Commissioning Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18 - 19, 2016 Cincinnati, OH
24

May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Mar 31, 2018

Download

Documents

nguyendieu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

CommissioningOtto Van Geet, PE

NREL

Hosted by:

FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR

May 18-19, 2016Cincinnati, OH

Page 2: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Why Commission?

• Commissioning (Cx) of systems has its roots in ship building – first used to ensure a ship was

seaworthy and ready for service.

• Cx is a specialized application of quality assurance.

• Good cx involves extensive testing and:

– early planning, – continuous coordination, – comprehensive documentation,

and – thorough O&M training.

An analogy to a ship’s sea trials or “shake-down” cruise

Page 3: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Commissioning Background

• The goals of commissioning are to:

─ Improve energy performance and minimize energy consumption.

─ Reduce operating costs.─ Ensure adequate O&M staff orientation and training.─ Improve systems documentation.

─ Specific to UESC:─ “Performance assurance” rather than “savings guarantee”

assists keeping costs reasonable and appropriate to the project size/ ECM

─ Use a consistent set of procedures/activities to monitor, adjust, and report on ECM performance.

─ utility/agency monitoring, comparison to baseline, makes improvement recommendations, and agency makes adjustments

Page 4: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Role of Commissioning within a long-term Performance Assurance Plan

1. Cycle of ECM performance assurance

2. Baseline /compare: Existing equipment/system performance and O&M procedures and logs

3. Design & install /adjust: improve equipment/system performance and update O&M procedures and logs

4. Pre-acceptance commissioning: prove performance meets design

5. On going O&M:updated O&M procedures and logs

6. Post-acceptance commissioning:monitor, adjust, assure long-term optimal performance

Baseline /compare to

baseline

Design & install /adjust

Commissioning

On going O&M

Post-acceptance

commissioning

ECM Commissioning Cycle

Page 5: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Commissioning Comes in a Number of

Styles

Ongoing operation &

commissioning

Existing Building (Retro)

commissioning

UESC

ECM Set

Commissioning

Technical steps and techniques

Field Experience

Design Intent

Page 6: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Cx Activities for UESC

• Re-commissioning– Performed 5 to 10 years after previously commissioned– Used to help identify deferred maintenance

• Retro-commissioning (RCx)– Performed to existing buildings not previously

commissioned– Usually instigated due to high energy bills or poor

occupant comfort

• Monitoring-Based Commissioning (MBCx)• Continuous-commissioning (CCx)

– Ongoing process to resolve operating problems, optimize energy use and identify retrofits

Page 7: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Development phase Commissioning Activity

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Data for the graph courtesy Karl Stum; Summit Engineering

Page 8: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Construction Commissioning Activity

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Data for the graph courtesy Karl Stum; Summit Engineering

Desig

n D

evelo

pm

ent

Phase

Develop:

Cx plan

Cx specs

Draft tests

Cx budget

Training plan

Begin Cx focused design review

Page 9: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Construction Commissioning Activity

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Data for the graph courtesy Karl Stum; Summit Engineering

Constr

uction D

ocum

ent P

hase

Finalize Cx documents

Continue Cx focused

design review

Page 10: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Construction Phase Commissioning Activity

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Data for the graph courtesy Karl Stum; Summit Engineering

Early a

nd M

id-C

onstr

uctionKick-off

Meeting

Review Shop

Drawings

Fine Tune Tests

Page 11: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Construction Commissioning Activity

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Data for the graph courtesy Karl Stum; Summit Engineering

Early a

nd M

id-C

onstr

uction

Construction Observation

Page 12: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Construction Commissioning Activity

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Data for the graph courtesy Karl Stum; Summit Engineering

Verification a

nd P

resta

rt C

hecks

Functional TestingThe

Heart of

the Cx

Process

Page 13: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Construction Commissioning Activity

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Data for the graph courtesy Karl Stum; Summit Engineering

Verification a

nd P

resta

rt C

hecks

Functional Testing

Opposite S

eason T

esting

Tre

nd A

naly

sis

Page 14: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Responsibility Shifting from Utility to Agency - Commissioning

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Verification a

nd P

resta

rt C

hecks

Functional Testing

Opposite S

eason T

esting

Tre

nd A

naly

sis

Early a

nd M

id-C

onstr

uction

Data for the graph courtesy Karl Stum; Summit Engineering

Training by

Contractor

Training by Real World

Training by Cx Provider

Page 15: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Agency fully responsible phase - Commissioning

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Data for the graph courtesy Karl Stum; Summit Engineering

Ongoin

g C

om

mis

sio

nin

g

Agency fully responsible phase;

utility commitment complete

Page 16: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Data for the graph courtesy Karl Stum; Summit Engineering

Commissioning Activity

Time

Activity L

evel

Design Phase Construction Phase Warranty0% 100%

Ve

rifica

tion a

nd P

resta

rt C

he

cks

Fu

nctional T

estin

g

Op

posite S

ea

son T

esting

Tre

nd A

na

lysis

Ea

rly a

nd M

id-C

on

str

uction

Ea

rly D

esig

n P

hase

De

sig

n D

eve

lopm

ent P

ha

se

Co

nstr

uction D

ocu

ment P

ha

se

Ongoing Commissioning for the life of the building

Page 17: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

MBCx & AFDD Definitions

• Monitoring-Based Commissioning (MBCx): Use monitored data to assess equipment operation (new or existing buildings), typically ongoing

• Automated Fault Detection and Diagnostics (AFDD): Analytical software that detects specific issues in operation, enabling MBCx.

Page 18: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Benefits

Studies show that 25% of RCx savings on average can be lost over 4 years without ongoing attention.

*Lawrence Berkeley National Laboratory, June 2009 report - Monitoring-Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects

Page 19: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

RCx Issues Identified

Issues/opportunities that can be detected:

• Air-Side OpportunitiesEquipment scheduling, ventilation/economizer control optimization, pressurization and temperature optimization

• Ideal VAV System OperationDuct static pressure and discharge air temperature optimization, morning warm-up control, minimum VAV box flow reduction

• Water Side OpportunitiesTemperature optimization (chilled water, condenser water, heating water), water-side economizer control, pump and pressure control, equipment staging

Page 20: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Fault Detection & Diagnostics (FDD)

Detailed analytics down to the equipment level

Meter Data

Weather Data

BAS DataDatabase

Cloud based or local software

Analytics provide information for action

Any device with a “pulse”

Page 21: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Fault Detection & Diagnostics (FDD)

• Data points constantly monitored and stored

• Programmed “rules” automatically detect “faults” or issues over all time

• One way communication – provides information that requires human action

Page 22: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Fault Detection & Diagnostics (FDD)

• Growing number of tools, not as many as EIS

Examples:

• Purchased as a license: Sky Foundry SkySpark

• SAAS cloud hosted: Climetrics Analytika, Ezenics, KGS Buildings Clockworks, SciEnergyEnergyScape and more…

• Built in to BAS: Growing number of options

Page 23: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

Example Fault - Scheduling

Example rule: “AHU ON During Scheduled Unocc” (Equipment ON when it should be OFF)

AHU-1-1 operating 24/7 from 30%-50% fan speed

Page 24: May 18-19, 2016 Cincinnati, OH Commissioning Otto Van ... Otto Van Geet, PE NREL Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR May 18-19, 2016 Cincinnati, OH Why Commission?

720 KW

1,156 KW

524 KW

449 KW408 KW 94 KW

NREL PV Systems - South Table Mesa Campus

Otto VanGeet 303.384.7369 [email protected]

QUESTIONS?

50 KW