Top Banner
Managing Material Flow TC/IS/2011/MS/118 Logistic Management Department business and Management Studies Trincomalee Campus
20

Material flow

Apr 11, 2017

Download

Marketing

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Material flow

Managing Material Flow

TC/IS/2011/MS/118Logistic ManagementDepartment business and Management StudiesTrincomalee Campus

Page 2: Material flow

Objectives of the chapters…• To identify the material management and its aspect and

activities.• To identify the major objectives of material management.• Forecasting .• Total Quality Management.(TQM)• Measurement of material management performance.• To identifying the Material Management Improvement

System.

Page 3: Material flow

‘’ Administration of raw materials, subassemblies, packaging material and in-process inventory ‘’

Material Management

Page 4: Material flow

Material Management Activities

Sourcing and obtaining materials

Introducing material in to the organization

Monitoring the status of materials

Anticipating material requirements

Page 5: Material flow

Major Objectives of Material Management

Company Objectives

Objective of the material management

Low cost High level of service

Quality assurance

Low level of tied-up cost

Support of other

functions

Page 6: Material flow

Aspect of Material Management

Purchasing and procurement

Production control

Inbound logistics

Warehousing and storage

Management information system

control

Inventory planning and control

Salvage and scrape disposal

Page 7: Material flow

Forecasting

‘’ Predict the future through quantitative or qualitative method or combination of both ‘’

- Customer satisfaction- Product efficiency- Superior negotiation- Pricing and promotion

management

- Stock out- Safety stock

needs

Page 8: Material flow

Forecasting Techniques

Demand forecast

Supply forecast

Price forecast

Long-term forecast

Midrange forecast

Short-term forecast

Page 9: Material flow

Total Quality Management

‘’ Application of quantitative and Human resource to improve the material services supplied to an organization, all the process within the organization and the degree to which the needs of the customer are met ‘’

Page 10: Material flow

Measuring the Performance of Materials Management

Service level

Inventory level

Price level of materials

Order cycle time, fill rate, number of production delays

Slow moving inventory, inventory turnover

Page 11: Material flow

Material Management Improvement System

Kanban / Just-in-time

( JIT )

MRP system- MRP I (Material Requirement Planning )

- MRP II (Manufacturing Resource Planning)

DRP system- DRP I (Distribution

Requirements Planning )

- DRP II (Distribution Resource Planning)

Page 12: Material flow

Kanban / Just-in-time

( JIT )

‘’ Production strategy that reduce manufacturing costs and to improve quality markedly by waste elimination and more effective use of existing company resources ‘’

JIT II concept Apply JIT concept to the purchasing function.

Page 13: Material flow

• Improved inventory turn.

• Bettor customer service.

• Decreased warehouse space.

• Improved response time.

Benefits and Problem of JIT

• Production scheduling.

• Supplier production schedule.

• Supplier locations.

Page 14: Material flow

Material Requirements

Planning (MRP I)

‘’ Computer based production and inventory control system that attempts to minimize inventories while maintaining adequate material through production process ‘’

Page 15: Material flow

Advantages and Disadvantages of MRP I

• - Improved business results and manufacturing results.

• Better manufacturing control.

• More accurate and timely information.

• Less inventory.• Optimize material

acquisition cost.• Higher

transportation bills and unit cost.

• Delivery problem and material shortage.

• Use of standard software package.

Page 16: Material flow

Advantages

Manufacturing Resource

Planning (MRP II)

‘’ Set of activities involved in planning and control of production operations ’’.

• Inventory reduction.• Minimize workforce

overtime.• Reduction in

purchasing cost.• Improved consistency

in customer delivery process.

Page 17: Material flow

Distribution Requirement Planning (DRP I)

Distribution Resource Planning (DRP II)

‘’Extension of (DRP I) and drive distribution schedule , control bill of material ‘’.

‘’Application of MRP principals to distribution environment and integrate distribution needs’’.

Page 18: Material flow

Uses of DRP generated information

• Coordinate the replenishment of SKU.• Select transportation modes, carriers, and shipment

sizes.• Schedule shipping and receiving labour.• Develop a master production schedule for each SKU.

Page 19: Material flow

Summary …

Material Management• Introducing• Anticipating• Sourcing and obtaining• Monitoring

Objectives

• Low cost.• High level of service.• Quality assurance.• Low level of tied up

capital.• Support other function.

Forecasting

Aspect

• Purchasing and procurement.• Production control.• Inbound traffic and

transportation.• Ware housing and storage.• MIS control.• Inventory planning and

control.• Salvage and scrap disposal. Ju

st-in

-tim

e (

JIT )

MRP

I , M

RP II

DRP

I , D

RP II

Total Quality Management

Page 20: Material flow