MEASURE L BOND CONSTRUCTION UPDATE December 6, 2016
9

MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

May 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

MEASURE L BOND CONSTRUCTION UPDATE

December 6, 2016

Page 2: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

Introduction The following presentation is intended to provide the Board of Trustees with an update on the progress of Measure L Construction Bond Projects. These are projects that are currently active throughout the District.

Page 3: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

Measure L - 2016 Project Overview

Y Phase 2 Technology Upgrade - Cable

Y Remaining Work by School

Y Energy Conservation - Solar

Y Central Kitchen - On Schedule

Cherrywood Solar

Page 4: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

Measure L - 2016 Project Details Y Phase II Technology Upgrade - Cabling

a. Stage I Cabling Upgrades: • FIS Cabling - completed • Exterior Wireless Access Points:

• Majestic Way, Noble, Northwood, Piedmont, Summerdale, Toyon - completed

• Laneview: ./ Buildings B, D & portables to be completed Feb. & Apr. 2017 breaks

b. Stage II Cabling Upgrades: • MOT awarded - Completed

c. Stage Ill Cabling Upgrades: • Noble awarded - Winter Break

Page 5: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

Measure L - Remaining Work by School 1. Noble ES: 3. Sierramont MS:

• FIS Furniture - Chairs on backorder • Specialty partition walls : Completed • Stage curtain replacement: Completed • Punch list items: Completed • Front gate replacement: Completed • Parking lot gates: Completed • Specialty doors : 12/9/16 • FIS furniture - Completed • Punch list items: 12/9/16 • FIS & MPR Audio Visual: In progress • FIS & MPR Audio Visual : 12/2/16

2. Northwood ES: 4. Summerdale ES: • Fence installation : 12/16/16 • Punch list items: 12/9/16 • FIS Furniture - Completed • FIS & MPR Audio Visual: Completed

• Wood ceiling & lighting - Com pleted • Specia lty partition wall: Completed • Fac;ade backing: Completed • Punch list items: 12/9/16 • FIS Furniture - Chairs on backorder • FIS & MPR Audio Visual : 12/16/16 5. Vinci Park ES:

• Punch list items: Completed • MPR Aud io Visual: Completed • Fence installation: 12/10/17

Page 6: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

Measure L -Solar Project Update

• All 13 sites are operational and have received Permission to Operate (PTO) from PG&E • All 13 sites secured Net Energy Metering (NEM) 1.0, which preserves project savings • Op Terra is finalizing punch list items including monitoring, commissioning, and ADA site work • DSA closeout process has begun. Final certification of projects should be obtained by the end

of2016 • The ribbon cutting event was picked up by at least 231 outlets online including the Silicon

Valley Business Journal and the Sacramento Bee

Page 7: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

Measure L - 2017 Project Overview

1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded -

Summer 2017

2. Central Kitchen - expected completion April 2017

3. Pavement Rehabilitation • Brooktree, Cherrywood, M ajestic Way • Piedmont Drop-Off Area

4. Future Project Presentations • Laneview - FIS/Modernization • Majestic Way - FIS/Modernization • Piedmont - Modernization • Ruskin - Modernization

Central Kitchen I

Page 8: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded

2017 Construction Projects

2017 Construction & Furniture Projects

Construction Legend Design Bid Award Construction

Start of School Long Lead Items & Added Project Scope Project Complete

Furniture Legend Furnlture Order Flnallzed

Quote Pricing PO Generated Furniture Ordered Start of School Lead Time Furniture Received and Placed

October I November I December I Janua~~ ~ I February I March I Week I Week I Week I Week I V/eek Week J

1 1 2 1 314 1 1 1 2 I 3 I 4 1 s 1 1 1 2 I 3 14 1 1 1 2 I 3 I 4 I 1 1 2 1 3 I 4 I 1 1 2 I 3 I 4~

Lanevlew FIS/ Modern,zacion i ---

Majestic Way FIS/Modernization

Vinci Park FIS

~---- I ----

~---- I ----[ Paving Rehabllitat,on

[ Piedmont Drop oft

[ Stage IV Cabl ing Upgrades

2017 Furniture Projects

Furniture

[ FIS Furniture

Page 9: MEASURE L BOND - Berryessa Union School District L/Measure... · Measure L - 2017 Project Overview 1. Stage IV Cabling Upgrades • Brooktree, Northwood, Ruskin, Vinci Park - awarded