MARKET RATES SYSTEM (MRS) 1 st BI-ANNUAL-2018 (1 ST January TO 30 th June) GOVERNMENT OF THE PUNJAB FINANCE DEPARTMENT Prepared & Compiled by Haroon Tahir [email protected]
164

MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

May 12, 2018

Download

Documents

vucong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

MARKET RATES SYSTEM (MRS)

1st BI-ANNUAL-2018

(1ST January TO 30th June)

GOVERNMENT OF THE PUNJAB

FINANCE DEPARTMENT

Prepared & Compiled by Haroon Tahir

[email protected]

Page 2: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

TABLE OF CONTENTS S.No. Chapter Page Nos

01. Carriage 3 to 23 02. Loading, Unloading & Stacking 24 to 26 03. Earthwork (Excavation & Embankment) 27 to 33 04. Dismantling (Demolition) 34 to 38 05. Mortar. 39 to 40 06. Concrete 41 to 50 07. Brickwork 51 to 56 08. Stone Masonry 57 to 59 09. Roofing 60 to 65 10. Flooring. 66 to 70 11. Surface Rendering 71 to 74 12. Wood Work 75 to 84 13. Painting & Varnishing. 85 to 90 14. Lining of Canals 91 to 92 15. Sheet Piling 93 to 94 16. Protection & Diversion Work 95 to 104 17. Outlets 105 to 106 18. Road & Road Structure 107 to 111 19. Plumbing, Sanitary Installation & Gas Fittings 112 to 117 20. Surface Drainage. 118 to 119 21. Sewerage 120 to 124 22. Sinking of Wells 125 to 127 23. Tubewell & Water Supply 128 to 140 24. Electric Installation 141 to 153 25. Iron Work 154 to 160 26. Miscellaneous 161 to 164

Page 3: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 3

1. CARRIAGENote: 1 The rates are applicable to carriage of material on pacca roads only.

For kacha roads an allowance of 25% extra shall be allowed for 2nd and subsequent mileage (Km) rates. Rateupto 1st mile (1st Km) is however common to both kacha and pacca roads.

Note: 2 For hilly areas 80% above the rates in the plain areas shall be allowed for total mileage (Km) covered.

Note: 3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:-

i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the rate given in the Composite Schedule of Rates.

ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the Composite Schedule of Rates.

The length measured shall not be the actual length, but the length of the form of consignment as actuallyreceived.

Note: 4 The term 'mile' (Km) whenever used is to mean statute mile (Km).

Note: 5 The rates include loading and unloading of material from the conveyance and stacking as directed.

Note: 6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on land.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite1 Carriage of 100 Cft. (2.83 cu.m) of all materials like stone 16.1

aggregate, spawl, kankar lime (unslaked), surkhi, etc. or150 Cft. (4.25 cu.m) of timber, by truck or by any othermeans owned by the contractor.

1st chain (1st 30 m) Chain 181.90 30M 181.902nd chain (2nd 30 m) " 33.50 30M 33.503rd to 10th chain (60 to 300 m) " 20.85 30M 20.851000 to 3000 ft. (300 to 900 m) 1000 ft. 204.25 300 M 204.25 1st Km Km 188.552nd Km Km 87.253rd Km Km 65.054th Km Km 43.955th Km Km 40.456th Km Km 39.657th Km Km 36.458th Km Km 35.959th Km Km 33.4010th Km Km 30.7011th Kms to 200Kms Km 22.85201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

2 Carriage of 5 tons of all material like coal, stone lime 16.1 Cement carried in containers other

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

Add 20% extra for the item"Recouping of Reserve Stock of stonefor Flood Protection Work inIrrigation Department".

Page 4: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 4

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

(unslaked), etc. B.G. Rail fastenings, points and crossing, than bags will be paid according toBridge Girders, pipes, sheets, Rail, M.S. bars, etc. etc. this item. The word "pipes" coversby truck or any other means owned by the contractor. G.I,C.I,R.C.C. and P.C.C.

1st chain (1st 30 m) Chain 181.90 30M 181.902nd chain (2nd 30 m) " 33.50 30M 33.503rd to 10th chain (60 to 300 m) " 20.85 30M 20.851000 to 3000 ft. (300 to 900 m) 1000 Ft. 204.25 300M 204.251st Km Km 188.552nd Km Km 87.253rd Km Km 65.054th Km Km 43.951st mile Mile 303.455th Km Km 40.452nd mile " 70.256th Km Km 39.653rd mile Mile 63.157th Km Km 36.454th mile " 57.008th Km Km 35.955th mile 52.259th Km Km 33.406th mile 48.2010th Km Km 30.701 " 30.0011th Kms to 200Kms Km 22.85201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

3 Carriage of 100 maunds of fuel wood by truck 16.1or any other means owned by the contractor:

1st chain (1st 30 m) Chain 181.90 30 M 181.902nd chain (2nd 30 m) " 33.50 30 M 33.503rd to 10th chain (60 to 300 m) " 20.85 30 M 20.851000 to 3000 ft. (300 to 900 m) 1000 ft 204.25 300 M 204.251st Km Km 188.552nd Km Km 87.253rd Km Km 65.054th Km Km 43.951st mile Mile 303.455th Km Km 40.452nd mile " 70.256th Km Km 39.653rd mile " 63.157th Km Km 36.454th mile " 57.008th Km Km 35.955th mile " 52.259th Km Km 33.406th mile " 48.2010th Km Km 30.70

Page 5: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 5

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

7th mile and subsequent miles " 30.0011th & subsequent Kms Km 22.85

4 Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm) ditto Reduce the rate by 33% in case ofor 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or carriage of 1000 Nos. tiles sizeany other means owned by the contractor :- 12"x6"x1¼" (300 x 150 x 30 mm).

1st chain (1st 30 m) Chain 181.90 30 M 181.902nd chain (2nd 30 m) " 33.50 30 M 33.503rd to 10th chain (60 to 300 m) " 20.85 30 M 20.851000 to 3000 ft. (300 to 900 m) 1000 Ft 204.25 300 M 204.251st Km Km 188.552nd Km Km 87.253rd Km Km 65.054th Km Km 43.951st mile Mile 303.455th Km Km 40.452nd mile " 70.256th Km Km 39.653rd mile " 63.157th Km Km 36.454th mile " 57.008th Km Km 35.955th mile " 52.259th Km Km 33.406th mile " 48.2010th Km Km 30.707th mile and subsequent miles " 30.0011th & subsequent Kms Km 22.85

5 Carriage of 100 cft. (2.83 cu.m) of all material like stone, 16.1 Material trolly to be supplied by theaggregate, spawl, kankar lime(unslaked), surkhi, etc. or Government and maintained and run150 cft. (4.25 cu.m) of timber, by means of material trolly. by the contractor.

1st chain (1st 30 m) Chain 181.90 30 M 181.902nd chain to 10th chain (2nd 30 m to 300 m) " 33.50 30 M 33.501000 to 3000 ft. (300 to 900 m) 1000 Ft. 204.25 300 M 204.251st Km Km 154.652nd Km Km 115.653rd Km Km 59.254th Km Km 45.251st mile Mile 248.855th Km Km 39.452nd mile 84.306th Km Km 37.853rd mile 71.357th Km Km 31.60 8th Km Km 31.20 9th Km Km 28.956th mile 48.2010th Km Km 26.657th mile and subsequent miles 30.0011th Kms to 200Kms Km 21.50201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

6 Carriage of 5 tons of all material like coal, stone lime 16.1 Material trolly to be supplied by the

Page 6: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 6

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

(unslaked), etc. B.G. Rail fastening, points and crossing, Government and maintained and runBridge girders, pipes, sheets, Rail, M.S. bars, etc. etc. by by the contractor.means of material trolly.

1st chain (1st 30 m) Chain 181.90 30 M 181.902nd chain (2nd 30 m) " 33.50 30 M 33.501000 to 3000 ft. (300 to 900 m) 0/00 Ft. 204.25 300 M 204.251st Km Km 154.652nd Km Km 115.653rd Km Km 59.254th Km Km 45.25 5th Km Km 39.45 6th Km Km 37.853rd mile and subsequent miles 71.357th Km Km 31.604th mile 57.008th Km Km 31.20 9th Km Km 28.95 10th Km Km 26.65 q 11th Kms to 200Kms Km 21.50201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

7 Carriage of 100 maunds of fuel wood, by means of ditto Material trolly to be suppliedmaterial trolly. by the Government and

1st chain (1st 30 m) Chain 181.90 30 M 181.90 maintained and run by the2nd chain (2nd 30 m) " 33.5 30 M 33.50 contractor.1000 to 3000 ft. (300 to 900 m) 1000 Ft 204.25 300 M 204.251st Km Km 154.652nd Km Km 115.653rd Km Km 59.254th Km Km 45.251st mile Mile 248.855th Km Km 39.452nd mile " 84.306th Km Km 37.853rd mile subsequent miles " 71.357th Km Km 31.604th mile 57.008th Km Km 31.205th mile 52.259th Km Km 28.956th mile 48.2010th Km Km 26.657th mile and subsequent miles 30.0011th & subsequent Kms Km 21.50

8 Carriage of 1000 Nos. tiles 12"x6"x2" (300x150x50 mm), ditto Material trolly to be supplied by theby means of material trolly. Government and maintained and run

1st chain (1st 30 m) Chain 181.90 30 M 181.90 by the contractor.2nd chain (2nd 30 m) " 33.50 30 M 33.501000 to 3000 ft. (300 to 900 m) 0/00 Ft. 204.25 300 M 204.251st Km Km 154.652nd Km Km 115.65 16.1

Page 7: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 7

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

3rd Km Km 59.254th Km Km 45.251st mile Mile 248.855th Km Km 39.452nd mile " 84.306th Km Km 37.853rd mile subsequent miles " 71.357th Km Km 31.604th mile 57.008th. Km 31.205th mile 52.259th Km Km 28.956th mile 48.2010th Km Km 26.657th mile and subsequent miles 30.0011th & subsequent Kms Km 21.50

9 Carriage of 1000 No. bricks, 9"x4½"x3" ditto(225x113x75 mm) or 8"x4"x4" (200x100x100mm) (nominal)

1st chain (1st 30 m) Chain 149.04 30 M 149.042nd chain (2nd 30 m) " 32.05 30 M 32.053rd to 10th chain (60 to 300 m) " 17.11 30 M 17.111000 to 3000 ft. (300 to 900 m) 0/00 Ft. 167.22 300 M 167.221st Km Km 154.552nd Km Km 71.353rd Km Km 53.304th Km Km 36.251st mile Mile 248.755th Km Km 34.102nd mile " 57.556th Km Km 33.253rd mile " 53.407th Km Km 29.854th mile " 46.758th Km Km 29.505th mile " 42.809th Km Km 27.356th mile " 39.5010th Km Km 25.157th mile and subsequent miles " 24.6011th & subsequent Kms Km 18.65

10 Carriage of 1000 No. tiles 9"x4½"x1½" 16.1(225x113x38 mm).

1st chain (1st 30 m) Chain 89.95 30 M 89.952nd chain (2nd 30 m) " 16.55 30 M 16.55 16.13rd to 10th chain (60 to 300 m) " 10.23 30 M 10.231000 to 3000 ft. (300 to 900 m) 0/00 Ft. 101.02 300 M 101.021st Km Km 93.302nd Km Km 43.20

Page 8: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 8

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

3rd Km Km 32.204th Km Km 21.751st mile Mile 150.155th Km Km 19.852nd mile " 34.806th Km Km 19.503rd mile " 31.007th Km Km 18.004th mile " 28.208th Km Km 17.805th mile " 25.859th Km Km 16.506th mile " 23.8510th Km Km 15.257th mile and subsequent miles " 14.8011th & subsequent Kms Km 11.30

11 Carriage of 1 Cwt. (50 Kg) cement in bags. ditto

1st chain (1st 30 m) Chain 3.43 30 M 3.432nd chain (2nd 30 m) " 0.41 30 M 0.413rd to 10th chain (60 to 300 m) " 0.20 30 M 0.20

1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 2.01 300 M 2.01

1st Km Km 2.351st mile Mile 3.752nd Km Km 1.552nd mile " 1.103rd Km Km 0.653rd mile subsequent miles " 0.554th Km and subsequent kilometers. Km 0.40

12 Carriage of 100 Nos. empty cement bags including 16.1bundling.

1st 1000 (300 m) ft. 0/00 Ft. 50.11 300 M 50.111000 to 3000 (300 to 900 m) ft. " 6.24 300 M 6.24

1st Km Km 5.701st mile Mile 9.152nd Km Km 5.152nd mile to 6th mile Mile 1.953rd Km Km 2.357th mile and subsequent miles " 3.654th Km & subsequent Kms Km 2.00

13 Carriage of 100 (2.83 cu.m) cft. of Sarkanda or pilchi, frash ditto Previous lead of collection notor brushwood, by boat or road :- to be deducted from the next

lead of carriage.

1st chain (1st 30 m) Chain 74.42 30 M 74.422nd chain (2nd 30 m) " 33.50 30 M 33.50

Page 9: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 9

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

3rd to 10th chain (60 to 300 m) " 10.23 30 M 10.23

1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 83.91 300 M 83.91

1st Km Km 87.301st mile Mile 133.502nd Km Km 43.202nd mile " 98.203rd Km Km 32.203rd mile " 82.054th Km Km 21.754th mile " 59.905th Km Km 19.855th mile " 49.606th Km Km 19.506th mile 39.507th Km Km 18.007th mile and subsequent miles 24.608th Km Km 17.809th Km Km 16.5010th Km Km 15.2511th Km & subsequent Km 11.30

14 Carriage of light machinery weighing upto 3 tonne Ton Tonne dittoupto 1000 ft. (300 metre) 0/00 ft. 607.11 300 M 607.11Exceeding 1000 to 5000 ft (300 to 1500metre) 1000 ft. 147.10 " 147.10

1st Km Km 185.501st mile Mile 298.552nd Km Km 85.352nd mile " 55.503rd Km Km 56.653rd mile " 52.454th Km Km 35.604th mile " 41.955th Km Km 33.455th mile " 42.506th Km Km 32.056th mile " 32.757th Km Km 27.507th mile and subsequent miles " 23.458th Km Km 27.109th Km Km 26.3010th Km Km 20.6511th Km & susequent Km 17.00

15 Carriage of small consignments weighing upto 5 maunds 16.1 For consignment weighing 5 to 10

Page 10: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 10

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

(job rates) : maunds, rate be increased by 25%;and for consignments weighing 10

Consig- to 20 maunds, rate be increased byUpto 1000 ft. (300 metre) ment/ 49.30 Consign- 49.30 100%.

1000 ft. ment/Exceeding 1000 to 3000 ft. (300 to 900 1000 ft. 33.81 300 M 33.81metre)

1st Km Consign- 29.051st mile Consign- 46.75 ment/ Km2nd Km ment/Mile 17.902nd mile and subsequent miles " 8.60 "3rd Km & subsequent " 5.70

16 Carriage of consignments job.

i) Cooly load for distance:- Each Each

a) Upto 5 Km Consignment 58.15 Consignmen 58.15b) Above 5 to 13 Km " 124.30 " 124.30

ii) Carriage of consignments odd jobs. Each Each a) Donkey load for distance upto 500 feet. Consignment 10.85 Consignmen 10.85b) Upto 1000 feet. " 16.45 " 16.45c) Upto ½ Mile/ 0.8 Km " 20.80 " 20.80d) Upto one Mile/ 1.6 Km " 26.00 " 26.00e) Upto three Miles/ 4.8 Km " 45.95 " 45.95f) Exceeding 3 Miles/ 16 km " 82.25 " 82.25

Each Eachiii) Cart load for a distance :- Consign- Consig-

ment nment a) upto 4 Miles/ 6.4 Km " 89.85 " 89.85b) Exceeding 4 Miles(6.4 Km) to10 Miles(16 Km) " 163.55 " 163.55

iv) Camel load for a distance:-

a) upto 4 Miles/ 6.4 Km.) " 66.45 " 66.45b) exceeding 4 to 12 mills (6.4 Km to 19.2 Km) " 100.75 " 100.75

17 Hire charges of:- 1. This item will be allowed withprior concurrence of Superintending

i) truck (10 Ton Capacity) Per 3000.00 Per 3000.00 Engineer.day day 2. The rate includes pay of driver

ii) tractor with trolly " 5456.00 " 1000.00 and cleaner only. The repairs shallbe the responsibility of the owner

iii) tractor without trolly " 5456.00 " 800.00 and the cost of lubrication, fuel,loading and unloading shall be paid

Page 11: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 11

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

by the borrower.

18 Carriage of bitumen, tar or other lubricants, in drums: 16.10 Kilometer to 100 Kilometers P.Ton 1255.950 Kilometer to 200 Kilometers P.Ton 1650.850 Kilometer to 250 Kilometers Per 49.80 P.Ton 1920.85251 to susequent Kilometers Ton P.Ton 8.102nd mile " 8.20

"3rd mile 13.10

19 Carriage of Asbestos cement pipes BSS Class 'B" withcomet joint and rubber ring, including loading, unloadingand stacking (rate per 100 Rft. (30 m pipes):-

i) 3" (75 mm) i/d pipes:-1st chain (1st 30 m) Chain 7.20 30 M 7.202nd chain (2nd 30 m) " 1.30 30 M 1.303rd to 10th chain (60 to 300 m) " 0.80 30 M 0.801000 to 3000 ft. (300 to 900 m) 0/00 Ft. 8.05 300 M 8.051st Km Km 7.452nd Km Km 3.453rd Km Km 2.551st mile Mile 12.004th Km Km 1.702nd mile " 2.755th Km Km 1.603rd mile " 2.506th Km Km 1.504th mile " 2.257th Km Km 1.405th mile " 2.058th Km Km 1.356th mile " 1.909th Km Km 1.307th mile and subsequent miles " 1.2010th Km Km 1.20

11th Km & Susequent Km 1.15

ii) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 9.40 30 M 9.402nd chain (2nd 30 m) " 1.75 30 M 1.753rd to 10th chain (60 to 300 m) " 1.10 30 M 1.10

1000 to 9000 ft. (300 to 900 m) 0/00 Ft. 10.55 300 M 10.55

1st Km Km 9.75

Page 12: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 12

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

1st mile Mile 15.702nd Km Km 4.502nd mile " 3.653rd Km Km 3.353rd mile " 3.254th Km Km 2.254th mile " 2.955th Km Km 2.055th mile " 2.706th Km Km 1.956th mile " 2.507th Km Km 1.857th mile and subsequent miles " 1.558th Km Km 1.809th Km Km 1.7010th Km Km 1.5511th Km & subsequent Km Km 1.50

iii) 6" (150 mm) i/d pipes:-

1st chain (1st 30 m) Chain 14.10 30 M 14.102nd chain (2nd 30 m) " 2.60 30 M 2.603rd to 10th chain (60 to 300 m) " 1.60 30 M 1.601000 to 9000 ft. (300 to 900 m) 0/00 Ft. 15.85 300 M 15.851st Km Km 14.652nd Km Km 6.753rd Km Km 5.051st mile Mile 23.554th Km Km 3.402nd mile " 5.455th Km Km 3.103rd mile " 4.906th Km Km 3.054th mile " 4.407th Km Km 2.805th mile " 4.058th Km Km 2.706th mile " 3.759th Km Km 2.557th mile and subsequent miles " 2.3510th Km Km 2.3511th Km & subsequent Km Km 2.00

iv) 8" (200 mm) i/d pipes:

1st chain (1st 30 m) Chain 23.85 30 M 23.852nd chain (2nd 30 m) " 4.40 30 M 4.403rd to 10th chain (60 to 300 m) " 2.75 30 M 2.751000 to 3000 ft. (300 to 900 m) 0/00 Ft. 26.80 300 M 26.801st Km Km 24.752nd Km Km 11.75

Page 13: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 13

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

3rd Km Km 8.651st mile Mile 39.804th Km Km 5.802nd mile " 9.205th Km Km 5.353rd mile " 8.306th Km Km 5.254th mile " 7.507th Km Km 4.855th mile " 6.858th Km Km 4.656th mile " 6.359th Km Km 4.157th mile and subsequent miles " 3.9510th Km Km 2.4511th Km & subsequent Km Km 1.75

v) 10" (250 mm) i/d pipes:-1st chain (1st 30 m) Chain 32.1 30 M 32.12nd chain (2nd 30 m) " 5.90 30 M 5.903rd to 10th chain (60 to 300 m) " 3.65 30 M 3.651000 to 3000 ft. (300 to 900 m) 0/00 Ft. 36.00 300 M 36.001st Km Km 33.252nd Km Km 15.253rd Km Km 11.351st mile Mile 53.504th Km Km 7.652nd mile " 12.405th Km Km 7.003rd mile " 11.156th Km Km 6.904th mile Mile 10.057th Km Km 6.555th mile " 9.208th Km Km 6.456th mile " 8.509th Km Km 6.007th mile and subsequent miles " 5.3010th Km Km 5.5511th Km & subsequent Kms Km 4.10

vi) 12" (300 mm) i/d pipes:1st chain (1st 30 m) Chain 41.70 30 M 41.702nd chain (2nd 30 m) " 7.70 30 M 7.703rd to 10th chain (60 to 300 m) " 4.80 30 M 4.801000 to 3000 ft. (300 to 900 m) 0/00 Ft. 46.85 300 M 46.851st Km Km 43.252nd Km Km 20.853rd Km Km 15.154th Km Km 9.95

