Top Banner
Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand Resources FCM and Tariff Administration ISO New England, Inc.
20

Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

Mar 27, 2015

Download

Documents

Dylan Roche
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

Measurement and Verification Standards for Demand Response in Wholesale Electric Markets

September 30, 2009

Eric Winkler, Ph.D.Project Manager, Demand ResourcesFCM and Tariff AdministrationISO New England, Inc.

Page 2: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

NAESB Overview

• ANSI Certified Standards Development Organization• Wholesale and Retail Electric and Gas Standards• Industry Driven Process/Balanced voting• Segments: Independent Grid Operators, Transmission,

Generation, Marketers, Distribution, End Users• Subcommittees and standards development is open to any

stakeholder• Recommendations voted on by Executive Leadership• Standards require full member ratification• Wholesale standards are filed with FERC• Retail model business practices are voluntary• Standards development is dynamic and ongoing

2

Page 3: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Standards For Business Practices And Communication Protocols For Public Utilities - FERC NOPR RM-05-017

3

Page 4: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Disclaimer

• The information provided in this presentation does not represent the views or position of NAESB, ISO New England, NEPOOL or the ISO/RTO Counsel relative to the FERC NOPR RM-05-017.

• Questions regarding this NOPR should be directed to the appropriate staff at FERC.

4

Page 5: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Overview

• April 17, 2009 - NAESB files results of March 16, 2009 adoption of Wholesale Demand Response Measurement and Verification Standards, under Docket RM-05-017

• September 17, 2009 - FERC NOPR announced at open meeting.

• September 22, 2009 – FERC NOPR published in Federal Register.

• October 22, 2009 - Comment period ends

5

Page 6: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary

1. FERC proposes to incorporate by reference in its regulations at 18 CFR 38.2 business practices standards adopted by the Wholesale Electric Quadrant of NAESB to categorize various demand response products and services and to report the measurement and verification of these products and services in wholesale energy markets. (Sec. 1)

6

Page 7: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary - Background

2. Standards developed by ANSI accredited Board, NAESB. (Sec. 2)

3. Standards developed by NAESB cover Wholesale and Retail Gas and Electric designed to streamline transactional and communications processes. (Sec. 3)

4. NAESB process is open and requires majority support from EC, 40% support from 6 industry segments in wholesale quadrant; transmission, generation, marketer/brokers, distribution/LSE, end users, independent grid operators/planners, and supermajority support from WEQ membership. (Sec.4)

7

Page 8: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary

5. NAESB submits Phase I Standards referenced in Section 1 April 17, 2009 and notes Phase II WEQ DR standards development work in progress (Sec.5)

6. Phase I standards include 31 business practices and 40 definitions identifying the M&V characteristics of Demand Response products in wholesale markets. Work plan item 4.b, Phase II standards, was established concurrently with EC approval of Phase I (Sec 6)

8

Page 9: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary – Description of M&V Standards

7. Phase I M&V standards identify operational information, performance evaluation methodologies, and definitions. (Sec 7)

8. Standards address transparency requirements for four Demand Response product types; Energy, Capacity, Ancillary Services Regulation and Ancillary Services Reserve products. Many characteristics are common across products types with some exclusive to a single product. (Sec 8)

9. Standards require System Operator to make specific methods to be used and required information publically available. (sec 9)

9

Page 10: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary - Discussion

10. Incorporate by reference into FERC regulations WEQ Phase I M&V standards and associated terms in WEQ-015 glossary. (Sec 10)

– The standard enhances Transparency and Consistency to methods used to measure and verify demand response products in wholesale markets

– Glossary provides standardized definitions of demand response services, operational terms and performance measurement.

– The standards establishes basis upon which to develop more comprehensive standards for provisioning demand response in wholesale markets.

10

Page 11: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary - Discussion

11. NAESB’s consensus driven process for adoption of standards provides for reasonableness test drawing broad support from segments of industry. (Sec 11)

12. Business Practice Standards are intended to facilitate ability of demand response providers to participate in markets, reduce transaction costs, and provide more customers to participate, especially for those in multiple markets. These standards provide framework for additional standardization efforts and to identify those elements for which standardization would be beneficial.

11

Page 12: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary - Discussion

13. NAESB’s WEQ should continue their efforts to develop substantive standards for operation, evaluation and performance of demand response.

