Top Banner
Maintenance of Medical Equipment Dr A Prakash Sr Professor, Health Management National Academy of Indian Railways Lalbaug Vadodara
30

Medical Equipment Maintenance

Aug 16, 2015

Download

Documents

Medical Equipment Maintenance
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Maintenance of Medical EquipmentDr A PrakashSr Professor, Health ManagementNational Academy of Indian ail!ays"al#aug$adodara %&'E()I$ESHighest le*el of a*aila#ility of medical equipment to the clinical users+uality impro*ement , cost reductionApplica#le regulations , standardseduce the need of premature replacement of the equipment DE-INI)I%NS-.N()I%N!hat the equipment is designed to doPE-%MAN(E S)ANDADSlimits !ithin !hich a function is considered accepta#le to the user#ut esta#lished #y %EM !hen designing the equipment-.N()I%NA" -AI".Eina#ility to fulfill a function to a performance standard accepta#le to the useror to perform according to the original technical specification -AI".E )/PESE$IDEN) -AI".Ethat on its o!n e*entually , ine*ita#ly #ecomes e*ident to the user under normal circumstancesHIDDEN -AI".Ethat !ill N%) #ecome e*ident to the user under normal circumstances if it occurs on its o!nSE+.EN)IA" -AI".E!hen a protected function fails after the failure of a 0not fail1safe0 protecti*e de*ice goes undetected -AI".E PA))ENS2ear1out -ailure Pattern 3 Normal distri#ution of failure frequency after M)&-4 Age related failure traditionally addressed #y pre*enti*e maintenance , scheduled replacement of parts4 Steady Increasing -ailure Pattern 3 )he pro#a#ility of failure increases steadily !ith age4 (ommon for mechanical de*ices that !ear out !ith time4 -AI".E PA))ENSandom -ailure Pattern 3 )he pro#a#ility of failure does not change !ith age #ut is constant through out the life of the equipment4 )ypical of electronic equipment4"o! Initial -ailures Pattern 3 )he pro#a#ility of failures increase rapidly initially #ut #ecomes constant after a short period of time4 &ad quality machines4 -AI".E PA))ENSInfant Mortality -ailure Pattern 3 High pro#a#ility of failure initially #ut #ecomes constant after!ard4 &ad +(40&athtu#0 -ailure Pattern 3 (om#ination of Infant Mortality -ailure Pattern , 2ear1out -ailure Pattern MAIN)ENAN(E (A)E5%IESProacti*e Maintenanceeacti*e Maintenance MAIN)ENAN(E (A)E5%IESP%A()I$EPre*enti*e MaintenanceScheduled replacement of parts for age6usage related deteriorationPredicti*e Maintenance)o check for potential failure , action taken to pre*ent functional failureEA()I$E-ailure1finding )askPeriodic inspection to detect Hidden -ailures , -ailure of non1fail1safe protecti*e de*icesA"" MAIN)ENAN(E M.S) &E )E(HNI(A""/ -EASI&"E , 2%)H D%IN5 7 MAIN)ENAN(E SE$I(E )/PESEquipment Acceptance%perational (heck%( frequency 3 High isk1Each .se6Medium1Daily6"o!12eeklySafety , Performance Inspection)o detect potential6hidden failures , includes Electrical Safety )estPre*enti*e Maintenance(orrecti*e Maintenanceeplacement MAIN)ENAN(E S)A)E5IESeplacement onlyepair or eplaceScheduled InspectionsNon1sampled InspectionsSampled Inspections-ull Ser*ice 8 Scheduled PM9 MAIN)ENAN(E S)A)E5IES *s SE$I(E )/PES Equipment Maintenance Management Plan2HA) )% IN(".DE : E(I Method 8;9IS? "E$E"-unction 1 therapy6diagnosis6monitoringApplication isk 3 in@ury6dangerous