MEASURE M ANNUAL REPORT FISCAL YEAR 2018—2019 Version 1/27/2020
49

MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

Jul 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

MEASURE M ANNUAL REPORTFISCAL YEAR 2018—2019

Version 1/27/2020

Page 2: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

2 SONOMA COUNTY TRANSPORTATION AUTHORITY

Page 3: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

12019 MEASURE M STRATEGIC PLAN

CONTENTS

1EXECUTIVE SUMMARY 05

2REVENUE AND DISBURSEMENTS 07

3MEASURE M PROGRAMS 09

A Apportionment Programs 101 Local Street Rehabilitation (LSR) Program 112 Local Bus Transit (LBT) Program 15

B Project Programs 161 Highway 101 Program 172 Local Street Projects (LSP) Program 293 Bicycle & Pedestrian Projects Program 354 Passenger Rail Program 43

Page 4: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

SONOMA COUNTY TRANSPORTATION AUTHORITYREGIONAL CLIMATE PROTECTION AUTHORITY

2019 BOARD OF DIRECTORS

MARK LANDMAN, CHAIRCity of Cotati

SUSAN GORIN, VICE-CHAIRSonoma County

MELANIE BAGBYCity of Cloverdale

JOSEPH CALLINAN City of Rohnert Park

LOGAN HARVEYCity of Sonoma

SARAH GURNEYCity of Sebastopol

KATHY MILLERCity of Petaluma

JOE NAUJOKASCity of Healdsburg

DAVID RABBITTSonoma County

CHRIS ROGERSCity of Santa Rosa

SAM SALMONTown of Windsor

SHIRLEE ZANESonoma County

Page 5: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

CITIZENS ADVISORY COMMITTEE

2019 MEMBERSHIP ROSTER

CURT NICHOLSBuilding Industry Association

RANDY BRYSONNorth Bay Labor Council

RAY MULASSonoma Co. Farm Bureau

WILLARD RICHARDS League of Women Voters

of Sonoma County

LISA BADENFORTNorth Bay Association of Realtors

DENNIS BATTENBERGTransit Paratransit Coordinating Committee

MOUSA ABBASISanta Rosa Chamber of Commerce

KATHLEEN CORTEZSonoma County Area Agency on Aging

STEVE BIRDLEBOUGHSierra Club

TOM CONLONSonoma County Conservation Coalition

JOHN BLYEngineering Contractors Association

VACANCYSenior Community Liaison

MICHAEL LAVINSonoma County Taxpayers Association

DENNIS HARTERSonoma County Alliance

ERIS WEAVER Sonoma County Bicycle Coalition

TERI SHORE Sonoma County Transportation

& Land Use Coalition

BOB ANDERSON, CHAIRUnited Winegrowers

MICHAEL WRAY1st District

VACANT2nd District

TOM BAHNING3rd District

VACANT4th District

ALBERT (AL) LERMA5th District

Page 6: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

4 SONOMA COUNTY TRANSPORTATION AUTHORITY

Page 7: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

52019 MEASURE M STRATEGIC PLAN

1EXECUTIVE SUMMARY

Page 8: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

6 SONOMA COUNTY TRANSPORTATION AUTHORITY

EXECUTIVE SUMMARY

EX

EC

UT

IVE

SU

MM

AR

Y

Passed by the voters in November 2004, the Traffic Relief Act for Sonoma County (Measure M) contin-ues to deliver multi-modal transportation improvements throughout the county. The Act provides for a ¼ cent sales tax to be used to maintain local streets, fix potholes, accelerate the widening of Highway 101 for High Occupancy Vehicle (HOV) lanes, improve local street operations, restore and enhance transit services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. The funds are dedicated towards the specific programs and projects specified in the Expenditure Plan.

LOCAL STREETS REHABILITATION (LSR) AND LOCAL BUS TRANSIT (LBT) PROGRAMS Measure M continues to provide Sonoma County and its nine cities with a reliable fund source for on-going local street maintenance and public transit operational needs through its two apportion-ment programs. The LSR program provides all nine jurisdictions with increased funding for the main-tenance and operations of their existing local streets. The LBT program provides funding to three transit operators, to augment both regular and paratransit bus service.

HIGHWAY 101 PROGRAMThe Highway 101 program continued to make substantial progress in the delivery of High Occupan-cy Vehicle (HOV) projects in Fiscal Year 2018-19. Construction continued on the San Antonio Creek Bridge Curve Correction Project at the County Line (MSN B3) and the Sonoma Median Widening (MSN B2 Phase 2) south of Kastania Road Over Crossing. The MSN C2 project opened bids on June 12, 2019 and the apparent low bidder is within the full funded project allocations. Construction on MSN C2 will start in the fall of 2019. The MSN C2 project is the final HOV lane project in Sonoma County to complete a 30 mile HOV system from south of the Marin/Sonoma County line to Windsor. All Sonoma County Highway 101 planned HOV lanes will be opened by the end of 2022.

LOCAL STREET PROJECTS (LSP) AND BICYCLE PEDESTRIAN PROJECTS PROGRAMLocal jurisdictions used Measure M to help fund various projects identified in the Local Street Projects (LSP) and Bicycle Pedestrian Projects (Bike-Ped) programs. In the LSP program, the City of Santa Rosa nearly completed work on the Design phase of Hearn Avenue Phase 3 and continued progress on Fulton Avenue Improvements Phase 1. The County continued plant establishment of the Airport Avenue Interchange land-scaping and the SCTA continued progress on the Design phase for the Highway 116/121 Intersection project.

Funding spent in the Bicycle and Pedestrian program dropped from the previous fiscal year as sponsors gear up for a new set of projects to move forward. This year’s expenditures include the Santa Rosa Creek Trail, NWPRR Path, Access Across 101 in Rohnert Park, and Bicycle Safety and Education; includ-ing Safe Routes to Schools and Bike to Work activities.

PASSENGER RAIL PROGRAM (SMART)SMART began service along the Initial Operating Segment (IOS) in August of 2017 and will open to Lark-spur in late 2019, despite not expending Measure M funds in FY 18-19.

In summary, Measure M has been a reliable fund source, helping to maintain and build upon Sonoma County’s transportation network. Measure M funds have been used to improve the quality of local roads, maintain local bus transit service, reduce congestion, add HOV lanes to Highway 101 and improve inter-changes, increase bicycle and pedestrian facilities, and bring commuter rail service to Sonoma County.

Page 9: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

72019 MEASURE M STRATEGIC PLAN

2REVENUE & DISBURSEMENTS

Page 10: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

8 SONOMA COUNTY TRANSPORTATION AUTHORITY

REVENUE AND DISBURSEMENTS

RE

VE

NU

E A

ND

DIS

BU

RS

EM

EN

TS

Fiscal Year 2018-19 sales tax revenue totaled $26,798,285. Compared to Fiscal Year 2017-18 revenue of $24,785,653, this reflects 8.1% year-to-year growth.

Measure M’s Expenditure Plan guides the distribution of funding among programs and projects. The following table summarizes the Measure M program accounts for the fiscal year ending June 30, 2019:

TABLE 1: MEASURE M FINANCIALS FISCAL YEAR 2018-19

Apportionment Programs

Beginning Balance

Revenue (Note 1)

Expenditures (Note 2)

Adjustments (Note 3)

Ending Balance

20% Local Road Rehabilitation (LSR)

$678,552 $5,380,280 $5,275,498 -$110,742 $672,591

10% Local Bus Transit (LBT) $285,412 $2,690,345 $2,637,952 -$55,295 $282,5111% Administration $561,865 $280,376 $192,666 -$15,877 $633,697

Project Programs

40% Highway 101 Projects $28,371,314 $11,699,447 $20,266,779 $813,848 $20,617,83020% Local Street

Projects (LSP)$24,935,914 $5,930,077 $2,459,388 $328,560 $28,735,163

4% Bike/Ped Projects $1,293,908 $1,489,901 $495,473 -$247,575 $2,040,7625% Passenger Rail (SMART) $656,305 $1,365,633 $753,835 -$594,627 $673,475

Total Measure M $56,783,270 $28,836,060 $32,081,592 $118,291 $53,656,029

Note 1: Revenue includes $26,798,285 in new sales tax revenue, $1,278,796 in interest and $758,979 in reimbursements.

Note 2: Expenditures include $22,930,579 in program expenses, including $9,151,012 in Debt Service.

Note 3: Adjustments include fiscal year end receivables and payables for both revenue and expenditures; as well as FY 18/19

$500K partial loan repayment from Rail to LSP, and Prior Year Revenue received for Hwy 101.

Fiscal Year 2018-19 sales tax revenue totaled

$26,798,285

Central Sonoma Valley Trail at Verano Avenue.

Page 11: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

92019 MEASURE M STRATEGIC PLAN

3MEASURE M PROGRAMS

Page 12: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

10 SONOMA COUNTY TRANSPORTATION AUTHORITY

AAPPORTIONMENT PROGRAMS

Of the six non-administrative programs within Measure M, two are considered apportionment programs in that funds are ap-portioned to designated sponsors within the program, based on a formula. The Expenditure Plan does not call for specific proj-ects within these programs. Local jurisdictions administer these funds and report on Measure M spending by submitting annual reporting letters.

1 LOCAL STREETS REHABILITATION (LSR) PROGRAM

2 LOCAL BUS TRANSIT (LBT) PROGRAM

Page 13: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

112019 MEASURE M STRATEGIC PLAN

1LOCAL STREETS REHABILITATION (LSR) PROGRAM

20%

Measure M provides 20 percent of its revenues to the County and each of the nine cities to be used to repair potholes, maintain streets and keep traffic moving. In Fiscal Year 2018-19, the SCTA distributed $5,275,498 in Measure M – LSR funds to the County and the nine cities to use on their individual rehabilitation programs. Distribution percentages are by population and road mile formula. Last year’s allocations were mistakenly calculated with a population only formula. This year’s distribution corrected the mistake and new accounting controls have been added to avoid this error in the future.

TABLE 2 - LOCAL STREET ROAD (LSR) PROGRAM REPORTING Fiscal Year 2018-19

LSR Jurisdiction

Unspent Prior Allocations

FY 2018-19 Allocations

Interest Reported

Available in FY 2018-19

Expended in FY 2018-19

Rollover to FY 2019-20

Cloverdale $210,935 $74,189 $1,232 $286,356 $34,756 $251,601Cotati $182,356 $54,392 $2,473 $239,221 $180,128 $59,093Healdsburg* $0 $103,056 $0 $103,056 $103,056 $0Petaluma $0 $415,293 $0 $415,293 $415,293 $0Rohnert Park $227,690 $235,774 $4,317 $467,781 $32,727 $435,054Santa Rosa $474,638 $1,211,821 $4,473 $1,690,932 $1,268,747 $422,186Sebastopol $144,294 $56,228 $1,563 $202,085 $130,415 $71,670Sonoma (City) $21,859 $78,401 $1,579 $101,838 $0 $101,838Windsor $255,068 $200,409 $0 $455,477 $455,477 $0County $0 $2,845,937 $0 $2,845,937 $2,845,937 $0Totals $1,516,839 $5,275,498 $15,638 $6,807,976 $5,466,535 $1,341,441

* Healdsburg submitted revised reporting for FY 17-18 that resulted in a change in the Rollover to FY 18-19 to $0, not $112,438

as previously reported

Page 14: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

12 SONOMA COUNTY TRANSPORTATION AUTHORITY

SCTA reports the following highlights:

CITY OF CLOVERDALE

The City of Cloverdale was al-located $74,189 in Measure M - LSR funds this year. Com-bined with $210,935 in unspent prior allocation and $1,232 in interest the City had a total of $286,356 available to spend. The City spent $34,756 on gen-eral street maintenance on Vis-ta Drive (filling potholes, lane striping, and red curb painting adjacent to fire hydrants). The City rolled over $251,601 for fu-ture years’ expenditures.

CITY OF COTATI

The City of Cotati received $54,392 in Measure M - LSR funds this year. Combined with unspent prior years’ alloca-tions of $182,356 and interest of $2,473, Cotati had $239,221 available this year. The City ex-pended $180,128 on construc-tion of the city’s 2018 Street Construction and Improve-ments Project (pavement pres-ervation). The City applied a full depth reclamation on Larch Avenue from Lincoln Avenue to LaSalle Avenue, and Lakewood

Avenue from Lincoln to La Salle. Crews ap-

plied wedge grinds with hot mix as-

phalt overlays on La Salle Av-enue from E. Cotati Avenue to Lakewood Avenue, Lin-coln from La Salle to the

City Limits, and Larkspur Court.

Overall, the City installed a total of 1.1 centerline miles of street paving, and six recon-structed (Americans with Dis-abilities Act (ADA) compliant)curb ramps. The City rolls over $59,093 for future years’ ex-penditures.

CITY OF HEALDSBURG

The City of Healdsburg re-ceived $103,056 in Measure M - LSR funds this year and did not report any interest earned. This City’s initial carry forward bal-ance differs from that reported in the FY17/18 Annual Report because Healdsburg submitted revised figures based on an au-dit of their accounting system.The City spent the entire FY 18-19 amount on various local road maintenance activities, includ-ing: routine preventative main-tenance of traffic signal sys-tems, routine on-street striping and signage maintenance; re-placement of in-ground flash-ing lighted crosswalk system with a new, rapid rectangular flashing beacon (RRFB) on Healdsburg Avenue at the in-tersection of Plaza Street; 600-ft removal and replacement of the top .20-feet of pavement

The City of Healdsburg received and expended $103,056 of Measure M

funds this year.

