PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010 Sl No Drawing No Description Rev.No Date of Approval SYSTEM DRAWINGS 1 MEC/11/Q6LL/00/14/50/DE/02500 General Plant layout( by Jspl - MECON)-final 6 Approved 2 MEC/11/Q6LL/01/17/55/BE/02316 Flow Diagram of Plant Layout 5 Approved 3 SCS/543/2010/QAP-01 Quality Assurance Plan 0 Approved 3.11.2010 4 SCS/543/2010/FQP-01 Field Quality Plan 0 Approved 3.11.2010 Motor & belt tension calculation sheet 3 Approved 06.10.2010 8 SCS/543/2010/LAYOUT-001 Layout Plan 1 Approved 6.10.2010 PROFILE DRAWINGS 9 SCS/543/2010/CP-001 Elevation Profile J1C1/J1C2 0 Approved 6.10.2010 10 SCS/543/2010/CP-002 Elevation Profile J2C1/J2C2 0 Approved 6.10.2010 11 SCS/543/2010/CP-003 Elevation Profile J3C1/J3C2/J3C3 0 Approved 6.10.2010 12 SCS/543/2010/CP-004 Elevation Profile J4C1/J4C2 0 Approved 6.10.2010 13 SCS/543/2010/CP-005 Elevation Profile J5C1/J5C2 0 Approved 6.10.2010 14 SCS/543/2010/CP-006 Elevation Profile J6C1 0 Approved 6.10.2010 15 SCS/543/2010/CP-007 Elevation Profile J7C1 0 Approved 6.10.2010 16 SCS/543/2010/CP-008 Elevation Profile J8C1 0 Approved 6.10.2010 17 SCS/543/2010/CP-009 Elevation Profile J9C1/J9C2/J9C3 0 Approved 6.10.2010 18 SCS/543/2010/P&BT-004 Power & Belt Tension Calculation 1 Approved 6.10.2010 GA OF CONVEYORS 19 SCS/543/2010/GA-01 G.A. of CONV. J1C1/J1C2 1 Approved 11.11.2010 20 SCS/543/2010/GA-02 G.A. of CONV. J2C1/J2C2 Approved as Noted 03.03.2011 21 SCS/543/2010/GA-03 G.A. of CONV. J3C1 1 Approved as Noted 11.11.2010 22 SCS/543/2010/GA-04 G.A. of CONV. J3C2 1 Approved as Noted 11.11.2011 23 SCS/543/2010/GA-05 G.A. of CONV. J3C3 1 Approved as Noted 11.11.2012 24 SCS/543/2010/GA-06 G.A. of CONV. J4C1/J4C2 2 Approved as Noted 30.12.2010 25 SCS/543/2010/GA-07 G.A. of CONV. J5C1/ J5C2 2 Approved as Noted 30.12.2010 26 SCS/543/2010/GA-08 G.A. of CONV. J6C1 2 Approved as Noted 30.12.2010 27 SCS/543/2010/GA-09 G.A. of CONV. J7C1 2 Approved as Noted 30.12.2010 28 SCS/543/2010/GA-10 G.A. of CONV. J8C1 2 Approved as Noted 30.12.2010 29 SCS/543/2010/GA-11 G.A. of CONV. J9C1 2 Approved as Noted 30.12.2010 30 SCS/543/2010/GA-12 G.A. of CONV. J9C2 2 Approved as Noted 30.12.2010 31 SCS/543/2010/GA-13 G.A. of CONV. J9C3 2 Approved as Noted 30.12.2010 GA OF JUNCTION HOUSES 32 SCS/543/2010/GA/TP-1 G.A. of Transfer Tower- J1 1 Approved as Noted 11.11.2012 33 SCS/543/2010/GA/TP-2 G.A. of Transfer Tower- J2 34 SCS/543/2010/GA/TP-3 G.A. of Transfer Tower- J3 3 Approve as noted 20.12.2010 35 SCS/543/2010/GA/TP-4 G.A. of Transfer Tower- J4 2 Approve as noted 20.12.2011 36 SCS/543/2010/GA/TP-5 G.A. of Transfer Tower- J5 2 Approve as noted 20.12.2012 37 SCS/543/2010/GA/TP-6 G.A. of Transfer Tower- J6 2 Approve as noted 20.12.2013 38 SCS/543/2010/GA/TP-7 G.A. of Transfer Tower- J7 2 Approve as noted 20.12.2014 39 SCS/543/2010/GA/TP-8 