2810 Duniven Circle Amarillo, Texas 806/358-7069 Maxor Mail Order Pharmacy 416 S. Tyler Amarillo, Texas ARCHITECTURAL ADDENDUM #3 DATE: July 20, 2017 FROM: Lavin Associates, Architects TO: Plan Holders of Record PROJECT: Maxor Mail Order Pharmacy This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated July 5, 2017. Work not specifically deleted, modified, changed or altered by the Addendum should remain in effect as part of the Contract Documents. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. IN THE PROJECT MANUAL: 1. Specifications Sections below: Insert revised Table of Contents attached. Insert new Section 01210 Allowances Insert revised Room Finish Schedule attached. IN THE DRAWINGS: 1. Sheet G1.01 Insert revised sheet attached. 2. Sheet A2.02 Insert revised sheet attached. 3. Sheet A2.03 Insert revised sheet attached. 4. Sheet A3.02 Insert revised sheet attached. 5. Sheet A4.01 Insert revised sheet attached. 6. Sheet A5.03 Insert revised sheet attached. 7. Sheet A5.04 Insert revised sheet attached. 8. Sheet A5.06 Insert revised sheet attached. 9. Sheet A9.01 Insert revised sheet attached. 10. Mechanical Addendum 3 attached. 11. Electrical Addendum 3 attached. END OF ADDENDUM NO. 3
26
Embed
Maxor Mail Order Pharmacy 416 S. Tyler Amarillo, Texas · division 6 – wood and plastics 06105 miscellaneous carpentry 06402 interior architectural woodwork 06420 laminate clad
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
2810 Duniven Circle Amarillo, Texas 806/358-7069
Maxor Mail Order Pharmacy 416 S. Tyler Amarillo, Texas
ARCHITECTURAL ADDENDUM #3
DATE: July 20, 2017 FROM: Lavin Associates, Architects TO: Plan Holders of Record PROJECT: Maxor Mail Order Pharmacy This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated July 5, 2017. Work not specifically deleted, modified, changed or altered by the Addendum should remain in effect as part of the Contract Documents. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. IN THE PROJECT MANUAL:
15481 COMPRESSED AIR SYSTEM 15535 REFRIGERANT PIPING AND SPECIALTIES*
Maxor Mail Order 2017-02 07/2017
* Issued with Site/Civil Package 6/18/2017 **Issued with Addendum 3 TOC Page 4 of 4
15580 FUEL FIRED HEATERS* 15775 DX SPLIT SYSTEMS* 15781 PACKAGED ROOF TOP AIR CONDITIONING UNITS* 15810 DUCTS* 15820 DUCT ACCESSORIES* 15830 FANS* 15850 AIR OUTLETS AND INLETS* 15910 DIRECT DIGITAL CONTROLS* 15940 SEQUENCE OF OPERATION* 15950 TESTING, ADJUSTING, AND BALANCING* DIVISION 16 – ELECTRICAL REYNOLDS ENGINEERING ASSOCIATES, INC SPECIFICATION SECTION (TABLE OF CONTENTS) 16050 GENERAL REQUIREMENTS FOR ELECTRICAL WORK 16060 GROUNDING 16111 RACEWAYS 16123 WIRES AND CABLES 600V AND BELOW 16130 BOXES 16140 WIRING DEVICES 16170 MOTOR AND CIRCUIT DISCONNECTS 16210 ELECTRIC UTILITY SERVICE AND METERING 16235 EMERGENCY STANDBY GENERATOR 16413 AUTOMATIC TRANSFER SWITCH 16440 COORDINATION AND ARC-FLASH STUDY 16441 DISTRIBUTION SWITCHBOARD 16442 PANELBOARDS 16491 FUSES 16500 LIGHTING FIXTURES 16505 LIGHT SOURCES 16510 LIGHTING CONTROL 16671 SURGE PROTECTIVE DEVICES 16740 TELEPHONE AND DATA SYSTEMS 16950 TESTING OF ELECTRICAL SYSTEMS END OF TABLE OF CONTENTS
Maxor Mail Order 2017-02 06/2017
ALLOWANCES 01210 - 1
SECTION 01210 - ALLOWANCES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements governing allowances.
