A New Rule Curve Based Regulation Plan for Lake Superior Masoud Asadzadeh 1 , Saman Razavi 1 , Bryan Tolson 1 David Fay 2 , William Werick 3 , Yin Fan 2 2- Great Lakes - St. Lawrence Regulation Office, Meteorologial Service of Canada, Environment Canada 1- Department of Civil and Environmental Engineering, University of Waterloo 3- Werick Creative Solutions
34

Masoud Asadzadeh 1, Masoud Asadzadeh 1, Saman Razavi 1, Bryan Tolson 1 David Fay 2, William Werick 3, Yin Fan 2 2- Great Lakes - St. Lawrence Regulation.

Dec 24, 2015

Download

Documents

Julian Watkins
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Slide 1
  • Masoud Asadzadeh 1, Masoud Asadzadeh 1, Saman Razavi 1, Bryan Tolson 1 David Fay 2, William Werick 3, Yin Fan 2 2- Great Lakes - St. Lawrence Regulation Office, Meteorologial Service of Canada, Environment Canada 1- Department of Civil and Environmental Engineering, University of Waterloo 3- Werick Creative Solutions
  • Slide 2
  • Outline Introduction Methodology Rule Curve Form System Simulation/Evaluation Optimization Algorithm Results and Discussions Conclusions 2
  • Slide 3
  • 3
  • Slide 4
  • 4 Objectives Develop a rule curve for Lake Superior Outflow Preforms better than the current plan (Plan 1977A) Respect the structural outflow constraints Consider the storage conditions upstream and downstream Parameterize the Lake Superior outflow Optimize the system performance by automatically calibrating the rule curve parameters Utilize the most accurate simulation of the system Consider multiple future climate conditions in the form of NBS
  • Slide 5
  • 5 Beginning of Period Lake Superior Surface Elevation (m) 1 1 1 a 1 b d c ef ExcessShortage a b d c 1 1 g h Beginning of Period Level MH Surface Elevation (m) Excess Shortage 22 2 (seasons) x 11 (a, b, , j, Baseline Flow) = 22 1 1 i j Beginning of Period Level ER Surface Elevation (m) Excess Shortage
  • Slide 6
  • 6 System Simulation/Evaluation CGLRRM, Co-ordinated Great Lakes Regulation and Routing Model (Fortran executable) SP, Shoreline Protection (Microsoft Excel) SVM, Shared Vision Model (Microsoft Excel) Commercial Navigation, Hydropower Generation, and Shoreline Protection benefits/costs relative to Plan 1977A Criteria satisfaction/violations checks
  • Slide 7
  • 7 Criteria (IUGLS) Lake Superior Levels Highest level: 183.86 m Lowest level: 182.76 m Lake Michigan-Huron Levels Highest level: 77A Lowest level: 77A Average 2% high levels: 77A Average 2% low levels: 77A
  • Slide 8
  • 8 Selected NBS Scenarios (from stochastic NBS) The 109-year period Stationary HI Historical From 1900-2008 Historical recorded NBS, adjusted to current demands and diversions. This sequence has as many as 7 consecutive years above, and 7 consecutive years below average NBS. Uncertain Change HM highest Michigan-Huron levels Based on current climate, but highest Michigan-Huron levels, with a great range between wettest and driest years. LM lowest Michigan-Huron levels Based on current climate, but creates the lowest Michigan-Huron levels while still producing a maximum level greater than historical. Includes 14 consecutive years of below average NBS. Change to Drier Period LS lowest Lake Superior level Based on current climate, but produces the lowest Lake Superior level in entire stochastic simulation. Change to Wetter Period HS highest Lake Superior level Current climate, average NBS close to historical NBS, but with the highest Lake Superior level. Its wettest portion comes early in the simulation, as would be expected if recent dry NBS forecast a reversal to wet conditions.
  • Slide 9
  • 9 Modified Criteria Lake Superior Levels Highest level: max(183.86 m, 77A) Lowest level: min(182.76 m, 77A) Lake Michigan-Huron Levels Highest level: 77A Lowest level: 77A Average 2% high levels: 77A Average 2% low levels: 77A
  • Slide 10
  • 10 Problem Formulation Optimize Criteria-Based Objective
  • Slide 11
  • 11 Problem Formulation Optimize Benefit-Based Objective Navigation, Hydropower, Shoreline Protection Sectors
  • Slide 12
  • Expected Solution F G 12 F F: Being Maximized Positive value: Benefits for Commercial Navigation, Hydropower Generation and Shoreline Protection across all 5 NBS scenarios G G: Being Maximized Positive value: No criteria Violation in any of the 6 criteria across all 5 NBS scenarios
  • Slide 13
  • Optimization Algorithm: PA-DDS Perturb current ND solution Update ND solutions Continue? STOP New solution is ND? Pick the New solution Pick a ND solution Initialize starting solutions Y N Create ND-solution set Y N 13
  • Slide 14
  • Simulation-Optimization Components 14 MATLAB: Solution Generation, preliminary Lake Superior Outflow Simulation Runtime < 1 sec/solution CGLRRM: Upper Great Lake Simulation by MATLAB results Runtime ~= 10 sec/solution MS Excel: Shared Vision Model Runtime ~= 20 sec/solution MS Excel: Shoreline Protection Runtime > 200 sec/solution 64-bit Intel Core i7 930 @ 2.80 GHz with 12 GB of Ram
  • Slide 15
  • Model Pre-emption 15 F G 0 Scenario1 simulation Scenario2 simulation Scenario3 simulation Scenario4 simulation Scenario5 simulation Objective Function Calculation
  • Slide 16
  • Pareto Approximate Front Pareto Approximate Front (20,000 solutions eval.) 16 Benefit Selected Solution for further evaluations Raw sum of benefits and costs
  • Slide 17
  • Selected Solution Selected Solution (Validation) 17 Uncertain ChangeStationary Change to Drier Period WS AT LRDSAVT1T2TR Max SUP 77A183.92 183.93 183.75183.81 183.75183.69- UW3183.97 183.91 183.81183.84183.88183.78183.70183.80 Min SUP 77A182.91 182.73 182.92182.71182.52181.86181.81