Welcome and Introductions- Working Group Chair Where We Are/Where We Are Going- Lindsay Batchelor GHG Inventory and CAP Overview- Lindsay Batchelor/Jeff Hightower Approach and Goals of the CAP Project- Consultant GHG Estimates for Focus Area- Consultant List Development- All Next Steps- Lindsay MEETING AGENDA 1-19-10
25

MEETING AGENDA 1-19-10

Feb 15, 2016

Download

Documents

morrie

MEETING AGENDA 1-19-10. Welcome and Introductions- Working Group Chair Where We Are/Where We Are Going- Lindsay Batchelor GHG Inventory and CAP Overview- Lindsay Batchelor /Jeff Hightower Approach and Goals of the CAP Project- Consultant GHG Estimates for Focus Area- Consultant - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MEETING AGENDA  1-19-10

• Welcome and Introductions- Working Group Chair

• Where We Are/Where We Are Going- Lindsay Batchelor

• GHG Inventory and CAP Overview- Lindsay Batchelor/Jeff Hightower

• Approach and Goals of the CAP Project- Consultant

• GHG Estimates for Focus Area- Consultant• List Development- All• Next Steps- Lindsay

MEETING AGENDA 1-19-10

Page 2: MEETING AGENDA  1-19-10

UPDATE ON PLANNING PROGRESS

Page 3: MEETING AGENDA  1-19-10

SUSTAINABILITY STRATEGIC PLAN

Land Use

Materials & Purchasing

Transportation

Waste Reduction &

Recycling

Academics & Research

Buildings

Energy & Water

Climate Action Plan

Page 4: MEETING AGENDA  1-19-10

CLIMATE IMPACT AT NC STATE UNIVERSITY

Page 5: MEETING AGENDA  1-19-10

AMERICAN COLLEGE AND UNIVERSITY PRESIDENTS CLIMATE COMMITMENT• Addresses global warming through a

commitment to work towards climate neutrality• Co-organized by AASHE, ecoAmerica and

Second Nature • Over 650 signatories nation-wide• NC State signed the ACUPCC in 2008

Page 6: MEETING AGENDA  1-19-10

REQUIREMENTS OF THE ACUPCC • Within two months of signing this document, create

institutional structures to guide the development and implementation of the plan

• Within one year complete a comprehensive inventory of greenhouse gas (GHG) emissions and update the inventory every other year thereafter

• Within two years of signing this document, develop an institutional action plan for becoming climate neutral

• Initiate two or more tangible actions to reduce greenhouse gases while the more comprehensive plan is being developed

• Make the action plan, inventory, and periodic progress reports publicly available

Source- http://www.presidentsclimatecommitment.org/html/commitment.php

Page 7: MEETING AGENDA  1-19-10

NC STATE UNIVERSITY’S TANGIBLE ACTIONS

• U.S Green Building Council’s LEED Silver Standard or equivalent

• U.S. EPA’s ENERGY STAR Partner

• Provide access to public transportation

Page 8: MEETING AGENDA  1-19-10

WHAT IS A GHG EMISSIONS INVENTORY?For the purposes of the

ACUPCC, a GHG inventory quantifies

your campus “carbon footprint” in terms of metric tons of carbon

dioxide equivalent per year (MTeCO2/yr)

Page 9: MEETING AGENDA  1-19-10

NC STATE GHG EMISSIONS INVENTORY• WHO: Jeff Hightower- Director of Utilities

Infrastructure for Facilities Operations and student interns

• WHEN: Time Frame- Data from both 2008 calendar year and 2007/2008 Fiscal Year

• WHERE: Boundaries- Main Campus, Centennial Campus, Centennial Biomedical Campus and some satellite offices

• HOW: Calculators- Clean Air, Cool Planet; Climate Registry; EPA; Atmosfair

Page 10: MEETING AGENDA  1-19-10

GHG EMISSIONS INVENTORY- SCOPES

Page 11: MEETING AGENDA  1-19-10

GHG EMISSIONS INVENTORY- 2008

Page 12: MEETING AGENDA  1-19-10
Page 13: MEETING AGENDA  1-19-10

CLIMATE ACTION PLANNING

Page 14: MEETING AGENDA  1-19-10

WHAT IS A CLIMATE ACTION PLAN?• A comprehensive plan including a target

date and interim milestones for how NC State will reach climate neutrality

• Will include the following sections: • Introduction• Campus Emissions• Mitigation Strategies• Educational, Research and

Community Outreach Efforts• Financing• Tracking Progress

Page 15: MEETING AGENDA  1-19-10

THE CARBON MANAGEMENT HIERARCHY

Avoid

Reduce

Replace

Offset

Do whatever you do more efficiently

Replace high-carbon energy sources with low-carbon energy ones

Offset those emissions that cannot be eliminated by the above

Modified Version from “Getting to Zero: Defining Corporate Carbon Neutrality” by Clean Air – Cool Planet

Avoid carbon-intensive activities (and rethink business strategy)

Page 16: MEETING AGENDA  1-19-10

STABILIZATION TRIANGLE (PACALA-SOCOLOW)

