Top Banner
Market Simulation Independent and Fall 2016 Release Phase 2 Trang Deluca Sr. Change and Release Planner Independent and Fall 2016 Release Market Simulation Phase 2 August 29, 2016
29

Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Feb 12, 2018

Download

Documents

dangkhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Market Simulation – Independent and Fall 2016

Release Phase 2

Trang Deluca

Sr. Change and Release Planner

Independent and Fall 2016 Release Market Simulation Phase 2

August 29, 2016

Page 2: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Agenda• Independent and Fall 2016 MAP Stage Availability

• Independent and Fall 2016 MAP Stage Environment Configuration

• Independent and Fall 2016 Market Simulation Initiatives and Timelines

• Independent Initiatives –

• Reliability Services Initiative (RSI) and Capacity Procurement Mechanism Replacement

(CPM) Initiative Phase 2 Simulation Timeline

• Known Issues List – RSI/CPM

• RSI/CPM Scenario Tracking

• Fall 2016 Initiatives –

• OMAR Online Replacement

• Known Issues List – OMAR Online Replacement

• ACL Groups for OMAR (MRI-S) and PIRP (CMRI) replacement

• EIM Year One Phase 2

• Known Issues List - EIM Year One Phase 2

• Bid Cost Recovery and Variable Energy Resources

• Forecasting and Data Transparency

• Frequency Response (BAL-003)

• CMRI Acceptable Use Policy

• Energy Storage and Distributed Energy Resources Phase 1

• Flexible Ramping Product Simulation Timeline

• Known Issues List - Flexible Ramping Product

• Next Steps

• Reference Slides Page 2

Page 3: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

MAP Stage Scheduled Maintenance –

Upcoming Environment Maintenance Outages

• August 29, 2016 - August 30, 2016 – No Outages (OASIS, Market)

• Tuesday, September 6, 2016 – September 7, 2016 (CMRI, SIBR, BSAP)

– Due to Monday, September 5, 2016 holiday

MAP Stage Daily Maintenance Window – Tuesday, Wednesday and Thursday

16:00 - 20:00

MAP Stage Weekly Maintenance Window – Monday 09:00 - Tuesday 09:00

Page 3

Independent and Fall 2016 Releases MAP Stage

Availability

Page 4: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

MAP Stage Load Forecast is NATIVE, and not

STUBBED/CANNED (GROUNDHOG DAY) Load

Forecast

Page 4

Independent and Fall 2016 Releases MAP Stage

Environment Configuration

Page 5: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Independent and Fall 2016 Releases Market Simulation

Phase 1 and 2 Initiatives and Timelines

Page 5

Fall and Independent Release 2016 Initiative Start Date (Trade Date)

End Date (Trade Date

Structured Simulation Start (Trade Date)

Expected Participation

Fall 2016 Release Market Simulation Phase 1

Energy Imbalance Market – APS and PSE7/6/2016 7/29/2016 7/6/2016

Arizona Public Service and Puget Sound Energy

OMAR Replacement 7/7/2016 9/23/2016 EIM Entities and ISO MPs

RSI/CPM Structured Scenario Testing (Independent) 7/19/2016 8/26/2016 7/19/2016 ISO MPs

Fall 2016 Release Market Simulation Phase 2

RSI/CPM Unstructured Testing (Independent) 8/23/2016 9/23/2016 ISO MPs

DRRS Enhancements Phase 2 (Independent) 9/6/2016 9/23/2016 EIM Entities and ISO MPs

Energy Imbalance Market - One Year Enhancements Phase 2 8/23/2016 9/23/2016

Arizona Public Service, NV Energy, PacifiCorp and Puget

Sound Energy

BCR/VER 8/23/2016 9/23/2016 EIM Entities and ISO MPs

Frequency Response (BAL-003) 8/23/2016 9/23/2016 ISO MPsCMRI AUP 8/23/2016 9/23/2016 EIM Entities and ISO MPs

ESDER 8/23/2016 9/23/2016 EIM Entities and ISO MPs

Flexible Ramping Product 8/23/2016 9/23/2016 8/29/2016 EIM Entities and ISO MPs

Forecasting and Data Transparency/PIRP Application Decommissioning 8/23/2016 9/23/2016