G.A. of Transfer Tower- J8 2 Approve as noted 20.12.2015 40 SCS/543/2010/GA/TP-9 G.A. of Transfer Tower- J9 2 Approve as noted 20.12.2016 41 42 43 A3C 16587-464 GA OF 250 KW TEFC MOTOR 0 Approved 28.01.2011 A3C 16587-465 GA OF 210KW TEFC MOTOR 0 Approved 28.01.2012 A4C17867-225 4P OUTLINE DIMENSIONS Drg OF 315KW HT MOTOR 0 Approved 28.01.2013 A4C17867-226 4P OUTLINE DIMENSIONS Drg OF 555KW HT MOTOR 0 Approved 28.01.2014 A4C 14150-001-THK 0 Approved 28.01.2015 A3C 13780-013 ASSEMBLY DRG FOR PHASE SEGRIGATED TERMINAL BOX 0 Approved 28.01.2016 A4C 18243-RTD-BTD ARRANGEMENT OF RTD BTD T.BOX 0 Approved 28.01.2017 1 2211-2800-0032-S-3346 GA of SPL.H2-280 with fan and RHB comented 27.01.2011 2 2211-2800-0032-S-3346-A GA of SPL.H2-355 with fan and RHB comented 27.01.2012 3 2211-2800-0032-S-3346-B GA of SPL.H2-355 with fan and RHB comented 27.01.2013 4 2211-2800-0032-S-3346-C GA of SPL.H2-355 with fan and RHB comented 27.01.2014 5 2211-2800-0032-S-3346 GA of SPL.B2-450 unit with FLS comented 27.01.2015 6 PR/D/8099 GA of Scoop Fluid Coupling SC-10 comented 7 PR/D/8100 GA of Scoop Fluid Coupling SC-10 comented Status of Approval by Mecon HEATER TERMINAL BOX ASSEMBLY ASSEMBLY AND CONNECTION DIAGRAM
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010
Sl No Drawing No Description Rev.No Status of Approval by Mecon Date of Approval
SYSTEM DRAWINGS1 MEC/11/Q6LL/00/14/50/DE/02500 General Plant layout( by Jspl - MECON)-final 6 Approved
2 MEC/11/Q6LL/01/17/55/BE/02316 Flow Diagram of Plant Layout 5 Approved
3 SCS/543/2010/QAP-01 Quality Assurance Plan 0 Approved 3.11.2010
4 SCS/543/2010/FQP-01 Field Quality Plan 0 Approved 3.11.2010
Motor & belt tension calculation sheet 3 Approved 06.10.2010
8 SCS/543/2010/LAYOUT-001 Layout Plan 1 Approved 6.10.2010
11 PR/D/8108 Control scheme & control panel drawing
12 643 Quality assurance plan of scoop fluid coupling SC-10
13 642 Quality assurance plan of scoop fluid coupling SC-10
14 PR/D/8113 GA of fluid coupling HFD-9
15 GPH/D/1096 Characteristic curve for fluid coupling HFD-10
16 SCS/543/2010/CRUSHER-01 G.A. of Double Roll Crushers
17 QAP of Crusher
18 SCS/543/2010/SCREEN-01 G.A. of Roller Screens
19 SCS/543/2010/MD-01 G.A. of Metal Detector for Conv. No. J5C1/J5C2
20 SCS/543/2010/ILMS-01 G.A. of Inline Magnetic Seprator for Conv.No.J4C1/J4C2
21 SCS/543/2010/BW-01
22 SCS/543/2010/GA/DG-01
23 SCS/543/2010/GA/RG-01 G.A. of Rod Gate RG1/RG2 /RG3/ RG4
24 SCS/543/2010/GA/RPG-01 G.A. of Rack & Pinion RP1/RP2/RP3/RP4
25 SCS/543/GA/IDR & BKT-01 GA of impact troughing idlers with bracket for 2400mm belt conv
26 SCS/543/GA/IDR & BKT-02 GA of carrying idlers with bracket for 2400mm belt conv
27 SCS/543/GA/IDR & BKT-03 GA of pressure idlers with bracket for 2400mm belt conv
28
29 SCS/543/GA/IDR & BKT-04 G.A. of Impact Troughing Idlers with Bracket Approved as Noted 29.11.2010