City of Cotati

City of Healdsburg

Page 15: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

132019 MEASURE M STRATEGIC PLAN

AP

PO

RT

ION

ME

NT

PR

OG

RA

MS

surface of the Healdsburg Av-enue northbound right lane just north of Dry Creek/March Avenue; and pavement surface repairs at various locations throughout the City.

CITY OF PETALUMA

The City of Petaluma received $415,293 in Measure M - LSR funds this year. Petaluma spent its entire balance of $415,293 in FY 2018-19 on its maintenance program. The maintenance pro-gram includes pothole patch-ing, skin patching, concrete work, pavement rehabilitation, overlays, street sign replace-ment, and traffic and bike lane pavement delineation. Approx-imately 3,480 potholes were repaired citywide. Skin patch-ing, which is used to cover pot-holes and seal the surround-ing areas to prevent further potholing, was conducted on 5,400 linear feet and included 29 digouts. Edge grinding and

a 2-inch overlay were in-stalled on all or sections

of Kiwi Court, Gregory Court, Persimmon Court and

Canterbury Court totaling 20 miles:

A total of 112 faded traffic signs were replaced. Additionally, 24,325 linear feet of lane lines were repainted including bike lanes, 6,315 linear feet of curb was painted, as well as 32 stop bars, 50 crosswalks, and 1,240 traffic buttons were laid.

CITY OF ROHNERT PARK

The City of Rohnert Park re-ceived $235,774 in Measure M - LSR funds this year. Combined with unspent prior years’ allo-cations of $227,690 and inter-est of $4,317, Rohnert Park had $467,781 of funding available. Rohnert Park expended a total of $32,727 this year and rolled over $435,054 for future years’ expenditures.

Rohnert Park spent $32,727 of Measure M - LSR funds on en-vironmental compliance and design for its State Farm Drive Rehabilitation Project (Rohnert Park Expressway to Profession-al Center Drive). The City will

implement construction in the next reporting cycle (2019-20).

CITY OF SANTA ROSA

The City of Santa Rosa re-ceived $1,211,821 in Measure M - LSR funds this year. Com-bined with $474,638 in unspent prior years’ allocations and $4,473 in interest, the City had $1,690,932 in Measure M - LSR funding available. The City ex-pended $1,268,747 and rolled over $422,186 for future years’ expenditures.

The City used $448,013 for the design and construction phase of the 2018 slurry seal project. The project included a few lo-calized minor pavement dig outs, applied slurry seal, and installed new traffic stripes and pavement markings on approx-imately 16.3 center line miles of city streets.

The City also used $100,000 for the design phase of the Fulton Road reconstruction project. Paving was scheduled to start in Fall 2019 and will be reported in the next (2019-20) cycle.

Measure M funds in the amount of $485,734 were used by the

Approximately 3,480 potholes were repaired citywide in Petaluma. City of Petaluma

Page 16: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

14 SONOMA COUNTY TRANSPORTATION AUTHORITY

AP

PO

RT

ION

ME

NT

PR

OG

RA

MS

City in the construction phase of the 2018 pavement preven-tative maintenance program. Roads that received treatment included:

• Yulupa Avenue between Douglas Drive and the City limits; (1.5 miles)

• Airway Drive between Piner Road and Hopper Avenue; (0.5 mile)

Finally, the City used $235,000 in Measure M funds to continue maintenance of existing adap-tive traffic control signals on College Avenue, Guerneville Road, Stony Point Road, and Mendocino Avenue totaling 49 signals. Santa Rosa Avenue was converted to adaptive traf-fic control in 2018 and contin-ues to be monitored. Marlow Road at Monroe School, which is on an adaptive corridor, was converted to a Flashing Yellow Arrow (FYA) protected per-missive signal in August 2018. The City is also moving toward updated traffic signal software and controllers for the remain-ing 150 signals.

CITY OF SEBASTOPOL

The City of Sebastopol re-ceived $56,228 in Measure M – LSR funds this year. Combined with $144,294, in prior alloca-tion and $1,563 in interest, the City had a total of $202,085 available to spend. Sebastopol expended a total of $130,415 to pave and maintain city owned Bodega Avenue and to im-plement traffic calming and safety upgrades to three in-tersections. The City rolls over the balance $71,670 for future years’ expenditures

CITY OF SONOMA

The City of Sonoma received $78,401 in Measure M - LSR funds this year. Combined with $21,859 in unspent prior allo-cations and $1,579 in interest, Sonoma had $101,838 available to spend. The City rolled over the entire amount for future years’ expenditures.

TOWN OF WINDSOR

The Town of Windsor received $200,409 in Measure M - LSR-funds this year. Combined with $255,068 prior allocation the Town had a total of $455,477 to spend. The Town expended the entire amount on its 2017-18 Pavement Preservation Project. This project included neighbor-hoods east of Hembree Lane and north of Old Redwood Highway and Pleasant Avenue and Billington Lane. In total 227,890 square yards of streets were repaired, slurry sealed and re-striped as part of the Town’s on-going Street Mainte-nance program.

COUNTY OF SONOMA

The County of Sonoma re-ceived and spent $2,845,937 in Measure M - LSR funds on county roads maintenance this year. The County spent the fis-cal year’s allocation on treat-ments of crack sealing, grind and pave, overlay, and fog seal. In total 5.95 miles were treated on the following roads:

• Arnold Drive (.45 miles)• Rainsville Road (.97 miles)• Spring Hill Road (2.02

miles)• West Railroad Avenue (1.08

miles)

Town of Windsor

Page 17: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

152019 MEASURE M STRATEGIC PLAN

2 LOCAL BUS TRANSIT (LBT) PROGRAM10%

TABLE 3: LOCAL BUS TRANSIT (LBT) PROGRAM REPORTING Fiscal Year 2018-19

LBT Jurisdiction FY 2018-19 Allocations

County* $1,396,373Santa Rosa $923,320Petaluma $318,259Totals $2,637,952

*Per Agreement, County has assumed operation of Healdsburg Transit. County’s share includes $61,625 for Healdsburg as prescribed

by the expenditure plan.

Sonoma County Transit received and expended $1,396,373 in Measure M – LBT funds this year. Those funds include $61,625 in Measure M allocation for Healdsburg Transit, for which Sonoma County Transit has assumed operations. There were 906,863 passenger trips taken on Sonoma County Transit which is a .9% decrease from last year and 58,711 passenger trips taken on Sonoma County paratransit which is a .8% decrease from last year.

Santa Rosa CityBus received $923,320 in Measure M – LBT funds this year. CityBus spent the entire amount on transit operations. The City used $895,920 for fixed route operations and $27,500 on Paratransit Operations. CityBus provided service to 1,852,000 passengers and the reliability and on-time performance of the fixed-route service has increased. Measure M provided about 7% of the fixed route operating revenue (and about 2% of ADA paratransit operating revenue) and continues to play a vital role as a stable source of local funding for CityBus service.

Petaluma Transit received and spent $318,259 in Measure M – LBT funds. Petaluma Transit spent their full allocation of Measure M – LBT funds to sustain both their fixed-route and paratransit operations. Measure M funds account for approximately 11% of Petaluma Transit’s operating budget. Petaluma Transit saw a decrease of 3% fixed route ridership (332,292 trips) over FY 2017-18. Petaluma Paratransit experienced a decrease of 1% (16,987 trips).

It is difficult to generalize why transit ridership fluctuates year to year because so many factors, such as gas prices, housing availability, and route adjustments can impact each transit operator differently. This annual report is meant to be a snapshot of the 18/19 fiscal year. For more detailed information about ridership trends over time, please reference the Sonoma County Comprehensive Transportation Plan (available on the SCTA website www.scta.ca.gov).

Page 18: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

16 SONOMA COUNTY TRANSPORTATION AUTHORITY

BPROJECT PROGRAMS

The remaining four Measure M programs are considered project programs in that the Measure M Expenditure Plan calls for one or more specific projects within each program.

1 HIGHWAY 101 PROGRAM

2 LOCAL STREET PROJECTS

3 BIKE & PEDESTRIAN PROJECTS

4 PASSENGER RAIL PROGRAM

Page 19: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

172019 MEASURE M STRATEGIC PLAN

1 HIGHWAY 101 PROGRAM40%

Measure M contributes 40 per-cent of its sales tax revenue to the Highway 101 program. SCTA manages the Measure M - High-way 101 program fund to devel-op and build High Occupancy Vehicle (HOV) lane projects along five distinct areas of High-way 101, as described in the Ex-penditure Plan. Net funding in the account began with a bal-ance of $28,371,314. Revenue to the program totaled $11,699,447, consisting of $10,719,314 in sales tax, $605,623 in interest, and $374,510 in reimbursements. Ex-penditures totaled $20,266,779. Adjustments totaled $813,848 leaving an ending balance of $20,617,830 (see Table 1, and project information sheets for more details).

For purposes of discussion, the below abbreviations apply to the information sheets on the following pages:

• PAED: Project Approval/Environmental Document• PSE: Project Specifications and Estimate• ROW CAP: Right of Way Capital• ROW SUP: Right of Way Support• CON CAP: Construction Capital• CON SUP: Construction Support• PM: Project Management

Highway 101 expenditures are tracked in accordance with the Measure M Expenditure Plan. The financing account includes the cost of financing, including interest and principal payments on the 2011 and 2015 revenue bonds. The following table summarizes Fiscal Year 2018-19 expenditures against the Measure M - Highway 101 Program fund:

TABLE 4 – HIGHWAY 101 PROGRAMFiscal Year 2018-19 Project Expenditures

PROJECT NAME EXPENDITURES

Wilfred $0

North $23,082

Central -$125,040

MSN-County Line to Pet River $6,386,419

MSN-Pet River to Old Red $5,422,949

Financing $8,431,346

TOTAL $20,138,756

Note: 101 Expenditures include $8,417,541 in principal and interest payments for debt service. Total Expenditures above = $20,266,779 (Highway 101 Expen-ditures from Table 1) - $128,024 in Adjustments (See table on page 23 for more details).

SCTA works with the Metropolitan Transportation Commission (MTC), Caltrans, and local partners to deliver the Highway 101 pro-gram. The following exhibits describe the status of the four High-way 101 projects:

Page 20: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

1 H

IGH

WA

Y 1

01

PR

OG

RA

M STO

NY

PO

INT

RD

PINER RD

OCCIDENTAL RD

LEVERONI

RD

TODD RD

PETA

LUM

A

HILL

RD

RIVER RD

3RD ST

FU

LT

ON R

D

ELY RD

SAN

TA

ROSA

AV

VERANO

AV

3R.

ST

ADOBE RD

SN.

LN

WR

IGH

T R

DF

UL

TO

N R

D

LL.RD

BR

USH

CR

EE

KR

D

PTL.BLV.

FU

LTO

NR

D

MN

.ST

BELLEVUEAV

PL

EA

S A NT

HILL R D

GUERNEVILLE RD

PLEASANTAV

LUDWIG AV

W ND.

RV. R D

COTATI AV

ROHNERTPARK EXPR

NAPA RD

CASA

GRN. A

V

WA

RM

SP

RIN

GS

RD

WIL

LOW

SID

ER

D

HWY116

WES

TSID

ER

D

LLA

NO

RD

PETALUM

A

AV

PTLM. VLYFORD RD

HWY12

CASA

GRA

ND

ERD

HW

Y116

NAPAST

SI E RRA AV

PETALUMA

AV

GUERNEVILLE RD

SNY

DE

R L

N

TOD

D

RD

RIVERRD

WA

SHIN

GTO

N S

T

CHILEN

O

VA

LLEYRD

HWY12

CRANECANYON RD

BODEGA AV

HWY116

SNY

DER

LN

GRAVENSTN .

