261,166

2012 Approved 77 - $7,217,467

2013 Approved 105 - -

2014 Approved 165 - -

North American Bancard, LLC Troy 411 2009 Approved 53 - $11,666,894

2010 Approved 118 - $3,313,991

2011 Approved 160 - $2,616,418

Quicken Loans, Inc. Livonia 275 2004 Approved 172 - -

2005 Approved 294 - -

2006 Approved 498 - -

2007.1 Approved 497 - -

2007.2 Approved 229 - -

Raymond James Regional Operations Center Southfield 268 2006 Approved 76 - -

2007 Approved 146 - -

2008.1 Approved 177 - -

2008.2 Approved 192 - -

2009 Approved 205 - $1,379,037

2010 Approved 199 - $1,245,950

2011 Approved 200 - $4,664,793

Coca-Cola Refreshments Paw Paw 68 1999 Approved 108 - -

2000 Approved 150 - -

2001 Approved 150 - -

2002 Approved 121 - -

2003 Approved 121 - -

2004 Approved 121 - -

2005 Approved 121 - -

2006 Approved 119 - -

2007 Approved 120 - -

2008 Approved 148 - -

2009 Approved 138 - -

2010 Approved 109 - -

Food Processing

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 27 of 52

Page 31: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Coca-Cola Refreshments Paw Paw 108 2003 Approved 84 - -

2004 Approved 78 - -

2006 Approved 77 - -

2007 Approved 92 - -

2008 Did Not Qualify 57 - -

ConAgra Food Packaged Foods, LLC Grand Rapids 643 2011 Approved 73 - $15,927,128

2012.1 Approved 165 - $44,392,860

2012.2 Did Not Qualify 41 - -

Continental Dairy Facilities, LLC Coopersville 532 2013 Approved 60 - $11,786,384

Dawn Food Products, Inc. Jackson 232 2006 Approved 74 - -

2007 Approved 93 - -

2008 Approved 103 - -

2009 Approved 104 - $7,949,816

2010 Approved 122 - -

2011 Approved 115 - -

2012 Approved 120 - -

2013 Approved 123 - -

JBS USA, LLC Plainwell 75 2000 Approved 105 - -

2001 Approved 226 - -

2002 Approved 270 - -

2003 Approved 300 - -

2004 Approved 300 - -

2005 Approved 279 - -

2006 Did Not Qualify 248 - -

2007 Did Not Qualify 267 - -

2008.1 Did Not Qualify 300 - -

2008.2 Did Not Qualify 300 - -

2008.3 Approved 161 - -

2009 Approved 210 - $1,932,591

2010 Approved 183 - -

2011 Approved 246 - -

Kellogg Company Battle Creek 237 2005 Approved 256 - -

2006 Approved 300 - -

2007 Approved 479 - -

2008 Approved 300 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 28 of 52

Page 32: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2009 Approved 296 - -

Kellogg Company Wyoming 305 2006 Approved 84 - -

2007 Approved 122 - -

2008 Approved 131 - -

2009 Approved 176 - -

2010 Approved 193 - -

2011 Approved 226 - $84,985,392

2012 Approved 237 - -

2013 Approved 209 - -

Request Foods, Inc. Holland 447 2010 Approved 105 - $39,681,409

2011 Approved 132 - $44,375,130

2012.1 Approved 132 - $1,928,671

2012.2 Approved 157 - $21,405,382

2013 Approved 235 - $13,827,115

2014 Approved 204 - $2,256,558

Big Rapids Components Big Rapids 003 1997 Approved 219 - -

1998 Approved 324 - -

1999 Approved 335 - -

2000 Approved 326 - -

2001 Approved 303 - -

Case Systems, Inc. Midland 022 1998 Approved 83 - -

1999 Approved 95 - -

2000 Approved 94 - -

2001 Approved 89 - -

2002 Approved 102 - -

2003 Did Not Qualify 52 - -

2004 Did Not Qualify 60 - -

2005 Did Not Qualify 53 - -

2006 Did Not Qualify 70 - -

2007 Approved 89 - -

2008 Approved 78 - -

Haworth, Inc. Holland 243 2005 Approved 133 - -

2006 Approved 115 - -

2007 Approved 186 - -

Furniture

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 29 of 52

Page 33: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2008 Approved 126 - -

Haworth, Inc. Holland 269 2004 Approved 24 - -

2005 Approved 103 - -

2006 Approved 113 - -

Haworth, Inc. Holland 576 2010 Approved 156 - -

2011 Approved 280 - -

2012 Approved 241 - -

2013 Approved 168 - -

Meridian Incorporated Spring Lake 009 1997 Approved 228 - -

1998 Approved 295 - -

1999 Approved 500 - -

2000 Approved 500 - -

2001 Approved 459 - -

2002 Approved 178 - -

2003 Approved 299 - -

2004 Approved 370 - -

2005 Approved 301 - -

2006 Approved 410 - -

2007.1 Approved 417 - -

2007.2 Approved 389 - -

2008 Approved 191 - $5,244,604

2009 Approved 173 - $2,067,145

2010 Approved 326 - $2,700,844

2011.1 Approved 300 - $1,458,562

2011.2 Approved 198 - $4,027,251

2012 Approved 226 - $5,142,909

2013 Approved 187 - $5,142,909

Steelcase, Inc. Grand Rapids 247 2005 Approved 276 - -

2006 Approved 323 - -

2007.1 Approved 287 - -

2007.2 Approved 270 - -

2008 Approved 173 - -

Steelcase, Inc. Grand Rapids 597 2012.1 Approved - 351 $7,813,909

2012.2 Approved - 351 $646,401

2013 Approved - 393 $16,858,870

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 30 of 52

Page 34: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2014 Approved - 382 $3,334,464