EIM Entities and ISO MPs

Page 6: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Reliability Services Initiative (RSI) and Capacity Procurement

Mechanism Replacement (CPM) Phase 2 SimulationThe RSI/CPM Initiatives Phase 2 Market Simulation Structured/Unstructured

timeline –

• RSI/CPM Market Simulation – July 18, 2016 - September 23, 2016

Structured Simulation Execution Timeline –

• Week 1/2 Scenarios (1B, 2B, 3B and 4B) – July 19, 2016 - July 21, 2016

• Week 3 Scenarios (6B,7B an 8B) – August 23, 2016 - August 25, 2016, for Trade Dates August 24,

2016 and August 25, 2016

CIRA API MOO Flag Timeline –

• API Unstructured Testing – August 22, 2016 - September 23, 2016

Updated Configuration file - http://www.caiso.com/Pages/documentsbygroup.aspx?GroupID=65F174E1-4AAB-4FE8-

9577-8A5EB1A02660

Structured Scenarios Document - http://www.caiso.com/Documents/2015-2016_ReliabilityServices-

CapacityProcurementMechanismReplacementMarketSimulationPlan.xls

Page 6

Page 7: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

RSI and CPM Known Issues Open -

Page 7

# System Summary Status Estimated Fix Date

1 CIRA CIDI 183204 - MKT SIM Jul16 Obligation Reports Peak Demand Showing Not

Reflecting Subset of Days Resource

Open TBD

2 CIRA CIDI 182997 - CIRA RA report for the month of July in MAP stage, there are no

values

Open Temporary workaround

in place - Final solution

TBD

3 OMS OMS is not auto populating end on end of the month if user choose nature of work

as "monthly use limit reached"

Open TBD

4 OMS CIDI 180692 - OMS is not auto populating end on end of the year if user choose

nature of work as "annual use limit reached"

Open TBD

5 CIRA Sorting on 'View Bilateral Trades' screen does not work Open TBD

6 CIRA CIRA Annual CSP offer set shows Resources without NQC or EFC Postponed Road Map Item

7 CIRA CIRA shows double warning message when LSE claims more MW in their RA

plan

Open TBD

8 CIRA CIRA Reset option for Supply Plan Upload is not working Open TBD

9 Settlements CIDI 183538 - Resources receiving DA Regulation Up Awards must self schedule

in RT, impacting RT Flex Availability

Resolved 8/24/2016

10 Settlements CIDI 183796 – Adjust Flex and Flex CPM bid obligation quantities to forecast Resolved 8/24/2016

Page 8: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

RSI/CPM Market Simulation Scenario Tracking

Page 8

Time Period Description Progress

Week 1/2 -1B, 2B, 3B, 4B

1.MAP Stage applications and overall environment stable functioning properly and accessible to MPs Monday 7/18 AM.

1.Complete

2.No showstopper known issues for week 1 and 2 scenarios. 2.Complete

3.Structured Scenarios 1B – 4B must be fully executed and successful bid to market output.

3.Complete

Scenario 5B

1.MAP Stage applications and overall environment stable functioning properly and accessible to MPs Monday 4/26 AM.

1.Complete

2.No showstopper known issues for week scenarios 5B. 2.Complete

3.Receive complete TD 4/28 settlement statements for Scenarios 5B. 3.Complete

Week 3 – 6B, 7B, 8B

1.MAP Stage applications and overall environment stable functioning properly and accessible to MPs Tuesday the week of scenario execution, 8/24.

1. Complete

2.No showstopper known issues for week 3 scenarios. 2. Complete

3.Receive complete settlement statements for Scenarios 1B – 4B.3. In Progress,

Statements 8/31

4.Structured Scenarios 6B – 8B must be fully executed and successful bid to market output.

4. Complete;

Settlements in

Progress,

Statements 9/2

Page 9: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

OMAR Online Replacement Simulation

The OMAR Online Replacement Market Simulation timeline –

• July 7, 2016 - September 23, 2016 Unstructured

• MRI-S for metering API - available July 7, 2016

• MRI-S for metering GUI - available August 11, 2016

No historical data will be migrated in MAP Stage, all data must be uploaded to

be retrieved.

ISO to hold a CPG soon to address MPs MRI-S design questions.

