Top Banner
1 NIIF General Session #63 Report Activities since the NIIF #62 meeting May 9, 2008 Todd Rodgers Robert Schafer NIIF Co Chair NIIF Co Chair
37
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: May 2008 Meeting Summary

1

NIIF General Session #63

ReportActivities since the NIIF #62 meeting

May 9, 2008Todd Rodgers Robert Schafer

NIIF Co Chair NIIF Co Chair

Page 2: May 2008 Meeting Summary

2

NIIF Leadership 2008Network Interconnection/Interoperability Forum

NIIF Co Chair: Todd Rodgers (Qwest)NIIF Co Chair: Robert Schafer (Verizon)

Network Inter-Operability CommitteeNIOC Co Chair: Ann Marie Cederberg (Qwest)NIOC Co Chair: Robin Meier (AT&T)

Network Routing Resources Information Committee

NRRIC Co Chair: Karen Riepenkroger (Sprint)NRRIC Co Chair: Joan Ross (Telcordia)

Page 3: May 2008 Meeting Summary

3

Meetings Held from February 8, 2008 to May 8, 2008February 12, 2008 – NRRIC Conference Call regarding the generation of correspondence to the OBF on the topic of CABS Bill Rejection from 10:00am – 12:00pm ESTFebruary 14, 2008 – NRRIC Issue #0273, Rehome Procedures and LERG Effective Dates, Conference Call from 11:00am – 1:00pm ESTFebruary 21, 2008 – NIOC Issue #0281, Emergency Notification Systems Jeopardize Network Reliability, Conference Call from 11:00am – 2:00pm ESTMarch 3, 2008 – NIOC Issue #0268, Update NIIF Terms and Definitions document, Conference Call from 11:00am – 2:00pm ESTMarch 4, 2008 - NIOC Issue #0284, SS7 Transit Carrier Screening, Conference Call from 11:00am – 2:00pm ESTMarch 5, 2008 – NRRIC Issue #0264, Update NIIF Mergers and Acquisitions document, Conference Call from 11:00am – 1:00pm ESTMarch 13, 2008 – NIOC Issue #0286, Lack of SS7 Transfer Controlled (TFC) Message support will degrade the probability of completion for NS/EP calls , Conference Call from 11:00am – 2:00pm EDTMarch 18, 2008 - Joint NIOC, OBF, and AMATSG Conference Call from 11:00am – 3:00pm EDT

Page 4: May 2008 Meeting Summary

4

Meetings Held from February 8, 2008 to May 8, 2008(Cont’) March 19, 2008 – NIOC Conference Call regarding AMOC Joint meeting with the PTSC

from 11:00am – 2:00pm EDT March 24, 2008 - NIIF General Conference Call regarding NG-CI Meeting and NIIF

Correspondence #080212-002 from 11:00am – 1:00pm EDT April 1, 2008 – NRRIC Issue #0264, Update NIIF Mergers and Acquisitions document,

Conference Call from 11:00am – 1:00pm EDT April 4, 2008 – NIIF Master Table of Contents Abstracts Update, Conference Call from

11:00am – 1:00pm EDT April 6, 2008 - Joint NIOC, OBF, and AMATSG Issue #0246, Jurisdiction Information

Parameter (JIP) Population Rules when VoIP, Conference Call from 11:00am – 12:30pm EDT

April 10, 2008 - NIOC Issue #0281, Emergency Notification Systems Jeopardize Network Reliability, Conference Call and Issue #0294, ENS survey questions while interfacing with the telecommunication network, conference call from 11:00am – 3:00pm EDT

April 15, 2008 – NIOC Issue #0286, Lack of SS7 Transfer Controlled (TFC) Message support will degrade the probability of call completion for NS/EP calls, conference call from 11:00am – 3:00pm EDT

April 17, 2008 – NIOC Issue #0284, SS7 Transit Carrier Screening, Conference Call from 11:00AM – 2:00PM EDT

Page 5: May 2008 Meeting Summary

5

Correspondence Received since NIIF General Session #62

NIIF Correspondence #080212-002: Susan Miller, President, ATIS to NIIF Leadership regarding CIO Council Initiative regarding IPTV

NIIF Correspondence #080304-001: Maria Estefania, VP of Standards Development, ATIS to NIIF Leadership regarding Invitation to Convergence and Identity Management Overview Sessions