Page 14: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 14

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

1st mile Mile 69.605th Km Km 9.152nd mile " 16.106th Km Km 8.953rd mile " 14.507th Km Km 8.204th mile " 13.108th Km Km 8.105th mile " 12.009th Km Km 7.506th mile " 11.0510th Km Km 6.907th mile and subsequent miles " 6.9011th Km & subsequent Kms Km 5.20

vii) 16" (400 mm) i/d pipes:-1st chain (1st 30 m) Chain 68.40 30 M 68.402nd chain (2nd 30 m) " 12.60 30 M 12.603rd to 10th chain (60 to 300 m) " 7.85 30 M 7.851000 to 3000 ft. (300 to 900 m) 0/00 Ft. 76.80 300 M 76.801st Km Km 70.902nd Km Km 33.053rd Km Km 24.451st mile Mile 114.104th Km Km 16.502nd mile " 26.405th Km Km 15.203rd mile " 23.756th Km Km 14.904th mile " 21.457th Km Km 13.705th mile " 19.658th Km Km 13.506th mile " 18.109th Km Km 12.507th mile and subsequent miles " 11.3010th Km Km 11.5011th Km & subsequent Kms Km 8.60

viii) 18" (450 mm) i/d pipes:-

1st chain (1st 30 m) Chain 87.90 30 M 87.902nd chain (2nd 30 m) " 16.20 30 M 16.203rd to 10th chain (60 to 300 m) " 10.05 30 M 10.051000 to 3000 ft. (300 to 900 m) 0/00 Ft. 98.65 300 M 98.651st Km Km 91.102nd Km Km 42.153rd Km Km 31.451st mile Mile 146.604th Km Km 21.25

Page 15: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 15

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

2nd mile " 33.955th Km Km 19.553rd mile " 30.506th Km Km 19.154th mile " 27.557th Km Km 17.605th mile " 25.258th Km Km 17.406th mile " 23.309th Km Km 16.157th mile and subsequent miles " 14.5010th Km Km 14.8511th Km & subsequent Kms Km 11.00

ix) 20" (500 mm) i/d pipes:-

1st chain (1st 30 m) Chain 93.30 30 M 93.302nd chain (2nd 30 m) " 17.20 30 M 17.203rd to 10th chain (60 to 300 m) " 10.70 30 M 10.701000 to 3000 ft. (300 to 900 m) 0/00 Ft. 104.75 300 M 104.751st Km Km 96.702nd Km Km 44.753rd Km Km 33.351st mile Mile 155.604th Km Km 22.552nd mile " 36.055th Km Km 20.753rd mile " 32.406th Km Km 20.304th mile " 29.257th Km Km 18.705th mile " 26.808th Km Km 18.456th mile " 24.709th Km Km 17.107th mile and subsequent miles " 15.4010th Km Km 15.7511th Km & subsequent Kms Km 11.80

x) 24" (600 mm) i/d pipes:-1st chain (1st 30 m) Chain 103.35 30 M 103.352nd chain (2nd 30 m) " 19.05 30 M 19.053rd to 10th chain (60 to 300 m) " 11.85 30 M 11.851000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 116.05 300 M 116.051st Km Km 107.152nd Km Km 49.553rd Km Km 36.901st mile Mile 172.404th Km Km 25.452nd mile " 39.90

Page 16: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 16

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

5th Km Km 22.953rd mile " 35.906th Km Km 22.504th mile Mile 32.407th Km Km 20.655th mile " 29.708th Km Km 20.406th mile " 27.409th Km Km 18.957th mile and subsequent miles " 17.0510th Km Km 17.4011th Km & subsequent Kms Km 12.90

20 Carriage of PVC pipes B.S.S. Class 'B' including loading,unloading and stacking (Rate per 1000 ft.) (300 metre) :-

i) 3" (75 mm) i/d pipes:-

1st chain (1st 30 m) Chain 14.10 30 M 14.102nd chain (2nd 30 m) " 2.60 30 M 2.603rd to 10th chain (60 to 300 m) " 1.60 30 M 1.601000 to 3000 ft. (300 to 900 m) 0/00 Ft. 15.80 300 M 15.801st Km Km 14.602nd Km Km 6.753rd Km Km 5.051st mile Mile 23.504th Km Km 3.402nd mile " 5.455th Km Km 3.103rd mile " 4.906th Km Km. 3.054th mile " 4.407th Km Km 2.805th mile Mile 4.058th Km Km 2.756th mile " 3.759th Km Km 2.557th mile and subsequent miles " 2.3010th Km Km 2.3511th Km & subsequent Kms Km 1.95

ii) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 21.70 30 M 21.702nd chain (2nd 30 m) " 4.00 30 M 4.003rd to 10th chain (60 to 300 m) " 2.50 30 M 2.501000 to 3000 ft. (300 to 900 m) 0/00 Ft. 24.35 300 M 24.351st Km Km 22.502nd Km Km 10.603rd Km Km 7.80

Page 17: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 17

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

1st mile Mile 36.204th Km Km 5.202nd mile " 8.405th Km Km 4.753rd mile " 7.556th Km Km 4.654th mile " 6.807th Km Km 4.255th mile " 6.258th Km Km 4.206th mile " 5.759th Km Km 3.907th mile and subsequent miles " 3.6010th Km Km 3.6011th Km & subsequent Kms Km 3.10

iii) 5" (125 mm) i/d pipes:-

1st chain (1st 30 m) Chain 29.60 30 M 29.602nd chain (2nd 30 m) " 5.45 " 5.453rd to 10th chain (60 to 300 m) " 3.40 " 3.401000 to 3000 ft. (300 to 900 m) 0/00 Ft. 33.20 300 M 33.201st Km Km 30.652nd Km " 14.353rd Km " 10.751st mile Mile 49.354th Km " 7.302nd mile " 11.455th Km Km. 6.503rd mile " 10.256th Km " 6.354th mile Mile 9.257th Km " 5.855th mile " 8.508th Km 5.756th mile " 7.859th Km 5.357th mile and subsequent miles " 4.9010th Km 4.9511th Km & subsequent Kms 3.70

iv) 6" (150 mm) i/d pipes:

1st chain (1st 30 m) Chain 40.80 30 M 40.802nd chain (2nd 30 m) " 7.50 30 M 7.503rd to 10th chain (60 to 300 m) " 4.65 30 M 4.651000 to 3000 ft. (300 to 300 m) 0/00 Ft. 45.80 300 M 45.801st Km. Km. 42.302nd Km Km. 19.603rd Km Km. 14.60

Page 18: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 18

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

1st mile Mile 68.05 4th Km Km. 9.852nd mile " 15.755th Km Km. 9.053rd mile " 14.156th Km Km. 8.904th mile " 12.807th Km Km. 8.205th mile " 11.708th Km Km. 8.056th mile " 10.809th Km Km. 7.507th mile and subsequent miles " 6.7510th Km Km. 6.9011th Km & subsequent Kms Km. 5.10

v) 8" (200 mm) i/d pipes:-

1st chain (1st 30 m) Chain 71.55 30 M 71.552nd chain (2nd 30 m) " 13.15 30 M 13.153rd to 10th chain (60 to 300 m) " 8.20 30 M 8.201000 to 3000 ft. (300 to 900 m) 0/00 Ft. 80.30 300 M 80.301st Km Km 74.152nd Km Km 34.353rd Km Km 25.601st mile Mile 119.354th Km Km 17.302nd mile " 27.655th Km Km 15.903rd mile Mile 24.856th Km Km 15.604th mile " 22.407th Km Km 14.305th mile " 20.558th Km Km 14.156th mile " 18.959th Km Km 13.157th mile and subsequent miles " 11.8010th Km Km 12.0511th Km & subsequent Kms Km 8.95

vi) 10" (250 mm) i/d pipes:-1st chain (1st 30 m) Chain 110.90 30 M 110.902nd chain (2nd 30 m) " 20.45 30 M 20.453rd to 10th chain (60 to 300 m) " 12.70 30 M 12.701000 to 3000 ft. (300 to 900 m) 0/00 Ft. 124.55 300 M 124.551st Km Km 115.002nd Km Km 53.203rd Km Km 39.70

Page 19: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 19

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

1st mile Mile 185.054th Km Km 26.802nd mile " 42.855th Km Km 24.653rd mile " 38.506th Km Km 24.154th mile " 34.757th Km Km 22.205th mile " 31.858th Km Km 21.906th mile " 29.409th Km Km 20.357th mile and subsequent miles " 18.3010th Km Km 18.7511th Km & subsequent Kms Km 14.00

vii) 12" (300 mm) i/d pipes:-

1st chain (1st 30 m) Chain 156.15 30 M 156.152nd chain (2nd 30 m) " 28.75 30 M 28.753rd to 10th chain (60 to 300 m) " 17.90 30 M 17.901000 to 3000 ft. (300 to 900 m) 0/00 Ft. 175.30 300 M 175.301st Km Km 161.852nd Km Km 74.903rd Km Km 55.851st mile Mile 260.454th Km Km 37.752nd mile Mile 60.305th Km Km 34.703rd mile " 54.206th Km Km 34.004th mile " 48.957th Km Km 31.305th mile " 44.858th Km Km 30.906th mile " 41.359th Km Km 28.657th mile and subsequent miles " 25.7510th Km Km 26.3011th Km & subsequent Kms Km 19.65

viii) 14" (350 mm) i/d pipes:-1st chain (1st 30 m) Chain 203.25 30 M 203.252nd chain (2nd 30 m) " 37.45 30 M 37.453rd to 10th chain (60 to 300 m) " 23.25 30 M 23.251000 to 3000 ft. (300 to 900 m) 0/00 Ft. 228.20 300 M 228.201st Km Km 210.702nd Km Km 97.503rd Km Km 72.70

Page 20: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 20

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

1st mile Mile 339.054th Km Km 49.102nd mile " 78.505th Km Km 45.153rd mile " 70.556th Km Km 44.254th mile Mile 63.707th Km Km 40.705th mile " 58.358th Km Km 40.156th mile " 53.859th Km Km 37.257th mile and subsequent miles " 33.5510th Km Km 34.3511th Km & subsequent Kms Km 25.65

21 Carriage of PVC pipes B.S.S. Class 'D' including loading,unloading and stacking (Rates per 1000 ft.):-

i) 2" (50 mm) i/d pipes:-1st chain (1st 30 m) Chain 10.30 30 M 10.302nd chain (2nd 30 m) " 1.90 30 M 1.903rd to 10th chain (60 to 300 m) " 1.20 30 M 1.201000 to 3000 ft. (300 to 900 m) 0/00 Ft. 11.55 300 M 11.551st Km Km 10.652nd Km Km 4.953rd Km Km 3.701st mile Mile 17.154th Km Km 2.502nd mile " 4.005th Km Km 2.253rd mile " 3.556th Km Km 2.254th mile " 3.257th Km Km 2.105th mile " 2.958th Km Km 2.056th mile " 2.759th Km Km 1.907th mile and subsequent miles " 1.7010Km Km 1.7511th Km & subsequent Kms Km 1.35

ii) 2½" (63 mm) i/d pipes:-

1st chain (1st 30 m) Chain 16.00 30 M 16.002nd chain (2nd 30 m) " 2.95 30 M 2.953rd to 10th chain (60 to 300 m) " 1.85 30 M 1.851000 to 3000 ft. (300 to 900 m) 0/00 Ft. 18.00 300 M 18.001st Km Km 16.60

Page 21: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 21

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

2nd Km Km 7.753rd Km Km 5.801st mile Mile 26.704th Km Km 3.902nd mile " 6.205th Km Km 3.603rd mile " 5.556th Km Km 3.504th mile " 5.007th Km Km 3.255th mile " 4.608th Km Km 3.006th mile " 4.259th Km Km 2.907th mile and subsequent miles " 2.6510Km Km 2.6511th Km & subsequent Kms Km 2.05

iii) 3" (75 mm) i/d pipes:-1st chain (1st 30 m) Chain 22.20 30 M 22.202nd chain (2nd 30 m) " 4.10 30 M 4.103rd to 10th chain (60 to 300 m) " 2.55 30 M 2.551000 to 3000 ft. (300 to 900 m) 0/00 Ft. 24.90 300 M 24.901st Km Km 23.002nd Km Km 10.653rd Km Km 7.951st mile Mile 37.004th Km Km 5.352nd mile " 8.555th Km Km 4.953rd mile " 7.706th Km Km 4.854th mile " 6.957th Km Km 4.455th mile Mile 6.358th Km Km 4.406th mile " 5.909th Km Km 4.007th mile and subsequent miles " 3.6510th Km Km 3.7011th Km & subsequent Kms Km 2.85

iv) 4" (100 mm) i/d pipes:-1st chain (1st 30 m) Chain 36.75 30 M 36.752nd chain (2nd 30 m) " 6.75 30 M 6.753rd to 10th chain (60 to 300 m) " 4.20 30 M 4.201000 to 3000 ft. (300 to 900 m) 0/00 Ft. 41.25 300 M 41.251st Km Km 38.052nd Km Km 17.603rd Km Km 13.15

Page 22: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 22

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

1st mile Mile 61.254th Km Km 8.902nd mile " 14.205th Km Km 8.153rd mile " 12.756th Km Km 8.004th mile " 11.507th Km Km 7.405th mile " 10.558th Km Km 7.206th mile " 9.759th Km Km 6.707th mile and subsequent miles " 6.0510th Km Km 6.1511th Km & subsequent Kms Km 4.75

v) 5" (125 mm) i/d pipes:-

1st chain (1st 30 m) Chain 54.90 30 M 54.902nd chain (2nd 30 m) " 10.10 30 M 10.103rd to 10th chain (60 to 300 m) " 6.30 30 M 6.301000 to 3000 ft. (300 to 900 m) 0/00 Ft. 61.65 300 M 61.651st Km Km 56.902nd Km Km 26.303rd Km Km 19.651st mile Mile 91.554th Km Km 13.252nd mile " 21.205th Km Km 12.203rd mile " 19.056th Km Km 11.954th mile " 17.207th Km Km 11.005th mile " 15.758th Km Km 10.856th mile 14.559th Km Km 10.057th mile and subsequent miles 9.0510th Km Km 9.1511th Km & subsequent Kms Km 7.00

vi) 6" (150 mm) i/d pipes:-1st chain (1st 30 m) Chain 79.10 30 M 79.102nd chain (2nd 30 m) " 14.55 30 M 14.553rd to 10th chain (60 to 300 m) " 9.05 30 M 9.051000 to 3000 ft. (300 to 900 m) 0/00 Ft. 88.80 300 M 88.801st Km Km 82.002nd Km Km 37.953rd Km Km 28.301st mile Mile 131.95

Page 23: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-1 (Carriage) Page 23

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

4th Km Km 19.102nd mile 30.555th Km Km 17.553rd mile 27.456th Km Km 17.204th mile 24.807th Km Km 15.855th mile 22.708th Km Km 15.656th mile 20.959th Km Km 14.507th mile and subsequent miles 13.0510th Km Km 13.3011th Km & subsequent Kms Km 10.05

22 Hand shunting loaded Railway wagons ortrucks:- a) upto ¼ mile / ¼ Km Each 277.20 Each 173.25b) upto ½ mile / ½ Km No 501.85 No 313.65c) upto ¾ mile / ¾ Km " 677.50 " 423.45d) upto 1 (1.6 Km) mile " 806.25 " 503.90e) 2nd mile and subsequent miles/ Each Each

2nd and subsequent kilometres No/Mile 469.25 No/Km 293.30

23 Hand shunting empty Railway wagons or trucks.

a) upto ¼ mile / ¼ Km Each 160.80 Each 100.50b) upto ½ mile / ½ Km No. 266.45 No. 166.55c) upto ¾ mile / ¾ Km " 351.35 " 219.60d) upto 1 mile / 1 Km " 421.75 " 263.60e) 2nd mile and subsequent miles/ Each Each

2nd and subsequent kilometres No/Mile 230.40 No/Km 144.00

Page 24: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-2 (Loading/Unloading) Page 24

2. LOADING, UNLOADING & STACKING1 The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Loading or unloading into or from Railway wagons, lead 100 Cft. 609.30 cu.m 215.20 within one chain, (30m) shingle, sand, ballast, surkhi, ashes, kankar, brick bats, coal, lime or 1,000 Nos. tiles size12"x6"x2" (300x150x50 mm) or 9"x4½"x1½"(225x113x37mm) properly laid & stacked.

2 Loading or unloading bricks into or from Railway wagonslaid and stacked, lead within one chain:-

a) Bricks 10" (250 mm) size. 1000 Nos. 761.65 1000 Nos. 761.65

b) Bricks 9" (225 mm) or smaller size. ditto 609.30 ditto 609.30

3 Loading or unloading into or from Railway wagons cement 100 Bags 761.65 100 Bags 761.65in bags (from inside or outside the godown) and stackingwithin one chain (30 m)

4 Loading or unloading into or from Railway wagons empty 100 Nos. 73.10 100 Nos. 73.10cement bags (from inside or outside the godown) andstacking.

5 Loading or unloading into or from Railway wagons (from 100 Mds. 457.00 100 Kg 12.25inside or outside the godown) and stacking, white lime in bags.

6 Loading or unloading into or from Railway wagons Per 365.60 Per 359.80Structural Steel, R.S. joists, broad, narrow or meter gauge Tonne Tonnerail and rail fastenings, etc.

7 Loading or unloading 45 gallon (204.57 Litres) drums full Each 45.70 Each 45.70into or from Railway wagons, lead upto one chain.

8 Loading or unloading packages of all sorts, upto one Cwt Each 22.85 Each 22.85 Except cement in jute or(50 Kg). paper bags.

9 Loading or unloading sleepers other than wooden,including stacking lead within one chain:-

a) Broad gauge sleepers 100 Nos. 1523.30 100 Nos. 1523.30

b) Metre gauge and narrow gauge sleepers. ditto 761.65 ditto 761.65

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

Page 25: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-2 (Loading/Unloading) Page 25

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

10 Loading or unloading timber logs or timber for shuttering, Per 190.4 Per 187.4into or from Railway wagons of any gauge, including Ton Tonnestacking lead within one chain (30 m)

11 Loading or unloading bhoosa in Railway wagons lead upto 100 Mds. 1827.95 100 Kg 49150 ft. (45 m)

12 Loading or unloading timber scrap or wooden plugs, into or Per 304.65 Per 299.85from Railway wagons, and stacking within one chain lead. Ton Tonne

13 Loading or unloading pitching stone or spawl from Railway 100 Cft. 225.45 cu.m 79.65wagons of any gauge (including clearing 5 ft. (1500 mm)away from the rail).

14 Loading or unloading building stone (including clearing 5 ft. 100 Cft. 292.45 cu.m 103.30(1.5 m) away from rails).

15 Unloading oil, bitumen tar, etc.

a) Crude oil (to be pumped from tank wagon into tank). 1000 761.65 100 16.75Gallon litres

b) Crude oil (drained by gravity). 1000 761.65 100 16.75Gallon litres

c) Crude oil materials from railway wagons. 100 Cft. 97.50 cu.m 34.45

d) Fuel oil from tank into empty drums, including Per 270.80 Per 266.55stacking within one chain (30 m). Ton Tonne

e) Petrol (2 gallon tin) 100 Nos. 383.85 100 Nos. 383.85 The rate includes checkingand weighing the tins.

f) Kerosene oil (4 gallon tin) 100 Nos. 761.65 100 Nos. 761.6516 Removing and stacking within one chain

(30 m) lead:

a) Stone, spawl, brick bats, shingle, sand, lime, 100 Cft. 304.65 cu.m 107.60surkhi, ashes, kankar and coat, etc.

b) Bricks. 1000 Nos. 812.40 1000 Nos. 812.40

c) Broad gauge wooden sleepers. 100 Nos. 487.45 100 Nos. 487.45

d) Metre gauge or narrow gauge wooden sleepers. 100 Nos. 290.15 100 Nos. 290.15

e) Rails girders, pipes, cement etc. Per 135.40 Per 133.25Ton Tonne

Page 26: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-2 (Loading/Unloading) Page 26

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

f) Bridge and crossing timbers, etc. 100 No. 1624.85 100 No. 1624.85

17 Loading into wagons girders, rails, permanent way Per 304.65 Per 299.85material (except wooden sleepers) iron work, M.S. bars, Ton Tonnepipes, etc. including lead one chain (30 M) and stackinginside wagons.

18 Unloading from wagons girders, rails, permanent way Per 174.10 Per 171.35material (except wooden sleepers) iron work, M.S. bars, Ton Tonnepipes, etc. lead upto one chain (30 m) but excludingstacking.