energyEAperience , 5eneralSPE(IA" E+.IEMEN)S"ife (ycle (ost%perational DifficultiesStandards , egulations E(I isk "e*elsHI5H IS?"ife Support, esuscitation, (ritical Monitoring , other de*ices !hose failure or misuse is likely to seriously in@ure the patient or staffMEDI.M IS?De*ices including many diagnostic equipment !hose failure, misuse or a#sence !ould ha*e significant impact on patient care #ut is not likely to cause serious direct in@ury"%2 IS?De*ices !hose failure or misuse is not likely to cause serious consequences E(I Method Implementation.se isk "e*els , Special equirementsInclude all High , Medium and some "o! isk de*ices in Maintenance PlanInspection -requency 3 High isk 3 )!ice a yearMedium isk 3 Annually"o! isk 3 Eliminate unnecessary inspections #ased on eAperience -ennigkoh , Smith MethodAlso kno!n as isk &ased (riteriaEquipment gi*en a *alue 3 Equipment Management Num#er 8EM9EM B -unction C Physical isk C Maintenance equirements -unction)herapeutic"ife Support 1111111111111111111111111111111111111111111111111111 ;DSurgical , Intensi*e (are 11111111111111111111111111111111111(omputer , elated 1111111111111111111111111111111111111111111 HMiscellaneous 3 Patient related , %thers 1111111111 I Physical iskPatient Death GPatient or %perator In@ury >Inappropriate )herapy or Misdiagnosis HNo significant in@ury ; Maintenance equirementsEAtensi*e GA*erage HMinimal ; -ennigkoh , Smith Method ImplementationEM 3 min B > , maA B IDIf EM J ;I, the equipment is included in the Maintenance Management Plan%ther!ise EK(".DEDEAcluded equipment is repaired as neededIncluded equipment goes for pre*enti*e maintenance 3 monthly6quarterly6half yearly6yearly as per EM *alue Su#sets of EquipmentsPM.se , )hro!epairPM AN%)HE 2A/ 1 ("ASSI-I(A)I%NPatient iskHigh Medium "o!Mission(ritical)ier ; )ier ; )ier ;(riticalityImportant)ier ; )ier I )ier INecessary)ier I )ier H )ier H EKAMP"ES %- )IE S/S)EMPA)IEN) IS?HI5HMEDI.M "%2MISSI%N(I)I(A"Anaesth4 Machine, $entilatorAuto (hem Analyser, (), MI, (ath "a#Electron Microscope(I)I(A"I)/IMP%)AN)P(A Pump, Defi#rillator, Incu#atorInfusion Pump, ES., A&5, MonitorsSpecial Procedure )a#leNE(ESSA/Patient "ifter, "aminar Air -lo!E(5, Pulse %Aymeter, -eeding PumpPatient Scale, EAamination "ight IMP"EMEN)A)I%N)ier ; 3 Definitely SPI, Some for PMPSI for need , frequency, PM for need)ier I 3 May require SPI or PM for operational efficiency or quality of careSPI for need , frequency analysis, PM cost effecti*eness:)ier H 3 ecord maintained for asset control or replacement planningeplace only for lo! cost, epair or eplace the rest MAIN)ENAN(E S(HED."IN5)HE%A)I(A" APP%A(HPM Period L M)&-SPI Period B I K 8; 3 a*aila#ility9 K M)&-PA()I(A" APP%A(H%EM ecommendationPast EAperienceEApert %penion MAIN)ENAN(E M%NI)%IN5)otal Maintenance EApense as M of )otal In*entory Acquisition (ost)otal Maintenance EApense 6 Pt4 discharge or Pt4 Day)otal Maintenance EApense 6 &ed or )otal %perating EApenses)otal .ptime a*aila#le S.MME/ %&SE"EN(E , EP"A(EMEN)eplacement is not needed for a !ell !orking old machine4(hanged safety standards(hanged !ork needs%ther machines of different designs"ack of ser*ice from *ender 8eAplore %EM9"ack of accessoriesPost ser*icing certification6cali#ration not possi#le Thank you+uestions :emailN prakash4nrchOgmail4com