HWY

BENNETTVALLEY RD

OLD

REDWOOD

HWY

5TH

ST

ROHNERTPARK EXPR

OLD REDWOODHWY

GRAVENSTEIN

HWY

AIRPORTBLVD

BODEGA

HWY

SHILOHRD

AV

BL O

OM

FIE

L DR

D

OCCIDENTALRD

HW

Y116

COR

ON

ARD

EA

STSI

DE

RD

GUERNEV ILLERD

WESTERN

AV

5TH

ST

WINDSORRIVER RD

BR

OA

DW

AY

TODD RD

BODEGA AV

STEELE

LN

TREN

TON

HEA

LDSB

UR

GR

D

LLAN

ORD

FAUG

HT

RD

WARMSPRINGS RD

HW

Y12

D ST

HWY 121

HIG

H

SCH

OO

LR

D

BURBANK

MEMORIAL HWY

PE

TA

LU

MA

HIL

LR

D

AR

NO

LD

DR

AR

NO

LDD

R

OLD

REDWO

OD

HW

Y

ARN

OLD

DR

F REI R

D

MOUNTAINVIEW AV

GRAVENSTEINHW

Y

OCCIDENTAL RD

WIN

DSO

R R

D

LONEPINE RD

ADOBE RD

H

WY

116

CH

AL

KH

ILL

RD

TOMALES RD

WA

TER

TR

OU

GHRD PETALUMA

HILL RD

HWY 12

PN

ER

RD

MARK WEST

SPRINGS RD

MARK W EST

SPRI NGS RD

MEA

CH

AM

RD

H

ALL RD

SLU

SSE

RR

D

HALL RD

PINER RD

ADOBE RD

MCDOWELL BLVD

GR

AVEN

STEIN

HW

Y

MARK WEST

STATION RD

SON

OM

AM

TNR

D

STAGE

GULCH

RD

PE

TAL

UM

A H

ILL

RD

STO

NY

PO

INT

RD

PEPPER RD

HW

Y10

1

LA

GR

D

BENNETTVALLEY RD

GR

AN

GE

RD

STONYPOINT RD

STAGE

GULCH RD

PEPPER RD

EAST

SID

ER

D

HWY 12

ADOBE RD

RIEBLIRD

PRESS

L EYR

D

BENNETTVALLEY RD

PETALUMAVLY FORD RD

SONOMA

MTN RD

ROBLAR RD

LAKEVILLE RD

Ê

£¤101

·|}þ116

·|}þ116

·|}þ116

·|}þ12

·|}þ12

SANTA ROSA

WINDSOR

SEBASTOPOL

ROHNERT PARK

COTATI

PETALUMA

SONOMA

Marin County

Lake County

NOVATO

NORTH-B, NORTH-C

WILFRED

CENTRAL-A

CENTRAL-B

MSN-C

MSN-B

CENTRAL-C

HOV lanescompleted

HOV to be completed

*Current as of printing of 2019 strategic plan.

1 | HIGHWAY 101 PROJECTS

Page 21: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

192019 MEASURE M STRATEGIC PLAN

CO

MP

LE

TE

D

PR

OJE

CT

PR

OG

RA

MS

WILFRED | Rohnert Park Expressway in Rohnert Park to Santa Rosa Avenue in Santa Rosa

PROJECT LOCATION:

This project will construct approximately 1.6 miles of High Oc-cupancy Vehicle (HOV) lanes from just north of the Rohnert Park Expressway Overcrossing to Santa Rosa Avenue Over-crossing in Rohnert Park.

PROJECT SCOPE:

• Reduce recurrent congestion on Highway 101• Improve access and circulation between local streets

and Highway 101• Upgrade highway facility to current standards

ADDITIONAL PROJECT DETAILS:

• Add northbound and southbound High Occupancy Vehi-cle (HOV) lanes by widening the freeway from four to six lanes

• Widen shoulders• Upgrade highway drainage facilities• Add concrete median barrier• Correct the vertical alignment of Highway 101• Construct a new bridge undercrossing to link Wilfred Av-

enue to Golf Course Drive • Replace the existing Wilfred/Commerce Boulevard Un-

dercrossing • Construct a two lane collector-distributor road between

Wilfred Avenue and Santa Rosa Avenue on southbound Highway 101

• Build auxiliary lanes between Rohnert Park Expressway Overcrossing to Wilfred Avenue/Golf Course Drive Inter-change

• Build auxiliary Lane northbound from Wilfred/Golf Course Drive to Santa Rosa Avenue Overcrossing

• Construct HOV bypass lanes, ramp metering, CHP en-forcement areas, and re-alignment of on-ramps

• Re-alignment of Wilfred Avenue, Golf Course Drive, Com-merce Boulevard, and Roberts Lake Road

• Construct sidewalks and bicycle lanes along Wilfred Ave-nue/Golf Course Drive

Tracks

Red

woo

d H

wy

Horn Ave

Com

mer

ce B

lvd

Fairway Dr

Wilfred Ave

Scenic Ave

Golf Course Dr

Lab

ath

Ave

Millbrae Ave

Hudis St

Dow

del

l Ave

Redwood D

r

Estrella Dr

Lang

ner

Ave

Holly Ave

Rob

erts Lak

e Rd

Da

niel

Dr

Laguna Dr

Santa Alicia Dr

Dolores D

r

Portal St

Firethorn Dr

Enterprise Dr

Hu

nter

Ln

Walnut C

irD

avis C

ir

Dorian D

r

Daw

n D

r

Fern Pl

Flores Ave

Fauna Ave

Sant

a R

osa

Ave

Roh

nert

Pa

rk E

xpy

Martin Ave

Cou

ntry

Clu

b D

rSanta Dorotea Cir

Don

na C

t

Business Park Dr

City Hall Dr

Dexte

r Cir

Seed Farm D

r

Avram Ave

Fleming Way

Flor

al W

ay

Del

la C

t

Cascade Ct

Fescue Way Fig Ct

Park Ct

Airport R

d

Dia

ne C

t

Helm

an Ln

Filament St

Dorine Ave

Francis Cir

Madrigal St

Utility Ct

State Farm D

r

Dana Ct

Dinah C

t

Carlita Cir

Rancho Verde Cir

Darleen Ct

Civic C

ente

r Dr

Lare

do

St

Clas

sic C

t

Apple Ln

Ron

da

St

Kir

sten

Ct

Racquet Club Cir

Professional Center D

r

Carlson Ct

Los F

eliz

Will

is A

ve

Dou

blet

ree

Dr

Sala

ma

nca

St

Freedom

Pl

Ra

leys Towne C

entre

Executive Ave

Hickory Way

Corte M

oreno

Calle Roja

Joa

nne

Ct

Toyon Ct

Faw

n C

t

Red

woo

d H

wy

Rohnert Park Expy

Scenic Ave

Lab

ath

Ave Rohnert Park Expy

Lang

ner

Ave

Ê

£¤101

£¤101

ROHNERT PARK

Rohnert Park Expressway

Santa Rosa Ave

HIGHWAY 101 - WILFRED AVE INTERCHANGEAND HOV LANE WIDENING PROJECT

Wilfred Ave

Golf Course Dr

PROJECT STATUS/SCHEDULE: Wilfred – Wilfred - SCTA secured $73.3 Million in Corridor Mobility Improvement Account (Prop. 1B), State Transportation Improvement Program (STIP), and Measure M funding to fully fund the roadway portion of the Wilfred Project. Construction of the roadway phase of the Wilfred project started in spring 2009 and was completed on June 28, 2013. Construction and Right-of-Way phases continued through 2015 and are complete.

Phase L –SCTA is pursuing funding opportunities for a follow-up landscaping project. The project schedule is dependent upon securing funding.

FISCAL YEAR 2018-19 EXPENDITURES:

FY 2018-19, SCTA expended a total of $0 in Measure M – Highway 101 Projects Program funds on the Wilfred project.

PROJECT MAP

Page 22: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

20 SONOMA COUNTY TRANSPORTATION AUTHORITY

CO

MP

LE

TE

D

NORTH | Steele Lane in Santa Rosa to Windsor River Road in Windsor

This project has been split into three phases, Phase A – High-way 101 High Occupancy Vehicle (HOV) Lanes; Phase B- Air-port Boulevard & Fulton Road Interchange Improvements and Soundwalls in Windsor; and a follow-up landscaping project. In addition, the Steele Lane Interchange Project (Phase S) was included as an early phase of the North proj-ect. The Phase S project was completed in 2008.

PROJECT SCOPE

• Reduce recurrent congestion on Highway 101 by con-structing a northbound and southbound HOV lane

• Upgrade existing freeway to current standards including widening shoulders and ramp improvements

• Rehabilitate existing highway

ADDITIONAL PROJECT DETAILS

Phase A – Highway 101 High Occupancy Vehicle (HOV) Lanes from Steele Lane in Santa Rosa to Windsor River Road in Windsor

• Construct northbound and southbound High Occupancy Vehicle (HOV) Lanes and provide standard 10 feet shoul-ders

• Upgrade on and off-ramps and provide HOV bypass lanes • Rehabilitate existing highway• Upgrade drainage• Widen bridges at Mark West Creek, Pool Creek, and

Pruitt Creek• Construct southbound auxiliary lanes at the Hopper Ave-

nue and Mendocino Avenue on-ramps• Extend auxiliary lanes from north of Steele Lane to Bicen-

tennial Way• Install Intelligent Transportation System (ITS) devices,

consisting of closed circuit television cameras, change-able message signs, traffic monitoring stations, and a highway advisory radio system

Phase B - Airport Boulevard & Fulton Road Interchange Im-provements & Sound walls in Windsor

• Replace Airport Boulevard Overcrossing with a new 5 lane structure (4 travel lanes and one turn lane)

• Reduce Highway 101 congestion and traffic weaving by reconfiguring ramps at Airport Boulevard and closing the ramps at Fulton Road

• Construct sound walls in Windsor between Shiloh Road and Windsor River Road (Formerly Phase C)

Phase L1 – Landscaping for Airport Blvd. overcrossing and Highway 101 interchange.

Phase L – Follow-up Landscaping

• Landscape Highway 101 Steele Lane to Windsor River Road.

PROJECT STATUS / SCHEDULE :The Environmental Assessment/Environmental Impact Re-port (EA/EIR) was completed in October 2007. The EA/EIR was revalidated in June 2010 for Phase B to include the replacement of the Airport Boulevard Overcrossing.

PR

OJE

CT

PR

OG

RA

MS

Phase A – SCTA secured $111.8 Million in Corridor Mo-bility Improvement Account (Prop. 1B), State Transpor-tation Improvement Program (STIP), Federal Earmark, and Measure M funding to fully fund Phase A of the North Project. The project completed construction in December 2010.

Phase B - SCTA and Sonoma County Public Works se-cured $53.9 Million in Measure M, County, Corridor Mo-bility Improvement Account (Prop 1B), and State and Local Partnership Program (Prop 1B) funding to ful-ly fund the North-B project. Construction started in spring 2013 and was substantially complete by the end of 2014, although due to plant establishment the final construction contract acceptance was August 3, 2015. Environmental mitigation monitoring, maintenance and reporting will continue through 2021. Final right of way activities are anticipated to be complete in 2020.

Phase L1 –Construction began in the spring of 2017 and com-pleted late in 2017. Three years of plant establishment will be complete in 2020.

Phase L – SCTA is pursuing funding opportunities for a fol-low-up landscaping project. The project schedule is depen-dent upon securing funding.

FISCAL YEAR 2018-19 EXPENDITURES:

In FY 2018-19, SCTA expended a total of $23,082 in Mea-sure M – Highway 101 Projects Program funds on the North project as shown in the following table

PHASE NORTH B TOTAL

ROW SUP $20,014 $20,014

PM $3,068 $3,068

Total $23,082 $23,082

FISCAL YEAR 2018-19 REIMBURSEMENTS:

In FY 2018-19, SCTA collected a total of $0 in reimburse-ments for the North-B project from the County based on funding commitments included in cooperative agreements.

Page 23: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

212019 MEASURE M STRATEGIC PLAN

/

PINER R D

RIVER RD

3RD ST

SAN

TA

RO

SAA

VF

UL

T ON

RD

FU

LTO

NR

D

PLEASANT AV

WIL

LO

WSI

DE

RD

GUERNEVILLE RD

AIRPORT BLVD

SKY

LAN

E

BL

VD

OLD

R

EDWOODH

WY

WINDSORRIVER RD

SHILOH RD

STEELE LN

FAUG

HT

RD

OLDREDWOOD HWY

OLD

REDWOOD

HW

Y

WIN

DSO

RR

D

RIVER RD

MARK W EST

SPRINGS RD

GUERNEVILLE RD

EA

STSI

DE

RD

SLU

SSE

RR

D

HALL RD

PINER RD

MARK WEST

STATION RD RIEBLI RD

Ê£¤101

£¤101

SANTA ROSA

WINDSOR

Phase APhase B

Phase BXXXXXX

HIGHWAY 101 - NORTH PROJECT

(Airport Blvd Interchange - LSP)

(Soundwalls)

SCTA - 10/05/2018

Phase S

PROJECT MAP

Highway 101 North

Page 24: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

22 SONOMA COUNTY TRANSPORTATION AUTHORITY

CO

MP

LE

TE

D

CENTRAL |Old Redwood Highway in Petaluma to Rohnert Park Expressway in Rohnert Park

This project has been split into four phases, Phase A - from North of Pepper Road to Rohnert Park Expressway; Phase B-from Old Redwood Highway to North of Pepper Road; Phase C, the Old Redwood – Highway 101 Interchange; and a follow-up landscaping project.