19 Loading into wagons wooden broad gauge sleepers, 100 Nos. 1218.60 100 Nos. 1218.60including one chain (30 m) lead and stacking,.

20 Unloading wooden broad gauge sleepers from wagons, 100 Nos. 580.30 100 Nos. 580.30including one chain (30 m) lead and stacking.

21 Loading metre gauge or narrow gauge wooden sleepers, 100 Nos. 609.30 100 Nos. 609.30including one chain (30 m) lead and stacking insidewagons.

22 Unloading metre gauge or narrow gauge wooden sleepers, 100 Nos. 320.70 100 Nos. 320.70including one chain (30 m) lead but excluding stacking.

23 Loading bridge and crossing timbers, including one chain 100 Nos. 2437.25 100 Nos. 2437.25(30 m) lead and stacking.

24 Unloading bridge and crossing timbers, including one 100 Nos. 1218.60 100 Nos. 1218.60chain (30 m) lead but excluding stacking.

25 Loading or unloading bitumen, asphalt or tar in drums, into Per 182.80 Per 179.90or from railway wagons, lead upto one chain (30 m). Ton Tonne

Page 27: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-3 (Earthwork) Page 27

1 Special allowances for the hardness, wetness and slush:-The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of suchallowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and ofwhich dry bulk density is not less than 1.5, will be treated as hard.

2 Deduction for shrinkage from bank measurements:-The following allowances should be provided for material which is not rammed, or equally consolidated:-a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%

Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractors.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

1 Earthwork excavation undressed lead upto a single throw 171 to 17.5of Kassi, phaorah or shovel:-

a) In ashes, sand, soft soil or silt clearance. 1000 Cft. 2,284.90 -- cu.m 80.70 --b) In ordinary soil. 1000 Cft. 2,741.90 -- cu.m 96.85 --

2 Earthwork excavation in ashes, sand and soft soil or silt 1000 Cft. 3,351.20 -- cu.m 118.35 -- ditto

clearance, undressed lead upto 50 ft (15 metre).

3 Bed clearance and dressing slopes of drains to required ditto The rate is applicable where the earthsections including the removal of weeds, roots, etc. of the bed to be removed is of thedisposal of excavated materials within 50 ft. (15 metre) lead. type of ordinary soil. When it is silt ora) Excavated material undressed. 1000 Cft. 4,265.20 -- cu.m 150.65 -- 1 or 2 above, whichever is applicable.b) Excavated material dressed in the specified manner. 1000 Cft. 4,613.65 -- cu.m 162.95 -- the drains of each category.

4 Borrowpit excavation undressed lead upto 100 ft (30 metre).

a) Ordinary soil 1000 Cft. 4,265.20 -- cu.m 150.65 --b) Hard soil 1000 Cft. 5,240.10 -- cu.m 185.10 --

5 Earthowrk in ordinary soil for embankments lead upto 100 *411-1 to The rate includes hire charges of

ft. (30 m), including ploughing and mixing with blade grade 411-13 and machinery, cost of fuel, lubricants, payor disc harrow or other suitable equipment, and 301-1 & of driver and cleaner. The rate alsocompaction by mechanical means at optimum moisture 202-3 includes clearing and grubbingcontent and dressing to designed section, complete in all where necessary.respects:- i) 95% to 100% maximum modified AASHO dry density. 1000 Cft. 4,655.10 5,349.60 cu.m 164.40 188.95ii) 90% maximum modified AASHO dry density. 1000 Cft. 4,655.10 5,244.50 cu.m 164.40 185.25iii) 85% maximum modified AASHO dry density. 1000 Cft. 4,655.10 5,139.40 cu.m 164.40 181.50

6 Regular excavation dressed. 1000 Cft. 3,141.70 -- cu.m 110.95 -- *411-2

7 Earthwork excavation in open cutting upto 5'-0" (1.5 m) 17.1 to depth for storm water channels, drains, sullage drains in 17.5open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

3. EARTHWORK (EXCAVATION & EMBANKMENT)

Page 28: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-3 (Earthwork) Page 28

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead:- i) ordinary 1000 Cft. 5,341.80 5,419.05 cu.m 188.65 191.40ii) hard 1000 Cft. 6,316.70 6,393.95 cu.m 223.10 225.85 iii) very hard 1000 Cft. 7,352.50 7,429.80 cu.m 259.70 262.40iv) gravel & shingle 1000 Cft. 12,373.15 12,450.45 cu.m 437.00 439.75

8 Earthwork excavation in open cutting 5.01 ft. (1.5 m) to ditto

10.0 ft. (3.0 mm) depth for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 100 ft. (30 m) lead:- i) ordinary 1000 Cft. 5,812.75 5,966.45 cu.m 205.30 210.75ii) hard 1000 Cft. 6,787.65 6,941.35 cu.m 239.75 245.15iii) very hard 1000 Cft. 7,823.50 7,977.20 cu.m 276.35 281.75iv) gravel & shingle 1000 Cft. 13,453.45 13,607.15 cu.m 475.20 480.60

9 Excavation in shingle or gravel formation and rock, not 17.1 to 17.5

requiring blasting, undressed lead upto 100 ft (30 m). i) Dry 1000 Cft. 11,576.95 -- cu.m 408.90 --ii) Wet 1000 Cft. 13,404.85 -- cu.m 473.45 --iii) In flowing water 1000 Cft. 17,060.75 -- cu.m 602.60 --

10 Earthwork excavation in irrigation channels, drains, etc. to

designed section, grades and profiles, excavated material dittodisposed off and dressed within 50 ft. (15 m) lead:-

i) ordinary 1000 Cft. 4,898.80 -- cu.m 173.05 --ii) hard 1000 Cft. 5,873.70 -- cu.m 207.45 --iii) very hard 1000 Cft. 6,909.50 -- cu.m 244.05 --iv) gravel & shingle 1000 Cft. 12,234.80 -- cu.m 432.15 --

11 Excavation in rock dressed to designed section, grades and profiles, excavated material disposed off within 100 ft. (30 m) 17.1 to 17.5 Tools and plants shall be the liabilityand lift upto 5'-0" (1.5 m). of the contractor.a) Soft rock, slate, shale, schist laterite work, with pick and 1000 Cft. 11,698.35 -- cu.m 413.20 --

crow bar. b) Medium hard rock, requiring occasional blasting. 1000 Cft. 18,508.15 19,098.55 cu.m 653.70 674.55

12 a) Excavation in hard rock requiring blasting and disposal

of excavated material (blasted material) upto 50 ft. (15 17.1 to 17.5 1) Tools and plants required shall bem) lead, (including dressing and leveling to designed the liability of the Contractorsection,e tc. complete).

2) Reduce the rate by 8% if thei) Grade I 1000 Cft. 11,288.10 11,878.50 cu.m 398.70 419.55 excavated section is not dressed orii) Grade II 1000 Cft. 12,097.55 13,081.55 cu.m 427.30 462.05 levelled to designed section.iii) Grade III 1000 Cft. 14,466.15 15,646.95 cu.m 510.95 552.65iv) Grade IV 1000 Cft. 16,067.05 17,444.65 cu.m 567.50 616.15

Page 29: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-3 (Earthwork) Page 29

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

v) Grade V 1000 Cft. 17,785.15 19,359.55 cu.m 628.15 683.80vi) Grade VI 1000 Cft. 19,081.40 20,852.60 cu.m 673.95 736.50

b) Excavation in hard rock requiring blasting, but blasting

prohibited, and disposal of excavated material within 50 17.1 to 17.5 1) Tools and plants required shall beft. (15 m) lead (including dressing and levelling to the liability of the contractor.designed section, etc. complete):-

2) Reduce the rate by 8% if thei) Grade I 1000 Cft. 22,576.20 23,757.00 cu.m 797.40 839.10 excavated section is not dressed orii) Grade II 1000 Cft. 24,195.05 26,163.05 cu.m 854.55 924.10 levelled to designed section.iii) Grade III 1000 Cft. 28,932.30 31,293.90 cu.m 1021.90 1105.30iv) Grade IV 1000 Cft. 32,134.10 34,889.30 cu.m 1135.00 1232.30v) Grade V 1000 Cft. 35,570.30 38,719.10 cu.m 1256.35 1367.55vi) Grade VI 1000 Cft. 38,162.80 41,705.20 cu.m 1347.90 1473.05

13 Rehandling of earthwork:

a) Lead upto a single throw of Kassi, phaorah or shovel 1000 Cft. 1,523.30 -- cu.m 53.80 -- dittob) Upto a lead of 50 ft. (15 m). 1000 Cft. 2,132.60 -- cu.m 75.30 --

14 Rehandling of gravel work or excavated rock, 1000 Cft. 6,093.10 -- cu.m 215.20 -- 17.1 to 17.5

lead upto 50 ft.( 15 m)

15 Filling, watering and ramming earth under floors:- ditto

i) with surplus earth from foundation, etc. 1000 Cft. 3,083.00 -- cu.m 108.90 --ii) with new earth excavated from outside, 1000 Cft. 6,203.10 -- cu.m 219.10 --

lead upto one chain (30 m). 16 Extra for every 50 ft. (15 m) additional lead or part thereof :- This rate shall be applicable upto

1000 ft. total distance, including the i) for earhtwork soft, ordinary, hard and very hard. 1000 Cft. 59.05 -- cu.m 2.10 -- lead covered in the item of earthworkii) for gravel, shingle or rock. 1000 Cft. 69.85 -- cu.m 2.45 --

17 Transportation of earth all types when the total distance, This rate will be paid inaddition to the

including the lead covered in the item of work, is more than rate of earthwork, without deducting1000 ft. (300 m) the lead covered in the item ofa) upto ¼ mile (400 m). 1000 Cft. 2,820.00 -- cu.m 99.60 -- earthworkb) for every 330 ft. (100 m) additional lead or part thereof,

beyond ¼ mile (400 m) upto one mile. (1.6 Km.) 1000 Cft. 17.90 -- cu.m 0.65 --c) for every ¼ mile (400 m) additional lead or part thereof,

beyond one mile (1.6 Km.) upto 5 mile (8 Km). 1000 Cft. 175.65 -- cu.m 6.20 --d) for every ½ mile (800 m) additional lead

or part thereof, beyond 5 miles (8 Km). 1000 Cft. 157.60 -- cu.m 5.55 --

18 Dressing and levelling of earhtwork to designed section, etc. 17.10 to 17.5complete:- a) Ashes, sand, silt or soft soil. 1000 Cft. 199.85 -- cu.m 7.05 --b) Ordinary or hard soil. 1000 Cft. 389.90 -- cu.m 13.75 --c) Gravel work or soft rock not requiring 1000 Cft. 938.25 -- cu.m 33.15 --

blasting.

Page 30: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-3 (Earthwork) Page 30

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

19 Dowel dressing. Per 182.80 -- Metre 6.00 -- ditto This rate is in addition to payment for

Chain dressed earhtwork.

20 a) Dressing slopes of banks or ground surface. 100Sft. 81.65 -- sq.m 8.80 -- ditto To be paid only when exclusively dressing is done and no earthwork is carried out in embankment or cutting.

b) Dressing of earthwork (done by machinery or otherwise 100Sft. 144.70 -- sq.m 15.55 -- i) The surface area dressed is to beand left undressed) to designed section. taken for measurement.

ii) The item is applicable where the dressing is done by the contractor other than the one who executed the

work.21 Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around 17.1 to 17.5structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) a) in sand, ashes or loose soil 1000 Cft. 5,508.10 -- cu.m 194.55 --b) in ordinary soil. 1000 Cft. 6,434.20 -- cu.m 227.25 --c) in hard soil or soft murum. 1000 Cft. 7,201.90 -- cu.m 254.35 --

22 Cutting hard rock such as granite, ballast, hard lime stone or 1000 Cft. 46,214.80 50,250.40 cu.m 1632.30 1774.85 17.1 to 17.5 Tools and plants required shall be thesand stone, etc. with chisels and hammers, for small liability of the contractor.foundations.

23 Extra for excavation requiring shoring. 1000 Cft. 782.25 1,040.95 cu.m 27.65 36.75 17.1 to 17.5 Composite rate includes materials,

i.e. plank, etc.24 Compaction of earthwork (soft, ordinary or hard soil) :- ditto

a) Mixing, moistening earth to optimum moisture content 1000 Cft. 738.40 -- cu.m 26.10 --

in layers for compaction, etc. complete.

b) Compaction by rolling with animal driven roller/hand rammed:

i) soft or sandy soil 1000 Cft. 913.95 -- cu.m 32.30 --

1) The rate does not include hireii) ordinary soil 1000 Cft. 1,066.30 -- cu.m 37.65 -- charges of the roller.

2) Roller to be 'supplied by iii) hard soil 1000 Cft. 1,218.60 -- cu.m 43.05 -- Government

iv) admixture of shingle 1000 Cft. 1,370.95 -- cu.m 48.40 --

c) Ramming earthwork (all types of soil). 1000 Cft. 913.95 -- cu.m 32.30 --

d) Ramming earhtwork behind retaining walls. 1000 Cft. 1,218.60 -- cu.m 43.05 --

25 Compaction of earthwork with power road roller, including 17.1 (a)

ploughing, mixing, moistening earth to optimum moisture *411-5 and The rate also includes hire charges of

Page 31: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-3 (Earthwork) Page 31

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

content in layers, etc. complete: 202-3 machinery, cost of fuel, lubricant, pay of driver and cleaner, etc.

i) 95% to 100% maximum modified AASHO dry density. 1000 Cft. -- 694.50 cu.m - 24.55

ii) 90% maximum modified AASHO dry density. 1000 Cft. -- 589.40 cu.m - 20.80

iiii) 85% maximum modified AASHO dry density. 1000 Cft. -- 484.30 cu.m - 17.10

26 Extra for wet earthwork. 1000 Cft. 2,132.60 -- cu.m 75.30 - 17.1 to 17.5 That will support a man's weight.

27 Extra for slush or Daldal including dewatering. 1000 Cft. 4,874.50 -- cu.m 172.15 - 17.1 to 17.5 That will not support a man's weight.

28 Extra for puddling. 1000 Cft. 3,844.65 -- cu.m 135.80 - ditto

29 Earthwork on small rain water drains, along canal banks, 100 Rft. 578.85 -- Metre 19.00 - dittoroads and plantation drains, dressed, etc. complete.

30 Filling and compacting soil, earth and boulders behind 1000 Cft. 5,483.80 -- cu.m 193.70 -- 17.1 to 17.5

retaining walls (including excavation of soil and lead upto 50 ft.( 15 m).

31 Dag bailing 3" (75 mm) deep. Per mile 2,341.80 -- Per 1455.45 -- ditto Dag bailing for layout of borrow pit, to

Km be done by contractors at their own cost.

32 Turfing slopes of banks or lawns with grass sods including 100Sft. 1,015.50 -- sq.m 109.25 -- dittoploughing, laying, setting and watering (Turf got from within a distance of 5 miles (8 Km.) and maintenance for 15 days).

33 Berm cutting:- 17.1 to 17.5

a) lead upto a single throw of Kassi, phaora or shovel 1000 Cft. 2,741.90 -- cu.m 96.85 --

(without dressing). b) upto 50 ft(15 m)lead (including dressing). 1000 Cft. 4,898.80 -- cu.m 173.05 --

34 Berm trimming both sides of channels:- 17.1 to 17.5

a) upto 3½ ft. (1.06 m) depth. Per Mile 7,149.10 -- Per Km. 4468.20 -- b) exceeding 3½ ft. to 5 ft. (1.06 to 1.5 m) depth. Per Mile 9,989.30 -- Per Km. 6243.30 --c) exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth Per Mile 15,594.90 -- Per Km. 9746.80 --

35 Ploughing and levelling borrowpits. ditto Area ploughed to be measured.

i) upto 3 ft. (0.9 m) depth. Per Acre 1,523.30 -- Per Hect. 3764.10 --ii) above 3 ft. (0.9 m) depth. Per Acre 3,046.55 -- Per Hect. 7528.20 --

36 Making boundary or service roads, including dag-belling, ditto

leveling and dressing:

i) in unploughed land:

Page 32: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-3 (Earthwork) Page 32

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 771.75 -- Metre 25.30 --b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 1,035.75 -- Metre 33.95 --

ii) in ploughed land:

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 794.15 -- Metre 26.05 --b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 1,058.15 -- Metre 34.70 --

37 Earthwork by boats, including hire of boats:- 17.1 to 17.5 For ordinary soil.

i) Digging and loading into boats, upto 50 ft. (15 m) lead. 1000 Cft. 4,569.85 -- cu.m 161.40 --ii) Carriage by boats upto 10 chains (300 m). 1000 Cft. 1,153.25 -- cu.m 40.75 --iii) Extra for every additional one chain (30 m) or part 1000 Cft. 121.85 -- cu.m 4.30 --

thereof beyond 10 chains (300 m). iv) Unloading earth from boats. 1000 Cft. 2,132.60 -- cu.m 75.30 --

38 Unloading earth from B.G. trucks and clearing 5 ft. (1.5 m) 1000 Cft. 1,827.95 -- cu.m 64.55 -- 17.1 to 17.5

from rail.

39 Earthwork by tramway, digging and loading in trucks, upto 50 1000 Cft. 4,265.20 -- cu.m 150.65 -- 17.1 to 17.5ft. (15 m) lead.

40 Unloading earth from B.G. trucks and spreading upto 1000 Cft. 3,427.40 -- cu.m 121.05 -- ditto

15 ft. (4.5 m) from rail.

41 Supplying clean and screened river or pit sand within 5 100Cft. 607.60 630.60 cu.m 214.60 222.75 ditto The rate incudes:-chains (150 m). i) removal of top crust of earth

over burden ii) royalty to the government or cost to the private owner.

42 Earthwork excavation in open cutting for sewers and 17.1 to 17.5 The rate does not include back fillingmanholes as shown in drawings including shuttering and **13.1 &13.4 after laying of sewer, which is payabletimbering, dressing to correct section and dimensions separately.according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-

If the timbering and shuttering is noti) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 1000 Cft. 4,969.95 5,353.10 cu.m 175.55 189.05 actually done at site, the compositeii) 7-01 ft. to 15.0 ft. (2.15 to 4.5 m) depth 1000 Cft. 8,427.85 8,996.35 cu.m 297.65 317.75 rate may be reduced by Rs. 368.20,iii) above 15.0 ft. (4.5 m) depth 1000 Cft. 10,865.10 11,433.60 cu.m 383.75 403.85 579.60 and 579.60 respectively.

43 Earthwork excavation of trenches in open cutting for sewers 17.1 to 17.5 The rate does not include back filling

and manhole chambers, etc. below sub-soil water level to **13.3 & after laying of sewer, which is payablecorrect section and dimensions according to templates and 13.5 separately.levels, including shoring, timbering and shuttering of M.S. sheets on both sides of the trenches:

i) 0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL. 1000 Cft. 6,846.60 9,427.80 cu.m 241.80 333.00ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL. 1000 Cft. 8,559.35 11,816.80 cu.m 302.30 417.35iii) Exceeding 8 ft. (2.4 m) depth below SSWL. 1000 Cft. 12,839.05 16,323.70 cu.m 453.50 576.55

Page 33: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-3 (Earthwork) Page 33

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

44 Excavation of trenches in all kinds of soil, except cutting 1000 Cft. 4,582.00 -- cu.m 161.85 -- 17.1 to 17.5 The rate does not include back filling

rock, for watersupply pipelines upto 5 ft. (1.5 m) depth **8.1 after laying of pipe line, which isfrom ground level, including trimming, dressing sides, payable separately.leveling the beds of trenches to correct grade and cutting pits for joints, etc. complete in all respects.

45 Cutting and removing trees within a distance of 100 ft. (30 m)

a) upto 2½ ft. (760 mm) girth. Each 891.35 -- Each 891.35 b) above 2½ ft. to 6 ft. (760 to 1800 mm) girth. Each 1,739.45 -- Each 1739.45

46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft. Each 1,142.45 -- Each 1142.45

to 6 ft. (600 to 1800 mm) girth.

47 Jungle clearance and removing within 100 ft. (30 m).

a) light 1000 Sft. 152.35 -- sq.m 1.65 --b) thick 1000 Sft. 304.65 -- sq.m 3.30 --

48 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 100Sft. 73.10 -- sq.m 7.85 --

49 Ploughing 3 times. Per 618.85 -- Per Hect. 1529.15 --

Acre

50 Leveling, dressing and making lawns. 100Sft. 304.65 -- sq.m 32.80 --

51 Turfing lawns (excluding cost of turf). 100Sft. 264.00 -- sq.m 28.40 --

52 Earthwork in excavation of drains, irrigation channels through excavator / drag lines in all kind of soil and conditions(dry,wetslush,daldal and under water) including its disposal and preparation of working pad for operation of machinery.(Rates includes 100 ft lead) 1000 Cft. -- 1805.00 cu.m -- 63.75

* Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".** Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).