ACN, Incorporated Gwinn 102 2001 Approved 75 - -

2002 Approved 80 - -

2003 Approved 146 - -

2004 Approved 223 - -

2005 Approved 170 - -

2006 Approved 145 - -

2007 Did Not Qualify 20 - -

Atomic Object, LLC Grand Rapids 751 2011 Approved 5 - -

Barracuda Networks Ann Arbor 472 2010 Approved 23 - $1,289,435

2011 Approved 42 - -

2012.1 Approved 79 - -

2012.2 Approved 98 - -

2013 Approved 131 - -

2014 Approved 170 - -

2015 Approved 201 - -

CCI Systems, Inc. Iron Mountain 086 2000 Approved 125 - -

2001 Approved 125 - -

Ciber, Inc. Southfield 621 2010 Approved 54 - $3,402,537

Comcast Midwest Management, Inc. Southfield 157 2003 Approved 246 - -

2004 Approved 304 - -

2005 Approved 350 - -

2006 Approved 364 - -

2007 Approved 375 - -

2008 Approved 359 - -

2009 Approved 482 - -

2010 Approved 391 - $376,344

2011 Approved 383 - -

Compuware Corporation Farmington Hills 030 1997 Approved 83 - -

1998 Approved 118 - -

1999 Approved 319 - -

2000 Approved 331 - -

2001 Approved 331 - -

2002 Approved 331 - -

Information Technology

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 31 of 52

Page 35: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2003 Approved 331 - -

Covenant Eyes, Inc Owosso 679 2011 Approved 5 - $75,983

2012 Approved 14 - $653,170

2013 Approved 19 - $278,048

2014 Approved 33 - $374,101

Edgewater Automation St. Joseph 137 2001 Approved 9 - -

2002 Approved 16 - -

2003 Approved 25 - -

2004 Approved 35 - -

2005 Approved 43 - -

FACTON INC. Auburn Hills 360 2007 Approved 5 - -

360 2008 Approved 6 - -

ForeSee Results, Incorporated Ann Arbor 439 2009 Approved 30 - -

2010 Approved 52 - $510,000

2011 Approved 78 - $495,000

2012 Approved 88 - $740,618

2013 Approved 125 - $358,664

GalaxE Solutions, Inc Detroit 634 2011 Approved 81 - $573,271

2012 Approved 83 - $588,945

Genesis10 Troy 666 2010 Approved 33 - $840,742

2011 Approved 107 - $80,497

2012 Approved 83 - $16,329

2013 Approved 71 - -

Google Inc. - AdWords Division Ann Arbor 326 2007 Approved 134 - -

2008 Approved 224 - -

Grand River Interactive, LLC Ann Arbor 648 2010 Approved 6 - $312,440

2011 Approved 12 - $110,522

2012 Approved 15 - -

2013 Approved 26 - -

Harman Becker Automotive Systems Farmington Hills 131 2001 Approved 40 - -

2002 Approved 57 - -

2003 Approved 85 - -

2004 Approved 78 - -

2005 Approved 78 - -

2006 Approved 76 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 32 of 52

Page 36: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2007 Approved 73 - -

HTC Global Services, Incorporated Troy 198 2004 Approved 77 - -

2005 Approved 99 - -

2006 Approved 139 - -

2007 Approved 109 - -

2008 Approved 111 - -

2009 Approved 120 - -

2010 Approved 85 - $1,244,044

ICON Creative Technologies Group Ann Arbor 462 2009 Approved 5 - $1,270,803

ilumisys, Inc. Troy 609 2011 Did Not Qualify 5 - -

Infineon Technologies North America Corp. Livonia 228 2004 Approved 15 - -

2005 Approved 27 - -

2006 Approved 35 - -

2007.1 Approved 33 - -

2007.2 Approved 35 - -

2008 Approved 34 - -

2009 Approved 33 - $23,315

2010 Approved 39 - $525,996

2011.1 Approved 44 - $20,616

2011.2 Approved 45 - $1,077,028

2012 Approved 47 - $2,432,065

2013 Approved 46 - $906,965

Kmart Corporation Troy 117 2000 Approved 431 - -

2001 Approved 146 - -

2002 Did Not Qualify - - -

Lakeside Software, Inc. Bloomfield Hills 754 2012 Approved 6 - $116,845

2013 Approved 7 - $174,440

Media Genesis Inc Troy 378 2007 Approved 5 - -

2008 Approved 5 - -

MyBuys, Inc. Ann Arbor 410 2009 Approved 10 - -

2010 Approved 25 - $500,000

2011 Approved 45 - $565,356

2012 Approved 62 - $503,257

2013 Approved 77 - $784,189

Netlink Madison Heights 361 2007 Approved 16 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 33 of 52

