May 16, 2003 May 16, 2003 Team #27 Team #27 EA-6B Flaperon EA-6B Flaperon Actuator Actuator Team Members: Team Members: Eric Sullivan Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Joseph Clark Casey Poeth Casey Poeth Josselin Legeay Josselin Legeay Janice Wisely Janice Wisely Advisor: Advisor: Dr. Dr. DeBartolo DeBartolo
18

May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

EA-6B Flaperon EA-6B Flaperon ActuatorActuator

Team Members:Team Members:

Eric Sullivan Eric Sullivan (Project Manager)(Project Manager)

Joseph ClarkJoseph Clark

Casey PoethCasey Poeth

Josselin LegeayJosselin Legeay

Janice WiselyJanice Wisely

Advisor:Advisor:

Dr. DeBartoloDr. DeBartolo

Page 2: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

AgendaAgenda

The Model -The Model - Josselin LegeayJosselin Legeay

Timeline -Timeline - Janice WiselyJanice Wisely

Testing -Testing - Eric SullivanEric Sullivan Testing Setbacks -Testing Setbacks - Eric SullivanEric Sullivan Results -Results - Casey PoethCasey Poeth

RecommendationsRecommendations– Clevis Design - Clevis Design - Joseph ClarkJoseph Clark

– Material Change - Material Change - Joseph ClarkJoseph Clark Corrosion Issues - Corrosion Issues - Josselin LegeayJosselin Legeay

Page 3: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

The ModelThe Model

Scaled downScaled down

Stiffening Stiffening RidgeRidge

1 2

3

Page 4: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

Timeline - Timeline - GANTTGANTT2/7 2/14 2/21 2/28 3/7 3/14 3/21 3/28 4/4 4/11 4/18 4/25 5/2 5/9 5/16

L7

L3

L4

L5

L6

J

K

L1

L2

F5

G

H

I

F6

F1

F2

F3

F4

D2

E1

E2

F

A

B

C

D1

Page 5: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

TestingTesting

Page 6: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

TestingTesting

6 Tests6 Tests– 3 w/ ridge3 w/ ridge– 3 w/o ridge3 w/o ridge

ProcedureProcedure– Set-upSet-up– Pre-loadPre-load– TestTest

Page 7: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

Testing SetbacksTesting Setbacks

Clevis DesignClevis Design

Apparatus Inconsistency Apparatus Inconsistency

Data Acquisition TechniquesData Acquisition Techniques

Page 8: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

ResultsResults

Page 9: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

Deflection of all samples

0.023

0.024

0.025

0.026

0.027

0.028

0.029

0 500000 1000000 1500000 2000000 2500000

Cycles

Test 1

Test 2A

Test 2B

Test 3

Test 4A

Test 4B

Test 6

Test 5

ResultsResults

Test 1: 745,155Test 2: 766,682Test 3: 957,059Test 4: 1,573,111Test 5: 2,000,000Test 6: 1,029,879

Page 10: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

RecommendationsRecommendations

Page 11: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

Clevis Clevis DesignDesign

One Piece DesignOne Piece Design

Three Piece DesignThree Piece Design

Page 12: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

Material Material ComparisonComparison

MaterialTensile Strength

(ksi)

Young's Modulus

(106 psi)

Thermal Expansion (strain/F)

Price / lb ($)

2014 T-6 Aluminum

55.98 - 71.07 10.44 - 11.17 12.33 - 13.44 0.50 - 0.81

4130 Steel (annealed)

72.52 - 89.92 29.15 - 31.33 6.11 - 7.22 0.17 - .30

Titanium alpha- beta Alloy

144.3 - 145.8 14.50 - 15.95 4.44 - 5.44 13.24 - 18.53

High-Tensile Manganese Bronze

107.3 - 134.9 12.92 - 13.18 11.28 - 11.5 0.70 - 0.74

Page 13: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

Cu

H2

Fe

Zn

Al

Cu2+

H+

Fe2+

Zn2+

Al3+

+0.34V

0.00V

-0.44V

-0.76V

-1.66V

MnMn2+ -1.18V

Corrosion Corrosion issuesissues

Copper could attack Copper could attack the aluminumthe aluminum

Could result in Could result in failure modesfailure modes

Aluminum oxide Aluminum oxide (Al(Al22OO33) is impervious ) is impervious and coherentand coherent

Corrosion stops Corrosion stops when the layer is when the layer is 1nm thick1nm thick

Page 14: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

ConclusionsConclusions

Clevis designClevis design

Material ChangeMaterial Change

Increase Number of Increase Number of Tests Tests – S-N curveS-N curve– Statistical verification Statistical verification

Page 15: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

¿ Questions ?¿ Questions ?

Page 16: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

ExpendituresExpenditures

Item Description Specifications Price / Unit Quantity CostLocking Ring 4130 Steel $85.00 12 $1,020.00End Cap 4130 Steel $76.00 6 $456.00Housing without ridge 2014 T-6 Aluminum $86.00 3 $258.00Housing with ridge 2014 T-6 Aluminum $129.00 3 $387.00Hanging Scale 50 lbs (8 oz graduations) $56.70 1 $56.70Spanner Wrench adjustible 2" to 4.75" $28.22 1 $28.22

3 1/2" X 16" alum 2014 - T6 round stock $98.40 10 $984.00

Clevis Grips created by Instron ® $4,000.00 2 $8,000.00

Total $11,190

Page 17: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

Maximum Working Maximum Working ForceForce

P= 3000 psi

Aef f = 4.879 in2

# Chambers 2Working

Force29274 lbf

Page 18: May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.

May 16, 2003May 16, 2003Team #27Team #27

Pre-loading ForcePre-loading Force

Pre-loading force greater than Pre-loading force greater than maximum working force.-maximum working force.-

.2*

TorqueF

d

P= 4500 psi

Aef f= 6.49 in2

Torque= 15 ft-lbf

Preload Force

29532 lbf