30 SCS/543/GA/IDR & BKT-05 G.A. of Carrying Idlers with Bracket Approved as Noted 29.11.2010
31 SCS/543/GA/IDR & BKT-06 G.A. of S.A.Carrying Idlers with Bracket Approved as Noted 29.11.2011
32 SCS/543/GA/IDR & BKT-07 G.A of return Idlers with Bracket Approved as Noted 29.11.2012
33 SCS/543/GA/IDR & BKT-08 G.A of S.A.Return Idlers with Bracket Approved as Noted 29.11.2013
34 SCS/543/GA/IDR & BKT-09 GA of pressure idlers with bracket for 1600mm belt conv Approved as Noted
35 SCS/543/2010/TDS-03 Belt Schedule 10.12.2010
36
37 SCS/543/GA/PU-01 G.A of Head Pulley Approved as Noted 29.11.2011
38 SCS/543/GA/PU-02 G.A of Tail Pulley Approved as Noted 29.11.2012
39 SCS/543/GA/PU-03 G.A of Snub Pulley/ Take-up Pulley/ Bend Pulley Approved as Noted 29.11.2013
40 GA of brakes
41 GA of HT Motor Approved
42 QAP of HT motor Approved
43 GA of LT Motor Approved
44 QAP of LT motor Approved
45 Load List
46 Feeder list
47 Logic Diagram
48 G.A. of safety Switches
49 G.A. of Electrical Motor with TS-Curve
50 Single Line Diagram
51 Terminal Diagram
52 Cable Routing Schedule
53 1-709-104(sheet 1 of2,sheet 2 of 2) GA and Load data of 2400x6000 long Roller screen 0 Comented 07.02.2011
54 0502065.02.00 Toothed double roll crusher 800Dia x 2599W 0 Comented 07.02.2011
55 Nil Motor Data sheet of crusher 0 Comented 07.02.2011
56% of Drawing Approval Balanced
G.A. of Belt Weigher for Conv. No. J3C1/J3C2/J3C3/J6C1/J7C1/J8C1
G.A. of Divertor Gate J1FG1/J1FG2/J2FG1/J2FG2/ J4FG1/J4FG2/J5FG1/J5FG2/J6FG1
PACKAGE - 2 Drawing Status As On Dt 11.12.2010
Sl No Drawing No Description Rev.NoStatus of Approval by Mecon
Date of ApprovalSYSTEM DRAWINGS
1 MEC/11/Q6LL/01/17/55/TS/02339 Flow Diagram 0 Drawing received with tender
2 MEC/11/Q6LL/01/17/55/TS/02342 Profile of Conveyors 0 Drawing received with tender
3 MEC/11/Q6LL/01/17/55/TS/02340 Layout of Material Handling System 1 Drawing received with tenderMEC/11/Q6LL/01/17/55/TS/02341 TECHNICAL PARAMETERS OF BELT CONVEYORS 0 Drawing received with tender
4 MEC/11/Q6LL/01/17/55/BE/02370 Schematic Drawing for Conveyor Gallery 0 Drawing received 07.08.2010MEC/11/Q6LL/00/14/50/DE/02500 GENERAL LAYOUT 6 Drawing received ON DATED 24.09.10
2535-CONV-SCH-01 Conv schedule
2535-QAP-01
5DRAWING AWAITED
6 2535-MA-01 Plot Plan with co-ordinate 0
72535-MA-02 Elevation Layout of J10C1,J10C2,J10C3
2 Approved 27.09.108
92535-MA-03 Elevation Layout of J11C1,J11C2,J11C3
4 Approved 16-Nov-1010
11 2535-MA-04 Elevation Layout of J12C1,J12C2,J12C3 2 Approved 16-Nov-10
12 2535-MA-05 Elevation Layout of J16C1,J16C2 2 Approved 16-Nov-10
13
2535-MA-06 Layout & Load data of Junction House No. J10 2 Approved 30-Sep-1014
15
162535-MA-07 Mechanical Layout & load data of Junction House No. J11
2
Approved 30-Sep-101718
2535-MA-08 LAYOUT GA & LOAD DATA OF JUNCTION HOUSE 11A 1 Approved as noted 24.12.2010