Page 37: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

P3-North America, Inc. Troy 696 2011 Approved 15 - $37,500

Quicken Loans, Inc. Livonia 123 2000 Approved 97 - -

2001 Approved 307 - -

2002.1 Approved 515 - -

2002.2 Approved 515 - -

2003 Approved 515 - -

2004 Approved 515 - -

2005 Approved 515 - -

RIIS, LLC Southfield 514 2009 Approved 6 - -

2010 Approved 8 - -

2011 Approved 12 - $240,102

2012 Approved 17 - $233,589

Secure-24 Inc. Southfield 528 2010 Approved 32 - -

2011 Approved 124 - -

2012 Approved 140 - $2,452,594

Stefanini Tech Team Southfield 017 1996 Approved 133 - -

1997 Approved 130 - -

1999 Approved 185 - -

2000 Approved 183 - -

2001 Approved 163 - -

2002 Approved 154 - -

2003 Approved 115 - -

Strategic Staffing Solutions LC Detroit 584 2011 Approved 106 - $2,037,904

2012 Approved 220 - -

2013 Approved 223 - -

2014 Approved 179 - -

Tata Technologies, Inc. Novi 244 2006 Approved 35 - -

2007 Approved 32 - -

2008.1 Approved 36 - -

2008.2 Approved 32 - -

2009 Did Not Qualify 19 - -

Rigaku Innovative Technologies, Inc. Auburn Hills 138 2003 Approved 7 - -

Auburn Hills 138 2004 Approved 8 - -

Auburn Hills 138 2005 Approved 6 - -

Instuments and Controls

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 34 of 52

Page 38: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Auburn Hills 138 2006 Approved 8 - -

Emergent Biosolutions Lansing 309 2006 Approved - 293 $37,112,518

2007 Approved - 319 -

2008 Approved - 337 -

2009 Approved - 365 $4,011,315

2010 Approved - 322 $4,691,924

2011 Approved - 312 $281,232

2012 Approved - 322 $398,385

2013 Approved - 320 $2,012,259

Emergent Biosolutions Lansing 526 2009 Approved 11 - -

2010 Approved 40 - -

2011 Approved 43 - -

2012 Approved 72 - $398,385

2013 Approved 69 - $2,012,259

Enzo Life Sciences Ann Arbor 278 2007 Approved 20 - -

2008.1 Approved 9 - -

2008.2 Approved 11 - -

Terumo Cardiovascular Systems Ann Arbor 459 2009 Approved 49 - $7,960,135

2010 Approved 60 - $4,997,096

2011.1 Approved 64 - $3,084,060

2011.2 Approved 65 - $2,806,496

2012 Approved 63 - $4,042,159

2013 Approved 64 - $4,351,188

Velesco Pharmaceutical Services Kalamazoo 542 2011 Did Not Qualify 3 - -

Xoran Technologies Ann Arbor 319 2007 Approved 12 - -

2008.1 Approved 21 - -

2008.2 Approved 22 - -

2009 Approved 8 - -

Delphinus Medical Technologies, LLC Plymouth Township 665 2011 Approved 5 - $81,112

2012 Approved 9 - $85,988

2013 Approved 12 - $10,581

2014 Approved 15 - -

Enovate IT Ferndale 697 2011 Did Not Qualify 37 - -

Life Science - Bio Technology

Life Science - Medical Devices/Instruments/Equipment

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 35 of 52

Page 39: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Materialise USA, Inc. Plymouth 628 2011 Approved 12 - $3,722,069

2012 Approved 23 - $231,760

2013 Approved 26 - $481,743

2014 Approved 32 - $579,264

Oxus America, Inc Rochester Hills 685 2011 Did Not Qualify 1 - -

Albemarle Corporation, Inc. South Haven 322 2007 Approved - 120 -

2008 Approved - 115 -

2009 Approved - 122 $1,436,110

2010 Approved - 123 $560,553

2011 Approved - 126 $1,784,603

2012 Approved - 127 $3,046,398

2013 Approved - 123 -

2014 Approved - 129 -

Ash Stevens, Incorporated Riverview 626 2011 Approved 8 - $5,846,981

2012 Approved 9 - $1,091,084

BD Biosciences Accuri Ann Arbor 398 2008 Approved 14 - -

2009 Approved 37 - $939,828

2010 Approved 48 - $981,731

Cayman Chemical Ann Arbor 367 2007.1 Approved 32 - -

2007.2 Approved 41 - -

2008 Approved 28 - -

2009 Approved 21 - $726,707

2010 Approved 25 - $468,945

2011 Approved 36 - $602,905

2012 Approved 49 - $1,065,325

2013 Approved 61 - -

2014 Approved 67 - $407,479

Diplomat Pharmacy, Inc. Flint 637 2011 Approved 60 - $2,524,434

2012 Approved 238 - -

Essen BioScience Ann Arbor 540 2010 Approved 7 - $436,739

2011 Approved 14 - $541,771

2012 Approved 19 - $156,971

2013 Approved 24 - $97,769

Forest Health Services Ypsilanti 118 2002 Approved 97 - -

Life Science - Other

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 36 of 52

Page 40: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Lycera Corporation Ann Arbor 359 2008 Approved 7 - $396,624