NIIF Correspondence #080318-001: Susan Miller, President and CEO, ATIS to NIIF Leadership regarding the ATIS Inter-Carrier VoIP Call Routing (IVCR) Assessment and Work Plan

NIIF Correspondence #080404-001: INC to the NIIF regarding the Implementation of new Service Access Code (SAC) Code 533 – for Personal Communications Services (PCS)

NIIF Correspondence #080408-001: Maria Estefania, VP of Standards Development, ATIS to NIIF Leadership regarding ATIS Conference Call regarding an Overview of the Report on Convergence completed by the ATIS Board’s Exploratory Group on Convergence (EGC) on 4/9/08

NIIF Correspondence #080423-001: Maria Estefania, VP of Standards Development, ATIS to NIIF Leadership regarding a reminder on ATIS Conference Call regarding an Overview of Identity Management and related standards work taking place on 4/24/08

NIIF Correspondence #080423-002: ESIF to the NRRIC regarding the Removal of LERG15

Page 6: May 2008 Meeting Summary

6

Correspondence Sent since NIIF General Session #62 NIIF Correspondence #080212-001: NRRIC to the OBF regarding

CABS bills – Instances of non-payment with use of Next Generation Network (NGN) VoIP switch CLLIs™

NIIF Correspondence #080324-001: NIIF to Yvonne Riegle, Director, ATIS regarding response to NIIF Correspondence #080212-002 on CIO Council initiative Regarding IPTV

NIIF Correspondence #080428-001: NIOC to the INC regarding response to NIIF Correspondence #080404-001 on the implementation of new Service Access Code (SAC) Code 533 - for Personal Communications Services (PCS)

NIIF Correspondence #080502-001: NRRIC to the PTSC regarding NIIF Issue #0296, Elements and Guidelines for IP Routing Database

Page 7: May 2008 Meeting Summary

7

NIIF New Issues NIOC Issue #0294, ENS Survey Questions

while interfacing with the telecommunication network

Information within NIOC Report NIOC Issue #0295, Documentation

Updates for 500/800/900 Series Expansion Information within NIOC Report

NRRIC Issue #0296, Elements and Guidelines for IP Routing Database

Information within NRRIC Report

* NIIF Issues can be accessed at http://www.atis.org/niif/issues.asp.

Page 8: May 2008 Meeting Summary

8

NIIF Issues in Initial Closure

Issues in Initial Closure: NRRIC Issue #0291, Removal of LERG15 (E911

tandem/county data) Note: Expected Final Closure Date 5/27/08

Resolution Statement: Based on NIIF Correspondence #080423-002 received

from the ESIF and information provided by NRRIC members, it has been determined that many of the selective routing providers do not utilize LERG 15. It was noted by NRRIC participants and ESIF that the LERG 15 data is known to be incomplete and outdated. Due to this fact, the value of LERG 15 data will be incomprehensive for use by all selective routing systems; therefore the LERG 15 table/file will be removed and discontinued as part of the LERG product.

* NIIF Issues can be accessed at http://www.atis.org/niif/issues.asp.

Page 9: May 2008 Meeting Summary

9

NIIF Issues in Initial Closure

Issues in Initial Closure: NIOC Issue # 0270,Update NIIF Documentation on Rating and

Routing in a Competitive Local Environment. Note: Expected Final Closure Date 5/28/08

Resolution Statement: The NIIF-NIOC has archived NIIF-0014, NIIF Report on Rating

and Routing in a Competitive Local Environment. The intent of Issue #0270 was to update NIIF 0014. Therefore, as the document has been archived, the NIOC has agreed to resolve this issue without further work.

Issues in Initial Pending: N/A

Page 10: May 2008 Meeting Summary

10

NIIF Issues in Final ClosureSince NIIF GS #62:Since NIIF GS #62: NIOC Issue #0246, Jurisdiction Information

Parameter (JIP) Population Rules when VoIP Technology is Involved for Some Portion of the Call

NRRIC Issue #0273, Rehome Procedures and LERG Effective Dates

NIOC Issue #0289, Review of e-TOM as Recommended by EGC

* NIIF Issues can be accessed at http://www.atis.org/niif/issues.asp.

