McDONALD’S DIRECTIONAL WITH ARCH 3’-0 ½” 3’-2 1/16” 4’-10” (SIGN OAH) 2” X 2” X 1/8” SQ. TUBE ½” X 20” ANCHOR BOLTS (QTY 4) ELECTRICAL CONDUIT FINISHED GRADE ANCHOR BOLT MOUNTING DETAIL (FIG. 1) ANCHOR BOLT DETAIL NOTICE: IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS SET FORTH IN THIS DOCUMENT. THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS. ½” THICK 3/4” HOLES ½” BOLTS 1” ELECTRICAL HOLE BASE PLATE DETAIL ½” THICK 9/16” HOLES ½” BOLTS 1” ELECTRICAL HOLE SIGN PLATE DETAIL 7” 6” 7” 6” 5” 4 ½” 5” 4” McDONALD’S VARIOUS 6-18-12 McDONALD’S DIRECTIONAL INSTALLATION MWR/CM File Name: Prepared By: Date: Customer: Location: Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYK equivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made. Page 1 OF 1 Rev 4 700 21st Street Southwest PO Box 210 Watertown, SD 57201-0210 1 (800) 843-9888 • www.persona-inc.com DISTRIBUTED BY SIGN UP COMPANY DIRECTIONAL INSTALLATION INSTRUCTIONS: 1. General contractor to stake sign location(s), establish final grade requirements and determine the sign orientation on the property, prior to excavation. 2. General contractor to excavate directional foundations, set anchor bolts and conduit per template included with plate & bolt kit. Pour concrete according to engineered drawing specifications . 3. Uncrate and inspect sign & faces (faces packaged separately). Notify Persona of any damage. 4. Place leveling nuts & washers on anchor bolts (see anchor bolt detail) and level temporarily for final adjustment later. 5. Feed primary electrical wires up through the base column and plates. 6. Feed primary electrical wires through the hole in bottom of sign frame and bolt sign to matching plate on support column. Tie a strain relief knot in the primary wires within the sign frame to prevent wires from falling back and to prevent poor connections. 7. If authorized to do so, make final electrical connections to primary power. Shorten wires prior to making final connections to avoid excess wires shadowing on the faces when illuminated. Test light for proper illumination. 8. Install directional faces with graphics as required for each specified location. 9. Re-check sign for level, make final adjustments, and tighten nuts on anchor bolts. 10. Touch up any paint on sign, bolts or structure as required. 11. Clean area. Remove excess soil & discard installation debris off-premise. (see note) Bolt down over leveling nuts. elevation: 16 / plates: 8 ANCHOR BOLT DETAIL BASE PLATE DOUBLE NUT PLATE WASHER CONCRETE FOOTING ½” Ø GALVANIZED ANCHOR BOLT 20” LONG W/ 5” THREAD @ TOP & 2” THREAD @ BOTTOM; 5 NUTS & 3 PLATE WASHERS PER BOLT LEVELING NUT & PLATE WASHER DOUBLE NUT & PLATE WASHER **NOTE: ALL PLATE WASHERS, NUTS, & LOCK NUTS TO REMAIN ON BOLTS DURING INSTALLATION OF FOUNDATION TO AVOID BEING MISPLACED ON THE JOB SITE This sign is intended to be installed in accordance With the requirements of article 600 of the national Electrical Code and / or applicable local codes. This includes proper grounding and bonding of the sign. NOTE: REFERENCE ENGINEERED DRAWINGS FOR DETAILS: Any modifications to base plates, anchor bolts, or any other structural elements must be approved by a registered structural engineer and documented on a stamped print http://www.personasigns.com/mcdonalds/products.htm ELECTRICAL SPECIFICATIONS: 1. ILLUMINATION: WHITE LEDS 2. POWER SUPPLY: (1) LED POWER SUPPLY 3. LOAD: 0.85 AMPS 4. CIRCUITS: (1) 20 AMP - 120 VOLT