2009 Approved 10 - $1,663,608

2010 Approved 13 - $2,003,392

2011 Approved 19 - $2,451,215

Mossberg Labs Kalamazoo 573 2010 Approved 6 - $55,911

2011 Approved 8 - $27,883

NanoBio Corporation Ann Arbor 649 2011 Approved 5 - $466,250

Perrigo Company Allegan 172 2004 Approved 9 - -

2005 Approved 20 - -

2006 Approved 25 - -

2007 Approved 25 - -

2008.1 Approved 25 - -

2008.2 Approved 25 - -

2009 Approved 40 - -

2010 Approved 25 - -

2011 Approved 49 - -

2012.1 Approved 54 - -

2012.2 Approved 58 - -

2013 Approved 60 - -

Perrigo Company Allegan 440 2010 Approved 158 - -

2011 Approved 374 - -

2012.1 Approved 465 - -

2012.2 Approved 380 - -

2013 Approved 740 - -

2014 Approved 761 - -

PureFlex, Inc. Kentwood 341 2008 Approved 35 - -

2009 Approved 50 - -

2010 Approved 52 - $454,773

2011 Approved 68 - -

2012 Approved 83 - $818,497

2013 Approved 99 - -

2014 Approved 87 - $1,542,801

Stryker Corporation World Headquarters Kalamazoo 287 2006 Approved 11 - -

2007 Approved 29 - -

2008 Approved 49 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 37 of 52

Page 41: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Summit Health, Inc. Novi 762 2013 Approved 83 - $2,632,806

2014 Approved 57 - -

BISSELL, Inc. Grand Rapids 460 2009 Approved - 88 $9,331,196

2010 Approved 46 - -

2010 Approved - 79 -

2011 Approved 25 - -

2011 Approved - 79 -

2012 Approved 36 - -

2012 Approved - 79 -

2013 Approved 28 - -

2013 Approved - 79 -

2014 Approved 26 - -

2014 Approved - 79 -

Cartridges Are Us Ithaca 490 2009 Approved 158 - $2,051,251

2010 Approved 220 - $1,505,990

2010 Approved 220 - $1,505,990

2011 Approved 281 - $1,814,266

2012 Approved 259 - $359,203

CertainTeed Ceilings Corp. L'Anse 555 2010 Approved - 89 $3,353,380

2011 Approved - 142 $1,432,034

Duncan Aviation Battle Creek 280 2006 Approved 74 - -

2007 Approved 137 - -

2008 Approved 185 - -

2009 Did Not Qualify 62 - -

2010 Did Not Qualify 59 - -

2011 Approved 95 - $847,955

Magna Seating of America Inc. Highland Park 560 2010 Approved 294 - -

2011 Approved 403 - -

2012 Approved 410 - -

2013 Approved 420 - -

2014 Approved 524 - -

MTU Detroit Diesel, Inc. Brownstown 721 2012 Approved 83 - -

2012 Approved - 170 $28,714,222

2013 Approved 88 - -

Manufacturing

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 38 of 52

Page 42: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2013 Approved - 244 $1,167,059

PolyCem, LLC Spring Lake 534 2010 Approved 11 - $2,135,255

2011 Approved 18 - $369,427

2012 Approved 19 - $325,749

Tribal Manufacturing, Inc. Marshall 512 2010 Approved 52 - $5,064,824

2011 Approved 56 - -

2012 Approved 71 - -

2013 Approved 69 - -

2014 Approved 77 - -

Aernnova Engineering US, Inc. Ann Arbor 389 2009 Approved 23 - -

2010 Approved 20 - $28,473

2011 Approved 21 - $76,291

2012 Approved 27 - $184,474

2013 Approved 37 - $171,834

AGA Marval Greenville 424 2009 Approved 18 - $11,084,668

2010 Approved 7 - $798,938

2011 Approved 14 - $248,578

2012 Approved 15 - -

2013 Approved 25 - -

2014 Approved 71 - -

Ameriwood Industries Dowagiac 446 2009 Approved 36 - $122,387

2010 Approved 39 - $663,448

2011 Approved 52 - $312,934

2012 Approved 80 - $325,241

2013 Approved 75 - $221,810

Attwood Corporation Lowell 444 2009 Approved 17 - -

2010 Approved 29 - -

2011 Approved 44 - -

Autocam Corporation Kentwood 41 1999 Approved 89 - -

2000 Approved 93 - -

2001 Approved 91 - -

2002 Approved 88 - -

2003 Approved 95 - -

2004.1 Approved 98 - -

Manufacturing - Advanced

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 39 of 52

Page 43: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2004.2 Approved 98 - -