Page 34: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-4 (Dismantling) Page 34

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

2 The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roofsupports such as beams and trusses.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Stone Work

1 Dismantling dry stone masonry. 100Cft. 517.90 cu.m 182.90 18.1

2 Dismantling stone masonry in mud mortar. 100Cft. 761.65 cu.m 269.00 ditto

3 Dismantling stone masonry in lime or cement mortar. 100Cft. 1,827.95 cu.m 645.65 ditto Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4thand subsequent floors respectively.

4 a) Dismantling dry stone or spawl pitching. 100Cft. 913.95 cu.m 322.80 ditto

b) Dismantling stone or spawl pitching (mud grouted). 100Cft. 1,157.70 cu.m 408.90 ditto

5 Dismantling stone or spawl pitching and apron in silted 100Cft. 1,523.30 cu.m 538.05 dittocondition.

6 Dismantling stone pitching, cement or lime grouted. 100Cft. 2,437.25 cu.m 860.85 ditto

7 Dismantling stone in crates:

a) wooden crates 100Cft. 1,218.60 cu.m 430.40

b) wire crates ditto 1,523.30 ditto 538.05

8 Dismantling stone ware drain including base concrete. 100Cft. 853.05 cu.m 301.30 ditto

Brick Work

9 100Cft. 304.65 cu.m 107.6 18.1

10 100Cft. 761.65 cu.m 269 ditto

11 100Cft. 517.9 cu.m 182.9 ditto

12 100Cft. 1066.3 cu.m 376.6 18.1 Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

13 100Cft. 2589.6 cu.m 914.65 ditto and subsequent floors respectivelyagainst item No. 12, 13, 14 & 15.

14 Dismantling cement block masonry. 100Cft. 2,284.90 cu.m 807.05 ditto

Dismantling brick work in mud mortar.

Dismantling brick work in lime or cement mortar.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

4. DISMANTLING (DEMOLITION)

Dismantling mud/pise walling.

Dismantling sun dried brick masonry.

Dismantling dry brick masonry.

Page 35: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-4 (Dismantling) Page 35

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

15 Dismantling Dhajji walling. 100Cft. 609.30 cu.m 215.20 ditto

Concrete

16 Dismantling mud concrete. 100Cft. 1,218.60 cu.m 430.40 ditto

17 Dismantling lime concrete. 100Cft. 1,675.60 cu.m 591.80 Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

18 Dismantling lime or cement concrete, under water. 100Cft. 6,397.80 cu.m 2259.70 and subsequent floors respectivelyagainst item No. 17, 19 & 20.

19 a) Dismantling cement concrete plain 100Cft. 3,351.20 cu.m 1183.65 ditto1:4:8.

b) Dismantling cement concrete plain ditto 5,483.80 ditto 1936.901:3:6.

c) Dismantling cement concrete 1:2:4 ditto 6,702.45 ditto 2367.30plain.

d) Dismantling cement concrete with brick ditto 1,827.95 ditto 645.65aggregate.

e) Dismantling D.P.C. of cement concrete ditto 913.95 ditto 322.801½" thick (40 mm) and clearing the site.

20 Dismantling cement concrete reinforced, 100Cft. 10,967.60 cu.m 3873.75 ditto

separating reinforcement from concrete,cleaning and straightening the same.

Roofing

21 Dismantling sirki sarkanda or thatched 100Sft. 365.60 sq.m 39.35 18.1roofing, supported on battens or bellies.

22 a) Dismantling 1st class tile roofing. 100Sft. 913.95 sq.m 98.35 Add extra 13%, 32 and 51% onlabour rate only for 2nd, 3rd, 4th

b) Dismantling 2nd class tile roofing. 100Sft. 761.65 sq.m 81.95 ditto and subsequent floors respectivelyagainst items No. 22, 25, 26 and 28.

23 Dismantling from any height, asbestos sheets and ridge 100Sft. 477.60 sq.m 51.40 18.1coping.

24 a) Dismantling roof of wooden planks and battens, from 100Sft. 382.05 sq.m 41.1 dittoany height.

b) Dismantling wooden ceiling above 20' (6.0 m) height 100Sft. 1,511.75 sq.m 162.65 dittoin difficult position, including lifting with care andspecial scaffolding along live electric wires and withmachines underneath.

Page 36: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-4 (Dismantling) Page 36

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

25 Dismantling jack arch roofing, including removal of joists. 100Sft. 1,218.60 sq.m 131.10 ditto

26 Dismantling R.B. roof complete with mud and plaster, 100Sft. 1,523.30 sq.m 163.90 dittoincluding separating reinforcement, cleaning andstraightening the same.

27 a) Stripping and stacking slate or tiles from the truss 100Sft. 761.65 sq.m 81.95roofing.

b) Stripping and stacking C.I. sheet roof. ditto 692.30 ditto 74.50

c) Extra for dismantling C.I. sheet roof above 20 ft. (6m) ditto 844.00 ditto 90.80in difficult position, including lifting with specialscaffolding along live electric wire with machineunderneath.

28 Dismantling slates or tiles including battens, purlins and 100Sft. 1,218.60 sq.m 131.10 18.1planking.

Flooring

29 Dismantling brick or flagged flooring without 100Sft. 517.90 sq.m 55.75 18.1 Add extra 13%, 32% and 51% onconcrete foundation. labour rates only for 2nd, 3rd, 4th

and subsequent floors respectively30 Dismantling plank or wooden block flooring, 100Sft. 761.65 sq.m 81.95 ditto against items No. 29 and 30.

etc.

31 Disjoining R.C.C. pipes inside the trench and dismantling i) The rate does not include theand removing the pipes from the trench and stacking them cost of excavation and refilling ofoutside:- trench, or the demolition of any

masonry or brick work.a) 6" to 12" (150 to 300 mm) diameter Per Lft 19.10 Metre 62.65b) 13" to 24" (325 to 600 mm) diameter Per Lft 31.30 Metre 102.65 ii) Bends, elbows, sluice valves,c) 25" to 36" (625 to 900 mm) diameter ditto 36.55 ditto 119.90 etc. should not be paid for extra ifd) Above 36" (Above 900 mm) diameter ditto 52.15 ditto 171.05 fixed in the length of pipe line that

is being dismantled.

WOOD WORK32 a) Removing door with chowkat. Per 243.95 Per 243.95 18.1 Add extra 13%, 32% and 51% on

No. No. labour rates only for 2nd, 3rd, 4thb) Removing windows and sky lights with chowkat. ditto 188.55 ditto 188.55 and subsequent floors respectively

against items No. 32, 33, 34, 35 &36.

33 Removing ventilators and wooden sunshade, etc. Per No. 98.60 Per No. 98.60 ditto

34 a) Dismantling wooden beams upto 12' (3.65m) Per No. 190.40 Per No. 190.40 dittolength.

Page 37: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-4 (Dismantling) Page 37

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

b) Dismantling wooden beams from 12.1' to 23' ditto 304.65 ditto 304.65(3.65 to 7.0 m) length.

35 a) Dismantling wooden partition Jaffry work etc. 100Sft. 341.15 sq.m 36.70 ditto

b) Dismantling wooden trusses. 100Kg 1,070.45 %Kg 1070.45

36 Dismantling wooden palisade fencing. Per Lft. 27.10 Metre 88.90 ditto

I ron work

37 Dismantling iron work of trusses, sheds, water tanks, etc. 100Kg 1,033.25 %Kg 1033.25 18.1 Add extra 13%, 32% and 51% onexcluding cutting of rivets. labour rates only for 2nd, 3rd, 4th

and subsequent floors respectivelyagainst items No. 37 and 38.

38 Dismantling rolled steel beams or iron rails, etc. 100Kg 500.00 %Kg 500.00 ditto

39 Dismantling iron latrine. Per Unit/ 1,107.50 Per Unit/ 1107.50 ditto2 Seats 2 Seats

40 Dismantling tees, bends or sluice valves upto 12" Each per 22.60 Each per 9.05 ditto(300 mm) bore. inch bore cm bore

41 a) Dismantling B.G. water column. Each 7,390.00 Each 7390.00 ditto

b) Dismantling M.G. or N.G. water column. Each 4,888.95 Each 4888.95 ditto

42 Dismantling all type of wire fencing, including rolling wire 100Lft. 517.90 Metre 17.00 18.1into bundles and collecting material.

Miscellaneous

43 Dismantling wire netting of tennis courts and frame work. 100Sft. 243.75 sq.m 26.25 18.1

44 Dismantling cloth ceiling and supporting timber. 100Sft. 457.00 sq.m 49.15 ditto

45 Dismantling and removing road metalling. 100Cft. 1,218.60 cu.m 430.40 ditto

46 Dismantling and removing road pavement, etc., including 100Cft. 1,626.85 cu.m 574.60 dittoscreening and stacking of byproducts upto one chain lead(30 metre).

47 Removing mud plaster from walls. 100Sft. 126.95 sq.m 13.65 ditto Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

48 Removing cement or lime plaster. 100Sft. 253.90 sq.m 27.30 ditto and subsequent floors against itemNo. 47, 48, 49, & 50 respectively

Page 38: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-4 (Dismantling) Page 38

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

49 Scraping:- 18.1

a) White wash or colour wash. 100Sft. 152.35 sq.m 16.40

b) Ordinary distemper, oil bound distemper, ditto 457.00 ditto 49.15or paint of wall.

50 Dismantling glazed or encaustic tiles, etc. 100Sft. 1,301.00 sq.m 140.00 18.1

51 Scraping boulders. 100Cft. 2,132.60 cu.m 753.25 18.1

52 Cleaning lime or cement mortar of old stones 100Cft. 1,066.30 cu.m 376.60 18.1to be used in masonry.

Electric Wiring

53 Dismantling light, fan and call bell point Per 41.50 42.00 Per 41.50 42.00including casing and capping/strip open type, point pointand making good damaged surface (buildingportion).

54 Dismantling plug point and making good Per 35.60 36.00 Per 35.60 36.00damaged surface (building portion). point point

55 Dismantling G.I./M.S. conduit/G.I. flexible/PVC pipes orconduit wiring, etc. of all sizes including making gooddamaged surface (building portion):-

i) on surface Per foot 7.60 7.70 P.Mtr 24.95 25.25ii) recessed in wall Per foot 16.55 16.65 P.Mtr 54.30 54.60

Page 39: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-5 (Mortar) Page 39

Dry Material Required for Dry Material Required for 100 Cft. Wet (Ready) Mortar One Cum Wet (Ready) Mortar

S. No. Ratio of Mortar Cement Lime Cement Lime Sand (50 Kg) Putty Sand (50 Kg.) Putty Cum.

Bag Cft. Cft. Bag. Cum 1 2 3 4 5 6 7 81 Cement : Sand

1 : 2 33.48 82 11.83 0.821 : 3 23.11 85 8.16 0.851 : 4 18.37 90 6.49 0.901 : 5 14.70 90 5.19 0.901 : 6 13.61 100 4.81 1.001 : 7 11.68 100 4.12 1.001 : 8 10.21 100 3.61 1.00

2 Cement : Lime : Sand1 : 1 : 6 12.25 15.0 90 4.33 0.15 0.901 : 1 : 7 10.70 13.1 92 3.78 0.13 0.921 : 1 : 8 9.39 11.5 92 3.32 0.12 0.921 : 1 : 9 8.52 10.44 94 3.00 0.10 0.941 : 1 : 10 7.67 9.4 94 2.71 0.09 0.941 : 2 : 8 9.19 22.5 90 3.25 0.23 0.901 : 2 : 9 8.16 20.0 90 2.88 0.20 0.901 : 2 : 10 7.67 18.8 94 2.71 0.19 0.941 : 2 : 12 6.39 15.66 94 2.26 0.16 0.941 : 3 : 12 6.26 23.0 92 2.21 0.23 0.921 : 3 : 14 5.47 20.1 94 1.93 0.20 0.941 : 3 : 16 4.82 17.7 94 1.70 0.18 0.941 : ¼ : 3 23.11 7.0 85 8.16 0.07 0.85

3 Lime : Sand1 : 2 43 86 0.43 0.861 : 3 31 93 0.31 0.93

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL5. MORTAR

Page 40: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-5 (Mortar) Page 40

Dry Material Required for 100 Cft. Dry Material Required for Wet (Ready) Mortar one M3 Wet (Ready) Mortar

S. Ratio of Mortar Clay Lime Sand Surkhi Cinder Clay Lime Sand Surkhi CinderNo. (Putty) (Putty)

Cft. Cft. Cft. Cft. Cft. M3 M3 M3 M3 M3

1 2 3 4 5 6 7 3 4 5 6 7

4 Mud 135 1.35

5 Lime : Surkhi2 : 3 49.00 - 73.5 - 0.49 - 0.74 -1 : 2 40.75 - 81.5 - 0.41 - 0.82 -1 : 3 30.30 - 91.0 - 0.30 - 0.91 -

6 Lime : Sand : Surkhi1 : 1 : 1 40.50 40.5 40.5 - 0.41 0.41 0.41

7 Lime : Cinder1 : 1 57.0 - 57.0 - 0.57 - - 0.57

Wet material required for 100 Cft. Wet material required for 1M³ (35.32 Cft) masonry (including wastage): masonry ( including wastage) :

1 Brick Masonry :a) Mud Mortar 35.00 Cft 0.35 M3

b) Cement, Sand 25.00 Cft 0.25 M3

c) Cement, Lime (Putty) Sand 25.00 Cft 0.25 M3

d) Lime (Putty) Sand 25.00 Cft 0.25 M3

2 Stone Masonry :a) Random rubble, uncoursed

i) Foundation and Plinth 45.00 Cft 0.45 M3

ii) Superstructure 40.00 Cft 0.40 M3

iii) Coursed 35.00 Cft 0.35 M3

b) Ashlar Block in course or Scabled masonry 30.00 Cft 0.30 M3

c) Ashlar fine masonry 20.00 Cft 0.20 M3

(1) Cement 1 Cft. = 40.8233 KgNotes : (2) Unslaked lime 1.7 Cft. = 37.3242 Kg

(3) Slaked lime 2.5 Cft. = 37.3242 Kg

(4) Quick lime 40 Kg Will yield 2.6 Cft. lime putty.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL5. MORTAR

Page 41: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 41

1.2.3.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Mud concrete in foundation including watering and ramming, 100Cft 3356.95 5105.95 cu.m 1185.70 1803.40 The stone ballast, crushed bajri,

using brick or stone ballast 1½" (40 mm) gauge. round shingle from nallah, or brickballast may be used according to

2 Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 100Cft 2284.90 3868.90 cu.m 807.05 1366.50 their comparative cheaper rates inmm) gauge. various areas of the Province.

3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 20.1 -do-50 mm) gauge, in foundation and plinth:-

(a) Ratio 1: 3: 6 100Cft 4420.35 14496.75 cu.m 1561.25 5120.25(b) Ratio 1: 4: 8 ditto 4420.35 12484.35 " 1561.25 4409.45(c) Ratio 1:5:10 ditto 4420.35 11416.35 " 1561.25 4032.25(d) Ratio 1: 6:12 ditto 4420.35 10612.95 " 1561.25 3748.50(e) Ratio 1: 6: 18 ditto 4420.35 9700.35 " 1561.25 3426.15(f) Ratio 1: 7:20 ditto 4420.35 9324.15 " 1561.25 3293.30

4 Extra on item No. 3 above, for sedimentation tank or filterbeds of Public Health Engineering Works: The stone ballast, crushed bajri,

round shingle from nallah, or brick(a) in bed 100Cft 1359.60 - cu.m 480.20 - ballast may be used according to

their comparative cheaper rates in(b) on slope ditto 2010.10 - " 709.95 - various areas of the Province.

5 Cement concrete plain including placing, 20.1compacting, finishing and curingcomplete (including screening andwashing of stone aggregate):

6. CONCRETE

a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.

If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including depreciation will be recovered from the contractor.Rates for all finished works include the removal of surplus debris, unused material and by products.

b) It shall be payable from the nearest approved quarry fom sit of work.

Subsequent carriage of crushed stone aggregate and bajri will be paid according to the following:

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

Page 42: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 42

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

(a) Ratio 1: 1:2 100Cft 5909.65 29541.85 cu.m 2087.30 10434.20(b) Ratio 1: 1½: 1½ ditto 5909.65 28926.25 " 2087.30 10216.75(c) Ratio 1: 1½: 3 ditto 5909.65 24300.25 " 2087.30 8582.85 (d) Ratio 1: 2: 3 ditto 5909.65 23255.65 " 2087.30 8213.90(e) Ratio 1: 3: 3 ditto 5909.65 20825.65 " 2087.30 7355.60(f) Ratio 1: 2: 4 100Cft 5909.65 21485.65 cu.m 2087.30 7588.75(g) Ratio 1: 2: 6 ditto 5909.65 19557.85 " 2087.30 6907.85(h) Ratio 1: 3: 6 ditto 5909.65 18856.45 " 2087.30 6660.10(i) Ratio 1: 4: 8 ditto 5909.65 16968.85 " 2087.30 5993.40

6 Providing and laying reinforced cement concrete (including 20.4 1) The rate includes rendering floorprestressed concrete), using coarse sand and screened surface smooth, and the plasteringgraded and washed aggregate, in required shape and design, done for making up all surfacesincluding forms, moulds, shuttering, lifting, compacting, after removing centring.curing, rendering and finishing exposed surface, complete(but excluding the cost of steel reinforcement, its fabrication 2) Plastering done under soffit ofand placing in position, etc.):- R.C.C. roof slab meant for human

habitation buildings shall be paid(a) (i) Reinforced cement concrete in roof slab, beams, extra.columns lintels, girders and other structural members laid insitu or precast laid in position, or prestressed members cast 3) This item shall not be applicablein situ, complete in all respects:- to factory made units.

(1) Type A (nominal mix 1:1:2) Per Cft 137.50 421.35 cu.m 4856.50 14882.10(2) Type B (nominal mix 1: 1½: 3) ditto 137.50 369.10 " 4856.50 13036.60(3) (c) Type C (nominal mix 1: 2: 4) ditto 137.50 341.05 " 4856.5 12045.90(a)(ii) Reinforced cement concrete in slab of rafts / stripfoundation, base slab of column and retaining walls; etc andother structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizentalshuttering) complete in all respects:-(1) Type A (nominal mix 1: 1: 2) Per Cft 79.55 331.10 cu.m 2809.70 11694.45(2) Type B (nominal mix 1: 1½: 3) ditto 79.55 274.00 " 2809.70 9677.70(3) Type C (nominal mix 1: 2: 4) ditto 79.55 245.85 " 2809.70 8683.40

4) Composite rate shall be reduced by Rs: 5/50- P.Cft & Rs:12/- P.Cft if chenab sand and local sand respectively is used.

Page 43: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 43

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

(b) Precast reinforced cement concrete and prestressedreinforced cement concrete in columns, beams, lintels, staircases, shelves, etc.(1) Type A (nominal mix 1: 1: 2) Per Cft 103.45 374.95 cu.m 3653.85 13243.25(2) Type B (nominal mix 1:1½: 3) ditto 103.45 322.30 " 3653.85 11383.65(3) Type C (nominal mix 1: 2: 4) ditto 103.45 294.65 " 3653.85 10407.05

(c) Erecting and fixing in position, precast cement concreteor stone slab in roofs or lintels, etc. lift unto 20 ft., (6m) Per Cft 46.75 56.95 cu.m 1651.20 2011.45including all charges.

(d) Add extra labour for R.C. concrete in Per Cft 22.85 -- cu.m 807.05 -2nd and subsequent storeys.

7 Providing and casting in situ bored reinforced concrete piles *851-1 Composite rate shall be reduced bywith type C concrete (nominal mix 1: 2: 4 ) , using 10% extra to Rs: 5/50 P.Cft & Rs:12/- P.Cft if chenab cement in dry mix, and course sand, including all labour and 851-10 sand and local sand respectively is used.material (except the cost of steel reinforcement and itslabour for bending and laying in position, etc. which will bepaid separately, including, screening & washing of shingleand curing:-i) 18 " (450 mm) dia pile Per Rft 793.20 1104.30 Metre 2601.70 3622.10ii) 20" (500 mm) dia pile Per Rft 932.00 1315.80 Metre 3056.95 4315.80iii) 22" (550 mm) dia pile Per Rft 1139.2 1585.85 Metre 3736.6 5201.6iv) 24" (600 mm) dia pile Per Rft 1421.40 1974.30 Metre 4662.20 6475.75

8 Fabrication of mild steel reinforcement bar cage for R.C.C. *851-5 The rate includes wastage, overlaps,

bored piles, including cutting, bending, laying in position, etc. but does not apply to the laps and

welding and fastening, including cost of binding wire and spiral reinforcement which are specifically

labour charges for binding of steel reinforcement (also shown in the structural / working drawings

includes removal of rust from the bars):- of piles as per lapping requirements of design.

(a) plain bars Per Cwt. 1574.75 5055.15 100 kg 3099.90 9951.10(b) deformed bars ditto 1574.75 6490.40 " 3099.90 12776.40

9 Fabrication of mild steel reinforcement for cement concrete, *851.5 The rate includes wastage, overlapsincluding cutting, bending, laying in position, making joints and chairs, etc.

