Measure 60 Cycle Transport Improvements 13.6.2012 Katerina Oktabcova Usti nad Labem Municipality
Jan 23, 2016
Measure 60
Cycle Transport Improvements
13.6.2012
Katerina Oktabcova
Usti nad Labem Municipality
Measure 60
Background & Objectives
Currently, Ústí nad Labem has very little road space dedicated to cycling and very low amount of cyclists.
Objectives
• Improve conditions for cycling in the city
– Provide complex information about cycling opportunities, services and points of interest (website)
– Improve cycling infrastructure and provided services (feasibility study)
– Utilise results of the cycle policy audit performed in the city and implement recommended actions (BYPAD)
Measure 60
Measure overview
Tasks
• 11.6.3 Improving Cycle Transport– Finished in M27
– RTD task
– Feasibility study of connecting the two international cycle routes by a new cycle route leading through the city
• 6.10 Cycle Transport Improvements
– Finished in M29
– DEMO task
– Providing complex information about cycling opportunities in the Usti region through a web portal
Measure 60
• Difficult elevation profile of the city – river basin surrounded by hills
• Insufficient cycling infrastructure
– City cycle routes lead through motor traffic roads
– No dedicated lanes, no priority for cyclists
– One separated cycle route along the Elbe river
• Low budget for cycle transport improvements
– Requires soft measures and assigning priorities to actions for cycle transport improvements
Challenges
Measure 60
Implementation
Comprehensive web portal for cyclists in the Ústí nad Labem put into operation - http://cyklomapa.usti-nl.cdsw.cz
Major cycle route connecting the international cycle routes in the territory and leading through Ústí nad Labem was proposed.
Individual steps towards cycle transport improvements in the form of an Action Plan were incorporated into the SUTP for Ústí nad Labem.
Training of school children in safe cycling and traffic rules in progress.
Measure 60
11.6.3 – Improving cycle transport
• Study of leading the cycle routes in the city
• Proposals for the Master Plan of the city
• Routes are leading primarily through:– Existing cycling infrastructure
– Pedestrian and recreation zones
– Segregated lines on roads
– Roads with restricted traffic
Proposal for new cycle infrastructure in the city
Measure 60
11.6.3 – Improving cycle transport
The proposed integrated cycling infrastructure connects:
• Current cycle network
• Cycle routes on both sides of the river Labe
• Cycle routes leading to neighboring regions
• Towns surrounding Ústí nad Labem with the city centre
• Touristic destinations in the area
Proposal for cycle routes in the city centre
Measure 60
6.10 - Cycle transport improvements
• Trial version of the cycling web portal for Ústí nad Labem was implemented:
• Information about cycling possibilities in the area, advices, services, interesting destinations etc.
http://cyklomapa.usti-nl.cdsw.cz
Measure 60
6.10 - Cycle transport improvements
• Content:
– Interactive map of all the cycle routes
– Characteristics of individual routes
– Safety information
– Videos and pictures from the routes
– Dangerous areas for cycling
– Technical support and services for cyclists
– Points of interest in the area
Measure 60
Interactive maps
• Each cycle route is accompanied by a video showing the passage through the route on a bike in both directions
• A point on the map is moving in the corresponding position
• Specific interactive marks on the map are giving characteristics of the route (critical parts, uphill, downhill, surface, descriptions, etc)
• Further information are included: pictures, points of interest, links, etc.
Measure 60
Results
Website promoted and accepted by local cyclists as a useful tool.
All 4th graders in the city participate in traffic training encouraging cycling.
Required future actions
• Implement the Action Plan for cycle transport improvements of the SUTP
• Implement the solution proposed within the feasibility study connecting the international cycle routes in the territory
• Implement recommendations of the BYPAD to improve cycling policy in the city and repeat the audit periodically
• Continuously update and improve the web portal for cyclists
Measure 60
Budget and costs
Purchases
• Website application for cyclists
• Budget 4 000€
• Actual costs 5 000€
Measure 60
Evaluation
processing data for final evaluation results
awareness level – data from questioners 2010/2011
acceptance level – data from questioners 2010/2011
traffic flow
average modal split
Emissions - transport model
•CO, NOx
No. Target Rating
13 – awareness level 15 % ?
14 – acceptance level 15 % ?
21 – traffic flow 10 %
29 – average modal split 3 %
8 – CO2 emissions 0,05 % NA
9 – CO emmisions 0,05 %
10 – NOX emmisions 0,05 %
11 – Particulate emissions 0,05 % NA
NA = Not Assessed 0 = Not Achieved = Substantially achieved (at least 50%)
= Achieved in full = Exceeded ? = in calculation
Measure 60
Thank you!
Katerina Oktabcova
CIVITAS Archimedes
Ústí nad Labem Municipality
www.usti-nad-labem.cz/civitas