2535-MA-09 GA and Load data of junction house No-12 Approved as noted
2535-MA-10 Approved as noted
192535-LD-01
0 APPROVED
202535-CONV-SCH-01 Conveyor Schedule
1 Approved 25.08.1021
QAP/2535/F&E/01 Quality Assurance plan for fabrication of stringer,chutes
222535-QAP-01
0 Approved 21.10.2010
23 2535-QAP-02 QAP for Bought-Out Components of Belt Conveyor 0 Approved 21.10.2010
24 2535-QAP-03 QAP for diverter gate Approved 21.10.2010
GA OF CONVEYORS24 2535-GA-J10C1 GA of Conveyor J10C1 1 Approved 16.09.10
25 2535-GA-J10C2 GA of Conveyor J10C2 1 Approved 16.09.10
26 2535-GA-J10C3 GA of Conveyor J10C3 1 Approved 16.09.10
27 2535-GA-J11C1 GA of Conveyor J11C1 2 Approved 17.01.2011
28 2535-GA-J11C2 GA of Conveyor J11C2 2 Approved 17.01.2012
29 2535-GA-J11C3 GA of Conveyor J11C3 2 Approved 17.01.2013
30 2535-GA-J12C1 GA of Conveyor J12C1 0
31 2535-GA-J12C2 GA of Conveyor J12C2 0
32 2535-GA-J12C3 GA of Conveyor J12C3 0
33 2535-GA-J16C1 GA of Conveyor J16C1 2 Approved 17.01.2011
34 2535-GA-J16C2 GA of Conveyor J16C2 2 Approved 17.01.2012
GA OF JUNCTION HOUSES
QAP of Mechanical Components and technological structure of belt conv
Profile with co-ordinates for Conv. J11BC1, J11BC2, J13C1, J13C2, J11CC1, J11CC2 & Junction Houses J15, J11B, J11C
Mechanical layout & load data of head end of conv J16C1/C2 at junction house no J16
Mechanical Load Data for Conveyor no. J10C1/C2/C3J10 C1, J10 C2 & J10 C3 (1600 B/W)
QAP for Mechanical Component & Technological Structure of Belt Conveyor
35 2535-GA-JH10 GA of Junction House JH-10 1 Approved 30-Sep-10
36 2535-GA-JH-9 GA of Junction House JH-9 0
37 2535-GA-JH-11 GA of Junction House JH-11 0 Approved 30-Sep-10
38 2535-GA-JH-11A GA of Junction House JH-11A 1 Approved 24.12.2010
39 2535-CI-GA-01 GA of carrying idlers 1 REFERENCE
40 2535-II-GA-02 GA of impact idlers 1 REFERENCE
41 2535-SAVRT-GA-05 GA of self alligning V type return idlers 1 REFERENCE
42 2535-STD-ST-D-01 Detail of standard stringer 0 REFERENCE
43 2535-STD-SP-D-01 Detail of standard short post REFERENCE
44 2535-GA-JH-12 GA of Junction House JH-12 3 Approved 17.01.2011
45
DRAWINGS FOR BOUGHT OUT ITEMS
KEPL/VSPL/2027/1 1REFERENCE 11.11.2010
KEPL/VSPL/2027/2 2REFERENCE 11.11.2010
KEPL/VSPL/2027/3 1REFERENCE 11.11.2010
KEPL/VSPL/2027/4 1REFERENCE 11.11.2010U
GEAR BOX (NEW ALLENBERRY)
DH 7810280/ DJ 0910280 1REFERENCE 23.10.2010
DH 7910280/ DJ 0810280 1REFERENCE 23.10.2010
DH 8110280/ DJ 0710280 G.A of Gear Boxes CKC-500 for Conv. No. J16C1& J16C2 1REFERENCE 23.10.2010
DH 8010280/ DJ 0610280 1REFERENCE 11.11.2010
FLUID COUPLING (PREMIUM)
1715001992 3REFERENCE
E96001 P&I Diagram for 430 to 750 PST Fluid Coupling
17515001649
SPEC/PG/16/04 Technical Specification for Pressure Gauge
C/SCR/21718/D12 Technical Specification for Temperature Gauge with Capillary.