• OMAR Online Replacement initiative Tech Spec –

http://www.caiso.com/Documents/OMAROnlineReplacementTechnicalSpeci

ficationClean_v16.pdf

Page 9

Page 10: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

OMAR Replacement Known Issues Open -

Page 10

* ACL group creation to filter for a read only role at the resource level is not

currently available

# System Summary Status Estimated Fix Date

1 MRI-S CIDI 183396 - In specific instances MPs are unable to

retrieve batch validation status from OMAR replacement

API

Open TBD

2 MRI-S CIDI 183777 - MRI-S for Metering Limitation of 100,000

records.

Open

3 MRI-S CIDI 183693 - Allow LOAD measurement type for all

generator resources

Open TBD

4 MRI-S CIDI 183973 - Validation to not allow meter data

submission for ISO polled resources is currently not in

place

Open TBD

5 MRI-S UOM is missng on the UI Open TBD

6 MRI-S CIDI 184018 - Time zone is missing on the UI On Hold

7 MRI-S CIDI 183777, 183993 - Modification to AUP policy on

data retrieval to include querying by last updated time

On Hold TBD

8 MRI-S CIDI 183996, 184026 - Ability to query for more than one

trade date on the UI

Open TBD

9 MRI-S CIDI 183818 - Unable to submit Gen/Load data for

Pumped Storage Unit

Open TBD

Page 11: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

ACL Groups for OMAR (MRI-S) and PIRP (CMRI)

Replacement

ACL (Access Control List) functionality –

• Ability to use ACL groups for the read only role for both the OMAR (MRI-S)

and PIRP (CMRI) is currently unavailable

• Work around is to continue to use existing OMAR and PIRP applications for

read only roles filtered at the resource level

• Target is to have this functionality available in the Fall Release

• Adequate time for testing the new read only roles in the Map-Stage

environment will be made available, including post 10/1

Page 11

Page 12: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

OMAR Use Cases

ISO Polled Meter data

• Ability to use the new MRI-S application to view meter data for all resources

mapped to a specific SCID

• All meter data will be available to view in OMAR with the existing read only

roles

• Work around is to continue to use existing OMAR application until the read

only MRI-S role is available

SC Submitted Meter data

• Ability to use the new MRI-S application to submit Meter data via the new

MRI-S application

• Meter data submitted via MRI-S WILL NOT BE VIEWABLE USING THE

EXISTING OMAR APPLICATION

• Work around is to continue to use existing OMAR application until the read

only MRI-S role is available

Page 12

Page 13: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

PIRP Use Cases

• Ability to use the new CMRI application to view data for all resources

mapped to a specific SCID is available

• Ability to view a subset of resources mapped to a specific SClD is not

available

• Work around is to continue to use PIRP until the ACL CMRI role is available

Page 13

Page 14: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

EIM Year One Enhancements Phase 2 Simulation

The EIMY1P2 Market Simulation Timeline –

• EIMY1P2 Market Simulation – August 23, 2016 - September 23, 2016

Unstructured Simulation Unstructured Execution Timeline -

• Unstructured Testing Support – August 23, 2016 - September 23, 2016

Page 14

Page 15: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

EIM Year One Enhancements Phase 2 Known Issues

List

Page 15

# System Summary Status Estimated Fix Date

1 Market Solution There are still cases in which the congestion components do not add up to the total congestion. Impact is that, the congestion allocation for those resources would not be accurate.

Open 8/30/16

Page 16: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Bid Cost Recovery and Variable Energy Resources

Simulation

The BCR/VER Market Simulation Timeline –

• BCR/VER Market Simulation – August 23, 2016 - September 23, 2016

Unstructured Simulation Unstructured Execution Timeline -

• Unstructured Testing Support – August 23, 2016 - September 23, 2016

Page 16

Page 17: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Forecasting and Data Transparency Simulation

The FDT Market Simulation Timeline –

• FDT Market Simulation – August 23, 2016 - September 23, 2016

Unstructured Simulation Unstructured Execution Timeline -

• Unstructured Testing Support – August 23, 2016 - September 23, 2016

Page 17

Page 18: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Forecasting and Data Transparency Simulation Known