Page 44: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 44

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

and fastenings, including cost of binding wire and labourcharges for binding of steel reinforcement (also includesremoval of rust from bars):-(a) Plain bars Per Cwt. 406.55 4067.10 100 kg 800.30 8006.10(b) Deformed bars (Grade-40) ditto 406.55 5618.10 ditto 800.30 11059.25('c) Deformed bars (Grade-60) ditto 406.55 5915.10 ditto 800.30 11643.90

10 Precast cement concrete solid or face blocks (1:2:4), Per Cft 52.40 197.00 cu.m 1850.75 6958.05 20.2including cost of templates.

11 Precast cement concrete hollow blocks (1: 2: 4) , including Per Cft 116.05 211.15 cu.m 4098.90 7457.80 20.2cost of templates and constructing walls thereof.

12 Providing and fixing ornamental cement jali 2" (50 mm) thick Per Sft 32.55 57.00 sq.m 350.25 613.30 20.1 to(1: 2: 4), without steel. 20.4

13 Extra labour for laying concrete plain or reinforced:

(a) above 20' (6 m) upto 40'(12 m) height 100Cft 2437.25 - cu.m 860.85 -(b) for every additional 10'(3 m) height. 100Cft 1523.30 - cu.m 538.05 -

14 Extra labour for work of weirs, rail or road bridges, syphons, and 100Cft 609.30 - cu.m 215.20 -concreting in superstructure

15 Making reinforced cement concrete spout, including fixing in Each 406.55 563.80 Each 406.55 563.80 20.4position (2½' x 6" x5") (760 mmx150 mm x 125 mm)

16 Making holes upto 3"(75 mm) dia 18"(450 mm) depth in cement Per hole 975.75 - Each 975.75 - 20.1concrete or stone masonry walls and repairing.

17 Extra labour for skipping concrete in wells. 100Cft 3622.95 - cu.m 1279.65 - 20.1

18 Nicking concrete surface:(a) Cement concrete surface 100Sft 345.85 - sq.m 37.20 -(b) Lime concrete surface ditto 114.15 - " 12.30 -

Page 45: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 45

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

19 Preparing, watering and ramming surface for laying concrete(for Headworks only):-(a) Horizontal floor 100Sft 346.00 - sq.m 37.25 -(b) Glacis and crest ditto 498.15 - " 53.60 -(c) Inverted filters ditto 162.60 - " 17.50 -

20 Fabrication of high tensile steel prestressing cables for 100 Kg. 4963.30 38007.80 100 Kg. 4963.30 38007.80 *811-1 The rate includes wastage inprestressed (post tensioned) concrete, including assembling by to cutting and breakage in stressing,drawing the H.T. wire through metal spacer plate, inserting in helix 811-11 etc.core and taping or tying, sheathing in longitudinally welded metalcorrugated sheath, positioning , anchorage with male and femaleset of anchorage cone, forming ducts for transverse cable,stressing cables with jack at both ends as per stressing schedule,maintaining stressing record and supply the same in the approvedproforma to the Engineer-in-charge, making loop at blind end,including all materials required for it, grouting the cable ducts withcement, cutting projected ends and making good recesses, etc.,complete in all respects.

21 Fabrication of High Tensile steel reinforcement for prestressed 100kg 2955.50 34880.25 %kg 2955.50 34880.25 1) The rate includes wastage in(pretension) concrete work, including inserting wire in moulds, cutting and breakage in stressing,etc.providing M.S. shear bars, spacers and lift hooks, male and female anchorage, tie down, struts, stressing cables, maintaining 2) Quantity of H. T. wire will formstress record and supply the same in approved proforma to the basis of payment.Engineer-in-charge, cutting wires and projecting ends and making 3) This item shall not be applicablegood recesses, etc., complete in all respects. to factory made units.

22 Lifting, transporting and placing precast prestressed concrete *811-1B eam, Girder and other members (excluding battens) etc. in toPosition on the bridge to correct alignment and level, etc. 811-11complete

i) Beam upto 50 ft. (15 m) length 100Cft 1826.05 cu.m 644.95ii) Beam above 50 ft. (15m) upto 75 ft. (22.5m) length 100Cft 2586.44 cu.m 913.55iii) Beam above 75ft. (22.5m) upto 100ft. (30m) length 100Cft 3500.35 cu.m 1236.30iv) Beam above 100ft. (30m) upto 150ft.(45m) length 100Cft 4548.15 cu.m 1606.40v) Beam above 150ft. (45m) length 100Cft 5629.05 cu.m 1988.20

Page 46: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 46

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

23 Providing and laying foam concrete 3 inch (75 mm) thick, Per Sft. 32.00 69.15 sq.m. 344.30 744.05using cement sand in the ratio of 1:2 and aluminium powderat the rate of 0.2% of the cement, sand mix,

24 Providing and fixing 6 in(150 mm). wide curved sheet ofrequired shape fixed on face of the construction joint with G.I.screw,1.5 in (40 mm) long to cover construction jointsvertically:-

i) aluminium sheet 1/16 in(1.5 mm) thick Per Rft. 15.80 92.70 Metre 51.80 304.05ii) G.I. sheet, 18 SWG Per Rft. 16.15 82.75 Metre 52.95 271.40

25 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminiumstrip on horizontal and vertical expansion joints in walls, columns,ceilings and floors etc., including cost of clips/screws etc.,complete in all respects:-

a) On interior surface (without mastic strip) Per Rft. 14.40 91.35 Metre 47.25 299.65b) On exterior surface (with mastic strip) ditto 14.40 94.95 " 47.25 311.45

26 Providing and fixing 1/16" (1.5 mm) thick copper flashing on Per Sft. 16.25 105.25 Sq.m 174.85 1132.50expansion joints complete in all respects.

27 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG. Per Rft. 5.35 66.20 Metre 17.55 217.15stopper to expansion joint.

28 Providing embeding 10" (250 mm) wide ¼" (6 mm) thick Per Rft. 21.60 69.60 Metre 70.85 228.25rubber water stopper in expansion joints of R.C.C. roofslab complete in all respects.

29 Filling expansion joints with bitumen. sand & saw dust in Per Rft P.Metre/ratio 1:2:2. per inch 3.80 16.95 Per 25 mm 12.45 55.60

width Width

30 Filling expansion joints with bitumen. Per Rft. 56.20 - Metre 184.35 -

Page 47: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 47

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

31 Laying asphaltic mixture in expansion joints. Per Rft. 53.30 - Metre 174.80 - Material to be paid on actuals.

32 Providing and fixing theremopore (foamed polythene)sheet in horizontal and vertical expansion joints:

a) 1" (25 mm) thick thermopore sheet Per Sft. 6.50 12.00 Sq.m 69.95 129.10b) 1½" (40 mm) thick thermopore sheet ditto 6.50 15.90 " 69.95 171.10

33 Providing and laying damp proof course of cement concrete 1:2: 4(using cement, sand and shingle), including bitumencoating :-

(a) with one coat bitumen and one coat polythene sheet 500gauge

i) 1½" thick (40 mm) 100Sft 1522.20 4473.60 sq.m 163.80 481.35ii) 2" thick (50 mm) 100Sft 1522.20 5019.05 sq.m 163.80 540.05iii) 3" thick (75 mm) 100Sft 1579.80 6265.35 sq.m 170.00 674.15

(b) with 2 coats of bitumen:

i) 1½" thick (40 mm) 100Sft 1522.20 4757.80 sq.m 163.80 511.95ii) 2" thick (50 mm) 100Sft 1522.20 5302.65 sq.m 163.80 570.55iii) 3" thick (75 mm) 100Sft 1579.80 6548.95 sq.m 170.00 704.65

34 Providing and laying damp proof course with cement sandplaster and bitumen coating:-

(a) with one coat of bitumen and one coat of polythene sheet500 gauge :-

i) Ratio 1: 4 a) ½" thick (13 mm) 100Sft 1435.70 2943.45 sq.m 154.50 316.70 b) ¾" thick (20 mm) 100Sft 1435.70 3226.15 sq.m 154.50 347.15

Page 48: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 48

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

ii) Ratio 1:3 a) ½ " thick (13 mm) 100Sft 1435.70 3032.70 sq.m 154.50 326.30 b) ¾ " thick (20mm) 100Sft 1435.70 3331.15 sq.m 154.50 358.45

iii) Ratio 1:2a) ½ " thick (13 mm) 100Sft 1435.70 3168.80 sq.m 154.50 340.95b) ¾ " thick (20 mm) 100Sft 1435.70 3582.85 sq.m 154.50 385.50

(b) with 2 coats of bitumen:-

i) Ratio 1: 4a) ½" thick (13 mm) 100Sft 1435.70 3098.20 sq.m 154.50 333.35b) ¾" thick (20 mm) 100Sft 1435.70 3381.10 sq.m 154.50 363.80

ii) Ratio 1:3a) ½ " thick (13 mm) 100Sft 1435.70 3188.50 sq.m 154.50 343.10b) ¾ " thick (20 mm) 100Sft 1435.70 3486.95 sq.m 154.50 375.20

iii) Ratio 1:2a) ½ " thick (13 mm) 100Sft 1435.70 3410.90 sq.m 154.50 367.00b) ¾ " thick (20 mm) 100Sft 1435.70 3856.15 sq.m 154.50 414.90

35 Providing and laying vertical damp proof course with cementsand plaster and bitumen coating:-

(a) with one coat of bitumen and one coat of polythene sheet 500 gauge:

i) Ratio 1: 4a) ½" thick (13 mm) 100Sft 1435.70 2856.70 sq.m 154.50 307.40b) ¾" thick (20 mm) 100Sft 1435.70 3139.85 sq.m 154.50 337.85

ii) Ratio 1:3a) ½ " thick (13 mm) 100Sft 1435.70 2946.40 sq.m 154.50 317.05b) ¾ " thick (20 mm) 100Sft 1435.70 3244.85 sq.m 154.50 349.15

Page 49: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 49

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

iii) Ratio 1:2a) ½ " thick (13 mm) 100Sft 1435.70 3168.80 sq.m 154.50 340.95b) ¾ " thick (20 mm) 100Sft 1435.70 3614.05 sq.m 154.50 388.85

(b) with 2 coats of bitumen:-

i) Ratio 1: 4a) ½" thick (13 mm) 100Sft 1435.70 3098.10 sq.m 154.50 333.35b) ¾" thick (20 mm) 100Sft 1435.70 3381.10 sq.m 154.50 363.80

ii) Ratio 1:3a) ½ " thick (13 mm) 100Sft 1435.70 3187.65 sq.m 154.50 343.00b) ¾ " thick (20 mm) 100Sft 1435.70 3486.10 sq.m 154.50 375.10

iii) Ratio 1:2a) ½ " thick (13 mm) 100Sft 1435.70 3410.30 sq.m 154.50 366.95b) ¾ " thick (20 mm) 100Sft 1435.70 3855.35 sq.m 154.50 414.85

36 Grouting concrete between, the grooves of gates, including 100Cft 6761.70 - cu.m. 2388.25 -shuttering.

37 Chiesel dressing concrete surface on sides of grooves. 100Sft 190.20 - sq.m 20.45 -

38 Laying and ramming dry ballast or kankar. 100Cft 2475.35 - cu.m 874.30 -

39 Hoisting and placing in position R.C.C. shelves. per No. 74.60 - per No. 74.60 -

40 Breaking brick ballast, screening and stacking:-(a) 2"(50 mm) ring 100Cft. 1904.10 - cu.m 672.55 -(b) 1½ "(40 mm) ring ditto 2132.60 - " 753.25 -(c) 1" (25 mm) ring ditto 2475.35 - " 874.30 -(d) Jhama ballast ¾"(20 mm) ring ditto 2856.15 - " 1008.80 -

41 Supplying and fixing broken glasses on court yard walls, Per Rft 58.85 104.75 metre 193.05 343.60including 1:3: 6 cement concrete coping.

Page 50: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

Chap-6 (Concrete) Page 50

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

42 Crushing stone ballast by machine. 100Cft 1904.10 - cu.m. 672.55 - This does not include the chargesfor working of crushers, but includesmanual labour for carriageof stone tocrusher within three chains (90 m)and also stacking the product aftercrushing within three chains (90 m).

43 Breaking stone ballast screened and stacked:-

(a) 2" ring (50 mm) 100Cft. 2132.60 - cu.m. 753.25 -(b) 1½ " ring (40 mm) ditto 2475.35 - " 874.30 -(c) 1" ring (25 mm) ditto 2856.15 - " 1008.80 -d) ½ " ring (13 mm) ditto 3808.20 - " 1345.05 -(e)1/8" to ¼" ring (3 mm to 6 mm) ditto 6473.95 - " 2286.60 -

44 Screening and stacking stone ballast shingle or bajri, etc. 100Cft. 609.30 - cu.m. 215.20 -

45 Washing ballast, bajri or shingle. 100Cft. 609.30 - cu.m. 215.20 -

46 Erecting and carting sun shades of precast R.C. concreteupto 5' x 2½' (1.50 m x 0.76 m) Each 330.20 - Each 330.20 -

Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"

Page 51: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-7(Brickwork) Page 51

1 Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.2 The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Pacca brick work in mud mortar in buildings: 21.1 Masonry of boundary wall to beto considered as masonry other than

i) in foundation and plinth 100Cft. 2955.85 14512.15 cu.m 1044.00 5125.70 21.4 building.ii) in ground floor ditto 3911.00 15467.30 ditto 1381.35 5463.05

The composite rate is to bereduced by 7% and 14%, if 2nd or3rd class bricks are used.

2 Add extra labour on item No. 1 for brick work in:-

i) first floor 100Cft. 782.25 -- cu.m 276.30 -ii) second floor ditto 1737.40 -- ditto 613.65 -iii) third floor ditto 2692.55 -- ditto 951.00 -iv) fourth & subsequent floors ditto 4298.20 -- ditto 1518.10 -

3 Pacca brick work in mud mortar other than building:- 21.1 to Same remarks as against21.4 item No. 1 above

i) upto 20 ft. (6.1 m) height 100Cft. 4029.70 15586.00 cu.m 1423.30 5505.00ii) extra labour for every 5 ft. (1.5 m) ditto 782.25 -- ditto 276.30 -

additional height, or part thereof.

4 Pacca brick work in foundation and plinth in:- ditto Same remarks as againstitem No. 1 above.

i) Cement, sand mortar:-

Ratio 1:2 100Cft. 3887.55 20483.55 cu.m 1373.05 7234.80Ratio 1:3 ditto 3887.55 19286.55 ditto 1373.05 6812.00Ratio 1:4 ditto 3887.55 18568.35 ditto 1373.05 6558.35Ratio 1:5 ditto 3887.55 18089.55 ditto 1373.05 6389.25Ratio 1:6 ditto 3887.55 17729.70 ditto 1373.05 6262.15Ratio 1:7 ditto 3887.55 17494.95 ditto 1373.05 6179.20Ratio 1:8 ditto 3887.55 17287.50 ditto 1373.05 6105.95

ii) lime, cement sand mortar:- 21.1 The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 3887.55 18009.55 cu.m 1373.05 6360.95Ratio 1:1:7 ditto 3887.55 17757.05 ditto 1373.05 6271.80Ratio 1:1:8 ditto 3887.55 17553.05 ditto 1373.05 6199.75Ratio 1:1:9 ditto 3887.55 17381.80 ditto 1373.05 6139.25Ratio 1:1:10 ditto 3887.55 17253.55 ditto 1373.05 6093.95

iii) lime, sand mortar 1:2 100Cft. 3887.55 16846.5 cu.m 1373.05 5950.2 ditto ditto

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

7. BRICK WORK

Page 52: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-7(Brickwork) Page 52

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

5 Pacca brick work in ground floor:- ditto i) The composite rate is tobe reduced by 7% and 14%,

i) cement, sand mortar:- if 2nd or 3rd class bricks areused.

Ratio 1:2 100Cft. 5147.40 21743.40 cu.m 1818.05 7679.75 ii) Masonry of boundary wallRatio 1:3 ditto 5147.40 20546.40 ditto 1818.05 7257.00 to be considered as masonryRatio 1:4 ditto 5147.40 19828.20 ditto 1818.05 7003.30 other than building.Ratio 1:5 ditto 5147.40 19349.40 ditto 1818.05 6834.20Ratio 1:6 ditto 5147.40 18989.50 ditto 1818.05 6707.10Ratio 1:7 ditto 5147.40 18754.80 ditto 1818.05 6624.20Ratio 1:8 ditto 5147.40 18545.75 ditto 1818.05 6550.35

ii) lime, cement, sand mortar:- The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 5147.40 19269.35 cu.m 1818.05 6805.95Ratio 1:1:7 ditto 5147.40 19019.50 ditto 1818.05 6717.70Ratio 1:1:8 ditto 5147.40 18812.85 ditto 1818.05 6644.70Ratio 1:1:9 ditto 5147.40 18641.60 ditto 1818.05 6584.20Ratio 1:1:10 ditto 5147.40 18513.80 ditto 1818.05 6539.05

iii) lime, sand mortar 1:2 100Cft. 5147.40 18106.30 cu.m 1818.05 6395.15 The rate of lime mortar also

includes grinding of mortar.

6 Add extra labour on item No. 5 for brickworkin:-

i) first floor 100Cft. 782.25 -- cu.m 276.30 -ii) second floor ditto 1737.40 -- ditto 613.65 -iii) third floor ditto 2692.55 -- ditto 951.00 -iv) fourth & subsequent floors ditto 4298.20 -- ditto 1518.10 -

7 Pacca brick work other than building upto 10ft. (3 m) 21.1 i) The composite rate is to beheight. to reduced by 7% and 14%, if 2nd or

21.5 3rd class bricks are used.i) cement, sand mortar:-

ii) Workshops, godowns,, bins,Ratio 1:2 100Cft. 4483.25 21079.25 cu.m 1583.50 7445.20 house type godowns, reservoirs,Ratio 1:3 ditto 4483.25 19882.25 ditto 1583.50 7022.40 filter beds, storage tanks, wells,Ratio 1:4 ditto 4483.25 19164.05 ditto 1583.50 6768.75 screening chambers, collectingRatio 1:5 ditto 4483.25 18685.25 ditto 1583.50 6599.65 tanks, manholes etc. are to beRatio 1:6 ditto 4483.25 18325.35 ditto 1583.50 6472.50 treated as masonry other thanRatio 1:7 ditto 4483.25 18090.65 ditto 1583.50 6389.60 buildings.Ratio 1:8 ditto 4483.25 17883.20 ditto 1583.50 6316.35

ii) lime, cement, sand mortar:- The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 4483.25 18605.25 cu.m 1583.50 6571.35Ratio 1:1:7 ditto 4483.25 18352.70 ditto 1583.50 6482.15

Page 53: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-7(Brickwork) Page 53

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

Ratio 1:1:8 ditto 4483.25 18148.70 ditto 1583.50 6410.10Ratio 1:1:9 ditto 4483.25 17977.40 ditto 1583.50 6349.60Ratio 1:1:10 ditto 4483.25 17849.25 ditto 1583.50 6304.35

iii) lime, sand mortar 1:2 100Cft. 4483.25 17442.15 cu.m 1583.50 6160.55 ditto

8 Add extra labour on item No. 7, for every 10ft.(3 m) 100Cft. 782.25 -- cu.m 276.30 -additional height, or part thereof.

9 Extra labour for arch work in brick masonry, including 100Cft. 1342.20 -- cu.m 474.05 - 21.5labour for centring and decentring.

10 Extra for pacca brick work in steining of wells or any other 100Cft. 864.60 1553.40 cu.m 305.40 548.65 21.1 The composite rate is to becircular masonry. to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.

11 Extra labour for profile and flared walls. 100Cft. 297.40 -- cu.m 105.05 -

12 Extra labour for pacca brick work in piers and abutment:-

i) from 10ft. to 20ft. (3 m to 6 m) height 100Cft. 387.65 -- cu.m 136.90 -ii) above 20 ft. (6 m) height. 100Cft. 782.25 -- cu.m 276.30 -

13 Extra for face work (half brick thick) using special bricks 100Cft. 3453.05 cu.m 1219.60 This item is to be executed onlyinstead of first class bricks. under the written permission of

Superintending Engineer.

14 Reinforced brick work in lintel of openings, laid in 1:3 Per Cft. 127.95 288.70 cu.m 4518.85 10196.90cement mortar, including all labour, material, forms,moulds, lifting & shuttering, etc, (but excluding cost andlabour of steel reinforcement which shall be paid forseparately).

