Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen
20

Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Jul 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Megaprojects - New Psychiatric hospital in Slagelse

Presentation 03.12.2015 by Henrik Bendix Olsen

Page 2: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Hospital projects in Denmark

The kvalitetsfond

constructions are partly

funded by the government

with 60% and regional

funded with 40%.

16 projects with a total cost

of 42 billion ddk.

Page 3: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Hospitals in Region SealandKvalitetsfond projects

Slagelse acute department

Hospital floor space: 11.000 m²

Beds: 85 total consisting of: 50 acute beds, 15

intensive beds and 20 cardiac monitoring beds.

Projekt sum: 0.315 billion ddk.

Occupancy of the hospital – late 2013

Slagelse psychiatric hospital

Hospital floor space: 44.000 m²

Site size: 158.463 m²

Beds: 194 total consisting of: 114 general

psychiatric beds, 50 forensic psychiatric beds

and 30 beds in a high secure ward.

Employees: approx. 650

Projekt sum: 1.2 billion ddk.

Occupancy of the hospital – late 2015

Koege University hospital

Hospital floor space: 189.000 m²

Site size: 275.000 m²

Beds: 900 total

Employees: approx. 4130

Projekt sum: 4 billion ddk.

Occupancy of the hospital – 2022

Page 4: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Special kvalitetsfond demands

Control manual

- Organisation

- Risk management

- Controlling

3D project, IKT

- New technology

Fixed bottomline

- Large reserves

- Change request lists

Networking

- Quarterly rapports

Innovation

Page 5: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Organisation diagram

Page 6: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Advisors

Building owner:

Region Sjælland

Architect (Lead consultant):

Karlsson arkitekter / VLA i/s

Advisors (architect):

Schønherr

Moe

NNE Pharmaplan

Cenergia Energy Consultants

Bartenbach Light Design

Signal

Advisor (building owner):

Kuben Management A/S

Construction/site management:

Rambøll

Security:

Molter Consult

External controlling:

Arkitema Architects

Page 7: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

7

Kvalitet og Udvikling – KU Byg – Alleen 15 – 4180 Sorø

7

New Psychiatric hospital in SlagelseTime schedule

Activity Time

General planning (Mangor & Nagel) 2008 to 2009

Advisor to the building owner (Kuben) Primo 2010

Lead consultant choosen by competition (Karlsson architects og Vilhelm Lauritsen architects)

Ultimo 2010

Usergroups, temp. Building program & Kvalitetsfond-application (Karlsson architects and Vilhelm Lauritsen architects)

Primo2011

Kvalitetsfond accept Ultimo2011

Usergroups & planning finished - Ultimo2012

Construction management (Rambøll) Ultimo 2012

Licitation - building Nov. 2012

Construction site and excavation Ultimo2012

Building period 2013 - 2015

Contractor hand over & operation start up Medio 2015

Hand over to psychiatry 1. August 2015

Page 8: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Arial photo 12. november 2015

Page 9: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Main entrance – office building

Page 10: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Entrance area

Page 11: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Office building - atrium

Page 12: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Sports and exercise centre

Page 13: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Patient area

Page 14: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Garden - patient area

Page 15: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

Multistimuli-area, General psychiatric

Page 16: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

HIS, General psychiatric

Page 17: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

17

GAPS – LED lightThe most advanced system in the world

17

LED light:

Dynamic light with the ability to control each roomseparatly.

Page 18: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

18

Building integrated art / colours

18

Painter: Malene Landgreen

Author:Ursula Andkjær Olsen

Page 19: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

19

Psychiatric bed

19

Billedkunstner: Malene Landgreen

Forfatter:Ursula Andkjær Olsen

LED-belysning indgår som en del af kunststrategien

Page 20: Megaprojects - New Psychiatric hospital in Slagelse · Megaprojects - New Psychiatric hospital in Slagelse Presentation 03.12.2015 by Henrik Bendix Olsen. Hospital projects in Denmark

20

DGNB – pre-certification

20