Page 11: May 2008 Meeting Summary

11

Joint AMOC Meetings

PTSC Status Updates on NIIF Referred Items in the joint AMOC meeting between NIIF NIOC and PTSC.

The NIOC had previously referred questions related to several working NIIF issues and was looking for updates and status from PTSC.

The three major topics addressed in this joint meeting were: TRS (Telecommunications Relay Service) in the IP world Call Forwarding is Causing Looping When New Technology is Involved Network Management Controls for High Volume Call In (HVCI) Events when VoIP Technology is Involved

TRS in the IP world discussion PTSC presented several power point presentations related to TRS. After considerable discussion

it was determined that the PTSC would need to develop a TR (Technical Report) related to TRS in the IP world. The TR should cover the convergence situation where one leg of a call could be over the IP realm while the other leg of the call could be over PSTN when considering solutions. A new issue needs to be created at PTSC for the creation of the IP TRS TR. It was identified that there will also be billing and ordering impacts related to this topic. The final TR will impact the OBF and NIOC committees, and when the TR is finalized in the PTSC new issues will need to be created at OBF and NIOC. PTSC and NIOC will continue to communicate and provide input during the creation of the PTSC TR.

Page 12: May 2008 Meeting Summary

12

Joint AMOC MeetingsPTSC Status Updates on NIIF Referred Items in the joint AMOC meeting between NIIF NIOC and PTSC

continued.

Call Forwarding is Causing Looping When New Technology is Involved The NIIF NIOC has an active issue #0269, Call Forwarding is Causing Looping when New Technology is

Involved. During discussion it was determined there may be a need to discern between looping to new parties vs. looping during call forwarding when considering solutions. The next steps for the looping issue include: using historical information as a tool used for testing routes, as well as documenting the various mechanisms that are used for forwarding. It was also noted that there is a need to support all three inter-workings when considering solutions to the looping problem.

Network Management Controls for High Volume Call In (HVCI) Events when VoIP Technology is Involved The NIOC has an active Issue #0247, Network Management Controls for High Volume Call In (HVCI) Events

when VoIP Technology is Involved. This topic describes a problem which occurs when a message is moving from the IP realm to the PSTN and vice versa. During discussion it was identified that there may be a need to address inter-working at the network management control of the PSTN network at the gateway. This is related to managing SS7 screening. This issue requires coordination and work with the IETF regarding IP congestion. The next steps for addressing the congestion caused by mass calling issue include: the PTSC keeping the NIIF apprised of work occurring within the IETF overload design team and taking the task of looking at cost code to SIP status mappings when T1.679 and the ITU-T Q.1912.5 are used.

Additional considerations for the joint NIOC/PTSC meeting: In conclusion the PTSC and NIOC leadership would need to share information with the TMOC leadership to

further determine if TMOC needs to be involved and what the next steps would be for work on the issues regarding TRS, looping, and congestion caused by mass calling. There are presentations available on request once ATIS has completed the review process.

Page 13: May 2008 Meeting Summary

13

Joint AMOC Meetings

Joint AMOC meeting between NIIF/OBF/PRQC/PTSC/TMOC on Ordering for QoS

This joint meeting was led by the OBF IP-NNI (Internet Protocol Network to Network Interface) committee. The OBF IP-NNI was working on an initiative determined in the previous work of the ATIS Exploratory Group on Covergence (EGC) Report and Recommendations. The purpose of this meeting was to determine if solutions had been reached and work could begin by other committees. It was identified that it would be more prudent to be working from the NG-CI (Next Generation – Carrier Interconnect) initiative completed in February 2008 rather than the EGC report which was about 1 ½ years old. It was also noted that additional work may be required from other ATIS committees and completed prior to the OBF IP-NNI coming to conclusions. It was identified that the current OBF IP-NNI work was good work and should be kept in mind as other work is completed before a definite path forward could be determined. There are presentations available on request once ATIS has completed the review process.

Page 14: May 2008 Meeting Summary

14

Joint AMOC Meetings

Joint AMOC NIIF NIOC/OPTXS/PRQC on Proposed Updates of T1.514 and ATIS 0300031

This joint meeting was led by PRQC responding to the NIIF NIOC request to update the T1.514 so that the NIIF could update the ATIS document 0300031. This work effort related to the NIIF NIOC issue #262, Interconnection Guidelines for Meet Point SONET Architectures.