SPEC/TS/15-01 Technical Specification for Temperature Switch.
SPEC/DPS/17-01 Technical Specification for Differential Pressure Switch.
SPEC/PS/17-01 Technical Specification for Pressure Switch.
E96107
-
FLUID COUPLING (VOITH)
306-740650-1000-042 3Approved 18.12.2010
306-740750-1000-042 3Approved 18.12.2010
306-740650-3000-042 1Approved 18.12.2010
306-740750-3000-042 1Approved 18.12.2010
306-740650-4000-042 0Approved 18.12.2010
306-740750-4000-042 0Approved 18.12.2010
306-740650-5000-042 0FOR REFERENCE ONLY
306-740650-5000-042 0
FOR REFERENCE ONLY
306-74010-042 0
FOR REFERENCE ONLY
306-74010-13940-042 0
FOR REFERENCE ONLY
306-74010-13950-042 0
FOR REFERENCE ONLY
Dimension drawing for Geared Coupling Size KBD-10 for Conveyor nos. J10 C1,J10 C2 & J10 C3
Dimension drawing for Geared Coupling Size KBD-11 for Conveyor nos. J11 C1, J11 C2, J11 C3,
Dimension drawing for Geared Coupling Size KBD-12 for Conveyor nos. J16 C1, J16 C2
Dimension drawing for Geared Coupling Size KBD-12 for Conveyor nos. J12 C1, J12 C2 & J12 C3
G.A of Gear Boxes CKC-315 for Conv. No. J10C1,J10C2 & J10C3
G.A of Gear Boxes CKC-450 for Conv. No. J11C1,J11C2 & J11C3
G.A of Gear Boxes CKC-500 for Conv. No. J12C1, J12C2 & J12C3
G.A. drawing for 500 PSP Fluid Coupling for Conv. No. J10C1,J10C2 & J10C3
Sectional arrangement drawing for 500 PST Variable speed Fluid Coupling
G.A Drawing of Standard Control Panel for SCR Fluid Coupling for Conveyor no. J10 C1,J10 C2 & J10 C3 (1600 B/W)
Functional/Operational Logic for "Pembril" Scoop Trim Type Fluid couplings for Conveyor no. J10 C1,J10 C2 & J10 C3 (1600 B/W)
Assembly Plan for variable speed Hydraulic Coupling type 650 SVTL 21.2 for Conv. J11C1,C2,C3
Assembly Plan for variable speed Hydraulic Coupling type 750 SVTL 21.2-6.3 for Conv. J16C1,C2,J12C1,C2,C3
F&M Diagram for variable speed Hydraulic Coupling type 650 SVTL 21.2 for Conv. J11C1,C2,C3
F&M Diagram for variable speed Hydraulic Coupling type 650 SVTL 21.2-6.3 for Conv. J16C1,C2/J12C1,C2,C3
List of Instruments for variable speed Hydraulic Coupling type 650 SVTL 21.2 for Conv. J11C1,C2,C3
List of Instruments for variable speed Hydraulic Coupling type 650 SVTL 21.2-6.3 for Conv. J16C1,C2/J12C1,C2,C3
Terminal Plan for Variable Speed Hydraulic Coupling Type 650 SVTL 21.2 for Conv. J11C1,J11C2,J11C3
Terminal Plan for Variable Speed Hydraulic Coupling Type 750 SVTL 21.2- 6.3 for Conv. J12C1,J12C2,J12C3, J16C1,J16C2.
Oil Cooler Assembly Variable Speed Hydraulic Coupling Type 650 SVTL 21.2 for Conv. J11C1,J11C2,J11C3
Oil Cooler Assembly Variable Speed Hydraulic Coupling Type 750 SVTL 21.2-6.3 for Conv. J16C1,J16C2.