PROJECT SCOPE:

• Reduce recurrent congestion on Highway 101 by con-structing a northbound and southbound High Occupancy Vehicle (HOV) lane

• Upgrade existing freeway to current standards

ADDITIONAL PROJECT DETAILS:

Phase A – Highway 101 High Occupancy Vehicle (HOV) Lanes from North of Pepper Road to Rohnert Park Expressway

• Construct northbound and southbound HOV lanes from north of Pepper Road to Rohnert Park Expressway

• Construct auxiliary lanes between Route 116 (West) and Rohnert Park Expressway

• Replace the Highway 101 southbound bridges at Copeland Creek and Laguna de Santa Rosa

• Widen Highway 101 bridge at West Sierra Avenue• Replace the existing Route 116 (West) Undercrossing and

modify the interchange ramps for improved alignment, construct HOV bypass lanes, ramp metering and Califor-nia Highway Patrol (CHP) enforcement areas

• Correct the profile of Highway 101 at the Route 116 (West) Interchange

• Install Intelligent Transportation System (ITS) devices, consisting of closed circuit television cameras, change-able message signs, traffic monitoring stations, and a highway advisory radio system

• Replace the Railroad Avenue Undercrossing• Construct sound walls in Cotati

Phase B - Highway 101 High Occupancy Vehicle (HOV) Lanes from Old Redwood Highway in Petaluma to North of Pepper Road

• Construct northbound and southbound HOV lanes from north of Old Redwood Highway to north of Pepper Road

• Widen Highway 101 bridge at Willow Brook• Install Intelligent Transportation System (ITS) devices,

consisting of closed circuit television cameras, change-able message signs, and traffic monitoring stations

• Construct a sound wall in Petaluma

Phase C – Highway 101 and Old Redwood Highway Interchange in Petaluma

• Replace Old Redwood Highway Overcrossing with a 4-lane structure, including sidewalks and bike lanes

• Re-construct ramps to Highway 101 at Old Redwood High-way, including HOV bypass lanes, CHP enforcement areas, and ramp metering

• Construct southern portion of sound wall near south-bound off-ramp

Phase L1 – Phase A Landscaping at Gravenstein Highway 116 Undercrossing

• Street tree planting installed by City of Cotati

Phase L – Follow-up Landscaping

• Landscape Highway 101 from Old Redwood Highway In-terchange to Rohnert Park Expressway

PROJECT STATUS / SCHEDULE:

PR

OJE

CT

PR

OG

RA

MS

The Environmental Assessment/Environmental Impact Report (EA/EIR) was completed in August 2007. The EA/EIR was re-validated in May 2010 for Phase C to include the Old Redwood Highway Overcrossing.

Phase A – SCTA secured $84.9 Million in Corridor Mo-bility Improvement Account (Prop. 1B), State Transpor-tation Improvement Program (STIP), and Measure M funding to fully fund Phase A of the Central Project. Construction started in late 2009 and was completed on December 26, 2012.

Phase B - SCTA secured $18.2 Million in Corridor Mo-bility Improvement Account (Prop. 1B), and Measure M funding to fully fund Phase B of the Central Project. Construction started in May 2010 and was completed on July 8, 2013.

Phase C – SCTA and City of Petaluma secured $38.2 Million in Measure M, City of Petaluma, and State and Local Partnership Program (Prop 1B) funding to ful-ly fund Phase C of the Central Project. Construction started in spring 2013 and was completed by the end of 2015. On site plant establishment was completed in June 2016. Willow Brook Creek environmental mitiga-tion is seeking resource agency signoff in 2019. Final right of way mapping and monumentation is scheduled for completion in 2020.

Phase L1 – City of Cotati received funding of $50,000 to perform street tree planting that was completed in 2017 at the Gravenstein Highway 116 undercrossing.

Phase L – SCTA is pursuing funding opportunities for a fol-low-up landscaping project. The project schedule is depen-dent upon securing funding.

Page 25: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

232019 MEASURE M STRATEGIC PLAN

FISCAL YEAR 2018-19 EXPENDITURES:

In FY 2018-19, SCTA was credited a total of $125,040 in Mea-sure M – Highway 101 Program funds on the Central project, as shown in the following table:

PHASE CENTRAL C TOTAL

CON CAP1 -$128,024 -$128,024

PM $2,983 $2,983

Total -$125,040 -$125,0401 Central C CON CAP expenditures include -$128,024 in re-fund of expenditures in EFS in FYE 18/19. When Cooperative Agreement 04-2363 was closed out with Caltrans, the to-tal Caltrans expenditures that are SCTA reimbursable were $128,024 less than the estimated Caltrans expenditures pri-or to closeout, therefore Caltrans issued the reimbursement to SCTA and is shown here as a negative expenditure.

FISCAL YEAR 2018-19 REIMBURSEMENTS:

In FY 18/19, SCTA collected a total of $0 in reimbursements for the Central projects from Caltrans and the City of Petalu-ma based on funding commitments included in cooperative agreements.

STONY POINT RD

PEPPER RD

PET

ALU

MA

HIL

L R

D

COTATI AV

OLD REDWOOD HWY

ROHNERT PARK EXPR

SIERRA AV

SNY

DER

LN

ELY RD

ADOBE RDMEA

CH

AM

RD

CO

MM

ERC

E B

LVD

HWY 116 HWY

MCDOWELL BLVD

GRAVENSTEIN HWY

PRESSLEY RD

ROBLAR RDST

ON

Y P

OIN

T R

D

Ê

£¤101

£¤101

PETALUMA

ROHNERT PARK

COTATI

Rohnert Park Expressway

Old RedwoodHighway

Pepper Rd

XXXXXXX

Phase A

Phase B

Phase C

HIGHWAY 101 - CENTRAL PROJECT

SCTA - 09/19/2018

PROJECT MAP

PR

OJE

CT

PR

OG

RA

MS

Page 26: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

24 SONOMA COUNTY TRANSPORTATION AUTHORITY

MARIN-SONOMA NARROWS (MSN)

From State Route 37 in Novato (Marin County) to Old Redwood Highway in Petaluma (Sonoma County)

PR

OJE

CT

PR

OG

RA

MS

The MSN project area is divided into three segments: Seg-ment A, from Route 37 to Atherton Avenue in Novato (Marin County), Segment B, from Atherton Avenue in Novato to Pet-aluma River Bridge, and Segment C from the Petaluma River Bridge to Old Redwood Highway in Petaluma. To accelerate delivery of an initial fundable phase, this project has been di-vided into eleven (11) fully funded projects (A1, A2, A3, B1, B2, B2 Phase 2, B3, C1, C2, C3, and L1).

PROJECT SCOPE:

• Reduce recurrent congestion on Highway 101 by con-structing a northbound and southbound High Occupancy Vehicle (HOV) lane

• Upgrade existing freeway (Segments A and C) and rural highway facility (Segment B) to current freeway standards

ADDITIONAL PROJECT DETAILS:

Contract A1 – Highway 101 High Occupancy Vehicle (HOV) Lanes from Route 37 in Novato to north of Atherton Avenue (Marin County)

• Add northbound HOV lane from Route 37 to north of Ath-erton Avenue

• Add southbound HOV lane from Rowland Boulevard Over-crossing to Route 37

• Widen shoulders• Install HOV-bypass lanes and ramp metering to on and off

ramps• Construct sound walls and retaining walls• Widen Novato Creek, Franklin Overhead and Olive Ave-

nue Undercrossing bridges for northbound HOV lane

Contract A2 – Highway 101 Southbound High Occupancy Vehicle (HOV) Lane from the Franklin Overhead to Rowland Boulevard (Marin County)

• Extend the southbound HOV lane from the Franklin Over-head to the Rowland Boulevard Overcrossing

• Widen Novato Creek bridge for southbound HOV lane

Contract A3 – Highway 101 High Occupancy Vehicle (HOV) Lanes from Atherton Avenue to 1.4 miles south of the San An-tonio Road Interchange (Marin County)

• Extend northbound HOV lane from Atherton Avenue to 1.4 miles south of the San Antonio Road Interchange

• Widen the North Novato Overhead bridge for a north-bound HOV lane

Contract B1 – San Antonio Road Interchange and Frontage Roads (Marin County)

• Upgrade the existing Redwood Landfill Overcrossing to a full interchange with standard freeway on and off ramps

• Construct frontage roads to remove uncontrolled access to Highway 101

Provide Class I and Class II bicycle facilities along new frontage roads

Contract B2 – Petaluma River Bridge & Petaluma Boulevard South Interchange and Frontage Roads

• Replace the existing two lane northbound and south-bound Petaluma River Bridge with a 6-lane bridge with standard inside and outside shoulders

• Construct a new overcrossing and standard freeway in-terchange with on and off ramps at Petaluma Boulevard South

• Provide ramp metering equipment to southbound on-ramp at Petaluma Boulevard South

• Construct frontage roads to remove uncontrolled access to Highway 101

• Provide Class II bicycle facilities along new frontage roads

Contract B3 – San Antonio Creek Curve Correction and Re-alignment (Marin & Sonoma Counties)

• Re-align Highway 101 to correct horizontal alignment at San Antonio Creek

• Construct a new Highway 101 San Antonio Creek bridge• Remove the existing southbound San Antonio Creek

bridge• Convert the existing northbound San Antonio Creek

bridge to the frontage road system connecting to the Red-wood Landfill Interchange

• Construct Class I and Class II bicycle facilities along frontage roads

Contract C1 – East Washington Street Interchange

• Reconfigure the on-ramp from East Washington Street to southbound Highway 101, and construct a HOV bypass lane

• Construct a new on-ramp from westbound East Washing-ton Street to northbound Highway 101, construct a HOV bypass lane and new bridge over Washington Creek

• Widen the terminus of the northbound off-ramp from High-way 101 to East Washington Street

Contract C2 – Highway 101 High Occupancy Vehicle (HOV) Lanes from Route 116 (East) to Old Redwood Highway in Pet-aluma

• Add northbound and southbound HOV lanes from Route 116 (East) to just north of the Corona Road Overcrossing

• Widen shoulders• Construct HOV-bypass lanes and ramp metering at vari-

ous ramp locations• Construct sound walls and retaining walls

Page 27: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

252019 MEASURE M STRATEGIC PLAN

CO

MP

LE

TE

DC

OM

PL

ET

ED

• Widen Washington Creek and Lynch Creek bridges for northbound and southbound HOV lanes

• Replace North Petaluma Overhead Bridge and correct vertical alignment

• Construct Rainer Undercrossing bridge • Re-align southbound and northbound off-ramps at East

Washington Street Interchange• Re-align southbound off-ramp at Route 116 (East)/Lakev-

ille Highway Interchange• Construct northbound auxiliary lane between Route 116

(East)/Lakeville Highway and East Washington Street In-terchanges

Contract C3 – Petaluma River and Route 116 (East) Bridges

• Widen the existing southbound Route 116 Separation Bridge for HOV lane

• Replace the existing northbound Route 116 Separation Bridge with a 3-lane bridge with standard inside and out-side shoulders

Contract B2 Phase 2 Sonoma Median Widening

• Construct a northbound and southbound HOV lane from just south of the Marin/Sonoma County line to just north of the Lakeville Highway Interchange

Contract L1A – Initial Tree Replacement Planting

• Plant trees along Highway 101 in Marin County and near the new Petaluma Boulevard South Interchange in Sono-ma County

Future Phases:

• Construct remaining HOV lanes in Segments A and B• Widen remaining shoulders • Provide HOV-bypass lanes and ramp metering to remain-

ing ramps in Segment A• Widen Novato Creek, Franklin Overhead and Olive Under-

crossing bridges for southbound HOV lane in Segment A• Complete remaining bike lanes along frontage roads• Additional tree replacement planting and landscaping not

covered in Contract L1

PROJECT STATUS / SCHEDULE:

Caltrans completed the environmental document in October 2009.

Phase 1 (Contracts A1, A2, A3, B1, B2, B3, C1, C3 and L1) - Cal-trans, SCTA and Transportation Authority of Marin (TAM) se-cured $424 Million in Corridor Mobility Improvement Account (Prop 1B), State Transportation Improvement Program (STIP), Transportation Construction Relief Program (TCRP), Sonoma County Measure M, and Federal demonstration and earmark funding to fully fund the Phase 1 projects.

continued on next page

PR

OJE

CT

PR

OG

RA

MS

Contract A1 The construction contract was awarded on July 2, 2011 and was completed on December 17, 2012

Contract A2 The construction contract was awarded on November 8, 2012 and was completed on Decem-ber 24, 2013.

Contract A3 The construction contract was awarded on November 1, 2012 and was completed in December of 2014.

Contract B1 The construction contract was awarded on September 14, 2012 and was completed in April of 2016.

Contract B2 The construction contract was awarded on November 1, 2012 and was completed in July 2017.

Contract B3 The construction contract was awarded on Janu-ary 21, 2016 and is expected to be completed in 2020.

Contract C1 The construction contract was awarded on November 1, 2011 and was completed on June 19, 2014.

Contract C3 The construction contract was awarded on November 2, 2012. Construction started in spring 2013 and was complete in 2016.

SB San Antonio Creek Bridge on US 101 looking north

Page 28: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

26 SONOMA COUNTY TRANSPORTATION AUTHORITY

MARIN-SONOMA NARROWS (MSN)

PR

OJE

CT

PR

OG

RA

MS

From State Route 37 in Novato (Marin County) to Old Redwood Highway in Petaluma (Sonoma County)

Contract L1A commenced construction after completion of the Phase 1 roadway work in 2016. Five years of plant estab-lishment will go through 2022.

Phase 2 (Contracts C2, B2 Phase 2 and Additional Contracts to be Developed)

Contract C2 Caltrans opened bids on June 12, 2019 and construction will start in the Fall of 2019. This contract is the final HOV project in Sonoma County providing continuous HOV lanes for 30 miles from south of the Marin/Sonoma County line to Windsor. Planned HOV lanes will open in Sonoma County by the end of 2022.