The PRQC and OPTX SME’s provided significant proposals for updating the T1.514 documentation. In the joint session we discussed following up by soliciting answers to a couple of questions that would assist in squaring away the analysis of the acceptance limits for the prospective agreement to update T1.514. These questions concerned: 1) the assumption parameter α in the original T1.514 Annex B Derivation of Test Limits and 2) operator feedback as to the current extent that individual in-service members of SONET virtual concatenation groups are diversely routed (i.e., outside the same OC-N transport system).

Page 15: May 2008 Meeting Summary

15

Joint AMOC Meetings

JOINT AMOC Working Session on Convergence with NIIF/PRQC/PTSC/TMOC/WTSC

This was a report on the current convergence activities related to the September 2007, ATIS Exploratory Group on Convergence (EGC) Report and Recommendations. It was determined that a method needs to be developed for coordination and tracking of the work in progress, success, roadblocks, identify the areas that need assistance to accomplish the work.

Joint AMOC Working Session on Next Generation Carrier Interconnect with NIIF/OBF/PRQC/PTSC/TMOC/WTSC

The NG-CI session was to bring all ATIS committees up to date on the NG-CI kick off meeting in February 2008. At the February meeting work items were developed and those work items were reviewed in the joint session at the AMOC meeting. Each ATIS committee with assigned work items reported their status on some of those items.

Page 16: May 2008 Meeting Summary

16

Joint AMOC Meetings

Joint AMOC meeting on Combined Entity Company Codes (CECCs) with INC/NIIF NRRIC/TMOC CLDR

The TMOC CLDR and INC presented the work they had completed on Combined Entity Company Codes

Combined Entity Company Code (CECC):A CECC is the Company Code (OCN) of a non-surviving legal entity that has been modified per NECA procedures to remain valid subsequent to a merger or acquisition.In other words: The CECC functions as a placeholder to keep the non-surviving entity’s Company Code (OCN) active

Target Company Code (OCN):A Target Company Code is the code associated with the surviving legal entity in a merger or acquisition. The CECC is linked to the Target Company Code in order to identify the current legal name for the CECC.In other words: The Target Company Code (OCN) functions as a reference point to associate the CECC to the correct legal name for the CECC

Page 17: May 2008 Meeting Summary

17

Other:

Phantom Traffic There has been US Senate Committee

action and discussions on Phantom Traffic and potential legislative rulings could take place if the industry doesn’t get together and address the phantom traffic issues. The NIIF will be scheduling a meeting to discuss.

Page 18: May 2008 Meeting Summary

18

Upcoming NIIF Meetings/General Conference Calls May 22, 2008 – NIIF Master Table of Contents

Update Conference Call from 11:00am – 1:00pm EDT

August 12, 2008 – NIIF General Session #64

Page 19: May 2008 Meeting Summary

19

NIOC Report to NIIF General Session #63

May 9, 2008

Page 20: May 2008 Meeting Summary

20

NIOC GS Report

Summary of Issues:Summary of Issues: New Issues: 2 Open Issues: 23 Issues in Initial Closure: 1 Issues in Initial Pending: 0 Issue Withdrawn: 0 Issues in Final Closure since GS #62: 1 Issues in Tabled Status: 1

Page 21: May 2008 Meeting Summary

21

NIOC G.S Report

Issues in Tabled Status:Issues in Tabled Status: Issue #0233R1: Terminating Switch

Identification Architecture (Accepted 8/14/03)Returning this issue into active status or

withdrawing this issue is dependant on the Missoula Plan or other future regulatory action

Page 22: May 2008 Meeting Summary

22

NIOC GS Report Active Issues:Active Issues:Issues Related to Network Management or Management of Issues Related to Network Management or Management of

Network:Network:Autodialer or SMS CongestionAutodialer or SMS Congestion

Issue #0281R1, Need for Emergency Notification Best Practices (Accepted 6/21/06)

This issue relates to municipalities or government bodies using autodialer type equipment (ENS) to send emergency notifications within areas of the community resulting in potential network congestion.

The NIOC is working via conference calls with ENS vendors, ENS Service Providers, and ENS users to find equipment, educational and process solutions. A Press Release has been developed and released. The next conference call is scheduled for May 21, 2008.