2005 Approved 105 - -

2006 Approved 104 - -

2007.1 Approved 102 - -

2007.2 Approved 99 - -

2008 Approved 89 - -

2009 Did Not Qualify 64 - -

2010 Did Not Qualify 74 - -

2011 Approved 100 - $21,518,287

2012 Approved 156 - $28,485,211

2013 Approved 212 - $32,259,321

2014.1 Approved 250 - $13,857,396

Axletech International, LLC Troy 178 2003 Approved 10 - -

2004 Approved 17 - -

2005.1 Approved 26 - -

2005.2 Approved 27 - -

2006 Approved 32 - -

2007 Approved 37 - -

Ceradyne, Inc Wixom 254 2005 Approved 5 - -

2006 Approved 9 - -

2007 Approved 17 - -

Commonwealth Associates, Inc. Jackson 289 2006 Approved 12 - -

2007 Approved 30 - -

2008 Approved 48 - -

2009 Approved 43 - -

2010 Approved 44 - $1,332,716

2011 Approved 48 - $399,946

Dematic Corporation Grand Rapids 700 2012.1 Approved 146 - $3,622,656

2012.2 Approved 210 - $6,857,010

2012.3 Approved 208 - -

2013 Approved 393 - -

2014 Approved 456 - -

Denso Manufacturing Michigan, Inc. Battle Creek 207 2004 Approved 199 - -

ESI North America Bloomfield Hills 486 2010 Approved 21 - -

2011.1 Approved 22 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 40 of 52

Page 44: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2011.2 Approved 27 - -

GE Analytical Instruments, Inc. Ann Arbor 223 2004 Approved 9 - -

2005 Approved 22 - -

2006 Approved 24 - -

2007 Approved 9 - -

Govinda Motors, LLC Eaton Rapids 491 2009 Approved 52 - -

Integrated Sensing Systems Inc Ypsilanti 158 2002 Approved 5 - -

Kaiser Aluminum Fabricated Products, LLC Kalamazoo 409 2010 Approved 132 - $94,784,098

2011 Approved 169 - $3,485,932

2012 Approved 155 - $6,318,962

2013 Approved 161 - $1,313,892

Martinrea Jonesville LLC North Adams 722 2011 Approved 92 - $12,847,421

2013 Approved 68 - -

Michigan Packaging Company Mason 233 2005 Approved - 107 $12,179,600

2006 Approved - 107 -

2007.1 Approved - 107 -

2007.2 Approved - 107 -

2008 Approved - 107 -

2009 Approved - 109 -

2010 Approved - 117 $1,549,938

2011 Approved - 119 -

Microposite, Inc. Auburn Hills 368 2008 Approved 11 - -

Nxtgen Emission Controls USA Inc. Wixom 404 2009 Approved 5 - -

2010 Did Not Qualify 4 - -

Parker Hydraulics Systems Kalamazoo 640 2012 Approved - 606 $7,447,407

Plasan Carbon Composites, Inc. Wixom 717 2012 Approved 43 - $15,948,132

2013 Approved 208 - -

2014 Approved 189 - -

Production Engineering, Inc. Jackson 432 2009 Approved - 75 $7,668,094

2010 Did Not Qualify - - -

2010 Approved - 99 $1,202,697

2011 Did Not Qualify 1 - -

2011 Approved - 112 $480,690

2012 Approved - 112 $562,119

2013 Approved - 78 $1,068,301

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 41 of 52

Page 45: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2014 Approved - 61 $686,383

Proto Manufacturing, Inc. Taylor 645 2011 Approved 5 - $2,478,673

2012 Approved 5 - $533,934

2013 Approved 8 - $470,593

SoundTech, Inc. Kentwood 603 2011 Approved - 53 $4,425,608

Steel Tool & Engineering Company Gibraltar 443 2009 Approved 5 - $2,246,180

2010 Approved 6 - $1,180,205

2011.1 Did Not Qualify 5 - -

2011.2 Approved 7 - $2,891,539

2012 Did Not Qualify 5 - $1,985,761

2013 Approved 26 - $3,633,189

Systrand Manufacturing Corporation Rockwood 755 2012 Approved - 137 $13,590,366

2013 Approved - 178 $8,056,838

The Holland Awning Group of Companies Zeeland 548 2010 Did Not Qualify 5 - -

The Tech Group Grand Rapids, Inc. Walker 331 2007 Approved 52 - -

2008 Approved 92 - -

2010 Approved 105 - $705,160

2011 Approved 100 - $0

Ventra Ionia Main, LLC Ionia 565 2010 Approved - 805 $4,647,162

2011 Approved - 778 $820,179

Weber Automotive Corporation Auburn Hills 690 2011 Approved 60 - $8,879,298

2012 Approved 94 - $16,193,768

2013 Approved 190 - -

2014 Approved 229 - $3,587,588

Whirlpool Corporation Technology Center St. Joseph 149 2002 Approved 164 - -

2003 Approved 164 - -

2004 Approved 164 - -

2005 Approved 164 - -

2006 Approved 156 - -

2007 Approved 159 - -

2008 Approved 161 - -

2009 Approved 162 - -

2010 Approved 163 - $2,007,329

2011 Approved 163 - $3,142,101

2012 Approved 161 - $2,826,176

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 42 of 52

Page 46: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2013 Approved 163 - $4,509,584