Contract B2 Phase 2 Sonoma Medi-an Widening - Construction started in April 2018. HOV Lanes to open in late 2019 and construction completed by July 2020.

Future Contracts - Subsequent Phase 2 contracts to extend HOV lanes in Marin County and landscape the corridor will be developed as funding is secured.

FISCAL YEAR 2018-2019 EXPENDITURES:

In FY 2018-19, SCTA expended a total of $11,809,368 in Measure M – Highway 101 Projects Program funds on the MSN Project as shown in the following table:

PHASE B2 B3 C1 C2 B2 PHASE 2 TOTAL

PS&E $0 $0 $0 $701,873 $0 $701,873

ROW SUP

$0 $0 $0 $351,694 $0 $351,694

ROW CAP

$0 $0 $0 $3,424,244 $0 $3,424,244

CON SUP

$0 $0 $47,268 $734,405 $374,510 $1,156,183

CON

CAP

$0 $0 $0 $0 $5,857,217 $5,857,217

PM $20 $46,303 $0 $163,466 $108,368 $318,157

Total $20 $46,303 $47,268 $5,375,681 $6,340,096 $11,809,368

FISCAL YEAR 2018-2019 REIMBURSEMENTS:

In FY 2018-19, SCTA received a total of $374,509 in reimbursements for the MSN Project based on funding commitments included in cooperative agreements with Caltrans as shown in the following table:

PHASE B2 PHASE 2 TOTAL

CON SUP $374,509 $374,509

Total $374,509 $374,509

MSN San Antonio Bridge Replacement & Future Bike Path

Page 29: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

272019 MEASURE M STRATEGIC PLAN

Continued on next page

PROJECT MAPS

PR

OJE

CT

PR

OG

RA

MS

101

MARIN SONOMA NARROWSBIKE ROUTE

Petaluma Blvd S Shollenberger Park

NOVATO SAN MARIN Atherton Ave

San Antonio Rd

Buck Center Dr

Redwood Landfill

Rush Creek Open Space Preserve

Olompali StateHistoric Park

Mount Burdell

LegendBike Route - Complete

Bike Route - Future

Existing Bike Routes

Open Space/Park

SMART Line

SMART Station

Marin-Sonoma County Line

SCTA - May 10, 2019

SONOMA COUNTY

MARIN COUNTY

PETALUMA BLVD S. INTERCHANGE TO COUNTY LINETO OPEN AUGUST 2019

Page 30: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

28 SONOMA COUNTY TRANSPORTATION AUTHORITY

PR

OJE

CT

PR

OG

RA

MS

Continued on next page

PROJECT MAPS

SkillmanSonomaCounty

MarinCounty

Petaluma

Novato

Atherton Ave

Was hingt on

MIXED FLOW

HOV BUILT/FUNDED HOVB7

CT32

05_M

SN_P

hase

s_11

_19_

2018

_HOV

_LAN

ES_V

2 08/0

1/201

9

E

Old Redwood Hwy

Hwy 116/Lakeville I/C

Petaluma BlvdS. I/C

Landfill I/C

Not to scale - This graphic is provided for illustrative purposes only.

MSN Proj

ect L

imit

Marin-Sonoma Narrows (MSN) HOV Lane Projects

Lanes OpenEnd of 2022

Lanes OpenEnd of 2019

B7

Page 31: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

292019 MEASURE M STRATEGIC PLAN

PR

OJE

CT

PR

OG

RA

MS

Continued from previous page

PROJECT PHASES MAP

Novato Blvd

San Antonio Road

Skillman

SonomaCounty

MarinCounty

PetalumaSegment C

Segment B

Segment A

Novato

Atherton Ave

Washin gton

Petaluma BlvdS. I/C

MSN CONTRACTSIn Progress

Completed

B7 (design)B2 Phase 2 (const.) B3 (const.)B8 (env-reval)B6 (env-reval)C2 (const.)

A1A2A3B1B2C3

Follow-up Mitigation / Landscape Contracts Not Shown CT32

05_M

SN_P

hase

s_11

_19_

2018

_CON

TRAC

TS_V

1 08/0

1/201

9

C2 - HOV lanes in Petaluma

C3 - Lakeville I/C

B2 - Kastania I/C, Frontage Rds& Petaluma River Bridge

B2 PHASE II - HOV LanesIn Sonoma County

B3 - Curve Correction

B6 - Replace Local Bridge(San Antonio Rd Bridge)

B8 - Utility RelocationIn Marin County

B7 - HOV LanesIn Marin County

A2 - S/B HOV LaneIn Novato

B1 - Landfill I/C &Frontage Rds

A3 - N/B HOV LaneIn Marin County

A1 - HOV LanesIn Novato

Hwy 116/Lakeville I/C

MARIN-SONOMA NARROWS (MSN) CONTRACTS

E

Page 32: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

30 SONOMA COUNTY TRANSPORTATION AUTHORITY

2 LOCAL STREET PROJECTS (LSP) PROGRAM

Measure M contributes 20 percent of its revenue to the Local Street Projects (LSP) Program. Net funding in the account began with a balance of $24,935,914. Revenue to the program totaled $5,930,077, consisting of $5,359,657 in sales tax and $570,420 in interest. Expenditures totaled $2,459,388, while adjustments totaled $328,560, leaving an ending balance of $28,735,163 (See Table 1).

Table 5A represents FY 2018-19 appropriations and expenditures for projects managed by the local juris-dictions whereas Table 5B represents the expenditures for projects managed directly by the SCTA

TABLE 5A - LSP PROGRAM APPROPRIATION/EXPENDITURE REPORTING Fiscal Year 2018-19

LSP PROJECT NAME

BEGINNING APPROPRIATION

BALANCE

FY 2018-19 APPROPRIATION

FY 2018-19 EXPENDITURES

ENDING APPROPRIATION

BALANCE

Airport IC - Phase 4A (Landscape)

$374,920 $0 $20,111 $354,809

Hearn Avenue Interchange

$2,597,483 $0 $846,467 $1,751,017

Fulton $1,099,772 $0 $694,984 $404,788

Totals $4,072,175 $0 $1,561,561 $2,510,614

TABLE 5B - LSP PROGRAM EXPENDITURES - PROJECTS MANAGED BY SCTA

LSP PROJECT NAME EXPENDITURES

Airport Interchange - Phase 4 $4,926

Route 116/121 Intersection $892,901

Totals $897,827

Note: LSP Expenditures include $38,108.42 in retention withheld from consultant on Route 116/121 intersection improvements.

The following exhibits describe the status of the five LSP projects that were advanced in FY2018-19:

2 | LOCAL STREET PROJECTS

20%

Page 33: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

312019 MEASURE M STRATEGIC PLAN

2 | LOCAL STREET PROJECTS

!

!

!

!

!

!

!!

!

!

!

SANTA ROSA

PETALUMA

WINDSOR

ROHNERT PARK

SONOMA

HEALDSBURG

COTATI

CLOVERDALE

SEBASTOPOL

8

9

7

6

5

4

3

2

1

11

10

D

RI VER

HWY

12

ADOBE

HWY 128

ARN

OLD

HW

Y

1

PINER

BOHEMIA

NDRY

CREEK

FULT

ON

BODEGA

WES TSIDE

AS

T I

ROBLAR

OCCIDENTAL

TODD

HALL

GR

AT

ON

PETA

LUM

A H

ILL

LAKEVILLE

PEPPER

LLANO

HEALDSBU

RG

GUERNEVILLE

ELY

RIE BLI

STONY POINT

MARK WEST SPRINGS

BENNETT VALLEY

MCDOWELL

SNYD

ER

SHILOH

NAPA

HWY 116

SONOMA MTN

PRESSL

EY

STA

GE GU LC

H

DU

TCHER

CR

EEK

EAST

SID

E

RAMAL

GEYSERVILLE

HW

Y 101

M

A INOLD REDW

OOD

LUDWIG

3RD

FAUGHT

F REI

FREMONT

CANYON

PETALUMAVLY

FO

RD

WARMSPRINGS

GRAVENSTEIN

SIERR A

KINSEY

PETALUMAWESTERN

SAN

TA R

OSA

STEELEW

OH

LER

LONE PINE

VERANO

BODEGA

H WY 116

RIVER

LAKEVIL LE

HWY

128

HWY

116

NAPA

EAST

SID

E

HWY 128

OLD REDWOOD

HW

Y 10

1

HWY 128

HWY 12

HWY 1

HWY 116 N

HWY 116

HWY 121

HWY 370 2 4 6 81Miles

LABEL DESCRIPTION PROJECT SPONSOR1 Penngrove Improvements Sonoma County TPW2 Airport Blvd. Improvements Sonoma County TPW3 Rt. 121 and Rt. 116 - Arnold Dr. Improvements Sonoma County TPW4 Forestville Bypass Sonoma County TPW5 Old Redwood Highway Interchange Petaluma6 Hearn Ave. Interchange Santa Rosa7 Farmers Lane Extension Santa Rosa8 Mark West Springs Road Improvements Sonoma County TPW9 River Road Improvements Sonoma County TPW

10 Fulton Road Improvements Santa Rosa11 Bodega Highway Improvements Sonoma County TPW

MEASURE M LOCAL ROAD PROJECTS

Legend

! Project Location

SMART Line

Highways

Major Roads

City Limits

SCTA - October 5, 2018

Ê

Highlighted to indicate projects shown in the following pages.

Page 34: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

32 SONOMA COUNTY TRANSPORTATION AUTHORITY

COMPLETED

CO

MP

LE

TE

D

AIRPORT BOULEVARD IMPROVEMENTS & AIRPORT BOULEVARD INTERCHANGE

PROJECT SCOPE:

This project will signalize and widen Air-port Boulevard from Sonoma County Air-port over Highway 101 to Old Redwood Highway. The project will also extend Brickway Boulevard from Laughlin Road to River Road as a congestion relief measure for the Airport Boulevard Interchange.

ADDITIONAL PROJECT DETAILS:

The Airport Boulevard project will be constructed in five separate phases over the course of several years. Some of the phases have yet to be programmed as they are planned for years beyond what is included in the current Strategic Plan.

Phase 1A will widen Airport Boulevard to accommodate additional lanes between Highway 101 and Aviation Boulevard and install traffic signals at the intersection of Aviation Boulevard and Airport Bou-levard.

Phase 1 will widen Airport Boulevard between Ordinance Road and Aviation Boulevard.

Phase 2 includes the construction of a new road and bridge across Mark West Creek from Brickway Boulevard to Laughlin Road.

Phase 3 will widen Airport Boulevard be-tween Old Redwood Highway and High-way 101 including the addition of a traf-fic signals at the intersection of Fulton Road and Highway 101.

Phase 4 will construct a new Airport Boulevard Interchange project. This project was combined with the Highway 101 Project #2 – North Phase B project. The project will replace the existing Air-port Boulevard Overcrossing with a new five lane bridge including a sidewalk and bike lanes.

Phase 4a is landscaping for Airport Bou-levard Overcrossing and Interchange at Highway 101.

Phase 5 extends Laughlin Road from River Road to Phase 2 Project bridge across Mark West Creek connecting to Brickway Boulevard.

PROJECT STATUS / SCHEDULE:

XXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXX

èéí èéí

èéí

èéí

River Rd

Tracks

Fult

on R

d

Airport Blvd

Redwood Hwy

Laughlin Rd

Old Redwood Hwy

Faug

ht R

dLa

vell

Rd

Bri

ckw

ay

Blv

d

Ba

rnes

Rd

Aviation Blvd

Skylane B

lvd

Donna Dr

Cop

per

hill

Pk

y

Reg

iona

l Pky

Deerwood Dr

Parnell Rd

Almar Pky

Ha

rt L

n

Woolsey R

d

Wes

twin

d B

lvd

Carriage Ln

B St

Asc

ot D

r

Wikiup Dr

Tabor Rd

Kiva Pl

Cervantes Rd

Bisordi Ln

Mark West Station Rd

Gilardoni Rd

Susse

x D

r

Becker Blvd

Eton

Ct

Withers R

d

C St

D St

Flig

htlin

e D

rN

cdf

Aero D

r

Ord

inance R

d

Kelp Ter

Cop

per

hill

Ln

Colonial Park Dr

Ga

yle

Dr

Cree

k W

ay

Summertree Ln

Dempsey Pl

Candy Ln

Redwood Hwy

Ê

LOCAL STREETS PROJECTS - AIRPORT DRIVE IMPROVEMENTS

PHASE 1

PHASE 2

PHASE 3

PHASE 5

PHASE 4

£¤101

WINDSOR

PHASE 1A

SCTA - October 5, 2018

Phase 1A Phase 1A work is complete.

Phase 1 Schedule is to be determined, dependent upon securing funding.

Phase 2 Funding for preliminary engineering and environmental phases was iden-tified in 2013 and design work was underway. Due to inadequate funding and fed-erally ineligible expenditure this project is on hold indefinitely.

Phase 3 Construction was completed in April 2013.