Issue #0294, ENS Survey Questions while interfacing with the telecommunication network

This new issue was created from issue #281 to finalize the set of questions developed for ENS Users, Service Providers and ENS vendors and have the ability to send them out without waiting for issue #281 to go to final closure.

The questions are close to being finalized, when that happens (target May 21 conference call) the issue will go to initial and final closure and the questions will be distributed. The responses will be used to assist in solutions for issue #281.

Issue #0293, Potential SMS Inter-Network Congestion This issue relates to congestion caused by SMS messages, typically in emergency or ‘event’

notification. This is a relatively new issue and work hasn’t started on this issue. However, solutions on the above

issues may play a role in solutions for this issue.

Page 23: May 2008 Meeting Summary

23

NIOC GS Report Active Issues:Active Issues:Issues Related to Network Management or Management of Issues Related to Network Management or Management of

Network:Network:

Autodialer or SMS CongestionAutodialer or SMS Congestion Issue #0266, Mass Call Blast Impact on Telecommunication Networks

(Accepted 8/15/05) This issue relates to telemarketer large call volumes impacting and congesting

networks Solutions for issue #281 may assist in solutions for this issue. The ENS community is

actively participating in a solution for issue #281. It may encourage the telemarketer community in seeing the benefits in avoiding network congestion situations.

Issue #0277, Auto-Dialer Focused Overloads (Accepted 6/21/06) This issue relates to ‘social unrest instigators’ who may intentionally try to target

or harm the network. The focus has been on issue #281 as solutions for that issue may help us deal with this

issue. Additional information may be obtained from NIOC Co-Chairs.

Page 24: May 2008 Meeting Summary

24

NIOC GS Report Active Issues:Active Issues:

Issues Related to Network Management or Management of Issues Related to Network Management or Management of Network:Network:

Issue #0247, Network Management Controls for High Volume Call In (HVCI) Events when VoIP Technology is Involved (Accepted 8/9/04)

Identified general areas for development of minimum standards that should be considered as requirements for companies that will by interconnecting VOIP technology networks and traditional digital switch or analog switch networks within and between companies which are part of the PSTN.

This issue has been referred to PTSC-SAC with a set of scenarios/questions to be addressed. A joint meeting was held at AMOC. NG-CI work plan item.

Issue #0269, Call Forwarding is Causing Looping When New Technology is Involved (Accepted 8/15/05)

The NIOC is concerned about a case where a call starts in a network and is forwarded to a new destination number in an IP network and then is further forwarded to another destination number in the PSTN.

Questions have been referred to PTSC-SAC and a joint meeting was held at AMOC. NG-CI work plan item.

Issue #0284, SS7 Transit Carrier Screening (Accepted 8/24/06) This issue is looking at guidelines for carrier screening and other related screening issues

Conference calls are being held with SS7 SME’s and a screening table is being developed. Issue #0286, Lack of SS7 Transfer Controlled (TFC) Message support will

degrade the probability of completion for NS/EP calls (Accepted 5/3/07) This issue explores the relationship between NS/EP calls and TFC

Vendor survey questions have been developed, sent and are being compiled, SP questions are under discussion

Page 25: May 2008 Meeting Summary

25

NIOC GS Report Active Issues:Active Issues:Jurisdiction Issues: Jurisdiction Issues:

Are being worked via conference calls with OBF and AMATSG Are being worked via conference calls with OBF and AMATSG assistance:assistance:

Issue #0227, Clarification to Resolution Statement of Issue #0199 Toll Free Number in Calling Party Field (Accepted 4/10/03) Issue relates to jurisdiction parameter looking for greater billing accuracy

Waiting for either Missoula or other regulatory action. May determine other possible actions in the interim especially since the ‘Phantom Traffic’ initiative.

Issue #0250, Guidelines for the Use of Charge Number Field (Accepted 9/21/04) Issue relates to jurisdiction parameter looking for greater billing accuracy

Waiting for either Missoula or other regulatory action. May determine other possible actions in the interim especially since the ‘Phantom Traffic’ initiative.