Whirlpool Corporation Benton Harbor 150 2002 Approved 23 - -

2003 Approved 44 - -

2004 Approved 196 - -

2005 Approved 215 - -

2006 Approved 220 - -

2007 Approved 211 - -

2008 Approved 218 - $24,521,404

2009 Approved 221 - $82,529,655

2010 Approved 219 - $34,128,000

2011 Approved 219 - $40,613,249

2012 Approved 216 - $52,081,420

2013 Approved 226 - $54,240,867

Whirlpool Corporation Benton Harbor 318 2008 Approved 290 - $28,584,102

2009 Approved 352 - -

2010 Approved 254 - $36,615,355

2011 Approved 218 - $44,040,200

2012 Approved 158 - $54,907,596

2013 Approved 552 - $58,750,451

Whitehall Industries, Inc. Ludington 376 2008 Approved 53 - $8,962,604

2009 Approved 22 - -

2010.1 Approved 27 - -

2010.2 Approved 59 - -

2011 Approved 37 - -

XG Sciences, Inc. Lansing 738 2012 Approved 16 - $2,064,368

2013 Approved 23 - $1,727,143

2014 Approved 32 - $1,450,971

AAR Mobility Systems Cadillac 043 2003 Approved 105 - -

2004 Approved 191 - -

2005 Approved 300 - -

2006 Approved 289 - -

2007.1 Approved 298 - -

2007.2 Approved 293 - -

2009 Approved 303 - $2,533,136

Metal Stamping and Fabrication

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 43 of 52

Page 47: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

Alcoa Howmet Whitehall 74 2001 Approved 201 - -

2007 Approved 152 - -

2008 Did Not Qualify 58 - -

2009 Did Not Qualify - - -

2010 Did Not Qualify - - -

Alsons Corporation Hillsdale 59 2001 Approved 76 - -

2002 Approved 78 - -

2004 Approved 77 - -

Cadillac Casting, Inc. Cadillac 304 2006 Approved - 375 -

2007 Approved - 409 -

2008 Approved - 314 -

2009 Did Not Qualify - 263 -

2010 Approved - 337 $1,882,692

2011 Approved - 372 -

2012 Approved - 412 $1,539,095

EAB Fabrication Quincy 257 2006 Approved 21 - -

2007 Approved 35 - -

2008 Approved 25 - -

2009 Approved 15 - -

2010 Approved 25 - $6,000

2011 Approved 32 - $49,434

2012 Approved 49 - $43,981

2013 Approved 65 - -

2014 Approved 54 - $303,466

Gentz Aero, LLC Warren 350 2007 Approved 38 - -

2008 Approved 68 - -

2009 Approved 57 - $1,853,195

2010 Approved 51 - $246,994

2011 Did Not Qualify 26 - $11,615

Hallite Seals Americas, Inc. Wixom 678 2011 Approved - 60 $3,198,853

2012.1 Approved - 60 $310,404

2012.2 Approved - 57 $1,034,583

2013 Approved - 59 $688,238

2014 Approved - 59 $1,373,721

L & W Engineering Company Blissfield 63 2000 Approved 258 - -

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 44 of 52

Page 48: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2001 Approved 283 - -

2002 Approved 278 - -

2003 Approved 327 - -

2004 Approved 340 - -

2005 Approved 340 - -

2006 Approved 264 - -

Midway Products Group Monroe 71 2000 Approved 78 - -

2001 Approved 82 - -

2002 Approved 77 - -

2003 Approved 75 - -

2004 Approved 83 - -

2005 Approved 84 - -

2006 Approved 75 - -

Premier Tool and Die Cast Corporation Berrien Springs 473 2010 Approved 5 - $1,142,033

Van-Rob Tecumseh (Lenawee Stamping) Tecumseh 537 2010 Approved 108 - -

2011 Approved 199 - $4,329,546

Dynamic Captioning LLC Cascade Township 702 2011 Approved 15 - -

Borders Group, Inc. Ann Arbor 002 1996 Approved 365 - -

1997 Approved 387 - -

1998 Approved 378 - -

1999 Approved 419 - -

2000 Approved 429 - -

2001 Approved 443 - -

2002 Approved 466 - -

2003 Approved 464 - -

2004 Approved 422 - -

2005 Approved 405 - -

2006 Approved 345 - -

2007.1 Approved 310 - -

2007.2 Approved 304 - -

2008 Approved 305 - -

2009 Approved 197 - -

Cobra Motorcycles Manufacturing, Inc. Hillsdale 303 2007 Approved 23 - -

Other

Motion Picture Production

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 45 of 52

Page 49: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2008 Approved 25 - -