Issues List

Page 18

# System Summary Status Estimated Fix Date

1 CMRI CIDI 184122 – No DA forecast data for 8/19-8/24 PIRP forecasts in CMRI Resolved 8/29/16

2 CMRI CIDI 184122 – Sporadic/limited data for 8/19-8/24 PIRP forecasts in CMRI Open TBD

Page 19: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Frequency Response Simulation

The BAL-003 Market Simulation Timeline –

• BAL-003 Market Simulation – August 23, 2016 - September 23, 2016

Unstructured Simulation Unstructured Execution Timeline -

• Unstructured Testing Support – August 23, 2016 - September 23, 2016

– Settlement statements and Invoices for Transferred Frequency Response (CC 7597) are

available in MRI-S in Map Stage

– In MRI-S, participants can find them by selecting TFR Initial, TFR Recalc, or TFR Invoice

under the “Run Type” dropdown.

Page 19

Page 20: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

CMRI Acceptable Use Policy Simulation

The CMRI AUP Market Simulation Timeline –

• CMRI AUP Market Simulation – August 23, 2016 - September 23, 2016

Unstructured Simulation Unstructured Execution Timeline -

• Unstructured Testing Support – August 23, 2016 - September 23, 2016

Page 20

Page 21: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Energy Storage and Distributed Energy Resources

Phase 1 Simulation

The ESDER Phase 1 Market Simulation Timeline –

• ESDER Phase 1 Market Simulation – August 23, 2016 - September 23, 2016

Unstructured Simulation Unstructured Execution Timeline -

• Unstructured Testing Support – August 23, 2016 - September 23, 2016

Page 21

Page 22: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Flexible Ramping Product Simulation

The FRP Market Simulation Structured/Unstructured Timeline –

• FRP Market Simulation – August 23, 2016 - September 23, 2016

Unstructured Simulation Execution Timeline -

• Unstructured Testing Support – August 23, 2016 - September 23, 2016

Structured Simulation Execution Timeline –

• Structured Testing Support – August 29, 2016 - September 2, 2016

– Scenarios 1, 2 – Trade Date August 31, 2016

– Scenarios 3, 4 – Trade Date September 1, 2016

Structured Scenarios Document -

http://www.caiso.com/Documents/FlexibleRampingProductStructuredScenarios10.pdf

Page 22

Page 23: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Flexible Ramping Product Simulation Known Issues List

Page 23

# System Summary Status Estimated Fix Date

1 ADS ADS Commitments are not being displayed, start up, shut down, transitions, etc. Open 8/30/16

2 OASIS CIDI - 184123 OASIS:FRP: New OASIS API's are giving invalid request. Resolved 8/25/16

3 CMRI CIDI 184145 – Incorrect formats on XML when trying to get SchedulePrices returned through RequestSchedulePrices_v4

Open TBD

Page 24: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Next Steps

• The next teleconference will take place @ 14:00 PPT on

Thursday September 1, 2016

Page 24

Page 25: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Page 25

Reference Slides

Page 26: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

ISO Market Simulation Support

• Hours - 09:00 - 18:00, PPT (Monday through Friday)

• ISO’s 24X7 Help Desk - (916) 351-2309 (Connectivity - GUI or API)

• Email - [email protected]

Page 26

Page 27: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Market Simulation Issue Management

• Submit all issues to the ISO CIDI case management system

• CIDI tickets will need to have “Functional Environment = Market

Simulation Fall 2016” to be reviewed by ISO SME’s

Page 27

Page 28: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

Early Release 2016 Tech Specs - CIRA

• CIRA Interface Specification v2.0 (Early 2016 Release)

http://www.caiso.com/Documents/CIRAInterfaceSpecification_Early2016Release.

pdf

• Retrieve Resource Adequacy Capacity Data v1 (Early 2016 Release)

http://www.caiso.com/Documents/RetrieveResourceAdequacyCapacityData_Earl

y2016Release.zip

Page 28

The ISO published the following technical documentation for the CIRA system, which

introduces application programming interface (API) services.

The documentation is available on the ISO website at:

Page 29: Market Simulation Independent and Fall 2016 Release · PDF fileMarket Simulation –Independent and Fall 2016 Release Phase 2 ... (RSI) and Capacity ... MAP Stage Load Forecast is

ISO System Access Documentation

• http://www.caiso.com/Documents/SystemAccessInformat

ion_MarketParticipants.pdf

Page 29