15 Extra for dressing or chamfering bricks for:-

a) special architectural bricks 100 Nos. 2282.20 - % Nos. 2282.20 -b) all other purposes ditto 1141.10 - ditto 1141.10 -

16 Perforated pacca brick walling half brick thick, in ground 21.1 The composite rate is to befloors:- to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.i) mud mortar 100 Sft. 1952.45 4845.70 Sqm. 210.10 521.40

ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 2579.90 6733.10 sq.m. 277.60 724.50Ratio 1:3 ditto 2579.90 6433.45 ditto 277.60 692.25Ratio 1:4 ditto 2579.90 6254.30 ditto 277.60 672.95

Page 54: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-7(Brickwork) Page 54

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

Ratio 1:5 ditto 2579.90 6134.60 ditto 277.60 660.10Ratio 1:6 ditto 2579.90 6050.40 ditto 277.60 651.00Ratio 1:7 ditto 2579.90 5985.25 ditto 277.60 644.00Ratio 1:8 ditto 2579.90 5937.20 ditto 277.60 638.85

iii) lime, cement sand mortar The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Sft. 2579.90 6114.60 sq.m 277.60 657.95Ratio 1:1:7 100Sft. 2579.90 6050.30 sq.m 277.60 651.00Ratio 1:1:8 100Sft. 2579.90 6003.15 sq.m 277.60 645.95Ratio 1:1:9 100Sft. 2579.90 5956.85 sq.m 277.60 640.95Ratio 1:1:10 100Sft. 2579.90 5929.90 sq.m 277.60 638.05

iv) lime, sand mortar 1:2 100Sft. 2579.90 5820.55 sq.m 277.60 626.30 ditto

17 Add extra labour on item No. 16 for pacca brick work in:-

i) first floor 100Sft. 394.55 - sq.m 42.45 -ii) second floor ditto 865.25 - ditto 93.10 -iii) third floor ditto 1349.75 - ditto 145.25 -iv) fourth & subsequent floors ditto 2066.40 - ditto 222.35 -

18 Perforated pacca brick walling one brick thick, in ground 21.1 The composite rate is to befloor: to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.i) mud mortar 100Sft. 2761.95 8540.10 sq.m 297.20 918.90

ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 3874.50 12172.50 sq.m 416.90 1309.75Ratio 1:3 ditto 3874.50 11574.00 ditto 416.90 1245.35Ratio 1:4 ditto 3874.50 11214.90 ditto 416.90 1206.70Ratio 1:5 ditto 3874.50 10975.50 ditto 416.90 1180.95Ratio 1:6 ditto 3874.50 10807.10 ditto 416.90 1162.85Ratio 1:7 ditto 3874.50 10676.30 ditto 416.90 1148.75Ratio 1:8 ditto 3874.50 10574.50 ditto 416.90 1137.80

iii) lime, cement, sand mortar:- The rate of lime mortar alsoRatio 1:1:6 100Sft. 3874.50 10935.45 sq.m 416.90 1176.65 includes grinding of mortarRatio 1:1:7 ditto 3874.50 10806.10 ditto 416.90 1162.75Ratio 1:1:8 ditto 3874.50 10707.30 ditto 416.90 1152.10Ratio 1:1:9 ditto 3874.50 10621.60 ditto 416.90 1142.90Ratio 1:1:10 ditto 3874.50 10558.85 ditto 416.90 1136.15

iv) lime, sand mortar 1:2 100Sft. 3874.50 10352.70 sq.m 416.90 1113.95 ditto

19 Add extra labour on item No. 18 for perforated pacca brickwork in:-

i) first floor 100Sft. 586.65 -- sq.m 207.20 -

Page 55: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-7(Brickwork) Page 55

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

ii) second floor ditto 1303.05 -- ditto 460.25 -iii) third floor ditto 2019.40 -- ditto 713.25 -iv) fourth & subsequent floors ditto 3223.65 -- ditto 1138.60 -

20 Fire brick masonry in fireclay mortar:- 21.1to

i) upto 20 ft. (6.10 m) height including all charges. Per Cft. 48.30 642.55 cu.m 1705.65 22695.05 21.2

ii) Extra for every 5 ft. (1.5 m) additional height, or part 100Cft. 782.25 -- ditto 276.30 - A&C No.I dated 2.9.1998thereof.

21 First class brick walling laid in 1:3 cement sand mortar,reinforced with 1" (25 mm) wide 18 gauge hoop iron:- 21.19

i) 4½" (113 mm) thick walling with hoop iron, bonding 6" 100Sft. 2144.35 9084.15 sq.m 230.75 977.45(150 mm) apart.

ii) 4½" (113 mm) thick walling with hoop iron, bonding 100Sft. 1910.70 8397.20 sq.m 205.60 903.5512" (300 mm) apart.

iii) 3" (75 mm) thick walling with hoop iron, bonding 6" ditto 1698.20 6758.20 ditto 182.75 727.20(150 mm) apart.

iv) 3" (75 mm) thick walling with hoop iron, bonding 12" ditto 1358.55 5915.05 ditto 146.20 636.45(300 mm) apart.

22 Ghilafi work (1½ brick thick wall) 100Cft. 3936.35 10247.90 cu.m 1390.30 3619.55 21.18

23 Dry brick pitching 100Cft. 2387.90 13727.90 cu.m 843.40 4848.70 21.1

24 Sun dried bricks in mud mortar 100Cft. 3328.50 4395.30 cu.m 1175.65 1552.40 21.16

25 Pise wall (mud walling) 100Cft. 1922.45 -- cu.m 679.00 - 21.17

26 Eave brick moulded, weathered and throated with back 21.1 to 21.2brick or drip course cornice, in 1:3 cement mortar:-

i) 3" (75 mm) thick drip course cornice Rft. 24.35 57.90 Metre 79.85 189.90 correction vide A&C No.I ii) 4½" (113 mm) thick drip course cornice. ditto 27.60 109.90 ditto 90.55 360.45 dated 2.9.98iii) 4½" (113 mm) thick eave brick with back brick. ditto 19.10 124.95 ditto 62.65 409.85

27 Laying dressed or moulded brick cornices in 1:6 cement 21.1 to 21.2mortar, plastering or painting complete:-

i) 1 brick Rft. 27.60 43.45 Metre 90.55 142.50ii) 2 bricks ditto 40.60 89.00 ditto 133.15 291.90iii) 3 bricks ditto 54.20 135.65 ditto 177.80 444.95iv) 4 bricks ditto 68.20 184.50 ditto 223.70 605.15

28 Cleaning bricks dismantled from kacha pacca masonry 1,000 1066.30 -- 1,000 1066.30 -Nos Nos

29 Scraping bricks dismantled from pacca masonry 1,000 2010.75 -- 1,000 2010.75 -

Page 56: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-7(Brickwork) Page 56

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

Nos Nos

30 Supplying and filling sand under floor; or plugging in wells. 100Cft. 253.90 1813.90 cu.m 89.70 640.65

31 Providing and laying 2" (50 mm) thick and 15" (375 mm) Rft. 101.65 157.90 Metre 333.40 517.90projected tile band, laid in 1:2 cement sand mortar, withhoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"apart.

32 First class brick tiles clad by laying tiles in stretcher This item is to be executed onlycourse in cement sand mortar reinforced with 18 SWG under the written permission of thehoop iron strips bonding placed at 2.0' (600 mm) apart Superintending Engineer.horizontally, and at 1.0' (300 mm) interval vertically.

i) 1:3 100Sft. 1910.70 9567.90 sq.m 205.60 1029.50ii) 1:4 ditto 1910.70 9280.60 ditto 205.60 998.60

33 Chamfering sides of head regulators and masonry walls to Per Sft. 54.20 -- sq.m 583.20 -increase width.

34 Replacing kallar eaten bricks Each No. 41.50 48.55 Each 41.50 48.55

35 Repairing corners of bridges and other hydraulic masonry Each No. 271.05 346.60 Each 271.05 346.60works

36 Extra labour for drains of bath rooms, etc. Per Lft. 21.60 -- Metre 70.85

37 Maroo corners Each 138.35 -- Each 138.35 Payable in addition to brick workCorner Corner

38 % Sft 4248.50 13874.25 P.Sqm 457.15 1492.85Providing and laying Fair Face Gutka, clading laid with 1:3 cement / red

Page 57: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-8(Stone masonary) Page 57

1 The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means oftransport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.

2 The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of thestone or spawl carried.

3 Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl issupplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall formthe basis of laying.

4 Rates for all finished work include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Random, rubble masonry (uncoursed), in foundation and 22.10,plinth: 22.11

a) dry masonry 100 Cft. 4014.10 4818.10 cu.m 1417.80 1701.75b) in mud mortar 100 Cft. 5025.25 6107.35 cu.m 1774.90 2157.10c) in lime, sand mortar 1:2 100 Cft. 7662.60 10547.40 cu.m 2706.45 3725.35d) in cement, sand mortar

i) ratio 1:3 100 Cft. 7662.60 14555.10 cu.m 2706.45 5140.85ii) ratio 1:4 100 Cft. 7662.60 13477.80 cu.m 2706.45 4760.35

iii) ratio 1:6 100 Cft. 7662.60 12244.80 cu.m 2706.45 4324.85iv) ratio 1:8 100 Cft. 7662.60 11562.60 cu.m 2706.45 4083.90

2 Coursed rubble masonry hammer dressed, in foundation 22.8and plinth:

a) dry masonry 100 Cft. 4878.70 5682.70 cu.m 1723.15 2007.15b) in mud mortar 100 Cft. 6900.95 7983.05 cu.m 2437.40 2819.60c) in lime, sand mortar 1:2 100 Cft. 8509.05 11161.90 cu.m 3005.40 3942.40d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 8509.05 15013.05 cu.m 3005.40 5302.60ii) ratio 1:4 100 Cft. 8509.05 14055.45 cu.m 3005.40 4964.40

iii) ratio 1:6 100 Cft. 8509.05 12958.85 cu.m 3005.40 4577.05iv) ratio 1:8 100 Cft. 8509.05 12356.50 cu.m 3005.40 4364.30

3 Random rubble masonry (uncoursed) in 22.10ground floor or 20 ft.(6 m) height, building/otherthan building.

a) dry masonry 100 Cft. 4446.40 5250.40 cu.m 1570.45 1854.45b) in mud mortar 100 Cft. 6036.35 7118.45 cu.m 2132.05 2514.25

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

8. STONE MASONRY

Page 58: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-8(Stone masonary) Page 58

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

c) in lime, sand mortar 1:2 100 Cft. 8292.90 11177.70 cu.m 2929.05 3947.95d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 8292.90 15185.40 cu.m 2929.05 5363.50ii) ratio 1:4 100 Cft. 8292.90 14108.10 cu.m 2929.05 4983.00

iii) ratio 1:6 100 Cft. 8292.90 12875.10 cu.m 2929.05 4547.50iv) ratio 1:8 100 Cft. 8292.90 12192.90 cu.m 2929.05 4306.55

4 Coursed rubble masonry hammer dressed, in ground floor 22.8or 20 ft. (6 m) height, building/other than building.

a) dry masonry 100 Cft. 5691.85 6495.85 cu.m 2010.35 2294.35b) in mud mortar 100 Cft. 8527.20 9596.95 cu.m 3011.80 3389.65c) in lime, sand mortar 1:2 100 Cft. 9538.30 12191.20 cu.m 3368.95 4305.95d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 9538.30 16042.30 cu.m 3368.95 5666.15ii) ratio 1:4 100 Cft. 9538.30 15084.70 cu.m 3368.95 5327.90

iii) ratio 1:6 100 Cft. 9538.30 13988.10 cu.m 3368.95 4940.60iv) ratio 1:8 100 Cft. 9538.30 13385.75 cu.m 3368.95 4727.85

5 Ashlar block in course or scabbled masonry (including 22.5dressing, etc.,) in ground floor or 20 ft. (6 m) height, &building/other than building. 22.6

a) in lime, sand mortar 1:2 100 Cft. 24732.85 27271.60 cu.m 8735.65 9632.35b) in cement, sand mortar:

i) ratio 1:3 100 Cft. 24732.85 29943.65 cu.m 8735.65 10576.10ii) ratio 1:4 100 Cft. 24732.85 29225.45 cu.m 8735.65 10322.45

iii) ratio 1:6 100 Cft. 24732.85 28411.50 cu.m 8735.65 10034.95

6 Ashlar fine masonry (including dressing, etc.) in ground 22.3floor or 20 ft. 6 m) height, building/other than building. (A) to

(C) &a) in lime, sand mortar 1:2 100 Cft. 43908.50 46197.75 cu.m 15508.50 16317.05 22.4b) in cement, sand mortar:

i) ratio 1:3 100 Cft. 43908.50 47533.80 cu.m 15508.50 16788.95ii) ratio 1:4 100 Cft. 43908.50 47174.20 cu.m 15508.50 16661.95

iii) ratio 1:6 100 Cft. 43908.50 46775.75 cu.m 15508.50 16521.20

7 Extra labour on items 3, 4, 5 & 6 above for work in:-

i) first floor 100 Cft. 1099.25 - cu.m 388.25 -ii) second floor 100 Cft. 2414.25 - cu.m 852.70 -iii) third floor 100 Cft. 3759.70 - cu.m 1327.95 -iv) fourth floor 100 Cft. 5902.20 - cu.m 2084.65 -

8 Extra labour on items 3,4,5 & 6 above for every 5 ft.(1.5 m) 100 Cft. 955.15 - cu.m 337.35 -

additional height, other than building, or part thereof.

Page 59: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-8(Stone masonary) Page 59

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

9 Extra labour for arch work in stone masonry, including 100 Cft. 2688.95 - cu.m 949.75 - 22.12centering and decentring, etc.

10 Extra labour for:- 22.7

a) coping and caps, etc. 100 Cft. 12450.25 - cu.m 4397.45 -b) cornice & string course 100 Rft. 12450.25 - Rm. 408.35 -

11 Dressing stones:- 22.2i) This rate of dressing shall be paid

a) hammer dressed 100 Sft. 4981.70 - sq.m 536.05 only when the supply of undressedb) rough tooled dressed 100 Sft. 9354.05 - sq.m 1006.50 stone is made.c) chisel dressed 100 Sft. 11346.70 - sq.m 1220.90 ii) In case of masonry, dressing isd) fine dressed 100 Sft. 23105.30 - sq.m 2486.15 already included and this rate shall

not be added thereto.iii) Only dressed surface of stoneshall be measured.

12 Dhajji walling 5"x5" (125 mmx125 mm) thick deodar 100 Sft. 9883.65 15708.35 sq.m 1063.50 1690.20 22.13framing with stone laid in 1:6 cement sand mortar, and 1:4cement sand plaster on both sides.

13 Providing and fixing stone blocks from 2 Cft. Per Cft. 460.80 490.60 cu.m 16275.45 17328.00(0.6 cu.m) to 6 Cft (0.17 cu.m). eachincluding lift upto 20 ft. (6 m)

14 Providing and fixing stone blocks, under 2 Per Cft. 259.60 292.35 cu.m 9169.05 10325.80Cft. (06 cu.m) each including lift upto 20 ft.(6 m)

Page 60: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-9(Roofing) Page 60

Rates for all finished works include the removal of surplus debris unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 First class tile roofing, consisting of 4" (100 mm) earth 100Sft. 6972.50 12255.40 sq.m 750.25 1318.70 23.1 Add extra 13%, 32% & 51% onand 1" (25 mm) mud plaster with Gobri leeping over ½" (13 labour rates only or 6%, 15% & 23%mm) thick cement plaster 1:6 with 34 lbs. per %Sft or on composite rates for 2nd, 3rd, 4th1.72 Kg/sq.m hot bitumen coating sand blinded, provided & sub- sequent floors, respectively.over 2 layers of tiles 12"x6"x1¼" (300x150x30 mm) laid in1:6 cement mortar with ½" (13 mm) thick sand wichedlayer of 1:6 cement mortar, including 1:2 cement pointingunderside of tiles, complete, including curing, etc.

2 Second class tile roofing consisting of 4" (100 mm) earth 100Sft. 5409.35 9209.20 sq.m 582.05 990.90 23.2 dittoand 1" (25 mm) mud plaster with Gobri leeping over ½" (13mm) thick cement plaster 1:6 with 34 lbs. per %Sft or1.72 Kg/sq.m of hot bitumen coating sand blinded,provided over one layer of 12"x6"x2" (300x150x50 mm)tiles laid in 1:6 cement mortar, including 1:2 cementpointing underneath of tiles complete including curing, etc.

3 Covering mud roof with coal tar, and fine sand. 100Sft. 294.15 966.50 sq.m 31.65 104.00 23.1 to 23.2 ditto

4 Filling spaces in between:-

a) Wooden battens over beams, filled with 100Sft. 542.10 2305.60 sq.m 58.35 248.10 Add extra 13%, 32% & 51% ondeodar wood pieces (spacers). roof area labour rates only or 6%, 15% &

b) RCC battens, filled with CC block 1:3:6. -ditto- 1034.35 1425.35 111.30 153.35 23% on composite rates for 2nd,c) Spaces filled with bricks. -ditto- 284.55 797.85 30.60 85.85 3rd, 4th & sub- sequent floors,

respectively.

5 Single layer of tiles 9"x4½"x1½" (225x113x40 mm) laid 100Sft. 1695.35 6292.95 sq.m 182.40 677.10 23.1 dittoover 4"(100 mm) earth and 1" (25 mm) mud plaster withoutBhoosa, grouted with cement sand 1:3 on top of RCC roofslab, provided with 34 lbs. per %Sft. or 1.72 Kg/Sq.mbitumen coating sand blinded.

6 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 to For steel part and its erection etc.mortar, including an average depth of 4" (100 mm) cement 23.5 items 10 & 14 under Chapter IRONconcrete in haunches and over crown, with 3" (75 mm) WORK be referred.earth and 1" (25 mm) plaster, soffits of arches cementplaster 1:6 and ½" (13 mm) thick. The rate also includes Add extra 13%, 32% & 51% onbitumen coating, centring, laying skew bricks in cement labour rates only or 6%, 15% & 23%mortar (1:3), and encasing exposed flanges of the joints on composite rates for 2nd, 3rd, 4thwith fine cement concrete 1:2:4 using stone aggregate:- & sub- sequent floors, respectively.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

9. ROOFING

Page 61: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-9(Roofing) Page 61

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

a) cement concrete in haunches 1:6:12. 100Sft. 7665.50 18493.10 sq.m 824.80 1989.85b) cement concrete in haunches 1:3:6. ditto 7665.50 19732.70 ditto 824.80 2123.25

7 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 For steel part and its erection etc.mortar, including an average depth of 4" (100 mm) cement to items 10 & 14 under Chapter IRONconcrete in haunches and over crown, with ½" (13 mm) 23.5 WORK be referred.cement plaster 1:6 on top (except earth filling mud plasterand gobri) soffit of arches cement plastered. The rate also Add extra 13%, 32% & 51% onincludes bitumen coating, centring, laying skew bricks in labour rates only or 6%, 15% & 23%cement sand mortar (1:3), and encasing exposed flanges on composite rates for 2nd, 3rd, 4thof the joints with fine cement concrete 1:2:4 using stone & sub- sequent floors, respectively.aggregate:-

a) cement concrete in haunches 1:6:12. 100Sft. 6232.80 17565.00 sq.m 670.65 1890.00b) cement concrete in haunches 1:3:6. ditto 6232.80 18046.75 ditto 670.65 1941.85

8 Extra for vaulted jack arch roofing. 100Sft. 1383.35 sq.m 148.85 - ditto

9 Jack arch roofing of shingle and cement concrete 1:3:6, 100Sft. 8943.65 17408.35 sq.m 962.35 1873.15 23.3 ditto

4½" (113 mm) thick at crown, with ½" (13 mm) cement toplaster including cost of supplying, erecting and 23.5dismantling centring.

10 Earth filling over roof including watering, ramming with 1" 23.1 Add extra 13%, 32% & 51% on(25 mm) mud plaster finished, with gobri leeping: to labour rates only or 6%, 15% & 23%

23.3 on composite rates for 2nd, 3rd, 4tha) 3" (75 mm) thick earth filling and 1" (25 mm) mud 100Sft. 768.35 1081.50 sq.m 82.70 116.35 & sub- sequent floors, respectively.

plaster

b) 4" (100 mm) thick earth filling and 1" (25mm) 100Sft. 1007.95 1382.90 sq.m 108.45 148.80mud plaster

11 1/8" (3 mm) thick gobri leeping on roofs or floors. 100Sft. 100.85 115.20 sq.m 10.85 12.40 ditto ditto

12 Two coats of bitumen laid hot using 34 lbs. per %Sft, or 100Sft. 609.30 1897.05 sq.m 65.55 204.10 23.11.72 Kg per square metre over roof and blinded with sandat one Cft. per %Sft. (0.003 cu.m per sq.m)

13 Providing & Fixing corrugated galvanized iron sheets with G.I. bolts, 23.7 Add extra 13%, 32% & 51% onnuts, limpet and bitumen washers, wind ties, complete in labour rates only or 6%, 15% & 23%all respects without valleys and ridges:- on composite rates for 2nd, 3rd, 4th

& sub- sequent floors, respectively,a) 20 BWG 100Sft. 1084.15 14426.95 sq.m 116.65 1552.35 on items 13 to 18.b) 22 BWG 100Sft. 1084.15 12377.1 sq.m 116.65 1331.8c) 24 BWG 100Sft. 1084.15 10072.6 sq.m 116.65 1083.8

14 Khassi parnalas in cement, sand mortar 1:2, 12" (300 Rft. 77.40 99.15 Metre 253.85 325.20 23.10

Page 62: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-9(Roofing) Page 62

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

mm) outside width finished smooth with a floating coat ofneat cement.

