Market Simulation Presentation Spring 2014 Release Christopher McIntosh Lead Market Simulation Coordinator Spring 2014 Release February 20 th , 2014
Market Simulation Presentation Spring 2014 Release
Christopher McIntosh
Lead Market Simulation Coordinator
Spring 2014 Release
February 20th, 2014
Page 2
Agenda • Spring 2014 Market Simulation Initiatives and Timelines
• Spring 2014 MAP Stage Availability
• FERC 764 with Dynamic Transfers
• RIMPR Phase 1 with Post Emergency BCR
• Revisions to Price Corrections
• Next Steps
• Reference Slides
Spring 2014 Release Market Simulation Initiatives and
Timelines
Page 3
Spring Release Connectivity Testing - February 3rd – February 7th, 2014
FERC Order 764 Compliance with 15 Minute Market and Dynamic
Transfers - February 11th – March 31st, 2014 (Structured and Unstructured)
Post Emergency Filing Bid Cost Recovery (BCR) with Mandatory Multi-
Stage Generations (MSG), Renewable Integration Market and Product
Review (RIMPR) Phase, Bid Cost Recovery (BCR) Mitigation Measures
and Bid Floor Cap - February 11th – March 31st, 2014 (Structured and
Unstructured)
Revisions to Price Corrections - February 17th – March 7th, 2014
(Unstructured)
Spring 2014 Release MAP Stage Availability
Upcoming Scheduled Maintenance - Closing February 21st, 2014 @ 09:00 to
20:00
MAP Stage Spring Release Daily Maintenance Window - 16:00 - 20:00
MAP Stage Weekly Maintenance Window - Friday’s, 09:00 - 20:00
Page 4
FERC 764 with Dynamic Transfers
Simulation
The FERC Order 764 Compliance with 15 Minute Market and Dynamic
Transfers Simulation timeline –
• FERC Order 764 Compliance with 15 Minute Market and Dynamic Transfers:
February 11th - March 31st, 2014 (Structured and Unstructured)
• FERC Order 764 Compliance with 15 Minute Market and Dynamic Transfers:
February 11th – February 27th, 2014 (Structured)
• FERC Order 764 Compliance with 15 Minute Market and Dynamic Transfers:
March 3rd - March 31st, 2014 (Unstructured)
• Structured Scenario Execution Dates Week 1
• Scenario #3 TD 2/11, Scenario #4 TD 2/12 and Scenario’s #1 & #2 TD 2/13
• Structured Scenario Execution Dates Week 2
• Scenario #8 TD 2/18 and Scenario #9 TD 2/19
• Structured Scenario Execution Dates Week 3
• Scenario #6 & #7 TD 2/25 and #5 TD 2/27
Page 5
Scenario #8
Page 6
Scenario Number
FERC ORDER 764 Structured Scenarios
8
Description Intra-Hour High VER Actual compared to forecast - TD 2/18 - 16:45 – 18:15
ISO Actions ISO to modify the VER forecast Intra-hour lower than original forecast.
SC Actions MP’s submit VER bids.
Expected Outcome
RTPD and RTD dispatches to meet and resolve system conditions. In ADS and CMRI view resource awards.
Anticipated Settlement Outcome CC 6470, CC 6460, CC 6475, CC 6455 and CC 701.
Scenario #9
Page 7
Scenario Number
FERC ORDER 764 Structured Scenarios
9
Description Intra-Hour Low VER Actual compared to forecast - TD 2/19 -16:35 – 18:00
ISO Actions ISO to modify the VER forecast Intra-hour higher than original forecast.
SC Actions MP’s submit VER bids.
Expected Outcome
RTPD and RTD dispatches to meet and resolve system conditions. In ADS and CMRI view resource awards.
Anticipated Settlement Outcome CC 6470, CC 6460, CC 6475, CC 6455 and CC 701.
FERC 764 Known Issues
Page 8
# Application Severity (H/M/L) New or Existing Variance
Variance Description Resolution Expectations
1 CMRI L Open In some instances SchedulePrices V1 API response is failing XSD Validation.
ISO is attempting to fix this issues for the schedule maintenance 2/21
2 CMRI L New RetrieveSchedulePrices_v2 API returns an unexpected error when request is submitted for a MarketType='RTM' and ExecutionType='HASP'
ISO is attempting to fix this issues for the schedule maintenance 2/21
3 CMRI H New RTUC Advisory Schedule Report is missing AS
ISO is attempting to fix this issues for the schedule maintenance 2/21
4 SIBR L Delayed MP can retrieve the historical forecast from SC VER but the status is not indicated
Not planned for go live.