2009 Approved 12 - $81,213

2010.1 Approved 19 - $11,846

2010.2 Approved 18 - $66,098

Eaton Aerospace Group Jackson 349 2007 Approved - 460 $1,502,450

2008 Approved - 560 -

2009 Approved - 563 $1,231,590

2010 Approved - 563 $469,998

2011 Approved - 582 $1,101,474

2012 Approved - 615 $828,853

2013 Approved - 634 $1,447,505

Kmart Corporation Troy 048 1999 Approved 425 - -

2000 Approved 425 - -

2001 Approved 425 - -

2002 Did Not Qualify - - -

Macomb Group, Inc. Sterling Heights 728 2012 Approved - 113 $8,542,657

2013 Approved - 107 -

2014 Approved - 115 -

Quicken Loans, Inc. Livonia 561 2011 Approved 162 - -

561 2011 Approved - 936 $99,549,733

Rec Boat Holdings, LLC Cadillac 140 2001 Approved 548 - -

2002 Approved 603 - -

2003 Approved 697 - -

2004 Approved 811 - -

2005 Approved 769 - -

2006 Approved 689 - -

2007.1 Approved 743 - -

2007.2 Approved 751 - -

2008 Approved 415 - -

Rec Boat Holdings, LLC Cadillac 620 2010 Approved 185 - $13,762,495

2011 Approved 246 - $1,981,000

2012 Approved 235 - $2,797,000

2013 Approved 255 - $2,326,000

S2 Yachts, Inc Holland 297 2007 Approved 105 - -

Siemens Water Technologies Corp Holland 333 2009 Approved 56 - $223,258

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 46 of 52

Page 50: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2010 Approved 80 - $1,188,100

2011.1 Approved 78 - $344,417

2011.2 Approved 82 - $445,223

Emerald Graphics Corporation Kentwood 276 2006 Approved 75 - -

Key Plastics LLC Howell 746 2012 Approved 190 - $4,765,050

2013 Approved 236 - $3,983,550

2014 Approved 208 - -

Lacks Enterprises, Inc. Grand Rapids 020 1998 Approved 200 - -

1999 Approved 200 - -

2000 Approved 200 - -

2001 Approved 200 - -

2002 Approved 200 - -

2003 Approved 200 - -

2004 Approved 200 - -

2005 Approved 200 - -

2006 Approved 186 - -

2007 Approved 198 - -

2008 Approved 177 - -

Mann + Hummel USA, Inc. Portage 596 2011 Approved 74 - $3,561,896

2012 Approved 198 - $3,762,229

2013 Approved 208 - $5,442,951

Maverick Industries, LLC Jackson 507 2010 Approved 10 - $2,386,286

2011 Approved 11 - $300,300

Nicholas Plastics, Inc. Allendale 037 1999 Approved 89 - -

2000 Approved 88 - -

2004 Approved 97 - -

2005 Approved 92 - -

2006 Approved 98 - -

Royal Technologies Corporation Hudsonville 197 2005 Approved 76 - -

2006 Approved 139 - -

2007 Approved 218 - -

2008 Approved 155 - -

2011 Approved 88 - -

Styron LLC Midland 663 2011 Approved 190 - $2,948,406

Plastics

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 47 of 52

Page 51: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2012 Approved 171 - $3,299,693

2013 Approved 159 - $2,267,528

Vantage Plastics Standish 390 2007.1 Approved 16 - -

2007.2 Approved 33 - -

2009 Approved 12 - -

American Greetings Company Kalamazoo 97 2001 Approved 162 - -

2002 Approved 85 - -

BUDCO Highland Park 046 2000 Approved 105 - -

2001 Approved 291 - -

2002 Approved 396 - -

2003 Approved 401 - -

2004 Approved 423 - -

2005 Approved 258 - -

2006 Approved 173 - -

2007.1 Approved 118 - -

2007.2 Approved 116 - -

2008 Approved 94 - -

IPC Print Services, Inc St. Joseph 740 2011 Approved - 150 $7,519,339

2012 Approved - 186 $742,771

2012 Approved - 189 $1,188,428

2013 Approved - 202 $1,415,822

2014 Approved - 196 $801,723

ProQuest, LLC Ann Arbor 402 2009 Approved 70 - $8,725,727

2010 Approved 64 - $6,420,715

2011 Approved 94 - $4,112,590

2012 Approved 102 - $2,789,218

2013 Approved 89 - $3,058,218

2014 Approved 85 - $3,308,448

AGC America, Inc Ypsilanti 114 2001 Approved 8 - -

2002 Approved 17 - -

2003 Approved 18 - -

2004 Approved 19 - -

2005 Approved 25 - -

Printing and Publishing

R&D/Engineering

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 48 of 52

Page 52: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2009 Approved 26 - -