B. Types of allowances include the following:
1. Unit-cost allowances.
1.2 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise Architect of the date when final selection and purchase of each product or system described by an allowance must be completed to avoid delaying the Work.
B. At Architect's request, obtain proposals for each allowance for use in making final selections. Include recommendations that are relevant to performing the Work.
C. Purchase products and systems selected by Architect from the designated supplier.
1.3 ACTION SUBMITTALS
A. Submit proposals for purchase of products or systems included in allowances, in the form specified for Change Orders.
1.4 INFORMATIONAL SUBMITTALS
A. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance.
B. Submit time sheets and other documentation to show labor time and cost for installation of allowance items that include installation as part of the allowance.
C. Coordinate and process submittals for allowance items in same manner as for other portions of the Work.
1.5 COORDINATION
A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate installation.
Maxor Mail Order 2017-02 06/2017
ALLOWANCES 01210 - 2
1.6 LUMP-SUM ALLOWANCES
A. Allowance shall include cost to Contractor of specific products and materials ordered by Owner or selected by Architect under allowance and shall include taxes and delivery to Project site.
B. Unless otherwise indicated, Contractor's costs for labor, installation, overhead and profit, and similar costs related to products and materials ordered by Owner or selected by Architect under allowance shall be included as part of the Contract Sum and not part of the allowance.
C. Unused Materials: Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after installation has been completed and accepted.
1. If requested by Architect, retain and prepare unused material for storage by Owner. Deliver unused material to Owner's storage space as directed.
1.7 ADJUSTMENT OF ALLOWANCES
A. Allowance Adjustment: To adjust allowance amounts, prepare a Change Order proposal based on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place where applicable. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins.
1. Include installation costs in purchase amount only where indicated as part of the allowance.
2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed.
3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to unit-cost allowances.
4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the purchase order amount or Contractor's handling, labor, installation, overhead, and profit.
1. Do not include Contractor's or subcontractor's indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the Contract Documents.
2. No change to Contractor's indirect expense is permitted for selection of higher- or lower-priced materials or systems of the same scope and nature as originally indicated.
Maxor Mail Order 2017-02 06/2017
ALLOWANCES 01210 - 3
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
3.3 SCHEDULE OF ALLOWANCES
A. Hardware Allowance: Include the sum of: 150,555 Dollars.
1. This allowance includes doors, frames, and aluminum door hardware, FOB jobsite.
END OF SECTION 01210
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
- Finishes Typical Throughout Building
Countertop Solid Surfacing LG Hi-Macs M104 Roma
Cabinet Plastic Laminate Formica Cognac Maple 7738-58
Window Stools Solid Surfacing LG Hi-Macs M104 Roma
Interior Door Prefinished Wood Door VT Industries Cherry Veneer
Alpine Finish AL07
Interior Door Painted Hollow Metal Sherwin Williams SW7075 Cyberspace
Interior Door Frame Painted Hollow Metal Sherwin Williams SW7076 Cyberspace
Toilet Partitions Solid Plastic ASI Accurate Solid Plastic Black 9205