Page 26: May 2008 Meeting Summary

26

NIOC GS Report Active Issues:Active Issues:NGN or New Technology Issues NGN or New Technology Issues

(note some NGN issues may fall under other categories)(note some NGN issues may fall under other categories)

Issue #0287, Development of NGN Documentation This issue is to create new NGN Documentation similar to the NIIF Reference

Document Developing outline and topics which should be included into the document. Identifying

higher priority items. Issue #0258, National Security/Emergency Preparedness (NS/EP) Calls May

Encounter Difficulties When Some Portion of the Call is Served by VoIP Technology (Accepted 1/12/05) This issue was worked with PTSC to develop mapping and testing for inclusion into

the NIIF Reference Document NCS provided a contribution with the above information after companies review the

contribution the NIOC should be able to place this issue into initial closure. Issue #0254, IP QoS and IP/PSTN Convergence as it relates to the PRQC

Work (Accepted 10/13/04) There are PRQC documents relevant to NIIF work and should be referred to in the

NGN document Create a contribution identifying relevant text to either include in NIIF documents or refer to

PRQC documents.

Page 27: May 2008 Meeting Summary

27

NIOC GS Report Active Issues:Active Issues:

Disaster Recovery or Outage Reporting issuesDisaster Recovery or Outage Reporting issues

Issue #0278, Interoperability and Services Restoration Guidelines for Telecommunications Disaster Recovery (Accepted 6/21/06) Develop NIIF guidelines related to disaster recovery

This issue needs to be looked at to determine if this work isn’t being done elsewhere and if a NIIF document would be redundant.

Issue #0292, NIIF Documentation Outage Reporting The NIOC needs to review and update the NIIF reference and

other documents as they relate to outage reporting utilizing ATIS-0100012.2007, Standard Outage Classification.

This is a new issue and NIOC work hasn’t begun

Page 28: May 2008 Meeting Summary

NIOC GS Report

NIOC Active Issues (cont.) NIOC Active Issues (cont.) Testing Issues:Testing Issues:

Issue #0260, VoP/VoIP and NIIF Testing Guidelines (Accepted 1/14/05) Look at needs for VoP/VoIP testing in NIIF Documentation

Abstracts will be created in NIIF NGN documentation pointing to relevant areas in the VoIP NNI Testing Framework document.

Issue #0241, ATM High Speed Link Test Plan (Accepted 3/22/04) This issue looks to revise NIIF documents to include ATM High Speed tests

Contributions have been submitted and need to be reviewed by participants. If accepted then the issue should go to initial closure

Issue #0267, Addition of Number Pooling Code Opening Testing Guidelines (Accepted 8/15/05) This issue is to add text related to Code Opening in Number Pooling environments

Referred to INC and NRRIC. Work was completed in those committees and NIOC needs to complete work based on input from those committees and update document information.

Issue #0262, Interconnection Guidelines for Meet Point SONET Architectures (Accepted 3/31/05) This issue is to update tables on SONET architecture not covered in NIIF document.

Working with PRQC to update relevant industry documents. PRQC has done significant work as shared at the AMOC

Page 29: May 2008 Meeting Summary

29

NIOC GS Report Active Issues:Active Issues:

Other:

Issue #0288, Minimum Time Frames for Mergers and Acquisitions It was identified that a minimal time frame for mergers and acquisitions was not

in ATIS 0300046, Recommended Notification Procedures to Industry for Changes in Access Network Architecture, Attachment B “BIRRDS Minimum Time Interval” section.

This is a relatively new issue and hasn’t been addressed yet. Issue #0268, Update NIIF Part XIII Terms and Definitions Document

(Accepted 8/15/05) Update term and definitions used in NIIF documents.

Work is progressing in Joint NIOC/NRRIC conference calls and is close to completion. NIOC Issue #0295, Documentation Updates for 500/800/900 Series

Expansion Information within NIOC Report

New issue introduced during NIOC #63

Page 30: May 2008 Meeting Summary

30

NIOC GS Report

Issues Over 12 Months*:Issues Over 12 Months*:Issue # Acceptance Date

Issue #0227 4/10/03

Issue #0241 3/22/04

Issue #0247 8/9/04

Issue #0250 9/21/04

Issue #0254 10/13/04

Issue #0258 1/12/05

Issue #0260 1/14/05

Issue #0262 3/31/05

Issue # Acceptance Date

Issue #0266 8/15/05

Issue #0267 8/15/05

Issue #0268 8/15/05

Issue #0269 8/15/05

Issue #0277 6/21/06

Issue #0278 6/21/06

Issue #0281R1 6/21/06

Issue #0284 8/24/06

*Please see Active Issues for Issue titles

Page 31: May 2008 Meeting Summary

31

Upcoming NIOC Conference Calls:Upcoming NIOC Conference Calls: May 8, 2008 – Issue #0284, SS7 Transit Carrier Screening, Conference Call

from 11:00am – 2:00pm EDT May 15, 2008 – Issue #0268, Update NIIF Terms and Definitions Document,