15 Khuras on roof 2'x2'x6" (600 x 600 x 150 mm) Each 291.90 481.05 Each 291.90 481.05 23.10

16 Bottom Khuras of brick masonry in cement mortar 1:6, Each 291.90 832.55 Each 291.90 832.55 23.104'x2'x4½" (1200x600x113 mm) over 3" (75 mm) cement concrete 1:4:8.

17 Plain galvanized iron sheets 22 SWG rain water down pipeincluding clamp and fixing in position.

a) 4" (100 mm) diameter down pipe Per Rft. 59.80 165.55 Metre 196.15 543.00b) 5" (125 mm) diameter down pipe Per Rft. 59.80 188.25 Metre 196.15 617.45

18 Plain galvanized iron sheet flashing, 22 gauge. Per Sft. 59.80 137.60 sq.m 643.45 1480.60 23.11

19 Providing and fixing 1/16" (1.5 mm) thick lead flashing over Per Sft. 17.30 83.70 Sq.m 186.15 900.60roof expansion joint complete in all respects.

20 Cast iron rain water downpipe fixed in position, excluding Add extra 13%, 32% & 51% onheads and shoes, but including painting and clamps, etc:- labour rates only or 6%, 15% & 23%

on composite rates for 2nd, 3rd, 4tha) 4" dia (100 mm) cast iron down pipe. Per Rft. 54.20 216.70 Metre 177.80 710.80 & sub- sequent floors, respectively,b) 3" (75 mm) cast iron down pipe. Per Rft. 54.20 192.85 Metre 177.80 632.55 on items 19 to 24

21 Rain water down pipe cast iron head fixed in place, Each 224.20 530.70 Each 224.20 530.70including cost of clamp holdfast and painting.

22 Shoes, bends or offsets for cast iron rain water down pipe, Each 81.30 323.60 Each 81.30 323.60including fixing and painting.

23 Plain GI sheet iron spouts fixed in position, including Each 249.10 370.50 Each 249.10 370.50 23.10painting.

24 Laying ½" (13 mm) thick deodar ceiling complete, 100Sft. 5743.30 19337.65 sq.m 618.00 2080.75 26.1including sawing, planing and fixing.

25 Flat sheet roof with galvanized iron plain sheets, includingbattens, rolls, screws, clips etc. (Planking to be paid forseparately):-

a) 22 BWG sheets roofing 100Sft. 3470.70 15720.55 sq.m 373.45 1691.55 23.60b) 24 BWG sheets roofing 100Sft. 3470.70 14193.10 sq.m 373.45 1527.20

26 Asbestos cement corrugated sheet roofing including 100Sft. 2387.90 6294.50 sq.m 256.95 677.30 23.8

necessary overlaps, and GI hook bolts, nuts, screws,washers and bitumen washers, etc. (excluding valleys and

Page 63: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-9(Roofing) Page 63

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

ridges, etc).

27 Extra labour for erection of GI sheets, flat sheet or 100Sft. 288.45 -- sq.m 31.05 - 23.6asbestos sheet roofing, above 20' (6.10 m) height indifficult position, including lifting with care and specialscaffolding along live electric wires.

28 Fixing asbestos cement sheet ridges and valleys ¼" Per Rft. 28.20 77.65 Metre 92.50 254.70 23.8(6 mm) thick.

29 Plain galvanized iron sheet ridging, including fixture, 23.6timber for ridge roll and ridge sheeting:-

a) 6" (150 mm) lap and 18" (450 mm) Per Rft. 74.75 391.75 Per Metre 245.20 1284.95overall, of 22 gauge G.I sheet ridging.

b) 9" (225 mm) lap and 24" (600 mm) Per Rft. 97.55 393.25 Per Metre 319.95 1289.85overall, of 24 gauge G.I sheet ridging.

c) 12" (300 mm) lap and 30" (750 mm) Per Rft. 97.55 458.75 Per Metre 319.95 1504.70overall, of 22 gauge G.I sheet ridging.

30 Plain 22 gauge G.I sheet gutter semi circular Per Rft. 48.80 167.75 Per Metre 160.05 550.20 23.118" (200 mm) dia meter.

31 Making masonry ventilators in cement, sand Each 1084.15 1622.95 Each 1084.15 1622.95mortar 1:4

32 Fixing water spouts or parnalas. Each 325.25 -- Each 325.25 - 23.10

33 Making drip course 2"x½" (50x13 mm) under RCC slab edges Per Rft. 14.00 15.30 Metre 45.90 50.20in outer opening, in cement, sand mortar 1:2.

34 Supplying and laying of twin G.I sheet 20 SWG duly Per Sft. 40.90 310.10 sq.m 440.10 3336.70painted with bitumen, with polythene film in between 300gauge, to provide a sliding joint under the bearing of thebeams, including 3" (75 mm) long, 3/8" (10 mm) dia bar toact as holdfast on wall and beam.

35 Providing and laying roof insulation, comprising of singlelayer of tiles 9"x4½"x1½" (225x113x40 mm) grouted withcement sand mortar 1:3 laid over 2" (50 mm) thick earth(including mud plaster) over thermopore sheet, overpolythene sheet 300 gauge over a layer of bitumen,complete in all respects:-

i) Thermopore sheet ½ " (13 mm) thick 100Sft. 2619.20 7319.70 sq.m 281.85 787.60ii) Thermopore sheet ¾ " (20 mm) thick 100Sft. 2619.20 7445.70 sq.m 281.85 801.15iii) Thermopore sheet 1" (25 mm) thick 100Sft. 2623.55 7576.05 sq.m 282.30 815.20

36 Providing and fixing AC rain water down pipe 4" (100 mm) Rft. 16.25 300.00 Metre 53.30 984.00

Page 64: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-9(Roofing) Page 64

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

dia, with shoe, T-bend, clamp, etc.

37 Making jharries in existing brick masonry for providing Rate will be increased by 1.5 timerecesses for bearing of RCC roof slab, including repairing for stone masonry or plain; concrete;the damaged face:- and 2 times for reinforced cement

concrete.i) for slabs upto 6" (150 mm) thick Rft. 17.30 19.25 Metre 56.75 63.15ii) for slabs exceeding 6" to 12" (150 to 300 mm) thick. Rft. 29.75 33.30 Metre 97.60 109.20

38 Making recess in existing brick masonry for bearing of Rates will be increased by 1.5 timesbeam, girder, R.S. Joist, etc. including repairing damaged for stone masonry and plainface:- cement concrete and two times

for reinforced cement concrete.i) upto 1.0' (300 mm) height of girder or beam. Each 72.05 78.50 Each 72.05 78.50

ii) for every 6" (150 mm) additional height or part thereof. Each 34.60 37.70 Each 34.60 37.70

39 Hoisting RS. Beams and wooden beams and placing in Each 314.95 - Each 314.95 -position.

40 Hoisting and placing in position sahl ballies, over roof. Each 46.45 - Each 46.45 -

41 Hoisting precast R.C.C/prestressed concretebattens and placing in position.

a) 5' to 6' (1.50 to 1.83 m) long Each 45.00 - Each 45.00 -b) 6' to 7' (1.83 to 2.13 m) long Each 63.00 - Each 63.00 -c) 7' to 8' (2.13 to 2.44 m) long Each 78.75 - Each 78.75 -d) 8' to 9' (2.44 to 2.74 m) long Each 105.00 - Each 105.00 -e) above 9' (2.74 m) length Each 126.00 - Each 126.00 -

42 Hoisting and placing in position R.C. trough: Applicable only to roof trough(inverted tees & trough) for height of

a) upto 10' (3 m) in length Each 126.00 - Each 126.00 - 1st storey only.b) 10' to 11' (3 to 3.36 m) in length ditto 157.50 - ditto 157.50 -c) 11' to 12' (3.36 to 3.66 m) in length ditto 209.95 - ditto 209.95 -d) 12' to 13' (3.66 to 3.96 m) in length ditto 242.25 - ditto 242.25 -e) 13' to 14' (3.96 to 4.26 m) in length ditto 262.45 - ditto 262.45 -f) 14' to 15' (4.26 to 4.57 m) in length ditto 286.30 - ditto 286.30 -g) 15' to 16' (4.57 to 4.88 m) in length ditto 314.95 - ditto 314.95 -h) 16' to 17' (4.88 to 5.19 m) in length ditto 349.95 - ditto 349.95 -i) 17' to 18' (5.19 to 5.49 m) in length ditto 449.95 - ditto 449.95 -j) 18' to 19' (5.49 to 5.80 m) in length ditto 484.55 - ditto 484.55 -k) 19' to 20' (5.80 to 6.10 m) in length ditto 524.90 - ditto 524.90 -

43 Hoisting and placing in position R.C. inverted battens:-

i) upto 10' (3.05 m) span Each 97.80 - Each 97.80 -ii) from 10' to 12' (3.05 to 3.66 m) span ditto 217.30 - ditto 217.30 -iii) from 12' to 13' (3.66 to 3.96 m) span ditto 260.75 - ditto 260.75 -

Page 65: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-9(Roofing) Page 65

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

iv) from 13' to 14' (3.96 to 4.26 m) span ditto 325.95 - ditto 325.95 -v) from 14' to 15' (4.26 to 4.57 m) span ditto 355.55 - ditto 355.55 -vi) from 15' to 16' (4.57 to 4.88 m) span ditto 391.10 - ditto 391.10 -vii) from 16' to 18' (4.88 to 5.49 m) span ditto 488.90 - ditto 488.90 -viii) from 18' to 20' (5.49 to 6.10 m) span ditto 782.25 - ditto 782.25 -

44 Reinforced cement concrete spout, including fixing in Each 433.65 723.20 Each 433.65 723.20position, with top and bottom Khurras.

45

a) 1" thick % Sft 396.00 5,436.00 P.Sqm 42.60 584.90 b) 1-1/2" thick % Sft 396.00 8,082.00 P.Sqm 42.60 869.60 c) 2" thick % Sft 396.00 10,476.00 P.Sqm 42.60 1,127.20

Providing and Laying Insulation material of Extruded Polystyrene XPS inRigid Insulation / Foam Board on roof or walls, Density 32-38Kg/M,compressive strength 250-400 kpa, R-value 5 per inch thickness and waterobsorption (1% by volume, cell structure clored cell) i/c cutting and placing in position. complete in all respect.

Page 66: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-10(Flooring) Page 66

Rates for all finished works include the removal of surplus debris, unused material and byproducts

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Laying Murum flooring, consisting of 1"(25 mm) layer of 100 Sft. 3113.20 4382.60 sq.m 335.00 471.55fine powdery or flakey variety of Murum, laid over 6"(150mm) good hard layer of Murum spreaded over 9"(225 mm)thick sub-base comprising of hand packed rubble orbroken bricks properly watered and rammed, provided overwell rammed earth.

2 Earth flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 1067.70 1376.70 sq.m 114.90 148.15 24.1layer of moistened earth, including ramming.

3 Providing, laying, watering and ramming brick ballast 1½" 100 Cft. 2440.30 4270.30 cum. 861.90 1508.25to 2"(40 mm to 50 mm) gauge mixed with 25% sand, forfloor foundation, complete in all respects.

4 Mud flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 1937.45 2409.05 sq.m 208.45 259.20 24.2layer of moistened earth and finished off with 1"(25 mm)mud plaster and gobri leeping.

5 Dry brick paving laid flat, sand grouted, including 100 Sft. 986.85 4041.90 sq.m 106.20 434.90 24.12

preparation of bed by watering, ramming and bringing thesame to proper camber, by ½"(13 mm) thick mud plaster.

6 Dry brick on edge paving, sand grouted, including 100 Sft. 1785.10 6325.80 sq.m 192.10 680.65 24.12preparation of bed by watering, ramming & bringing thesame to proper camber, by ½ "(13 mm) thick mud plaster.

7 Grouting 4½"(113 mm) dry brick work with cement mortar 100 Sft. 967.30 1470.10 sq.m 104.10 158.20ratio 1: 5

8 Flat brick flooring laid in 1:6 cement mortar, over a bed of 100 Sft. 1749.55 5648.95 sq.m 188.25 607.85 24.43/4" (20 mm) thick cement mortar, 1:6.

9 Brick on edge flooring, laid in 1:6 cement mortar, over a 100 Sft. 2,227.10 7,909.05 sq.m 239.65 851.00 24.4bed of ¾" (20 mm) thick cement mortar 1:6.

10 Brick tiles (12"x6"x2") (300x150x50mm) laid in 1:6 100 Sft. 2,186.90 4,301.90 sq.m 235.30 462.90 dittocement mortar, over a bed of ¾" (20 mm) thick cementmortar 1:6.

11 Brick ties (9"x4½"x1½")(225 mm x 113 mm x 40 mm) laid 100 Sft. 2,403.05 5,975.45 sq.m 258.55 642.95 24.4flat in 1:3 cement mortar, over a bed of 3/4"(20 mm) thickcement mortar 1:6.

12 Cement tiles (8"x8"x¾")(200 x 200 x 20 mm) laid flat in 100 Sft. 1,436.65 6,409.65 sq.m 154.60 689.70 24.71:2 cement mortar, over 3/4" (20 mm) thick bed of cement

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

10. FLOORING

Page 67: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-10(Flooring) Page 67

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

mortar 1:2.

13 Cement concrete tiles laid in 1:2 cement mortar, over 24.83/4" (20 mm) thick bed of cement mortar 1:2:-

(a) 12"x12"x1" (300 x 300 x 25 mm) 100 Sft. 1,436.65 4,542.80 sq.m 154.60 488.80 (b) 9"x9"x¾" (225 x 225 x 20 mm) ditto 1,436.65 5,783.80 ditto 154.60 622.35 (c) 6"x6"x¾"(150 x 150 x 20 mm) ditto 1,436.65 8,228.80 ditto 154.60 885.40

14 Coloured cement tiles (8"x8"x¾")(200 x 200 x 20 mm) of 100 Sft. 1,436.65 6,439.15 sq.m 154.60 692.85 24.7

approved dark shade laid flat in 1:2 cement mortar, over ¾" (20 mm) bedding mortar of 1:2.

15 Providing and laying topping of cement concrete 1:2:4, 24.9 If glass or marble strips are usedincluding surface finishing and dividing in panels:- for panelling, it will be paid extra as

per item No. 41 or 42. (a) 1"(25 mm) thick 100 Sft. 1,540.75 2,770.70 sq.m 165.80 298.15 (b) 1¼"(30 mm) thick ditto 1,540.75 3,043.15 ditto 165.80 327.45 (c) 1½"(40 mm) thick ditto 1,961.20 3,736.00 ditto 211.05 402.00 (d) 1¾"(45 mm) thick ditto 1,961.20 4,022.00 ditto 211.05 432.75 (e) 2"(50 mm) thick ditto 2,381.60 4,779.05 ditto 256.25 514.25 (f) 2¼"(56 mm) thick ditto 2,457.75 5,110.30 ditto 264.45 549.85 (g) 2½"(62 mm) thick ditto 2,802.05 5,629.45 ditto 301.50 605.75 (h)2¾"(70 mm) thick ditto 2,802.05 6,010.75 ditto 301.50 646.75 (i) 3"(75 mm) thick ditto 2,802.05 6,327.75 ditto 301.50 680.85

16 Providing and laying conglomerate flooring (two coat work) 24.10 If glass or marble strips are used

with top layer of ½"(13mm) thick wearing surface, for panelling, it will be paid extra asconsisting of one part of cement and 2 parts of stone per item No. 41 or 42.chips passing 3/16"(6 mm) sieve, over bottom layer ofcement concrete 1:3:6, including surface finishing anddividing in panels:-

(a) 1½"(40 mm) thick 100 Sft. 2,285.90 4,011.90 sq.m 245.95 431.70 (b) 1¾"(45 mm) thick ditto 2,285.90 4,192.85 ditto 245.95 451.15 (c) 2"(50 mm) thick ditto 2,922.50 5,107.90 ditto 314.45 549.60

17 Add extra in cement concrete floor topping, if finished with 100 Sft. 542.10 1,052.10 sq.m 58.35 113.20pigment and polishing.

18 Extra labour for each storey above ground, for mosaic, 100 Sft 457.00 - sq.m 49.15 - On items 19-25 & 29-34conglomerate, tiles, stone and wooden floor.

19 Flag stone flooring in lime mortar 1:2, over ¾"(20 mm) 24.5bedding mortar, in platforms and floors, etc.

(a) 2"(50 mm) thick 100 Sft. 4,704.10 6,379.30 sq.m 506.15 686.40 (b) 3"(75 mm) thick ditto 4,704.10 6,624.65 ditto 506.15 712.80

Page 68: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-10(Flooring) Page 68

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

20 Asphalt flooring , including preparation of proper base 24.10remelting, setting out, and finishing complete:-

(a) 1"(25 mm) thick topping 100 Sft. 1,955.60 13,187.60 sq.m 210.40 1419.00 (b) ½"(13 mm) thick topping ditto 1,531.55 7,273.00 ditto 164.80 782.60 (c) ¼"(6 mm) thick topping ditto 1,124.75 4,098.20 ditto 121.00 440.95

21 13/8"(35 mm) thick mosaic flooring, consisting of 3/8"(10 If glass or marble strips are usedmm) mosaic topping of one part of cement and marble for panelling, it will be paid extra aspowder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.laid over 1"(25 mm) thick flooring of 1:2:4 cement concreteincluding rubbing and polishing complete :-

(a) using grey cement 100 Sft. 6,965.40 9,599.80 sq.m 749.50 1032.95 (b) using white cement ditto 6,965.40 10,034.10 ditto 749.50 1079.65

22 1½"(40 mm) thick mosaic flooring, consisting of ½ "(13 If glass or marble strips are used

mm) mosaic topping of one part of cement and marble for panelling, it will be paid extra aspowder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.laid over 1"(25 mm) thick floor of 1:2:4 cement concrete,including rubbing and polishing complete with finishing :-

(a) using grey cement 100 Sft. 6,965.40 9,788.25 sq.m 749.50 1053.20 (b) using white cement ditto 6,965.40 10,633.90 ditto 749.50 1144.20

23 Providing and laying floor of mosaic marble chips tiles 100 Sft. 3,992.75 8,128.25 sq.m 429.60 874.60 24.81"(25 mm) thick of approved quality and shade, laid inwhite cement and pigment, over ¾"(20 mm) thick beddingof cement sand mortar 1:2, including finishing andpolishing, complete.

24 Laying floor of approved white glazed tile ¼" (6 mm) thick 100 Sft. 5,171.75 12,743.75 sq.m 556.50 1371.25 24.7in white cement 1:2 over ¾" (20mm) thick cement mortar1:2, complete.

25 Laying floor of approved coloured glazed tiles ¼ "(6 mm) 100 Sft. 5,171.75 14,300.05 sq.m 556.50 1538.70 dittothick, laid in white cement and pigment on a bed of ¾"(20 mm) thick cement mortar 1:2.

26 Rubbing and polishing old grit/ mosaic floor, including 100 Sft. 1,459.40 1,593.10 sq.m 157.05 171.40 The composite rate will be reducedrepairing voids, uneven surface, complete in all respects. by Rs. 150.00 per % Sft or Rs.13.95 per

Sq. metre respectively, if nopolishing is done.

27 Rubbing and polishing grit floor, including repairing voids, 100 Sft. 1,554.45 1,690.85 sq.m 167.25 181.95 The composite rate will be reduceduneven surface, complete in all respects by Rs. 150.00 per % Sft or Rs.13.95 per

Sq. metre respectively, if nopolishing is done.

Page 69: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-10(Flooring) Page 69

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

28 Cleaning and washing mosaic or marble floor with caustic 100 Sft. 207.45 253.00 sq.m 22.30 27.20 24.6soda mixture.

29 Shisham wood boarding or strip flooring 3/4" (20mm) thick 100 Sft. 4,323.00 36,597.60 sq.m 465.15 3937.90 24.13(sawn to required size) tongued and grooved or splayedrebated fixed with brass screws on deodar wood battens1½ "x2"(40 x 50 mm),size placed at 12"(300 mm) centreto centre, including two coats of bitumen laid hot on thebase.

30 Deodar wood boarding or strip flooring 3/4" (20 mm) thick 100 Sft. 4,878.70 41,591.35 sq.m 524.95 4475.25 ditto(sawn to required size) tongued and grooved or splayedrebated fixed with brass screws on deodar wood battens1½"x2"(40 x 50 mm) size , placed at 12"(300 mm) centre,to centre including two coats of bitumen laid hot on thebase.