Reflected Ceiling Plan - Level 2A8.2Reflected Ceiling Plan - Level 3A8.3Reflected Ceiling Plan - Level 4A8.4Retail Area B and C Roof PlansA9.1Retail Area A Roof Plan / A9.2
A4.2 Cladding Panel ScheduleA4.3 Cladding Panel ScheduleA4.4 Cladding Panel ScheduleA4.5 Cladding Panel ScheduleA4.6 Cast Stone and Metal Grille Schedules
Electrical Courtyard DetailE0.2
A3.4 Door and Window Details
A5.18 Stair Sections / Details
Stair and Elevator Tower Roof Plan
A1.1 Site Demolition Plan
G1.1 General Information
First Floor - Mechanical Floor PlanM1.11
M1.31Fourth Floor - Mechanical Floor PlanM1.41
First Floor Lighting PlanE1.1E1.2E1.3
Fourth Floor Lighting PlanE1.4
Parking Garage Streetscape PlanL-1.0
M1.61
E2.1Second Floor Power PlanE2.2Third Floor Power PlanE2.3
E2.4E2.5
Enlarged Power PlansE3.1E3.2E3.3
Panel SchedulesE3.4
A2.01 Overall Floor Plan
M1.21
FP1.31
First Floor - Fire Protection Floor PlanFP1.11Second Floor - Fire Protection Floor PlanFP1.21
Parking Garage Streetscape Site PlanE0.1
E1.5
Parking Garage Streetscape Layout PlanL-1.1
A5.01 Building Sections
Mechanical Schedules
Second Floor - Mechanical Floor PlanThird Floor - Mechanical Floor Plan
FP1.41Fire Protection Roof PlanFP1.51
Third Floor - Fire Protection Floor PlanFourth Floor - Fire Protection Floor Plan
Second Floor Lighting Plan
Roof Lighting Plan
Fourth Floor Power Plan
Light Fixture Schedule And Lighting Details
Third Floor Lighting Plan
First Floor Power Plan
Roof Power Plan
Riser Diagram And Fire Alarm Riser Diagram
C1.1 Existing Site ConditionsC2.1 Site LayoutC3.1 Site Grading Plan Master
C4.2 Storm Sewer Layout
C5.2 Erosion Control PlanC6.1 Details
C4.3 Storm Sewer Plan and Profile
C3.2 Site Grading Plan InsertC3.3 Site Grading Plan InsertC3.4 Site Grading Plan InsertC3.5 Site Grading Plan InsertC3.6 Site Grading Plan Insert
Embassy Suites Streetscape Irrigation PlanEmbassy Suites Tree Irrigation Plan
Embassy Suites Planting Plan
A1.01 Site PlanA1.02
Fire Protection DetailsFP1.61
C4.1 Storm Sewer Layout
C4.4 Storm Sewer Plan and ProfileC5.1 Erosion Control Plan
First Floor Life Safety PlanLS.01
Electrical Courtyard DetailE0.2
Site Demolition Plan
C1.1 Existing Site ConditionsC2.1 Site LayoutC3.1 Site Grading MasterC3.2 Site Grading Inset 1C3.3 Site Grading Inset 2C4.1 Site Utility PlanC5.1 Dock Sump Plan
C6.1 Erosion Control PlanC7.1 Paving DetailsC7.2 Utility Details
D2.1 First Floor Demolition Plan
A3.04
A5.1
Door and Window Details
ReservedReservedReserved
A5.2A5.3A5.4
A5.7
Reserved
Reserved
reservedA8.1
D2.2 Second Floor Demolition PlanD2.3 Third Floor Demolition Plan
A2.02 Floor Plan Area AA2.03 Floor Plan Area BA2.04 Equipment PlanA3.01 Schedule of Finish MaterialsA3.02 Door ScheduleA3.03 Door and Window DetailsA3.04 Window Details
A5.02 Wall SectionsA5.03A5.04A5.05A5.06
Wall SectionsWall SectionsWall SectionsSections
A6.01 Interior ElevationsA7.01 MillworkA8.01 Ceiling PlanA9.01 Roof Plan
C5.1 Joint Plan
M1.2 Area B Mechanical Floor PlanM2.1 Mechanical Schedules and Details
P1.1 Area A Waste and Vent Floor PlanP1.2 Area B Waste and Vent Floor PlanP1.2 Area B Waste and Vent Floor PlanP1.3 Area A Domestic Water and Gas Floor PlanP1.4 Area B Domestic Water and Gas Floor Plan
P2.1 Area A Plumbing Roof PlanP2.2 Area B Plumbing Roof PlanP3.1 Plumbing Schedules and Details
E2.1 Area A Lighting Floor PlanE2.2 Area B Lighting Floor PlanE2.3 Area A Power Floor PlanE2.4 Area B Power Floor PlanE2.5 Area A - Mechanical Power Floor Plan
E1.2 Electrical Site DetailsE1.3 Electrical Site Plan - Communications
E2.6 Area B - Mechanical Power Floor PlanE3.1 Lighting Fixture ScheduleE3.2 One line DiagramsE3.3 Short Circuit DiagramsE3.4 Panel SchedulesE3.5 Panel Schedules
8
L
K
J
H.6
H
G
L
765432.52.221
K
J
H
G
3.6 4.4 5.6 6.55.2
G.6
H.2
G.4
B
C
D
(ABOVE)
(ABOVE)
(ABOVE)
AL-3
F
A2.02
Catalog No.No.
