Top Banner
Mass DEP Waste Site Cleanup Advisory Committee Resolving Vapor Intrusion Challenges via Automated Continuous Real-Time Monitoring Blayne Hartman Ph.D. 858-204-6170 www.hartmaneg.com
35

Mass DEP Waste Site Cleanup Advisory Committee

Nov 26, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Mass DEP Waste Site Cleanup Advisory Committee

Mass DEP

Waste Site Cleanup

Advisory Committee

Resolving Vapor Intrusion Challenges via

Automated Continuous Real-Time Monitoring

Blayne Hartman Ph.D.

858-204-6170

www.hartmaneg.com

Page 2: Mass DEP Waste Site Cleanup Advisory Committee

Presentation Summary

• Brief System Description

• IA Temporal Variation

• Applications of Monitoring

Page 3: Mass DEP Waste Site Cleanup Advisory Committee

The Fundamental Problem with VI

Assessments & Remedies:

You Get: With These:

Page 4: Mass DEP Waste Site Cleanup Advisory Committee
Page 5: Mass DEP Waste Site Cleanup Advisory Committee

R

I

N

N N

E

Category: Song

Page 6: Mass DEP Waste Site Cleanup Advisory Committee

Continuous Monitoring System

Sample Inlets 12” High

Page 7: Mass DEP Waste Site Cleanup Advisory Committee

System Capability

• Fully Quantitative! EPA Method TO-14

• Can Reach Ultra-Low Levels (<1 ug/m3) for

TCE, PCE, Vinyl Chloride & others

• <10 min Analysis Time for TCE & PCE

• Multiple Sample Locations (16 to 30)

• Very Stable - holds calibration for months

• Real-Time Data – Web-Based Dashboard

• Discrete Sampling Mode

Page 8: Mass DEP Waste Site Cleanup Advisory Committee

Data

• Concentrations

• Pressure Differential

• Barometric, Temp., Wind Speed, etc.

• Daily Summary Reports (by e-mail)

• Trigger Relays

• User Friendly Dashboard – VOC Conc vs Time

– Contour/Isopleth Images

– Moving Averages

– Plots in Seconds

Page 9: Mass DEP Waste Site Cleanup Advisory Committee

User Friendly Web-Based Data

Page 10: Mass DEP Waste Site Cleanup Advisory Committee

10

Former Dry Cleaner

PCE

BP

WS

Page 12: Mass DEP Waste Site Cleanup Advisory Committee

Simple Set-Up Logistics

• GC Setup – Small footprint (~2’ x 4’ table required)

– Standard wall power (115v)

– Room with some temperature control

• Sampling Lines – Up to 100m from instrument possible

– Small diameter tubing (1/8” or ¼”)

• O&M – Change nitrogen every 3 to 5 months

• Internet Connectivity – Ethernet cable, site Wifi or cellular modem

Page 13: Mass DEP Waste Site Cleanup Advisory Committee

IA Values Are Not Like This

0

10

20

30

40

50

60

70

80

1 21 41 61 81 101 121 141 161 181 201 221 241 261 281 301 321 341 361 381 401 421 441 461 481 501 521 541 561 581

ug

/m

3

Run #

Office Area (P2)

PCE

Time (min)

Page 14: Mass DEP Waste Site Cleanup Advisory Committee

Print Shop Air - PCE– June 2014

0

10

20

30

40

50

60

70

80

1 21 41 61 81 101 121 141 161 181 201 221 241 261 281 301 321 341 361 381 401 421 441 461 481 501 521 541 561 581

ug

/m3

Run #

Office Area (P2)

PCE

10x-15x

Page 15: Mass DEP Waste Site Cleanup Advisory Committee

Freon 11 - Office Bldg – 10 Days

Page 16: Mass DEP Waste Site Cleanup Advisory Committee

0

50

100

150

200

250

300

350

400

450

500

0 50 100 150 200 250 300 350 400 450

tce

Large Industrial Building

20x to 50x

300 ug/m3

Page 17: Mass DEP Waste Site Cleanup Advisory Committee

Determining Exposures to VOCs

How High?

How Often?

For How Long?