Phase 4 The project was environmentally cleared through a revalidation of the Environmental Assessment/Final Environmental Impact Report on the Highway 101 Project in October 2007. The project started construction in Spring 2013 and was substantially complete by the end of 2014, although due to plant establishment the final construction contract acceptance was August 3, 2015. See the Highway 101 Project #2 – North Phase B information sheet for more information on the interchange project.

Phase 4a Construction began in the spring of 2017 and completed by the end of 2017. Plant Establishment will continue through the end of 2020

Phase 5 Scoping is complete and the Environmental and Design work commenced in 2013. Due to inadequate funding and federally ineligible expenditures this proj-ect is on hold indefinitely

FISCAL YEAR 2018-19 EXPENDITURES::

In FY 2018/19 SCTA disbursed $20,111 to Sonoma County Transportation and Pub-lic Works (TPW) for Airport Blvd Phase 4A. TPW has $354,809 remaining in the current appropriation balance for Airport Blvd Phase 4A. SCTA expended a total of $4,926 in Measure M - LSP funds for construction support on the Airport Phase 4 - North-B project by cooperative agreement with the County. See the Highway 101 Project #2 - North-B for additional financial information.

PROJECT MAP

PR

OJE

CT

PR

OG

RA

MS

Page 35: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

332019 MEASURE M STRATEGIC PLAN

PR

OJE

CT

PR

OG

RA

MS

HIGHWAY 121/116 INTERSECTION IMPROVEMENTS & ARNOLD DRIVE IMPROVEMENTS

PROJECT SCOPE:

This project would remove a right turn lane and install a traffic signal or round-about at the intersection of Highway 121 and 116. The project would relocate the park and ride lot, replace the Yel-low Creek Bridge (if a traffic signal is installed), and widen the roadway to allow for turn lanes into and out of ex-isting commercial businesses. The ca-pacity of the park and ride lot could be increased.

The Arnold Drive improvements would include adding a traffic signal at Madro-ne Road, roundabout at Agua Caliente Road, and shoulder widenings and cen-ter turn lanes at various locations. This project is both a congestion relief and safety project..

ADDITIONAL PROJECT DETAILS:

There are two distinct elements to this project, the improvements at various locations along Arnold Drive (Phases 1, 2, 4, and 5), which will be constructed in phases, and the improvements at the intersection of 121/116 (Phase 3) which requires coordination with and an Envi-ronmental Document/Project Approval (PAED) from Caltrans. Phase 1 widened Arnold Drive in the vicinity of Glen El-len Market. This widening included bike shoulders and striping. Phase 2 in-cluded replacing the existing stopped controlled intersection at Agua Cali-ente Road with a new roundabout, sidewalks, bike lanes, drainage facili-ties, lighting, signage and landscaping. Phase 4 will widen shoulders on Arnold Drive between Country Club Drive and Loma Vista Drive. Phase 5 will replace the existing stopped intersection at Ar-nold Drive and Madrone Avenue with a signalized intersection or roundabout.

By cooperative agreement responsibil-ity for implementing Phase 3 has been delegated to the SCTA from the Sono-ma County Transportation and Public Works Department. SCTA contracted with Caltrans to complete a Project Study Report/Project Development Support (PSR/PDS) document which was completed in FY12/13. SCTA initi-ated the environmental phase via con-

tract with a consultant in FY13/14, and initiated the design phase with the same con-sultant in FY17/18. The environmental document was completed and the Design and Right of Way phases initiated in 2018. SCTA entered into a contract with Caltrans to complete the Right of Way capital and support phases of the project.

PROJECT STATUS / SCHEDULE:

èéí

HWY 12HWY 121

HWY12

HWY 116

HWY

12

SONOMA

Ê

Arnold Dr.

Arnold Dr.

PHASE 1

PHASE 5

PHASE 2

PHASE 3

PHASE 4

LOCAL STREETS PROJECTS -HIGHWAY 121/116 INTERSECTION

AND ARNOLD DRIVE IMPROVEMENTS

SCTA - October 1, 2018

COMPLETEDPhase 1 – construction was completed in 2012.

Phase 2 - construction was completed in 2013.

Phase 3 - The Project Study Report was completed September 2013. Environmen-tal Document was completed in April 2018. Work on Plans, Specifications and Es-timates (PSE) and R/W began in FY17/18. Current cost estimate for the remaining phases of this project is approximately $19.25 million

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS:

Phase 3 – Highway 121/116

In FY 2018-19, SCTA expended a total of $892,901 in Measure M-LSP funds on the consultant contract to provide design work; and for Caltrans contract work on Right of Way activities for the improvements at the intersection of 121/116 (Phase 3).

PROJECT MAP

Page 36: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

34 SONOMA COUNTY TRANSPORTATION AUTHORITY

HEARN AVENUE INTERCHANGE IMPROVEMENTS IN SANTA ROSA

PROJECT SCOPE:

This project would widen the Hearn Av-enue Bridge and add turn lanes, widen the Santa Rosa Avenue approaches to the Hearn Interchange, and realign the ramps on the west side of the inter-change.

ADDITIONAL PROJECT DETAILS:

The purpose of this project is to re-lieve traffic congestion and improve regional traffic operations, including providing multimodal access and con-nectivity adjacent to the Highway 101 and Hearn Avenue intersection. There are three phases, which will be con-structed separately. Phase 1 adds turn lanes, bike lanes, sidewalks and widens the Santa Rosa Avenue approach to the Hearn Avenue Interchange. Phase 1 also includes traffic signal coordina-tion, ADA accessible curb ramps, and audible pedestrian signals. Phase 2 widens Hearn Avenue from the High-way 101 Overcrossing to Dutton Av-enue and adds bike lanes and shoul-ders. Phase 3 completes the project by replacing the existing Hearn Avenue Overcrossing with a wider bridge and reconfiguring the ramps. Bicycle and pedestrian needs are addressed by adding bike lanes and sidewalks on the new Overcrossing. Phase 3 requires Caltrans coordination, including a Proj-ect Study Report (PSR).

PROJECT STATUS / SCHEDULE:

XXXXXXX

XXXXXX

XX

KawanaSprings Rd

Baker Ave

Sant

a R

osa

Ave

Vic

tori

a D

r

Hearn Ave

Cor

by

Ave

WaysideDr

Gloria Dr

Funston Dr

Metaxa Ct

Kenton C

t

Ca

lico

Ln

Bea

chw

ood

Dr

Ros

ewoo

d D

r

Whi

tew

ood

Dr

Ma

thw

ig D

r

Arrowood Dr

Ashwood Dr

Debbie Dr

Javore Dr

Colgan

Ave

Du

tton Ave

BakerAve

West A

ve

Dow

d D

r

Squi

re L

nNaify Ln

CorbyAvenue

Ext

Coachman Ln

Commercial Ct

Cherrywood Dr

Pinewood Dr

Smokewood Dr

Santini Ct

Valerie Way

James Ct

Corby AveCottonwood Dr

Leo Dr

Southwood Dr

Trac

ks

Yolanda Ave

Red

woo

d H

wy

Ê

LOCAL STREETS PROJECTS - HEARN AVE IMPROVEMENTS

PHASE 1

PHASE 2

PHASE 3

£¤101

SCTA - October 1, 2018

CO

MP

LE

TE

D

Phase 1 - The widening of Santa Rosa Avenue between Yolanda Avenue and Kawana Springs Road was completed in FY 2014-15.

Phase 2 - The widening of Hearn Avenue from the Highway 101 Overcross-ing to Dutton Avenue was completed in 2011.

Phase 3 - Caltrans approval of the PSR was completed in FY 2012-13. In FY 2013-14 the City selected a consultant to complete the Project Approval and Environmental Document (PAED) under oversight from Caltrans. Work on the PAED phase was completed in FY 2016-17.

The City awarded the design contract to a consultant and design is expected to

be completed in FY19/20.

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS:

Santa Rosa had a carry forward balance of $2,597,483 from FY 2017-18 for design and right of way work. Santa Rosa expended $739,961 for design and $106,506 for R/W on the project totaling $846,467. The City carries forward a balance of $1,155,205 in PSE and $595,514 in R/W for a project total of $1,751,017 for future

years’ expenditures.

PROJECT MAP

PR

OJE

CT

PR

OG

RA

MS

Page 37: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

352019 MEASURE M STRATEGIC PLAN

PR

OJE

CT

PR

OG

RA

MS

FULTON ROAD IMPROVEMENTS AND FULTON ROAD INTERCHANGE AT ROUTE 12

PROJECT SCOPE:

This project would add turn lanes and one through lane in each direction on Fulton Road and would build an inter-change at Highway 12 and Fulton Road.

ADDITIONAL PROJECT DETAILS:

The City of Santa Rosa implemented a phased delivery schedule for the Fulton Road Improvements as detailed below

Phase 1 – Widen Fulton Road - Phase 1 will overlay existing pavement, add bike lanes, curb/gutter, drainage and sidewalk on both sides of Fulton Road for a distance of approximately 2 miles between Wood Road and Guerneville Road in Santa Rosa. This phase will be constructed in two segments: Wood Road to Piner Road and Piner Road to Guerneville Road.

Phase 2 – Highway 12/Fulton Road In-terchange - Phase 2 will convert the existing signalized intersection of Ful-ton Road and Highway 12 into a full in-terchange.

PROJECT STATUS/SCHEDULE:

Phase 1 is fully funded.

Tracks

Hwy 12

Fult

on R

d

Cof

fey

Ln

Occidental Rd

College Ave

Irw

in L

n

Piner Rd

Pet

erso

n Ln

Ma

rlow

Rd

Stony Point R

d

Wood Rd

Jennings Ave

Barnes Rd

Joe Rodota Trl

Steele Ln

9Th St

Hopper Ave

San Miguel AveAlton Ln

3Rd St

Clover D

r

Woolsey Rd

Fran

cisc

o A

ve

Wa

ltze

r R

d

Guerneville Rd

Dennis Ln

8Th St

Pie

zzi R

dRedwood Hwy

Air

wa

y D

r

Pinercrest Dr

Hall RdH

ard

ies

Ln

Marsh Rd

Rid

ley

Ave

Glenbrook Dr

Chico Ave

Ha

rtm

an

Ln

Mer

ced

Ave

Finley Ave

Ab

ram

son

Rd

Valley West Dr

Lance D

r

Donahue Ave

Moc

ha L

n

Ga

may

St

Jahn Dr

Ditty Ave

Brittain Ln

Pfis

ter

RdGads Hill St

Ind

ust

rial D

r

Ba

nyan

St

Eardley A

ve

Russell Ave

Lomba

rdi Ln

Sunn

y V

iew

Wa

y

Bluebell Dr

Raplee Ter

Iroquois St

Par

adi

se L

n

Fresno Ave

Darla DrBancroft Dr

Sebastopol Rd

Yard

ley

StFloral Way

Larry Dr

Yuma St

Com

alli St

Jud

son

Ln

Oak

Far

m L

n

Ha

ll Ln

Cervantes Rd

Marble St

Sierra V

ista R

d

Cunn

ingh

am W

ay Hei

di P

lNavajo St

Julio Ln

Par

k R

oyal

Ave

Valdes Dr

Phyllis St

Vel

ma

Ave

Cha

rro

Dr

Sansone Dr

Jobe Ln

Kipland Dr

Surrey Dr

Hol

iday

St

Ma

nhattan W

ay

Miller Dr

Sequoia Cir

Arboleda D

r

Plata Ct

Wood Ranch Rd

Kow

ell Rd

Abramson Ln

Jenes Ln

Triple Oak Way

Win

ber

ie K

nls

Cla

re S

t

Fred

eric

k S

t

Gen

oa P

l

Ba

tter

sea

St

Greenvale Ct

Aztec St

Country M

anor Dr

Cor

ona

tion

Dr

Stre

iff L

n

Ma

nning Ct

Ga

mbe

ls W

ay

Placer DrStony Cir

Ê Sebastopol Rd

Guerneville Rd

College Ave

3rd St

£¤101

·|}þ12

PHASE 1

PHASE 2

Piner Rd

Wood Rd

Fult

on R

d

Complete

LOCAL STREETS PROJECTS - FULTON ROAD IMPROVEMENTS AND

FULTON ROAD INTERCHANGE AT ROUTE 12

SCTA - October 2, 2018

CO

MP

LE

TE

DConstruction from Wood Road to Piner Road was completed in 2008 using Developer Fees. Work on the environmental document from Piner Road to Guerneville Road was complet-ed in 2017.

Design (PSE) and Right of Way(R/W) progressed during FY2018-19 and con-struction funds are programmed for FY 2020-21

Phase 2 Work has not begun.

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS:

The City of Santa Rosa carried forward a balance of $1,099,773 from FY2017-18 for Design (PSE: $904,673) and Right of Way (R/W: $195,100) activities. The City requested and received reimbursement of $524,813 for PSE and $170,171 for R/W. Santa Rosa carries forward balances of $379,860 for PSE and $24,929 for R/W ($404,788 total) for future years’ expenditures.