Oil Cooler Assembly Variable Speed Hydraulic Coupling Type 750 SVTL 21.2-6.3 for Conv. J12C1,J12C2,J12C3
306-740650-7000-042 0
FOR REFERENCE ONLY
650- SVTL-21.2 Counter Torque for Motor Startup
750- SVTL-21 6.3 Counter Torque for Motor Startup
1715001649 1FOR REFERENCE ONLY 24.12.2010
E96001 P&I Diagram for 430 to 750 PST Fluid Coupling 1 FOR REFERENCE ONLY 24.12.2010
1715001992 GA DRAWING FOR 500 PST FLUID COUPLING 1 FOR REFERENCE ONLY 24.12.2010
750- SVTL-21 6.3 Counter Torque for Motor Startup
BELT SCRAPERS (KAVERI)
K/BS/J-10227/101 GA of External Belt Scraper Primary Type FOR REFERENCE ONLY 24.12.2010
K/BS/J-10227/102 GA of External Belt Scraper Secondary Type FOR REFERENCE ONLY 24.12.2010
K/BS/J-10227/103 GA of internal Belt Scraper V Plough Type FOR REFERENCE ONLY 24.12.2010
BRAKE (ELEKTROMAG)
101-88-250-1
101-88-500-1
101-88-400-1
101-88-600-1
101/88/PNLRPNLC/1 Wiring Diagram for DC Brake for RPNLC Panel 1APPROVED
101-88-WRNG-RPNLC-1 Wiring Diagram for DC Brake for RPNLC Panel 1APPROVED
101-BB-PNL-RPNLC-1 GA of Control Panel for DC Brake.
SAFETY SWITCHES
SW-4321E22P
GA DRAWINGS2535-CI-GA-01 GA OF CARRYING IDLERS 1 REFERENCE 26.08.2010
2535-11-GA-02 GA OF IMPACT IDLERS 1 REFERENCE 26.08.2010
2535-SAVRT-GA-05 GA OF SELF ALLIGNING 1 REFERENCE 26.08.2010
2535-PU-GA-01 GA OF PULLYS 1 APPROVED 26.08.2010
2535-J10-ENGG-01REFERENCE
2535-J11-ENGG-02REFERENCE
2535-J12-ENGG-03REFERENCE
2535-J16-ENGG-04 Calculation for stoping time of brake for conv no J16C1/C2REFERENCE
2535-DG-GA-01 GA of diverter gate 2 APPROVED 17.01.2011
79.5% of Drawing Approval Balanced
PACKAGE -6 Drawing Status As On Dt 11.12.2010
Drawing No Description Rev.No Status of Approval by Mecon Date of ApprovalSYSTEM DRAWINGS
Sl No 4-0814-00-MD-01 DESIGN CRITERIA (DBR) 1 Approved1-0814-00-MA-02 FLOW DIAGRAM 2 Re Appoved
1 1-0814-00-MA-01 PLOT PLAN 1 Approved
2 1-0814-16-MA-01 G.A & Load Data of Truck Unloading Station
Detail of Laced Purlins, Sag Rods, Diaphram PL. & BOM 1
Details of Grating MKD. G1,G2.G3 & G4 with marking & BOM 1
CGP C1/CGP C2Base Plan of Trestles & Elevation of Coveyor Gallery CGPC1/C2 from TR/1 to TR/5 0
0
Plan at Rafter,top Chord,Bottom Chord & Walkway Level TR/1 to TR/5 0Plan at Rafter,top Chord,Bottom Chord & Walkway Level TR/5 to S301/1 0Detail of Trestles 0Typical Detail of Connection and Base Details 0Arrgt. & Detail of standrd Roller at gallery Base Cover Trestle Cap.-25T 0Base Plan of Trestles & Elevation of Coveyor Gallery CGPC1/C2 from TR/1 to TR/5 1
1
Plan at Rafter,top Chord,Bottom Chord & Walkway Level TR/1 to TR/5 1Plan at Rafter,top Chord,Bottom Chord & Walkway Level TR/5 to S301/1 1Detail of Trestles 1Typical Detail of Connection and Base Details 1
Base Plan of Trestles & Elevation of Coveyor Gallery CGPC1/C2 fromTR/5 to S301/1 and
Table of members
Base Plan of Trestles & Elevation of Coveyor Gallery CGPC1/C2 fromTR/5 to S301/1 and
Table of members
PACKAGE -2 Drawing Approval Status As On Dt 11.12.2010
Description Rev.No
STRUCTURAL DRAWINGS
PACKAGE -6 Drawing Approval Status As On Dt 11.12.2010
Description Rev.No
STRUCTURAL DRAWINGSRAW COAL SHED