5 Settlements M Open LAP LMP is calculated based on FMM LMP, not weighted average of FMM and RTD LMP
ISO is attempting to fix this issues for the schedule maintenance 2/21
FERC 764 Known Issues
Page 9
# Application Severity (H/M/L) New or Existing Variance
Variance Description Resolution Expectations
6 Settlement M New Settlement system is calculating Undelivered Spin Compliance Flag and Undelivered Non-Spin Compliance Flag based upon Capacity and not Dispatch resulting inaccurate No Pay Settlement
This issue will be resolved with the publication of 2/18/14 Daily Initial Market Statements and 2/11/14 Daily Recalculation Statement.
7 Settlements L New Settlement system is calculating is inaccurately calculating the IFM Day Ahead MSS Net Schedule.
This issue will be resolved with the publication of 2/18/14 Daily Initial Market Statements and 2/11/14 Daily Recalculation Statement.
8 Settlements L New Settlement system is calculating the Total FMM price as a negative.
This issue will be resolved with the publication of 2/18/14 Daily Initial Market Statements and 2/11/14 Daily Recalculation Statement.
9 Settlements L New Settlement system is incorrectly calculating the Exceptional Dispatch Meter Adjustment Factor (EDE MEAF)on RTD Exceptional Dispatch Energy only.
This issue will be resolved with the publication of 2/18/14 Daily Initial Market Statements and 2/11/14 Daily Recalculation Statement.
RIMPR Phase 1, Mandatory MSG, Post Emergency
Filing BCR and BCR Mitigation Measures with Bid
Floor Cap Simulation
The RIMPR Phase 1, BCR changes with Bid Floor and Mandatory MSG –
• RIMPR Phase 1, BCR changes with Bid Floor and Mandatory MSG: February 11th
- March 31st, 2014 (Structured and Unstructured)
• Bid Floor Cap Structured Scenario Execution Date Scenario #1 TD 2/20
Page 10
Scenario #1
Page 11
Scenario Number
RIMPR Phase 1 with BCR Mitigation and Bid Floor
1
Description Bid Floor Cap of Negative 150 - TD 2/20
ISO Actions
ISO will manually lower the load forecast ISO to create over generation conditions in ISO control area such that the system price goes down to around negative 150.
SC Actions
MP’s to submit bids on desired resources between the previous bid floor of negative 30 and the negative 150 bid floor. MP’s should also attempt to submit bids below the negative 150 bid floor.
Expected Outcome
Resources dispatched by the real time market, resolving the over generation condition economically. SIBR should not allow MP’s to submit bid segments priced below the negative 150 bid floor. MP’s should observe that dispatches for their resources are consistent with their bid prices.
Anticipated Settlement Outcome
Since the LMP is negative, market participants will see how the negative bid price will work with the negative LMP in the bid cost recovery. CC# - 6620, 6470 and 6460
RIMPR Known Issues
Page 12
# Application Severity
(H/M/L)
New or Existing
Variance
Variance Description Resolution Expectations
1 CMRI L Open
Record Versioning for
Resource Time Ranges is
not correct.
ISO is attempting to fix this
issues for the schedule
maintenance 2/21
2 CMRI L Open
ISO Commitment Cost
Details_V1 version
should be deprecated.
ISO is attempting to fix this
issues for the schedule
maintenance 2/21
3 CMRI L Open Expected Energy
Allocation Details Report
missing RTMarketType
tag
ISO is attempting to fix this
issues for the schedule
maintenance 2/21
Revisions to Price Corrections
The Revisions to Price Corrections Simulation timeline –
• Revisions to Price Corrections: February 17th – March 7th, 2014 (Unstructured)
Page 13
Page 14
Next Steps
• The next teleconference will take place at 13:00 PPT on Monday, February
24th, 2014.
Spring 2014 Release Market Simulation Plan
• http://www.caiso.com/Documents/STAY%20INFORMED/
Release%20planning/Spring%202014%20release/Sprin
g%202014%20release%20-%20plans
Page 16
ISO System Access Documentation
• http://www.caiso.com/Documents/SystemAccessInformat
ion_MarketParticipants.pdf
Page 17
ISO Market Simulation Support
• Hours - 09:00 - 18:00, PST (Monday through Friday)
• Phone - (916) 351-2248
• ISO’s 24X7 Help Desk - (916) 351-2309 (Connectivity, Endpoints)
• Email - [email protected]
Page 18
Market Simulation Issue Management
• Submit all issues to the CIDI case management system.
• CIDI tickets will need to have “Functional Environment = Market
Simulation Spring 2014” to be reviewed by ISO SME’s.
Page 19
Spring 2014 Release Communication Plan
Page 20
Please note ISO has shifted the normally scheduled call from February 17th to
18th, 2014 in observance of Presidents Day.