Joint Conference Call from 11:00am – 2:00pm EDT May 20, 2008 – Issue #0294, ENS survey questions while interfacing with the

telecommunications network, Conference call 11:00 – 3:00 PM EDT May 21, 2008 – Issue #0281, Emergency Notification Systems Jeopardize

Network Reliability, Conference Call from 11:00am – 2:00pm EDT May 22, 2008 – Master Table of Contents Abstracts document, Conference

Call 11:00 AM – 1:00 PM EDT June 4, 2008 - Issue #0286, Lack of SS7 Transfer Controlled (TFC) Message

support will degrade the probability of completion for NS/EP calls , Conference Call from 11:00am – 3:00pm EDT

June 12, 2008 – Conference Call regarding the IVCR Work Plan, 11:00am – 2:00pm EDT

July 22, 2008 - Joint NIOC, OBF, and AMATSG Issue #227, Clarification to resolution statement of Issue #0199 Toll Free Numbers in Calling Party Field; and Issue #0250, Guidelines for the Use of Charge Number Field, Conference Call from 11:00am – 1:00pm EDT

NIOC #64, Virtual meeting, August 4-8, 2008

Page 32: May 2008 Meeting Summary

32

NRRIC Report to NIIF General Session #63

May 9, 2008

Page 33: May 2008 Meeting Summary

33

NRRIC G.S. Report

Summary of Issues:Summary of Issues: New Issues since GS #62: 1 Open Issues: 3 Issues Withdrawn since GS #62: 0 Issues in Initial Closure: 1 Issues Placed in Final Closure since GS #62: 1 Issues in Tabled Status: 0

Page 34: May 2008 Meeting Summary

34

NRRIC G.S. ReportActive Issues:Active Issues: Issue #0264: Update the NIIF Mergers and Acquisitions Document (Accepted

6/20/05) This issue is covering the review and updating of the Mergers and Acquisitions

Document to provide companies current information when involved in a merger and acquisition.

Focus at NRRIC #37 was on the contributions received from LNPA and Telcordia. LNPA contribution was accepted with some modifications. Telcordia contribution is still under review by the NRRIC.

Issue #0290, Removal of LERG14 (Diverse Toll Routing) (Accepted 11/27/07) This issue is to remove the LERG 14 file from the LERG due to minimal data and is

not being used. Responses received to date service providers have indicated that the data in LERG 14 is not

being utilized.

Issue #0296, Elements and Guidelines for IP Routing Database (Accepted 5/1/08)

As the industry moves in a direction of IP technology, the NRRIC has identified a business need for developing elements required for an IP routing database.

NRRIC members were asked to go back to their companies to provide input on the elements that would be required for an IP routing database at NRRIC #38.

Page 35: May 2008 Meeting Summary

35

NRRIC G.S. Report

Issues Over 12 Months:Issues Over 12 Months:

Issue # Title Acceptance Date

Issue #0264 Update the NIIF Mergers and Acquisitions

Document

6/20/05

Page 36: May 2008 Meeting Summary

36

Upcoming NRRIC Conference Calls:Upcoming NRRIC Conference Calls:

May 22, 2008 – Master Table of Contents Abstracts document, Conference Call 11:00 AM – 1:00 PM EDT

July 23, 2008 - Issue #0264, Update NIIF Mergers and Acquisitions Document, Conference Call from 11:00am – 1:00pm EDT

September 4, 2008 - Issue #0264, Update NIIF Mergers and Acquisitions Document, Conference Call from 11:00am – 1:00pm EDT

September 25, 2008 - Issue #0264, Update NIIF Mergers and Acquisitions Document, Conference Call from 11:00am – 1:00pm EDT

NRRIC #38

Page 37: May 2008 Meeting Summary

37

Any Questions?