PROJECT MAP:

Page 38: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

36 SONOMA COUNTY TRANSPORTATION AUTHORITY

3 BICYCLE AND PEDESTRIAN PROJECTS PROGRAM4%

Measure M contributes 4 percent of its revenue to the Bicycle and Pedestrian Projects program. Net fund-ing in the account began with a balance of $1,293,908. Revenue to the program totaled $1,489,901 consist-ing of $1,071,931 in sales tax, $33,502 in interest, and $384,468 in reimbursements. Expenditures totaled $495,473, while adjustments totaled -$247,975, leaving an ending balance of $2,040,762 (See Table 1).

The following table summarizes FY 2018-19 Bike / Ped Project program appropriations and expenditures:

TABLE 6A – BIKE/PED PROJECTS PROGRAM REPORTING Fiscal Year 2018-19

PROJECT NAME

BEGINNING APPROPRIATION

BALANCE

FY 2018-19 APPROPRIATION

FY 2018-19 EXPENDITURES

ENDING APPROPRIATION

BALANCE

Santa Rosa Creek Trail $0 $52,000 $6,733 $45,267

Central Sonoma Valley Trail $0 $20,000 $0 $20,000

NWPRR Trail $196,118 $0 $55,249 $140,868

Access Across 101 - RP $0 $250,000 $2,989 $247,011

Safety and Education* $37,084 $8,898 $45,955 $27

Totals $233,201 $330,898 $110,926 $453,173

*Ending balance will be deleted. No action is taken by the Board for left over balance amounts less than $1,000. Sonoma County

Bicycle Coalition has indicated they will not seek reimbursement for balance

TABLE 6B - BIKE/PED PROGRAM EXPENDITURES PROJECTS MANAGED BY SCTA

LSP PROJECT NAME EXPENDITURES

SRTS Federal Project $384,547

Totals $384,547

The following exhibits describe the status of the six Bike/Ped projects receiving either an appropriation or a disbursement during FY2018-19:

Page 39: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

372019 MEASURE M STRATEGIC PLAN

3 | BICYCLE PEDESTRIAN PROJECTS

!

!

!

!

! !

!!

!

!

!!

!

!

14

SANTA ROSA

PETALUMA

WINDSOR

ROHNERT PARK

SONOMA

HEALDSBURG

COTATI

CLOVERDALE

SEBASTOPOL

9

21

5

3

4

6

7

8 13

11

12

10

D

R IVER

HWY

12

H

W Y 1

ADOBE

HWY 128

AR

NOLD

PINER

BOHEMIA

ND

RY

CREEK

FULT

ON

BODEGA

AST I

WES TSIDE

ROBLAR

OCCIDENTAL

TODD

HALL

GR

AT

ON

PETA

LUM

A H

ILL

PEPPER

LLANO

HEALDS

BUR

G

GUERNEVILLE

ELY

RIE BLI

STONY POINT

MARK WEST SPRINGS

BENNETT VALLEY

MCDOWELL

SNY

DE

R

SHILOH

HWY 116

SONOMA MTN

PRESSL

EY

STA

GE GU LC

H

DU

TCH

ERC

RE

EK

EAST

SID

E

LAG

UN

A

GEYSERVILLE

HW

Y 101

M

A IN

OLD REDWO

OD

LUDWIG

3RD

FAUG

HT

F RE

I

LAKE

VILLE

AIRPORT

CANYON

PETALUMA

VLYFO

RD

WARM

SPRINGS

GRAVENSTEIN

SIERR A

SLU

SSE

R

PETALUMAWESTERN

TOMALES

HWY 121

STEELE

WO

HLER

LONE PINE

BUR

ND

ALE

BODEGA

OLD REDWOOD

GRAVENSTEIN

RIVER

HWY 128

RIVER

HWY 128

EAS

TSID

E

H WY 116

LAKEVILLE

HWY 101

HWY 128

HWY 1

HWY 12

HWY 116 N

HWY 116 S

HW

Y 121

8

0 2 4 6 81Miles

Legend

SMARTline

Highways

MajorRoads

CityLimits

Project Location

LABEL DESCRIPTION PROJECT SPONSOR1 Santa Rosa Creek Trail Santa Rosa2 Old Redwd Hwy/Mendo Ave/Sr Ave Corridor Santa Rosa3 Central Sonoma Valley Trail Sonoma County RP4 Sonoma/Schellville Trail Sonoma County RP5 Arnold Dr - Altimira MS to Hwy 12 Sonoma County TPW6 Petaluma River Trail Enhancement Project Petaluma7 Copeland Creek Trail - Rwd Dr. to RPXWY Rohnert Park8 Street Smart Sebastopol Program Sebastopol9 West County Trail Sonoma County TPW

10 McCray Road Cloverdale11 Hwy 1 in Bodega Bay Sonoma County RP12 Foss Creek Trail Healdsburg13 NW Pacific Bike Path Segments NWPRR14 Access Across HWY 101 - 101 Corridor Various15 Bike Safety Education - Countywide SC Bike Coalition

MEASURE M BIKE/PED PROJECTS

Highlighted to indicate projects shown in the following pages.

Page 40: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

38 SONOMA COUNTY TRANSPORTATION AUTHORITY

CO

MP

LE

TE

D

SANTA ROSA CREEK TRAIL

PROJECT SCOPE:

Close gaps along the Santa Rosa Creek Trail in Santa Rosa. This will create an east-west connection through central Santa Rosa.

ADDITIONAL PROJECT DETAILS:

This project creates a new trail and connects to the existing Class 1 multi-use path along Santa Rosa Creek. While some locations have already been constructed, the first two sections to be funded with Measure M money are located from Streamside Drive to Mis-sion Circle (Phase 1) and from Dutton Avenue to Santa Rosa Creek (Phase 2). The third section Dutton Avenue Ac-cess West Side (Phase 3) will provide an ADA accessible ramp from Dutton Avenue on the west side to the multi-use path along Santa Rosa Creek.

PROJECT STATUS / SCHEDULE:

STON

Y P

OIN

T

PINER

OCCIDENTAL

RIVER

3RD

SAN

TA

RO

SA

WR

IGH

TFU

LTO

N

BR

USH

CR

E EK

BELLEVUELUDWIG

PETALUM

A

HILL

RIEBLI

STEELE

LLAN

O

OLDREDW

OOD

HALL

HWY 12

GUERNEVILLE

BENN

ETT

VALLEYÊ

Phase 1 (complete):Streamside Drive to Mission Circle Expansion

Phase 2 (complete): Dutton Avenue (East Side)to Santa Rosa Creek

£¤101

£¤101

Phase 3 (scope/ED): Dutton Avenue (West Side)to Santa Rosa Creek

Existing multi-use path

New multi-use path - completed phase 1

Proposed multi-use path - future phases

SCTA - 10/4/2018

BICYCLE/PEDESTRIAN PROJECTS -SANTA ROSA CREEK TRAIL

Gap: use on-street connector,no path along creek

Phases 1 Construction was com-pleted for the Streamside to Mis-sion Avenue path in 2014.

Phase 2 Construction was com-pleted for Dutton Avenue access path in 2012.

Phase 3 Measure M will provide for all developmental phases of this phase of the project to construct an ADA ramp that complements the improvements of Phase 2.

PR

OJE

CT

PR

OG

RA

MS

PR

OJE

CT

PR

OG

RA

MS

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS:

Phase 3: The City of Santa Rosa requested and received an appropriation in the amount of $52,000 for environmental studies The City received reimbursements in the amount of $6,733 for work done to release a request for proposals for envi-ronmental studies but only received one proposal. The City expects to re-release an RFP for both Environmental and Design services in FY19-20. The City carries forward a balance of $45,267 for future years’ expenditures.

PROJECT MAP:

Page 41: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

392019 MEASURE M STRATEGIC PLAN

PR

OJE

CT

PR

OG

RA

MS

Verano Ave looking W

Verano Ave looking E

Sonoma Charter School looking S

Fetters Apts finishing construction looking N

Verano Ave at crossing to Maxwell Park looking SE

Page 42: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

40 SONOMA COUNTY TRANSPORTATION AUTHORITY

CO

MP

LE

TE

D

CENTRAL SONOMA VALLEY BIKEWAY

PROJECT SCOPE:

Create a safe route for pedestrians and bicyclists between Verano Ave-nue and Agua Caliente Road. There is currently no alternative through route to Highway 12 forcing pedestrians and bicyclists to use the shoulder of High-way 12 for such destinations as Flowery School, Larson Park, La Luz Communi-ty Center, Maxwell Farms Park and the Boys and Girls Club.

ADDITIONAL PROJECT DETAILS:

This project will construct a bicycle and pedestrian pathway in multiple phases. The first phase provides a pathway from Larsen Park to Highway 12. The second phase provides a path-way from Verano Avenue to Larson Park. The first phase was split into two segments in order to build a portion of the pathway while right of way is-sues were resolved with Sonoma Valley Union School District.

PROJECT STATUS / SCHEDULE:

Linden

St

LasLomas Rd

Riverside Dr

ChestnutAve

Park Tree Ln

Bokm

an Pl

Alberca

Rd

Thom

son

Ave

Crivelli Dr

Hill

side

Ave

Richards

Blvd

Vailetti

Dr

VassarCt

Om

anSp

rings

Cir

Jerico

Rd

Country

Club Ln

Melrose Ct

Cherry

Ave

Sunnysi

de Ave

Jeric

hoRd

Hill

cres

tA

ve

BowenCt

Melody

Ln

Willow

St

Gillman Dr

Sonoma

Hw

y

Arbor

Ave

Fairway

Ct

EscalonD

r

Anza

Ct

Suns

etW

ay

PolleyLn

CasabellaDr

Los

Rob

lesD

r

SierraD

r

Happy

Ln

Fano Ln

King Ct

Par

kA

ve

Madrid

Way

Bay

St

De Chene

Ave

Bea

trice

Dr

Mai

nSt

WoodlandAve

Mich

ael D

r

JayCt

VistaDr

Fetters

Ave

Fairview Ln

BoyesBlvd

VeranoAve

Escon di doC

t

Mountain

Ave

Acacia

Lom

ita

Av e

Siesta

Way

Poplar

Ave

Mea

dow

broo

kA

veCherryLn

Craig

Ave

Orchard Ave

ElNi no

Ct

ArguelloCt

NikkiDr

Cuneo Dr

Cal

iforn

iaC

t

Railroad

Ave

VallejoAve

RoseAve

5ThAve

Buena

Vida Ct

Lichtenberg

Ave

Agua

Caliente Rd

Cottonwood

Ave

Amherst Cir

Maldon

ado

Ave

Bernhard

Ave

Elm Ct

Wagele Dr

Bar

celo

naD

rIstvanRd

Mana

Way

Arnold

Dr

C restW ay

Encinas Ln

Schumann Ct

Kelsey

Ct

Locust

Ave

Depot

Rd

Mulford Rd

Brooks

Ave

Anza

Dr

Marin

Ave

Bonita

Way

Verde

Vista Dr

San

Ramon Dr

Hopkins St

Malek

Rd

School

St

IndianLn

Baines

Ave

6ThAve

SanJacintoD

r

Alley

Monterey

Ave

Serpilio

Dr

Northside

Ave

Sonoma

Hw

y

4ThAve

2Nd

Ave

3RdAve

Academy

Ln

Jacey St

Verano

Ave

Madera

Rd

FairwayDr

1StAvePrinceton

Dr

Thomson

Ave

Baxter

Ave

Calle

Del Monte

Sierra Pl

Madison

Dr

Elm Ave

RiversideDr

River Rd

Donald St

Ernest Dr

Brookside

Rd

PineAve

Mulberr yA

v e

Jami

LeeLn

Mid

dlef

ield

Rd

Sonoma

Hw

y

Cedar

Ave

Johnson

Ave

Hig

hlan

dB

lvd

Myrtl eA

ve

Calle

DelArro

yo

San

Carlos Dr

Sonoma

VistaDr

Queeno Ln

Comstock

Ave

Central

Ave

VeranoAve

San

Gabriel Dr

Rob

inso

nR

d

Harley St

Greger

S t

El Dorado Dr

ToyLn

RailroadA

ve

LakeSt

Boyes

Blvd

Lucas

Ave

Manzanita

Rd

Mel

vin

Ave

Vista

Cir

Barrett

Ave

Clayton

Ave

Rancho Dr

Railroad

Ave

Bue

naV

ista

Ave

Keat

on

Ave

Phase 1C

Larson Park Completed Class I Trail, Phase 1A

Phase 1B

Completed by others (2017)

Ê

BICYCLE/PEDESTRIAN PROJECTS - CENTRAL SONOMA VALLEY TRAIL

Maxwell FarmsRegional Park

Ernie SmithCommunity Park

Larson Park

SCTA - October 1, 2018

New bicycle/pedestrian path complete phase 1A

New class I bicycle path complete phase 1B

New class I bicycle path complete phase 1C

Existing bicycle/pedestrian path

Possible future bicycle/pedestrian path

Phases 1, 2, and 3: All three seg-ments (Larson Park (1A), Flowery School (1B), and Verano Avenue Trail (1C) were completed in this fiscal year. The project includ-ed a bike/pedestrian pathway from Larson Park to Vailetti Drive and from Main Street along Ve-rano Avenue to Sonoma Creek Bridge, improving access to Max-well Farms Regional Park, Boys and Girls Club, Flowery Elemen-tary School, and Sonoma Char-ter School. Construction work included asphalt paving, gravel shoulders, grading and drainage, striping, signage, fencing, bike/pedestrian bridge, and bollards.

