This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Master Planning from A – ZMaster Planning from A – Z
City of Portland NWDP Master Plan Code LanguagePlan Code Language
33.562.300 Northwest Master Plan 33.562.300 Northwest Master Plan A. Purpose. The Northwest Master Plan allows flexibility in
design and development of a site in a manner that evokes an urban development pattern, and does not overwhelm public services. The provisions of this section accommodate the needs of property owners to begin long-range planning for their property in advance of adoption of the Northwest District Plan. The Northwest District Plan may modify or delete this section of the code It is likely that there will be significant delete this section of the code. It is likely that there will be significant overlap in both timelines and issues addressed by the private and public planning efforts; the two efforts should inform and improve each other throughout their processes
City of Oregon City Master Plan Code LanguageCode Language
17.65.010 - Purpose and intent. It is the intent of this chapter to foster the growth of major institutions and other large-scale development while the growth of major institutions and other large-scale development, while identifying and mitigating the impacts of such growth on surrounding properties and public infrastructure. The city recognizes the valuable services and employment opportunities that these developments bring to Oregon City residents. The master plan process is intended to facilitate an efficient and flexible review process for major developments and to provide them with the flexible review process for major developments and to provide them with the assurance they need over the long term so that they can plan for and execute their developments in a phased manner. To facilitate this, the master plan process is structured to allow an applicant to address the larger development issues, such as adequacy of infrastructure and transportation capacity, and reserve capacity of the infrastructure and transportation system before expenditure of final design of the infrastructure and transportation system before expenditure of final design costs.
i. Required for institutional users on 10 acres or more, but can also be voluntary
• Old parcel configuration made access and orientation under this urban style code difficultunder this urban style code difficult Entryways Pedestrian Connections Main access towards a transit street
• 7 adjustments needed• Wetlands – is it really a wetlands if we just left the hose
on too long?• Old and new buildings in single development• Wild Card – edible landscaping!
• Maximum Allowed Setbacks – sewer easement and city inventoried wetlands made setbacks difficult – could not inventoried wetlands made setbacks difficult could not abut the street on any street side
• Parking Lot Landscaping• Connectivity – standard that required parking behind the y q p g
building when we needed parking in the front• Front Façade oriented toward the street – inline shops
faced Beavercreek and Safeway faced the internal private streetprivate street
• Transit street standards could not be met because of sewer line easement and wetlands
Farleigh Wada Witt’s real estate team understands the need to safeguard and maximize commercial real estate assets while trying to minimize legal fees. Our clients include developers, management companies, landlords, tenants, homeowners’ associations and brokers, along with local, regional and national financial institutions that we routinely assist in Oregon and Washington with a broad range of commercial real estate issues, including:
formation of partnerships, joint ventures and LLCs
acquisition, development, construction and sales of real estate
office, retail, industrial and ground leases
financing transactions
condominium formation and conversions
representation of homeowners’ associations
Farleigh Wada Witt is a proud sponsor of the RELU Annual Meeting
Paul
Migchelbrink David Ludwig
SteveBennett
LauryHennings
Marisol McAllister
VinceSliwoski
Sales and Acquisitions • Lease Preparation and Negotiation • Entity Formation
Planned Community Developments • Construction • Loan Documentation
Portland Office – 121 SW Morrison Street, Suite 600, Portland, Oregon 97204 Central Oregon Office – Five Pine Station, 750 Buckaroo Trail, Suite 203, Sisters, Oregon 97759
2007 Began working with the City and NWDA on the concept of a master planp
2008 Formed a task force with neighbors and City leaders2009 LUBA Remand Resolution 2010-2011 Hiatus with downturn of economy2011 Spring Began working with a small group of leadership from NWDA – a
paired down task force and a paired down plan2011 August Pre-app with the City of Portland2012 December 1st of 5 sessions before the Design Commission ending August 2012 December 1 of 5 sessions before the Design Commission ending August
1. Standards vs. Guidelines2 Push for more guidelines to preserve flexibility and innovative 2. Push for more guidelines to preserve flexibility and innovative
design3. Market driven plan4. Layered new standards and guidelines over existing ones –
ll lall apply5. In the event of a conflict – MP controls6. Height Concerns7 Overall 3:1 FAR which allows more FAR on certain sites given 7. Overall 3:1 FAR which allows more FAR on certain sites given
the open space; roughly 5:18. Minimum FAR 1:1.5 push from NWDA9. Robust series of examples for guidelines
• Master Plan approval states Con-way is only responsible for roughly 15% of the costresponsible for roughly 15% of the cost
• However, Con-way cannot develop more than 506 “auto trips” worth of development capacity before the jughandle financing is in placethe jughandle financing is in place
• Who will ultimately pay is still unanswered• Likely a local improvement district will be used • Compromise to move forward with the auto trips
• Market Driven PlanFlexibility was key allows for a range of uses • Flexibility was key – allows for a range of uses with some caps. Mainly commercial, office and residential. G R i iti th t i i l id f t l ti • Grocer - Revisiting that original idea of a catalytic grocer, with one parcel under contract – we included a provision for a single specific user over 20 000 square feet to be located on Block 29620,000 square feet to be located on Block 296
• Some flexibility to move the grocer use in the future