0Column Elevation along Row A & B 0Plan of Truss Top Chord Level 0Plan at Truss Bottom Chord Level & Section 0Plan at purlin Level 0Plan of Tripper Gallery Tie Level, Rafter Level & Digram Of wind Girder 0Wall Framing Along Row A and Section 5-5 0Wall Framing Along Row A,B and sections 0
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 0Wall Framing Along Row A,B and sections 0
Plan at +1500Level, Column Elevations Along Axis 1 to 45 & Diagram of roof Truss And BOM
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 0Wall Framing Along Row A,B and sections 0
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 0Wall Framing Along Row A,B and sections 0
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 0Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1
Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1
CLEAN COAL YARD
plan at +1500 level, column elevation along axes 1to 41 & diagram of roof truss & BOM 0
Column elevation along row A & B 0 Plan of truss top chord level 0 Plan at truss bottom chord level & section 0Plan at purlin level 0Plan of tripper gallery tie level, rafter level & diagram of wind girder 0Wall framing along row A’, and section 5-5 0Wall framing along row A, B, and sections 0
Wall framing along row B’, and along axes 2 & 40, louver bracket detail & section 0
Sections, details and table of members 0G.A. and section of rain water drainage 0Section of rain water drainage 0Details and sections 0Typ. Detail & section 0Sections and details 0Detail of Column Mkd. B/4 to B/9,B/12,B/15 to B/29,32,33,34,35,36,21A,21B 1
1
BOM for Column Mkd. B/4 to B/9,B/12,B/15 to B/29,32,33,34,35,36,21A,21B 1Detail of column mkd. A/4 to 9,12,15 to 20,21A,21B,22 to 29,32,35,36 1
1
BOM for column mkd. A/4 to 9,12,15 to 20,21A,21B,22 to 29,32,35,36 1Detail of Column Mkd. B/2,3,13,14,30,31,37,38 0
Detail of Column Mkd. B/2,3,13,14,30,31,37,38 Marking Key Plan of column & BOM 0
BOM fro column Mkd. B/2,3,13,14,30,31,37,38 0Detail of column mkd. B/41 1Detail of column mkd. B/41 & BOM 1GA marking of truss top chord level 1
Detail of Column Mkd. B/4 to B/9,B/12,B/15 to B/29,32,33,34,35,36,21A,21B & Marking Key plan
Detail of column mkd. A/4 to 9,12,15 to 20,21A,21B,22 to 29,32,35,36 & marking Key
Plan
GA marking of truss bottom chord level 1Detail of Roof Truss Mkd. RT-1,1X to RT-9,9X 1Detail of Roof Truss Mkd. RT-1,1X to RT-9,9X 1Detail of Roof Truss Mkd. RT-1,1X to RT-9,9X & BOM 1G.A Marking of wall framing along row A & B 1Detail of side runner ,Laced Side Runner,Sag rod ,on Row A' & B' 1GA marking & detail of Purlin & Laced Purlin 1Detail of Laced Purlin, Sag Rod & BOM 1G.A Marking of wall framing along row A & B 1
1
BOM for side runner ,Laced Side Runner,Louvre Runner,Sag Rod,Louver Bracket 1Detail of tie bracing, Rafter bracing, vertical bracing & B.O.M 2Detail of column mkd. A'/1 to A'/41 & B'/1 to B'/41 1Detail of column mkd. A'/1 to A'/41 & B'/1 to B'/41 & BOM 2G.A of marking plan, elevation & section 1Detail of Box Girder MKD A/BG-1 to A/BG-4 & B/BG-1 to B/BG-4 with B.O.M 1Detail of Box Girder MKD A/BG-5 to A/BG-8 & B/BG-5 to B/BG-8 with B.O.M 1G.A, Marking & Detail of Purlin,LP,Bkt,SR,Tie Beam & TBR 2Detail of purlin, LP,Monitor Truss,Monorail,TB, & B.O.M 2Detail of Wind Girder MKD-WG-1 & WG-1X 1