Date Time
January
February
March
28 – Kick Off Call
1:00 p.m. to 2:30 p.m. (Pacific
Time)
3, 6, 10,13, 18, 20,
24, 27
3, 6, 10, 13, 17, 20,
24, 27
The web conference details are different for each scheduled meeting. Please
refer to the California ISO public calendar at http://www.caiso.com/Pages/Calendar.aspx
for current login information relevant for each meeting.
ISO will host Bi-weekly call on Mondays and Thursdays starting February 3rd,
2014
Web Service Impacts CMRI
Page 21
Report Release Affected API Version Availability as of
spring 2014 release
Expected
Energy
GoLive RetrieveExpectedEnergy_PTR_AP
RetrieveExpectedEnergy_PTR_DocAttach_AP Remain supported
MSG RetrieveExpectedEnergy_PTRv20091101_AP
RetrieveExpectedEnergy_PTRv20091101_DocAttach_AP Remain supported
GMT Fall 2013 RetrieveExpectedEnergy_CMRIv1_AP
RetrieveExpectedEnergy_CMRIv1_DocAttach_AP
To be
decommissioned
Spring 2014 RetrieveExpectedEnergy_CMRIv2_AP
RetrieveExpectedEnergy_CMRIv2_DocAttach_AP
New version will be
supported
Expected
Energy
Allocation
GoLive RetrieveExpectedEnergyAllocationDetails_PTR_AP
RetrieveExpectedEnergyAllocationDetails_PTR_DocAttach_AP Remain supported
MSG RetrieveExpectedEnergyAllocationDetails_PTRv20091101_AP
RetrieveExpectedEnergyAllocationDetails_PTRv20091101_DocAttach_AP Remain supported
GMT
Fall 2013
RetrieveExpectedEnergyAllocationDetails_CMRIv1_AP
RetrieveExpectedEnergyAllocationDetails_CMRIv1_DocAttach_AP
To be
decommissioned
Spring 2014 RetrieveExpectedEnergyAllocationDetails_CMRIv2_AP
RetrieveExpectedEnergyAllocationDetails_CMRIv2_DocAttach_AP
New version will be
supported
ISO
Commitment
Cost Details
GoLive RetrieveISOCommitmentCostDetails_PTR_AP
RetrieveISOCommitmentCostDetails_PTR_DocAttach_AP Remain supported
MSG RetrieveISOCommitmentCostDetails_PTRv20091101_AP
RetrieveISOCommitmentCostDetails_PTRv20091101_DocAttach_AP Remain supported
GMT
Fall 2013
RetrieveISOCommitmentCostDetails_CMRIv1_AP
RetrieveISOCommitmentCostDetails_CMRIv1_DocAttach_AP
To be
decommissioned
Spring 2014 RetrieveISOCommitmentCostDetails_CMRIv2_AP
RetrieveISOCommitmentCostDetails_CMRIv2_DocAttach_AP
New version will be
supported
Market
Schedules Spring 2014
RetrieveMarketSchedules_CMRIv1_AP
RetrieveMarketSchedules_CMRIv1_DocAttach_AP
New version will be
supported
Non-
Dispatchable
Time Ranges
Spring 2014 RetrieveNonDispatchableTimeRanges_CMRIv1_AP
RetrieveNonDispatchableTimeRanges_CMRIv1_DocAttach_AP
New version will be
supported
Market
Forecast Spring 2014
RetrieveMarketForecast_CMRIv1_AP
RetrieveMarketForecast_CMRIv1_DocAttach_AP
New version will be
supported
Web Service Impacts OASIS
Page 22
• Current Transmission Usage TRNS_CURR_USAGE
• Transmission Interface Usage TRNS_USAGE
• Market Available Transfer Capacity TRNS_ATC
• CAISO Demand Forecast SLD_FCST
• Wind and Solar Forecast SLD_REN_FCST
• Locational Marginal Prices - 15 minute
level
PRC_RTPD_LMP (new)
Web Service Impacts
Page 23
Service Operation Version 4
Multi-Stage Generator
Version 5 Contingency Dispatch
Enhancements
Version 6 FERC764
Retrieve/Request getDispatchBatchesSinceUID getBatchStatus getBatchHeader getDispatchBatch isNewTrajData getTrajectoryData submitMSSLFRequest validateDispatchBatch
To be decommissioned upon spring 2014 ADS deployment
Will still be supported New; to be supported upon
spring 2014 ADS deployment
Response acceptInstruction declineInstruction partialAcceptInstruction
To be decommissioned upon spring 2014 ADS deployment
To be decommissioned upon FERC 764 activation
New; to be supported upon spring 2014 ADS deployment