– FERC believe Industry should continue to take lead in developing and implementing demand response standards that are practical and workable.

– FERC seeks comment on establishing a deadline for development of these remaining critical standards.

12

Page 13: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary – Notice of Voluntary Consensus Standards

• FERC provides Notice of Proposed Rule Making in compliance with OMB Circular A-119 (section 11) (February 10, 1998). (Sec 14)

13

Page 14: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Summary - Misc

• Information Collection – Sections 15-20• Environmental Analysis – Section 21• Regulatory Flexibility Act Certification – Sections 22-23• Comment Procedures

– Comments due 30 days after filing in Federal Register (sec 24)

– Filings may be electronic or paper, paper filings must include 14 copies (Sec 25)

– Filings may be view as described in Document Availability section (Sec 26)

• Document Availability– Available in Federal Register and FERC’s home page (Sec 27)

– Available from FERC’s eLibrary (Sec 28)

– Assitance is available for accessing FERC’s eLibrary. (Sec 29)

14

Page 15: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Phase II M&V Standards Development For Demand Response in Wholesale Electric Markets

15

Page 16: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Phase II Activities

16

Date Location Minutes Misc.

8-Oct-09 Conference Call/Webex    Energy Curtailment Specialists Comments

FERC 9/17/09 NOPR on NAESB WEQ DR M&V Standards

FERC 9/17/09 Press Release on NAESB WEQ DR M&V Standards

20-Aug-09 

DSM/EE Working Group 3 Meeting, WEQ, Colorado

Springs,

Cancelled  Energy Curtailment Specialists Comments

15-Jul-09 Conference Call/Webex   EnerNOC Cumulative Edits Redlined July 1, 2009

Energy Curtailment Specialists Comemnts to EnerNOC Cumulative Edits Redlined July 1 2009

Retail and Wholesale DR Definitions Compared

1-Jul-09 Conference Call/Webex Meeting Notes EnerNOC Cumulative Product Edits

EnerNOC Cumulative Edits Redlined July 1,

2009

2008 WEQ Annual Plan Item 5(a) Final Action: Review and develop business practice standards to

support DR and DSM-EE programs. - Ratified March 16, 2009

17-Jun-09 Conference Call/Webex 

  Retail Metering Working Group Process for Performing VEE for AMS

Comverge’s revised edits to the WEQ DR standards

EnerNOC’s revised edits to the WEQ DR standards

EnerNOC’s Energy Products Edits

Page 17: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Phase II Activities

17

Date Location Minutes Misc.

10-Jun-09 DSM/EE Working Group 3 Meeting, WEQ, Boston,

MA 

Meeting Notes EnerNOC - The Demand Response Baseline

Comverge’s revised edits to the WEQ DR standards

WEQ DR Standards - EnerNOC Capacity Product Recommendations v.1

EnerNOC’s revised edits to the WEQ DR standards

  

Comverge Edits to the WEQ DR Standards by W. Miyaji

IRC Website Link to MATRIX

2008 WEQ Annual Plan Item 5(a) Final Action: Review and develop business practice standards to support DR and DSM-EE programs. -

Ratified March 16, 2009

18-May-09 Conference Call/Webex   IRC Website Link to MATRIX

16-Apr-09 DSM/EE Working Group 3 Meeting, WEQ, Austin, TX

  Recommendation 2008 WEQ Annual Plan Item 5(a) Approved by the WEQ EC on February 10, 2009 (Clean)

Page 18: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

IRC Matrix of DR products

• Matrix of demand response technical requirements inclusive of Operational, Measurement and Performance Evaluation Criteria.

• Covers all current Demand Response Products offered throughout North America.

• Over 2500 data elements with links to additional tariff and operating manuals.

• Matrix is easily searchable and free to public.• Matrix will be maintained by ISO-RTO Counsel.• Located at www.isorto.org under documents.

18

Page 19: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Next Steps

• Forward going process• Discussion of Scope

19

Page 20: Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.

September 30, 2009© 2009 ISO New England Inc.

Contact

North American Energy Standards Board1301 Fannin St.Suite 2350Houston, TX 77002Voice: (713) 356-0060Email: [email protected]

Eric Winkler, Ph.D.FCM &Tariff Administration

ISO New England

Email: [email protected]

www.iso-ne.com

20