2
Detail of Walkway Beam mkd. WB-1 to WB-27 & BOM 1Detail of stair case Mkd ST-1 to 4 & CBR-1 to 4 1Detail of Gable Post, Short Post & Column Bracing 1Detail of CHQD plate, walk way beam & B.O.M 1Detail of Tie bracing mkd TBR-8 to 11 & B.O.M 1Detail of Truss Mkd. RT-10,10X & RT-11, 11X 1Detail of Truss Mkd. RT-10,10X & RT-11, 11X & B.O.M 1Detail of column mkd. B/10,11,39,40 1Detail of column mkd. B/10,11,39,40 & Marking Key Plan 1BOM for column mkd. B/10,11,39,41 1Detail of Column Mkd. A/2,3,13,14,30,31,33,34,37,38,40 0
0
BOM for Column Mkd. A/2,3,13,14,30,31,33,34,37,38,40 0Detail of column mkd. A/10,11,39 1Detail of column mkd. A/10,11,39 & marking key plan 1BOM for column mkd. A/10,11,39 1Detail of column mkd. B/1 1Detail of column mkd. B/1 & BOM 1Detail of column mkd. A/1,A/41 1Detail of column mkd. A/1,A/41 & BOM 1Detail of Runner, LR,SR,Louver Bkt & B.O.M 1
Detail of side runner ,Laced Side Runner,Louvre Runner,Sag Rod,Louver Bracket on Row
A & B
Detail of Col. Brcg mkd A/CBR-1 to 3 , B/CBR-1 to 3, A'/CBR-1 to 6 & B'/CBR-1 to 6 & B.O.M
Detail of Column Mkd. A/2,3,13,14,30,31,33,34,37,38,40, Marking Key Plan of Column & BOM
Detail of Column Mkd. C-B'/1,2 & C-A'/1,2 1Detail of Column Mkd. C-B'/1,2 & C-A'/1,3 & B.O.M 1Detail of Colunm Mkd, C-B'/3,3X, C-A'/3,3X, C-1,1X,C-2,2X 1Detail of Colunm Mkd, C-B'/3,3X, C-A'/3,3X, C-1,1X,C-2,2X & B.O.M 1Detail of Column Bracing mkd A/CBR-4 to 7 & B/ CBR-4 to 7 1B.O.M of Column Bracing MkdA/CBR 4 to 7 & B/ CBR-4 to 7 1
MIDDLING COAL SHED
Plan at +1500 level, Column Elevation Along Axis 1 to 45 & Digram of Roof Truss & BOM 0
Column Elevation Along Row A & B 0Plan of Truss Top Chord Level 0Plan of Truss Bottom Chord Level & Section 0Plan at Purlin Level 0Plan of Tripper Gallery Tie level,Rafter level & Diagram of wind girder 0Wall framing along Row A' & section 5-5 0Wall framing along Row A,B & sections 0Wall framing along row B' & Along Axes 1 & 45 Louvre Bracket Detail & Section 0Sections, Details & table of members 0GA and Sections of rain water drainage 0Sections of rain water drainage 0Details and sections 0Typ detail & section 0Sections and detail 0
PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010
STRUCTURAL DRAWINGSTRACK HOPPER SHED
CGP C1/CGP C2
Status of Approval by Mecon
Date of Approval
PACKAGE -2 Drawing Approval Status As On Dt 11.12.2010
STRUCTURAL DRAWINGS
Status of Approval by Mecon
Date of Approval
PACKAGE -6 Drawing Approval Status As On Dt 11.12.2010
PADDLE FEEDERSl No Drawing Description Drawing No Revision
1 GA of paddle feeder 10111120-DWK2 Quality Assurance plan MMIPL-QA-01-20103 Trailing cable size calculation4 Single line diagram5 GA of rail fixing arrangement
67 PCRD cable specification8 CCRD cable specification9 GA of power CRD drawing
10 GA of control CRD drawing11 I/O list for PLC
GA for MCCVVFD GA pannel-for long driveControl schematic for MCCPLC configuration drawingGA of PLC PanelControl schematic for PLC PanelGA of control deskCable schedule( Power & control)List of
Location of junction boxes of paddle Feeders
PADDLE FEEDERApproved statusApproved
Awaiting for approvalAwaiting for approvalFor informationFor informationAwaiting for approval