Page 18: Mass DEP Waste Site Cleanup Advisory Committee

0

0.5

1

1.5

2

2.5

3

3.5

4

0 50 100 150 200 250 300 350 400 450 500 550 600

Co

nc

(ug

/m

3)

Run Number

PCE - 420 1st Floor Air

PCE

Monitoring Indoor Air VOCs

12/2012 3/2013 1/2013 2/2013

~24 hours

21 days

Page 19: Mass DEP Waste Site Cleanup Advisory Committee

Finding VOC Entry Points

• Discrete Sample Mode: 40-50 samples/day

• Continuous Mode: 16 locations at a time

19 Minimizes False Negatives

Page 20: Mass DEP Waste Site Cleanup Advisory Committee

Time

ug/m3

0

2

4

6

8

10

12

14

16

18

0 10 20 30 40 50 60 70 80 90 100

Room103IndoorAir- TCE(ug/m3)

Room Closed:17:00

Door Opened

8:00 am

Door Closed

8:20 am

VOC Entry Point Determination

15 hours

Page 21: Mass DEP Waste Site Cleanup Advisory Committee

Determining IA vs VI Source

0

10

20

30

40

50

60

70

80

1 21 41 61 81 101 121 141 161 181 201 221 241 261 281 301 321 341 361 381 401 421 441 461 481 501 521 541 561 581

ug

/m3

Run #

Office Area (P2)

PCE

Page 22: Mass DEP Waste Site Cleanup Advisory Committee

Typical Data After 14 Days

0

10

20

30

40

50

60

70

80

1 21 41 61 81 101 121 141 161 181 201 221 241 261 281 301 321 341 361 381 401 421 441 461 481 501 521 541 561 581

ug

/m3

Run #

Office Area (P2)

PCE

15 ug/m3

Page 23: Mass DEP Waste Site Cleanup Advisory Committee

Determining IA vs VI Source

0

50

100

150

200

250

300

350

400

450

500

0 10 20 30 40 50 60 70 80

TCE

TCE

7:00 am 5:00 pm 5:00 pm

7:00 am

5:00 pm

Page 24: Mass DEP Waste Site Cleanup Advisory Committee

Assessing Effectiveness of Remedies

• Can Try Various Remedies & See Effects

24

Can put VI Issue to Rest in Days

Rather than Months or Years!!

– HVAC modifications

– Fans on/off

– Air filtration units

– Sealing sumps & cracks

–Optimizing vapor recovery systems

Page 25: Mass DEP Waste Site Cleanup Advisory Committee

Proving the Effectiveness of a Remedy

SSD System

Page 26: Mass DEP Waste Site Cleanup Advisory Committee

Remedy Effectiveness Air Filtration Units

0

5

10

15

20

25

30

35

40

0 50 100 150 200 250 300 350

Trailer - 1st Floor

TCE

Filters On Filters Off

2 ug/m3

Page 27: Mass DEP Waste Site Cleanup Advisory Committee

0

2

4

6

8

10

12

14

16

18

20

0 50 100 150 200 250

TCE

-B

ZD 2

4 (u

g/m

3)

Run #

Location BZD24

24 vs 22

Remedy Effectiveness

4 ug/m3

14 ug/m3

2/24/17 3/21/17

Seal Sumps

Page 28: Mass DEP Waste Site Cleanup Advisory Committee

Air filtration units off

0

2

4

6

8

10

12

14

16

18

20

0 100 200 300 400

SSD Off

Remedy Effectiveness Residential SSD

Page 29: Mass DEP Waste Site Cleanup Advisory Committee

Determining Cause & Effect

Correlation with Barometric Pressure Change

Correlation with Differential Pressure

Page 30: Mass DEP Waste Site Cleanup Advisory Committee

30

Determining Cause & Effect

PCE

BP

WS

Page 31: Mass DEP Waste Site Cleanup Advisory Committee

Monitoring Remediation

• Remediation & Mitigation System Monitoring

– Thermal Heating - ERH

– In-Situ GW/Soil Remediation - Peroxide

– Sub-Slab Depressurization Systems

31

Page 32: Mass DEP Waste Site Cleanup Advisory Committee

0

10

20

30

40

50

60

70

80

0 20 40 60 80 100 120 140

Vin

yl c

hlo

rid

e (

ug/

m3

)

Run #

Location EF-1 - Vinyl Chloride

Remediation Monitoring Vinyl Chloride Effluent

73 ug/m3

Energized

Before Energized

3/11/17 3/21/17 2/27/17

Page 33: Mass DEP Waste Site Cleanup Advisory Committee

Summary

• High Resolution Data Gives Pattern

• Pattern = Opportunity

• Opportunity to:

– Differentiate Indoor vs Subsurface Source

– Find VOC entry locations, preferential pathways

– Determine best remedy

– Evaluate effectiveness of mitigation systems

– Evaluate effectiveness of remediation systems

Within Days!

Page 34: Mass DEP Waste Site Cleanup Advisory Committee

The Obvious Questions:

• What Does it Cost? $1000 - $2000/day (~$10/analysis)

10 canisters: $5000

• Do Agencies Accept? EPA Regions 1, 9, 10

MA, CA, NH, IN, AZ, OH, Navy

Upcoming: EPA-R5, NC, USACE

• How do Results Compare to TO-15? No complaints to date

Page 35: Mass DEP Waste Site Cleanup Advisory Committee

Blayne Hartman, Ph.D. [email protected]

0

2

4

6

8

10

12

14

16

18

20

0 100 200 300 400