2010 Approved 26 - -

2011 Approved 26 - $513,935

BorgWarner Thermal Systems of Michigan Marshall 116 2001 Approved 5 - -

2002 Approved 5 - -

2003 Approved 5 - -

2004 Approved 26 - -

2005 Approved 27 - -

2006 Approved 25 - -

2007 Approved 25 - -

CAS-MI Ypsilanti 541 2010 Approved 5 - $89,150

Edgewater Automation St. Joseph 332 2008 Approved 5 - -

2009 Approved 5 - -

2010 Approved 7 - -

2011 Approved 16 - -

General Dynamics Land Systems Sterling Heights 236 2004 Approved 245 - -

2005 Approved 265 - -

2006 Approved 324 - -

2007 Approved 325 - -

2008 Approved 324 - -

2009 Approved 325 - $358,404

2010 Approved 324 - $12,041,925

2011 Approved 325 - $2,922,641

Hexagon Metrology, Inc. Wixom 756 2012 Approved 5 - $0

Howa USA Holdings, Inc. Novi 487 2009 Did Not Qualify 3 - -

2010 Did Not Qualify 3 - -

2011 Did Not Qualify 3 - -

Integrity Design, Incorporated Benton Harbor 143 2002 Approved 9 - -

2003 Approved 10 - -

2004 Approved 8 - -

2005 Approved 7 - -

Landon IP, Inc. Southfield 352 2008 Approved 12 - -

2009 Approved 8 - -

2010 Approved 13 - -

2011 Approved 13 - $144,637

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 49 of 52

Page 53: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

LMS North America, Inc. Troy 344 2008 Approved 12 - -

2009 Approved 13 - -

2010 Approved 6 - $198,923

2011 Approved 11 - $198,554

Magna Electronics Technology, Inc. Rochester Hills 523 2010 Approved 44 - -

2011 Approved 48 - -

2012 Approved 125 - -

2013 Approved 67 - -

2014 Approved 79 - -

Magneti Marelli Holding USA, Inc. Auburn Hills 614 2011 Approved 13 - -

McLaren Performance Technologies Livonia 518 2010 Approved 26 - $9,063,324

2011 Approved 41 - $291,269

2012 Approved 34 - -

2013 Approved 68 - $1,627,968

2014 Approved 79 - $632,760

Aleris International, Inc. Coldwater 018 1998 Approved 75 - -

1999 Approved 81 - -

2000 Approved 79 - -

2001 Approved 81 - -

2002 Approved 89 - -

2003 Approved 77 - -

2004 Approved 77 - -

2005 Approved 75 - -

Cequent Performance Products, Inc. Plymouth 701 2012 Approved 13 - $3,390,022

2013 Approved 22 - -

2014 Approved 36 - -

Gerdau Monroe 705 2012 Approved - 781 $70,566,565

2013 Approved - 781 -

2014 Approved - 779 -

RSDC of Michigan Holt 38 1999 Approved 204 - -

2000 Approved 222 - -

2001 Approved 222 - -

2002 Approved 222 - -

2003 Approved 222 - -

Steel and Steel Products

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 50 of 52

Page 54: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2004 Approved 222 - -

2005 Approved 222 - -

2006 Approved 351 - -

2007.1 Approved 337 - -

2007.2 Approved 324 - -

2008 Approved 210 - -

2009 Approved 150 - -

2010.1 Approved 152 - -

2010.2 Approved 155 - -

2011 Approved 173 - $415,411

2012.1 Approved 180 - -

2012.2 Approved 201 - $410,155

2013 Approved 222 - $450,561

Severstal Dearborn LLC Dearborn 295 2007 Approved - 2,031 $279,720,446

2008 Approved - 2,012 $382,486,846

2009 Approved - 1,779 -

2010 Approved - 1,720 $200,699,623

2011 Approved - 1,786 $284,898,261

2012 Approved - 1,686 $109,133,787

2013 Approved - 1,576 $86,950,360

Shiloh of Michigan, Inc. Romulus 008 1999 Approved 153 - -

Spartan Steel Coating LLC Monroe 016 1999 Approved 85 - -

2000 Approved 80 - -

2001 Approved 75 - -

2002 Approved 76 - -

2003 Approved 75 - -

2004 Approved 75 - -

2005 Approved 75 - -

Speedrack Products Group, Ltd. Quincy 153 2004 Approved 113 - -

2005 Approved 127 - -

2006 Approved 132 - -

2007 Approved 146 - -

Target Distribution Center Galesburg 115 2002 Approved 691 - -

2003 Approved 786 - -

Warehouse/Distribution

FY2015 Legislative Report - Total Jobs and Investment as of 09/30/2015 Page 51 of 52

Page 55: MEMORANDUM - Michigan › EI360TransparencyApp › files...MEMORANDUM DATE: October 1, 2015 TO: Members of the Michigan Legislature FROM: Steve Arwood CEO SUBJECT: FY 2015 MEGA Annual

Project Industry Company Name CityApplication

NumberTax Year Status

Actual Jobs

Created

Actual Jobs

Retained

Capital Investment

Reported

MEGA Total Jobs & Investment Reported for Each Year

2004 Approved 663 - -

2005 Approved 674 - -

2006 Approved 480 - -

2007.1 Approved 450 - -

2007.2 Approved 420 - -

2008 Approved 434 - -

2009 Approved 411 - -

2010 Approved 422 - $1,767,621

U.S. Foodservice, Inc. Wixom 070 2000 Approved 92 - -

2002 Approved 94 - -

2003 Approved 149 - -

2004 Approved 141 - -

2005 Approved 105 - -

2006 Approved 115 - -

2007.1 Approved 81 - -

2007.2 Approved 78 - -

2008 Approved 79 - -

2009 Approved 75 - -

2010 Approved 82 - $284,237

2011 Approved 85 - $960,525

2012 Approved 118 - $468,062

2013 Approved 96 - $975,105

2014 Approved 76 - $1,688,286

XPO NLM Inc Southfield 655 2011 Approved - 89 $3,363,749

XPO NLM Inc Southfield 655 2011 Did Not Qualify 7 - -

Graphic Packaging International Kalamazoo 437 2009 Approved 54 - $27,600,000

2010 Approved 79 - $0

Universal Consumer Products White Pigeon 184 2006 Did Not Qualify 74 - -

2007 Approved 80 - -

Wood Products