1
Manufacturer
Toilet Accessories Schedule
B-6806 x 42Bobrick
Bobrick
2 42" Grab Bar
Description
3 Toilet Tissue Dispenser
4
5
B-6806 x 36 36" Grab Bar
6
Paper Towel Dispenser / Disposal
7
9
B-682Bobrick Single Robe Hook
B-223 x 36Bobrick 36" Mop Rack (Typ. at all Janitor Closets)
B-4112 Soap Dispenser
B-165 1836Bobrick 18" x 36" Channel Frame Mirror
8
Bobrick
Ensure all accessories meet all TAS standards for Handicap Accessibility
Provide wood blocking in all walls behind toilet accessories - Typical for all
* All toilet paper, paper towel, and soap dispensers provided by owner - Install atheights and locations to meet all TAS requirements
B-2888
Bobrick
Bobrick
B-43944
10
KB110-SSREKoala Recessed Diaper Station
B-270 Sanitary Napkin DisposalBobrick
11 B-165 2448Bobrick 24" x 48" Channel Frame Mirror
Floor Finish Legend
Thom
as L
. Lav
inTe
xas
Arc
hite
ct R
egis
trat
ion
No.
655
9D
ate:
____
____
____
_
This
doc
umen
t is
inco
mpl
ete
and
cann
ot b
e us
ed fo
rre
gula
tory
app
rova
l, pe
rmitt
ing,
or
cons
truc
tion.
95%
RE
VIE
WS
ET
Max
or M
ail O
rderWall Legend
G
F
E
D
C
B
A
865321
G
F.3
E.3
D
C
B
A
2.6 7
G.4
3.8
A
A
A
A
A
B(ABOVE)
21 2.6
A2.03
Catalog No.No.
1
Manufacturer
Toilet Accessories Schedule
B-6806 x 42Bobrick
Bobrick
2 42" Grab Bar
Description
3 Toilet Tissue Dispenser
4
5
B-6806 x 36 36" Grab Bar
6
Paper Towel Dispenser / Disposal
7
9
B-682Bobrick Single Robe Hook
B-223 x 36Bobrick 36" Mop Rack (Typ. at all Janitor Closets)
B-4112 Soap Dispenser
B-165 1836Bobrick 18" x 36" Channel Frame Mirror
8
Bobrick
Ensure all accessories meet all TAS standards for Handicap Accessibility
Provide wood blocking in all walls behind toilet accessories - Typical for all
* All toilet paper, paper towel, and soap dispensers provided by owner - Install atheights and locations to meet all TAS requirements
B-2888
Bobrick
Bobrick
B-43944
10
KB110-SSREKoala Recessed Diaper Station
B-270 Sanitary Napkin DisposalBobrick
11 B-165 2448Bobrick 24" x 48" Channel Frame Mirror