Graph from the Princeton Environmental Institute’s “Stabilization Wedges: A Concept and Game”

Page 17: MEETING AGENDA  1-19-10

STABILIZATION WEDGES (PACALA-SOCOLOW)

Graph from the Princeton Environmental Institute’s “Stabilization Wedges: A Concept and Game”

Page 18: MEETING AGENDA  1-19-10

ACTUAL EXAMPLE – DUKE UNIVERSITY

Page 19: MEETING AGENDA  1-19-10

Climate Action Plan

($200)

($150)

($100)

($50)

$0

$50

$100

$150

0 100 200 300 400 500 600 700 800 900 1,000 1,100 1,200 1,300 1,400

Leve

lized

Cos

t (Sa

ving

s) p

er M

TCO

2e

Contribution Toward Neutrality in 2050 (1,000's MTCDE)

Thin clients where appropriate

Business Travel

Behavioral_Initiative

Computer Standby Mode (Purchasing/Recycling)Chiller Plant Efficiency (incl. phase I, phase II, and Tomkins)Commuter Emissions

Commercial Mail Management

ECM (Low Financial Investment)

SB 668 Main

Campus Fleet

Heat Recovery Chillers and Solar Thermal (CN)

Compost

SB 668 CN

Heat Recovery Chiller at IRB (Phase II)

Consolidated Delivery

Heat Recovery Chiller at IRB (600 ton)

Landfill Gas (CN)

Co-fire 20 Percent Coal Substitute

Biomass Gasification at Carolina North (Phase I)

100% Coal Substitute

50% Coal Substitute

Plasma Arc Gasification of MSW - Syngas

Shops and Informal Contract Recycling

50% NG, 50% Coal Substitute

Plasma Arc Gasification of MSW - Syngas plus NG (Replace All Coal)50 Percent Natural Gas

Biomass Gasification w/ Biochar Production at CNECM (Mid+High Financial Investment)

Large Scale Biomass

Biomass Gasification at Carolina North (Phase II)Solar Thermal (CN)

Solar Thermal to Electricity (Troughs) (CN)

Solar Thermal to Electric (Dish Sterling) (CN)

Demo Scale Concentrating Solar PV (CN)

Adjusted Levelized Cost (Savings)

>

<

Traditional valuation

Page 20: MEETING AGENDA  1-19-10

Climate Action Plan

($200)

($150)

($100)

($50)

$0

$50

$100

$150

0 100 200 300 400 500 600 700 800 900 1,000 1,100 1,200 1,300 1,400

Leve

lized

Cos

t (Sa

ving

s) p

er M

TCO

2e

Contribution Toward Neutrality in 2050 (1,000's MTCDE)

Thin clients where appropriate

Business Travel

Behavioral_Initiative

Computer Standby Mode (Purchasing/Recycling)Chiller Plant Efficiency (incl. phase I, phase II, and Tomkins)Commuter Emissions

Commercial Mail Management

ECM (Low Financial Investment)

SB 668 Main

Campus Fleet

Heat Recovery Chillers and Solar Thermal (CN)

Compost

SB 668 CN

Heat Recovery Chiller at IRB (Phase II)

Consolidated Delivery

Heat Recovery Chiller at IRB (600 ton)

Landfill Gas (CN)

Co-fire 20 Percent Coal Substitute

Biomass Gasification at Carolina North (Phase I)

100% Coal Substitute

50% Coal Substitute

Plasma Arc Gasification of MSW - Syngas

Shops and Informal Contract Recycling

50% NG, 50% Coal Substitute

Plasma Arc Gasification of MSW - Syngas plus NG (Replace All Coal)50 Percent Natural Gas

Biomass Gasification w/ Biochar Production at CNECM (Mid+High Financial Investment)

Large Scale Biomass

Biomass Gasification at Carolina North (Phase II)Solar Thermal (CN)

Solar Thermal to Electricity (Troughs) (CN)

Solar Thermal to Electric (Dish Sterling) (CN)

Demo Scale Concentrating Solar PV (CN)

Adjusted Levelized Cost (Savings)

>

<

Value when GHG has a price

Page 21: MEETING AGENDA  1-19-10

CAP WEDGE GROUPS• Green Development (campus growth, new

buildings)• Energy Conservation (existing buildings)• Fuel Mix and Renewable Energy• Transportation (commuting, business travel,

fleet)• Offsets (off-campus carbon reduction)

*Base Case• Define “business as usual” assumptions across all

wedges• Estimate “do-nothing” cost associated with GHG

emissions

Page 22: MEETING AGENDA  1-19-10
Page 23: MEETING AGENDA  1-19-10

AEI APPROACHPhase 1 Phase 2

Page 24: MEETING AGENDA  1-19-10

LAND USE GHG IMPACT

– Has an impact on future growth– Offset potential in conservation of existing

green space– Grounds Management activities– Stormwater?

Page 25: MEETING AGENDA  1-19-10

LAND USE STRATEGIES

• Use of Space• Reservation and Preservation• Conservation• Grounds Management• Stormwater Management• Campus Engagement