MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT Andrew Labbett – Associate Remediation Engineer
28

MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Mar 15, 2016

Download

Documents

cordelia-weeks

MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT Andrew Labbett – Associate Remediation Engineer. Presentation Outline. Melbourne Docklands - proximity/size History of the Melbourne Docklands Area The Docklands Authority - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Andrew Labbett – Associate Remediation Engineer

Page 2: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Presentation Outline

• Melbourne Docklands - proximity/size• History of the Melbourne Docklands Area• The Docklands Authority• The Former West Melbourne Gasworks Remediation Project

– What it was– What we found– What we did

• The visions being realised…

Page 3: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Melbourne Docklands Precinct

• Central Business District

• Melbourne Docklands

Page 4: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Melbourne’s West – 1864

Page 5: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Melbourne’s West – 1858

Page 6: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

West Melbourne Gasworks – 1928

Page 7: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

West Melbourne Gasworks – 1937

Contaminant Sources

• Wharf/ Coal Loading Area• Coal Stores• Retorts• Purifiers• Sulphate & Ammonia Plant• Gasholders• Tar Pits & Tanks• Plant Upgrades

Page 8: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Dereliction of The Wharfs, Railyards & Gasworks

• Ship freight became more containerised – hence bigger, open yards and deeper docks required (Appleton, Webb and Swanston Docks).

• Charles Grimes Bridge pushed larger ship docking sites westwards.• Modern day transport methods (air & truck) made large shunting

yards redundant.• Discovery & use of natural gas from Bass Strait saw gasworks

closed in 1970.• Derelict waterfront area now ripe for “reconnection” with the city.

Page 9: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

West Melbourne Gasworks & Docklands – 1989

Page 10: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

West Melbourne Gasworks & Docklands – 1989

Page 11: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Docklands Authority

Page 12: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Melbourne Docklands Development Precincts

Page 13: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Wooden Piles…

Page 14: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Coal Tar…

Page 15: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Soil Treatment Processes

Page 16: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Waste Minimisation – Soil Screening

Page 17: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Waste Minimisation – Concrete Recycling

Page 18: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Waste Minimisation – Soil Treatment

Page 19: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Remediation Works

Page 20: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Remediation Project Statistics

• 7.6 hectare site• 273,000 m3 material excavated (1.0 – 8.3 m below original grade) • 4100 Wooden Piles & 460 Steel Encased Concrete Piles• 1700 stockpiles• 50,000 truck movements• 35% of excavated material recycled• 69,000 m3 of intra-precinct material imported and used as fill• Over 300,000 tonnes of ‘Contaminated Soil’ to landfill• 40,000,000 litres water treated and disposed (some for dust)• 500 site inductees• $45 M plus for level site.

Page 21: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Victoria Harbour Precinct - 2009

Page 22: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Victoria Harbour Precinct – 2009 (N – S)

Page 23: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Victoria Harbour Precinct – 2009 (W – NE)

Page 24: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Victoria Harbour Precinct – 2009 (S – NW)

Page 25: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Victoria Harbour Precinct – 2009 (S – N)

Page 26: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Victoria Harbour Precinct – 2009 (Mid – S)

Page 27: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Summary of Whole-Precinct Development Benefits

• Ability to optimise best sites for purpose (i.e. ensure correct mix of open space, residential, commercial) based on levels of contamination.

• “Over-kill” remediation – i.e. sustainability considerations can be made.

• Odours, dust & other construction emissions have less impact. • Materials and treatment-space sharing (when appropriate).• Services sharing/ staged development.

Page 28: MELBOURNE DOCKLANDS PRECINCT DEVELOPMENT & THE FORMER WEST MELBOURNE GASWORKS REMEDIATION PROJECT

Thank You!