PR

OJE

CT

PR

OG

RA

MS

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS:

The Sonoma County Regional Parks Department received an appropriation in the amount of $20,000 for Construction activities. Regional parks also requested and received a 6-month extension for invoicing and rolled over the entire amount ($20,000) of the appropriation for reimbursement in FY19-20.

PROJECT MAP:

Page 43: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

412019 MEASURE M STRATEGIC PLAN

PR

OJE

CT

PR

OG

RA

MS

CO

MP

LE

TE

D

NORTHWESTERN PACIFIC RAILROAD BIKE TRAIL

NEPACompliance

Design

101

101

SONOMA COUNTY

MARIN COUNTY

Cloverdale

Healdsburg

Santa Rosa Downtown

Cotati

Petaluma Downtown

Rohnert Park

Petaluma North

Santa Rosa North

Windsor

Sonoma County Airport

SCTA - November 1, 2019

LegendSMART Stations

Existing

Planned

NWPR Pathway

City Limits

Open Space/Park

BICYCLE / PEDESTRIAN PROJECTS - NORTHWEST PACIFIC RAILROAD PATHWAY

(Fully Programmed)

PROJECT SCOPE:

Work with SMART (Sonoma Marin Area Rail Transit) to build a north-south bike path parallel to the Northwestern Pacific Railroad track throughout Sonoma County.

ADDITIONAL PROJECT DETAILS:

SMART has completed National En-vironmental Policy Act (NEPA) com-pliance documentation in FY17/18 for the entire Sonoma County portion of the project that Caltrans would allow under federal rules, from the Sono-ma County line to the Northern Santa Rosa station ($184,359). SMART will complete 100% design ($815,641) for the remainder of the Initial Operating Segment (IOS) within Sonoma County (Petaluma River to Railroad Square in Santa Rosa). SMART’s actions on en-vironmental clearance and design will prepare the remainder of the IOS bike path for construction by various other agencies.

The bike path from Novato to the south side of the Petaluma River is in-cluded in Phase 1 of the Highway 101 Marin Sonoma Narrows (MSN) project.

PROJECT STATUS / SCHEDULE

SMART anticipated using the entire $1 million for NEPA compliance and design of the IOS. SMART applied for advance funding to initiate environ-mental and design activities before FY 2014-15 when the funds were pro-grammed. SMART funds the design and is reimbursed through Measure M funds as portions are completed.

State environmental compli-ance was completed prior to federal compliance with the National Environmental Policy Act (NEPA). SMART used Mea-sure M to complete NEPA com-pliance documentation.

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS:

SMART had a carry forward balance of $196,118 for FY 2018-19 for design. SMART requested and received reimbursements in the amount of $55,249 for design expenditures in FY 2018-19. SMART has a remaining appropriation balance of $140,868 for design to carry forward for future years’ expenditures.

PROJECT MAP:

Page 44: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

42 SONOMA COUNTY TRANSPORTATION AUTHORITY

PR

OJE

CT

PR

OG

RA

MS

CO

MP

LE

TE

D

ACCESS ACROSS 101

Ê£¤101

BICYCLE/PEDESTRIAN PROJECTS - ACCESS ACROSS HWY 101

CLOVERDALE

HEALDSBURG

WINDSOR

SEBASTOPOL

SANTA ROSA

SONOMA

COTATI

ROHNERT PARK

PETALUMA £¤101

Dec. 1, 2017Study Area

PROJECT SCOPE:

Identify key east-west access points across Highway 101. This funding will be used for feasibility studies and be provided to four jurisdictions along the 101 corridor on a first come, first served basis, and will not exceed $250,000 per jurisdiction.

ADDITIONAL PROJECT DETAILS:

This project category is open to all the jurisdictions adjacent to or bisect-ed by Highway 101 through Sonoma County. Sponsors that have request-ed an appropriation include the Cities of Rohnert Park, Santa Rosa, and the Town of Windsor.

Santa Rosa: The City of Santa Rosa used $250,000 in Measure M programming for a fea-sibility study and a Project Initiation Document (PID) for a Class I multi-use ADA accessible crossing over Highway 101 in the vicinity of Santa Rosa Junior College.

Windsor: The Town of Windsor used their ap-propriation to complete a feasibility study near central Windsor.

Rohnert Park: The City of Rohnert Park has drafted a Request for Qualifications (RFQ) for a feasibility study to identify potential locations for a bicycle and pedestrian crossing across 101. The release of the RFQ will be timed with the completion of the General Plan Alternatives Anal-ysis. The Alternatives Analysis and subsequent decisions about future land uses will affect the transportation needs and conditions for active trans-portation access across Highway 101.

PROJECT STATUS / SCHEDULE

Santa Rosa A feasibility study for a 101 crossing in the vicinity of Santa Rosa Junior college was completed in FY15-16.

Windsor A feasibility study for a 101 crossing near Downtown Windsor was completed in FY17-18.

Rohnert Park The City of Rohnert Park drafted a RFQ for a feasibility study for a bicycle and pedestrian overcrossing over Highway 101 in FY 2018-19.

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS:

Rohnert Park The City appropriated $250,000 for use during the FY18-19. Rohnert Park received $2,989 in reimbursements for work completed in FY 2018-19 and carries forward a balance of $247,011 for future years’ expenditures.

PROJECT MAP:

Page 45: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

432019 MEASURE M STRATEGIC PLAN

PR

OJE

CT

PR

OG

RA

MS

BICYCLE SAFETY AND EDUCATION

PROJECT SCOPE:

Implement bicycle safety programs focused on educating the public and, in particular, school children.

ADDITIONAL PROJECT DETAILS:

There are two project sponsors implementing two phases of the Bike Safety and Education Project. The Sonoma Coun-ty Bicycle Coalition (SCBC) implements two phases of this project: Safe Routes to Schools (SRTS) and Bike Month. Safe Routes to Schools creates activities and materials to educate and promote safety through Education, Encouragement, En-forcement, Engineering and Evaluation (Five E’s). This work supports the SRTS phase being implemented by the SCTA, below. The Bike Month (AKA Bike to Work) is designed to encourage commuters to try bicycling to work, school or er-rands during the month of May and to increase the public’s awareness and respect for bicyclists.

The Sonoma County Transportation Authority (SCTA) also implemented a Safe Routes to Schools phase. SCTA was re-sponsible for the Countywide Safe Routes to Schools Pro-gram for the 18/19 fiscal year and used Measure M funds to

supplement that effort.

PROJECT STATUS / SCHEDULE:

SCBC worked in coordination with SCTA to implement the Countywide Safe Routes to Schools Program and SCTA re-ceived a federal grant to implement the program. Measure M funds are used by SCTA as a match for the federal grant funding. Due to timing of the obligation of federal funds, SCBC used Measure M funds to implement the SRTS phase in the gap between the previous federal grant and the cur-rent grant. SCBC used Measure M funds for ineligible federal activities important to implementing the Countywide Safe Routes to Schools Program on an annual basis. The county-wide program did outreach to schools within Sonoma County in order to increase participation and encourage schools to start their own safety and education programs with a goal of increasing walking and bicycle ridership to and from schools and promote healthy and active lifestyles. SCTA has obligat-ed the next round of Federal funding and will be administer-ing the program in the future.

The funds for the Bike to Work (BTW) phase are used to in-crease participation in Bike to Work Day and Bike Month ac-tivities and to produce advertisements and promotional ma-

terial to encourage biking within Sonoma County

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS::

SCBC had $35,981 in carry over funding from the prior year’s appropriations for Safe Routes to School. No additional funds were appropriated, so SCBC used the carry forward balance to fund the Safe Routes to Schools phase in FY 2018-19. The SCTA disbursed $35,955 to SCBC for SRTS. SCBC has indi-cated they will not seek reimbursement for the remaining bal-ance of $27 thus those funds will be returned to the Bicycle Safety and Education project for future authorized expendi-tures. (See Table below for further details)

SCBC requested and received an appropriation in the amount of $10,000 that was used to fund the BTW phase in FY 2018-19 and $10,000 was disbursed to the SCBC for BTW which closed out the appropriation.

The Sonoma County Department of Health Services (DHS)* carried forward a balance of $1,102 into FY18-19 that was sub-sequently deobligated at the agency’s request.

The Sonoma County Transportation Authority used $384,547 for matching funds to the federal Countywide Safe Routes to Schools Program.

PHASE (SPONSOR)

BEGIN END

SRTS (SCBC) $35,981 $27

SRTS (DHS) $1,102 $0

Total $37,083* $27*Compare total to Safety and Education amount in Table 6

was responsible for

the Countywide Safe Routes

to Schools Program for the 18/19

fiscal year and used Measure M

funds to supplement

that effort.

SCTA

Page 46: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

44 SONOMA COUNTY TRANSPORTATION AUTHORITY

4 PASSENGER RAIL PROGRAM5%

Measure M contributes 5 percent of its revenue to the Passenger Rail Program. Net funding in the account began with a balance of $656,305. Revenue to the program totaled $1,365,633 consisting of $1,339,914 in sales tax, $25,719 in interest (See Table 1). There were no expenditures while SMART continues to pay down an inter-program loan. Principal and interest payments from Rail to LSP reduced the inter-program loan balance to $400,000. The inter program loan is expected to be paid off by FY 2021.

Passenger Rail ending appropriation balance in FY 2014-15 was $0 and since then SMART had no new ap-propriations. Expenditures include, $547,500 in bond principal payments, $185,971.88 in bond interest, $550,000 in inter-program LSP Loan Principal, $19,644.53 inter-program LSP loan interest, $375 in bond DAC filing fees and $344 Bond trustee expenses.

TABLE 7 – PASSENGER RAIL PROJECT PROGRAM REPORTING Fiscal Year 2018-19

6.3

BIC

YC

LE

PE

DE

ST

RIA

N

PROJECT NAME BEGINNING APPROPRIATION

BALANCE

FY 2018-19 APPROPRIATION

FY 2018-19 EXPENDITURES

ENDING APPROPRIATION

BALANCE

SMART $0 $0 $0 $0

Page 47: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

452019 MEASURE M STRATEGIC PLAN

6.3

BIC

YC

LE

PE

DE

ST

RIA

N

6.4

RA

IL P

RO

JEC

T

4 | RAIL PROJECT

Sources: Esri, DeLorme, USGS, NPSÊ

Sonoma

Dec. 22, 2017

Legend

Future Phases

Initial Operating Segment

Cotati

Sebastopol

Cloverdale

£¤101

£¤101

Page 48: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

46 SONOMA COUNTY TRANSPORTATION AUTHORITY

SONOMA MARIN AREA RAIL TRANSIT (SMART)

PROJECT SCOPE:

The Sonoma Marin Area Rail Transit (SMART) project is to provide passenger train service to Sonoma and Marin Coun-ty residents along the Northwestern Pacific (NWP) rail corri-dor that lies next to Highway 101.

ADDITIONAL PROJECT DETAILS:

SMART passenger train service will provide an attractive, high quality transportation alternative for thousands of commut-ers traveling within and between Sonoma and Marin counties as well as commuting to San Francisco. Since over half of all traffic entering Marin County from the north on Highway 101 is destined for Marin County, providing rail service to San Rafael will make a significant contribution to relieving congestion on Highway 101. SMART will also provide rail service to the exist-ing ferry terminal at Larkspur Landing enabling commuters to transfer to a San Francisco bound ferry.

PROJECT STATUS / SCHEDULE:

Measure M funding provides only a portion of the overall funding needed to initiate passenger rail service. Additional funding was secured by a ballot measure in 2009 providing a secure funding source for SMART allowing a delivery sched-ule to be developed. SMART uses Measure M funding to de-velop station sites, improve rail crossings on local roads, and perform final engineering. Measure M funds are only used for expenditures in Sonoma County from the Marin/Sonoma County line north to Santa Rosa. SMART will be phasing ser-vice as sections are completed.

CO

MP

LE

TE

D

The first phase of passenger rail operations between Santa Rosa and San Rafael was com-pleted and service commenced in 2017.

Future service is anticipated to begin from San Rafael to Larkspur in late 2019 and north from Santa Rosa to Windsor, Healdsburg and Cloverdale subsequently.

FISCAL YEAR 2018-19 APPROPRIATIONS AND DISBURSEMENTS:

SMART had $0 in carry over from the prior year’s appro-priations for the Rail program in construction. The SCTA disbursed $0 to SMART for construction activities this year. SMART has fully expended all appropriations.

PA

SS

EN

GE

R R

AIL

PR

OG

RA

MP

RO

JEC

T P

RO

GR

AM

S

SMART Train

PR

OJE

CT

PR

OG

RA

MS

Page 49: MEASURE M ANNUAL REPORT · services, support the development of passenger rail service, and build safe bicycle and pedestrian routes. ... completed work on the Design phase of Hearn

472019 MEASURE M STRATEGIC PLAN

PA

SS

EN

GE

R R

AIL

PR

OG

RA

MP

RO

JEC

T P

RO

GR

AM

S

SMART Train