31 Teak wood boarding or strip flooring ½" (13 mm) "thick 100 Sft. 4,151.40 49,692.45 sq.m 446.70 5346.90 ditto(sawn to required size) to tongued and grooved screwedon deodar wood battens 1½ " x2"(40 x 50 mm) size,placed at 12"(300 mm) centre to centre, including 2 coatsof bitumen laid hot on base.

32 Shisham wood block flooring 1"(25 mm) thick cut to 100 Sft. 4,497.90 41,896.05 sq.m 483.95 4508.00 24.13required size, fixed on a layer of asphalt bitumen laid onbase.

33 Teak wood block 1"(25 mm) thick cut to required size, 100 Sft. 4,151.40 84,463.20 sq.m 446.70 9088.25 dittofixed on a layer of asphalt bitumen laid on base.

34 Laying wooden paving of hard wood on edge in coal tar dittoand asphalt:- 100 Sft. sq.m

Per Inch per cm (a) Shisham wood thickness 2,676.10 25,988.70 thickness 287.95 2796.40 (b) Kikar wood ditto 2,676.10 16,891.50 ditto 287.95 1817.55

35 Tile skirting laid in 1:2 cement mortar, over ¾"(20 mm)thick cement mortar, 1:2 including cement washing andfilling joints complete:-

(a) cement tiles 100 Sft. 2,348.10 7,744.10 sq.m 252.65 833.25 (b) mosaic tiles ditto 3,831.30 11,169.30 ditto 412.25 1201.80

36 Providing grey cement skirting or dado 3/8"(10 mm) thickincluding rounding of corner and straight ening of top edgeand finishing to smooth surface afterplastering :-

(a) 1:2 cement, sand mortar 100 Sft. 2,858.60 3,490.85 sq.m 307.60 375.60

Page 70: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-10(Flooring) Page 70

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

(b) 1:3 cement, sand mortar ditto 2,858.60 3,306.25 ditto 307.60 355.75 (c) Extra if skirting or dado is finished ditto 190.40 458.05 ditto 20.50 49.30 with pigment of any colour.

37 White glazed tile (6"x6"x¼") (6 mm) thick dado jointed in white 100 Sft. 6,365.70 13,937.70 sq.m 684.95 1499.70 24.7cement and laid over 1:2 cement sand mortar 3/4" (20mm)thick, including finishing.

38 Coloured glazed tile dado (6"x6"¼") (6mm) thick in pigment over 100 Sft. 6,365.70 15,476.10 sq.m 684.95 1665.25 ditto1:2 cement, sand mortar 3/4"(20mm) thick, including finishing.

39 Mosaic dado or skirting with one part of cement andmarble powder in the ratio of 3:1 and two parts of marblechips, laid over ½"(13 mm) thick cement plaster 1:3,including rubbing and polishing, complete with finishing:

(a) using grey cement: i) 3/8"(10 mm) thick 100 Sft. 8,367.50 9,751.40 sq.m 900.35 1049.25 ii) ½"(13 mm) thick ditto 8,367.50 10,604.10 ditto 900.35 1141.00

(b) using white cement :

'i) 3/8"(10 mm) thick 100 Sft. 8,367.50 10,819.70 sq.m 900.35 1164.20 ii) ½"(13 mm) thick ditto 8,367.50 11,190.85 ditto 900.35 1204.15

40 Rubber flooring, consisting of 12"x12"x1/8" Per Sft. 20.05 82.95 sq.m 215.75 892.55 24.14 The cost of base for rubber flooring(300x300x3mm) rubber tiles, laid on firm foundation. is not included in the rate and is

payable separately.

41 Providing and fixing glass strip 5mm thick and 1½" Per Rft. - 4.20 Metre - 13.80 Labour for fixing already included in(40 mm) wide, for dividing the mosaic flooring into panels. items No. 15, 16, 21and 22 of this

Chapter.

42 Providing and fixing marble strip of any shade for dividingthe mosaic flooring into panels

a) s Size 1½" x 3/8" (40 x 10 mm) Per Rft. - 6.60 Metre - 21.65b) s Size 1½" x ¼" (40 x 6 mm) ditto - 4.60 ditto - 15.10

43

a) 50-mm thick P.Sft 13.95 83.30 Sq.m 150.00 896.55 b) 60-mm thick P.Sft 13.95 94.40 Sq.m 150.00 1,015.75 c) 80-mm thick P.Sft 13.95 117.75 Sq.m 150.00 1,266.80

Providing and laying Tuff pavers, having 7000 PSI, crushing strengthof approved manufacturer, over 2" to 3" sand cushion i/c grouting withsand in joints i/c finishing to require slope . complete in all respect. (50% Grey / 50% Coloured)

Page 71: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-11(Surface Rendering) Page 71

1 PLASTERING, POINTING, WHITE WASHING, COLOUR WASHING AND DISTEMPERING, ETC.2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Mud plaster on walls (excluding Gobri leeping) upto 20' 25.7(6.00 m) height:-

a) ½" (13 mm) thick 100 Sft. 453.90 536.00 sq.m 48.85 57.65b) 1" (25 mm) thick ditto 639.65 803.85 ditto 68.85 86.50

2 Mud plaster on floor or roof (excluding Gobri leeping):- ditto Add extra 13%, 32% and 51% above

the labour rates only or 6%, 15% &a) ½" (13 mm) thick 100 Sft. 409.60 491.70 sq.m 44.05 52.90 23% on the composite rates for 2nd,

3rd, 4th and subsequenct floors,b) 1" (25 mm) thick ditto 409.60 573.80 ditto 44.05 61.75 respectively.

3 Cement lime plaster 1:7:12 (cement, lime and sand) upto 25.1 to 25.620' (6.00 m) height.

a) ¼" (6 mm) thick 100 Sft. 1286.45 1461.55 sq.m 138.40 157.25

b) ½" (13 mm) thick ditto 1286.45 1636.50 ditto 138.40 176.10

4 Cement Neru plaster 1:2 (cement and sand) upto 20' ditto(6.00 m) height:-

a) ¼" (6 mm) thick 100 Sft. 1286.45 1737.15 sq.m 138.40 186.90b) ½" (13 mm) thick ditto 1286.45 2010.80 ditto 138.40 216.35

5 2" (50 mm) stucco cement plaster 1:2:4 (cement, sand 100 Sft. 3319.00 6072.05 sq.m 357.10 653.35 ditto

and shingle) upto 20' (6.00 m) height.

6 Providing and laying machine sprayed plaster ½" (13 mm) dittothick, using cement and chips zero gauge, over theexisting plastered and roughened surface, upto 20' (6.00m) height:-

i) ratio 1:1 100 Sft. 1089.25 2766.85 sq.m 117.20 297.70ii) ratio 1:1½ ditto 1089.25 2658.55 ditto 117.20 286.05iii) ratio 1:2 ditto 1089.25 2596.15 ditto 117.20 279.35

7 Cement plaster 1:2 upto 20' (6.00 m) height:- 25.1to

a) 3/8" (10 mm) thick 100 Sft. 1286.45 1918.75 sq.m 138.40 206.45 25.6b) ½" (13 mm) thick ditto 1286.45 2105.75 ditto 138.40 226.60c) ¾" (20 mm) thick ditto 1611.70 2876.30 ditto 173.40 309.50

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

11. SURFACE RENDERING

Page 72: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-11(Surface Rendering) Page 72

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

8 Cement plaster 1:3 upto 20' (6.00 m) height:- ditto

a) 3/8" (10 mm) thick 100 Sft. 1286.45 1734.15 sq.m 138.40 186.60b) ½" (13 mm) thick ditto 1286.45 1883.35 ditto 138.40 202.65c) ¾" (20 mm) thick ditto 1611.70 2507.05 ditto 173.40 269.75

9 Cement plaster 1:4 upto 20' (6.00 m) height:- ditto

a) 3/8" (10 mm) thick 100 Sft. 1286.45 1685.55 sq.m 138.40 181.35b) ½" (13 mm) thick ditto 1286.45 1793.75 ditto 138.40 193.00c) ¾" (20 mm) thick ditto 1611.70 2402.05 ditto 173.40 258.45

10 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. ditto i) This item shall be applicable toroof slabs only, upto 20' height. buildings meant for human

habitation only, such as buildingslike residences, offices,

a) 1:2 100 Sft. 1459.40 2216.05 sq.m 157.05 238.45 educational institutions andb) 1:3 ditto 1459.40 2030.65 ditto 157.05 218.50 hospitals, etc. It shall not bec) 1:4 ditto 1459.40 1982.05 ditto 157.05 213.25 admissible on godowns; bins;

agriculture, poultry and animalsheds; cycle stands; garrages; etc.ii) The thickness of the plaster willnot be more than 3/8" (10 mm)thick.

11 Cement plaster 1:5 upto 20' (6.00 mm) height:- 25.1 to 25.6

a) 3/8" (10 mm) thick 100 Sft. 1286.45 1642.25 sq.m 138.40 176.70b) ½" (13 mm) thick ditto 1286.45 1719.65 ditto 138.40 185.05c) ¾" (20 mm) thick ditto 1611.70 2323.30 ditto 173.40 250.00

12 Cement plaster 1:6 upto 20' (6.00 mm) dittoheight:-a) 3/8" (10 mm) thick 100 Sft. 1286.45 1580.45 sq.m 138.40 170.05b) ½" (13 mm) thick ditto 1286.45 1676.40 ditto 138.40 180.40c) ¾" (20 mm) thick ditto 1611.70 2199.70 ditto 173.40 236.70

13 Applying floating coat of cement 1/32" (0.8 mm) thick. 100 Sft. 734.45 981.65 sq.m 79.05 105.65 25.4 to 25.6

14 Lime pointing flush upto 20' (6.00 m) height including 100 Sft. 961.20 1086.05 sq.m 103.45 116.85 25.8

raking joints, in lime, sand mortar 1:2.

15 Lime pointing struck joints on walls, upto 20' (6.00 m) 100 Sft. 1459.40 1584.25 sq.m 157.05 170.45 dittoheight, including raking joints in lime sand mortar 1:2.

16 Cement pointing flush upto 20' (6.00 m) heihgt:- ditto

a) ratio 1:2 100 Sft. 1286.45 1759.50 sq.m 138.40 189.30b) ratio 1:3 ditto 1286.45 1651.40 ditto 138.40 177.70

Page 73: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-11(Surface Rendering) Page 73

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

17 Cement pointing 1:2 flush on floor. 100 Sft. 961.20 1434.25 sq.m 103.45 154.35 ditto

18 Cement pointing struck joints, on walls, upto20' (6.00 m) hiehgt:-

a) ratio 1:2 100 Sft. 1459.40 1932.45 sq.m 157.05 207.95b) ratio 1:3 ditto 1459.40 1824.30 ditto 157.05 196.30

19 Pointing flush on stone work, upto 20' (6.00 m) height. 25.8

a) in lime mortar 1:2 (lime, sand) 100 Sft. 1154.75 1320.30 sq.m 124.25 142.05b) in cement mortar 1:3 ditto 1154.75 1519.65 ditto 124.25 163.50c) on stone work raised:-

i) in lime mortar 1:2 100 Sft. 2151.05 2316.60 sq.m 231.45 249.25ii) in cement mortar 1:3 ditto 2151.05 2516.00 ditto 231.45 270.70

20 Raking and washing joints of stone masonry 100 Sft. 691.70 - sq.m 74.45 - ditto

(old work).

21 Raking and washing joints of brick masonry (old work). 100 Sft. 345.85 - sq.m 37.20 - ditto

22 Priming coat of chalk under distemper. 100 Sft. 130.10 151.95 sq.m 14.00 16.35 25.11

23 Distempering:- ditto

a) new surface:-i) one coat 100 Sft. 131.60 212.75 sq.m 14.15 22.90ii) two coats ditto 194.70 300.50 ditto 20.95 32.35iii) three coats ditto 257.80 388.20 ditto 27.75 41.75

b) old surface:- i) one coat 100 Sft. 120.90 177.45 sq.m 13.00 19.10ii) two coats ditto 194.70 251.30 ditto 20.95 27.05

24 Colour washing:- 25.10

a) new surface:- i) one coat 100 Sft. 119.55 148.25 sq.m 12.85 15.95ii) two coats ditto 179.35 221.25 ditto 19.30 23.80

b) old surface:-

i) one coat 100 Sft. 119.55 137.30 sq.m 12.85 14.75ii) two coats ditto 179.35 208.40 ditto 19.30 22.40

25 White washing:- 25.9

a) new surface:- i) one coat 100 Sft. 119.55 143.00 sq.m 12.85 15.40ii) two coats ditto 179.35 214.40 ditto 19.30 23.05

Page 74: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-11(Surface Rendering) Page 74

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

iii) three coats ditto 232.20 278.90 ditto 25.00 30.00

b) old surface:- i) one coat 100 Sft. 119.55 137.15 sq.m 12.85 14.75ii) two coats ditto 179.35 208.55 ditto 19.30 22.45

26 Gobri leeping:- 25.7

a) on walls 100 Sft. 141.75 145.90 sq.m 15.25 15.70b) over roofs ditto 121.00 125.15 ditto 13.00 13.45

27 Striking joints of burnt bricks in lime or cement mortar. 100 Sft. 172.90 - sq.m 18.60 - 25.8 Payable with fresh masonry, when

the face of the work is not to be plastered/pointed.

28 Extra for lime, mud or cement plaster and pointing from 100 Sft. 235.35 - sq.m 25.30 -20' (6.00 m) and above for each additional 10' (3.00 m) height or part thereof.

29 Caulking joints of sleeper wall, with sand and coaltar. 100 Sft. 650.50 1054.95 sq.m 70.00 113.50

30 Caulking joints of sleepers, withmud and chopped straw. 100 Sft. 650.50 680.60 sq.m 70.00 73.25

31 Extra cost of labour and material for red oxide pigment in 100 Sft. 216.15 316.65 sq.m 23.25 34.05

cement pointing to match with the colour of bricks.

32 Providing grooved cement sand plaster 1:3 over existingplastered and roughened surface upto 20' (6.00 m) height.

i) 3/8" (10 mm) thick 100 Sft. 1459.40 1907.05 sq.m 157.05 205.20ii) ½" (13 mm) thick ditto 1459.40 2056.25 ditto 157.05 221.25

33 Providing and fitting expanded metal edge bead for Rft. 10.30 39.90 Metre 33.80 130.85corners, with nails on both sides of edges.

34 Petty repairs to fire place.

i) Single Each 227.65 280.55 Each 227.65 280.55ii) Double Each 455.35 561.10 Each 455.35 561.10

Area above 100 Sft (10.76 sq.m)35 Petty repair to main rooms. Each 475.10 616.65 Each 475.10 616.65

Area upto 100 Sft (10.76 sq.m)36 Petty repair to small rooms. Each 237.55 308.30 Each 237.55 308.30

37 Petty repair to verandah. Each 475.10 588.25 Each 475.10 588.25The height will be taken from the

38 Extra labour for white washing, colour washing, priming coat 100 Sft. 19.95 - sq.m 2.15 - floor, roof or ground uderneath asand distempering, etc. from 20' (6.00 m) height and above, Per Per the case may be on the siderequiring scaffolding, for every additional 10' (3.00m) height coat coat towards which the work is to beor part thereof. done.

Page 75: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 75

1 No extra rate is to be paid for sawing as the rates are inclusive of these.2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Plain wood work sawn, wrought, planed and fixed 26.1inposition, including cost of nails and screws etc.

a) Deodar wood Per Cft. 760.85 3826.60 cu.m 26873.20 135155.50b) Shisham wood ditto 864.60 3240.85 ditto 30537.65 114466.80

2 Plain wood work for regulation karries or needles, etc. 26.1including sawing, planning, wroughting wood and providingand fixing steel parts of karries i.e. end strip and rods, etc.

a) Deodar wood Per Cft. 492.80 3610.65 cu.m 17405.70 127528.15b) Shisham wood ditto 492.80 2938.65 ditto 17405.70 103793.10

3 First class teak wood wrought joinery in doors and 26.1windows, etc. panelled, panelled and glazed or fully toglazed and fixed in position, including chowkat, holdfast, 26.3tower bolt, chocks, rubber stop, cleats/G.I. clamps, &chords with hooks, nails, screws, etc. complete 26.7(excluding sliding bolt and lock):-

i) 2" (50 mm) thick Per Sft. 131.35 1558.00 sq.m 1413.35 16764.10ii) 1¾" ( 45 mm) thick ditto 131.35 1455.35 ditto 1413.35 15659.55iii) 1½" (40 mm) thick ditto 131.35 1355.10 ditto 1413.35 14580.90

4 First class teak wood wrought joinery in wire gauze doors 26.8 i) This also includes the cost ofand windows with frames 22 SWG galvanized iron wire to wood required for extra thickness ofgauze 12x12 meshes to square inch, (5x5 meshes in cm2) 26.10 chowkat.including brass fittings, sash bars, etc. complete:- ii) If 24 SWG wire gauge is used,

the composite rate shall bea) teak wood framing 1¾" (45 mm) thick with wire gauze reduced by Rs.4.70 per sft. and

fixed in position:- Rs.50.60 per sq.m.

i) without springs or spring hinges. Per Sft. 24.00 632.10 sq.m 258.25 6801.40

ii) with springs or spring hinges. ditto 24.00 635.80 ditto 258.25 6841.20

b) teak wood framing 1½" (40 mm) thick, with wiregauze fixed in position:-i) without springs or spring hinges. Per Sft. 24.00 583.20 sq.m 258.25 6275.25ii) with springs or spring hinges. ditto 24.00 587.40 ditto 258.25 6320.40

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

12. WOOD WORK

Page 76: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 76

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

c) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 43.25 198.85 sq.m 465.35 2139.65inch, (5x5 meshes per cm2) fixed to chowkat with ¾"(20 mm) teak wood strips and screws.

d) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 40.55 610.40 sq.m 436.30 6567.90inch (5x5 meshes per cm2) fixed with ½" (13 mm) stripon separate frame of teak wood 2"x2" (50x50 mm),for windows, etc.

5 P/F expanded metal ½" to ¾" (13 to 20 mm) mesh, 16 Per Sft. 54.05 315.60 sq.m 581.60 3395.85Guage, fixed to chowkat with 1" (25 mm) teak wood coverstrips and screw etc., complete.

6 Providing and fixing expanded metal ½" (13 mm) to ¾" Per Sft. 54.05 461.90 sq.m 581.60 4970.0520 mm), 16 gauge, fixed to chowkat with 1" (25 mm)covermoulding and screws, including teak wood frame 2"x2" (50 mm x 50 mm)

7 First class deodar wood wrought joinery in doors and 26.1 towindows, etc. panelled, or panelled or glazed, or fully 26.3 & 26.7glazed, fixed in position, including chowkat, holdfast, hinges, tower bolts, chocks, rubber stop, cleats/G.I. clamps, handles and chord with hooks, etc. complete (excluding sliding bolt or lock):-

a) 2" thick (50 mm) Per Sft. 128.10 1040.75 sq.m 1378.35 11198.45b) 1¾" thick (45 mm) ditto 128.10 975.75 ditto 1378.35 10499.15c) 1½" thick (40 mm) ditto 128.10 930.55 ditto 1378.35 10012.70

8 Deodar wood framed, braced and battened doors and 26.1, 26.2windows, complete with iron fittings and fixed in position, & 26.4including chowkats:-

a) 2¼" (56 mm) thick, with 1¼" (30 mm) Per Sft. 144.10 699.50 sq.m 1550.50 7526.60battens and 1" (25 mm) planks.

b) 1¾" (40 mm) thick with 1" (25 mm) ditto 133.00 607.45 ditto 1431.10 6536.15battens and ¾" (20 mm) planks.

9 1" (25 mm) thick battneded doors and windows fitted in Per Sft. 164.25 419.05 sq.m 1767.35 4509.00position, complete with iron fittings, without chowkats.

10 Deodar battened ledged and braced doors and windows 26.1, 26.22¼" (56 mm) thick (1¼" (30 mm) thick ledge braces and 26.4 to1" (25 mm) thick battens complete with iron fittings, Per Sft. 155.20 686.70 sq.m 1669.95 7388.90 26.6chowkats and fixed in position.

11 a) Deodar wood framed with braces and 22 SWG G.I. 26.1, 26.2 If 24 gauge G.I. sheet is used, the

sheet facing, including holdfast, wooden beadings, & 26.4 composite rate will be reduced byhinges, and locking arrangements as directed by the Re.4.70 per Sft. (Rs. Per 50.60

Page 77: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 77

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

Engineer incharge:- Sq.m) for G.I. facing on one sideand Rs.9.40 per Sft. (Rs.101.20

i) G.I. sheet facing on one side. Per Sft. 67.55 541.25 sq.m 726.85 5823.85 per Sq.m) for G.I. sheet facing onii) G.I. sheet facing on both sides. ditto 74.30 572.40 ditto 799.45 6159.00 both sides.

b) Partal wood framed with braces and 22 SWG G.I.sheet facing, including holdfast, wooden beadings, -ditto-hinges and locking arrangements, as directed by theEngineer-in-charge:-

i) G.I. sheet facing on one side. Per Sft. 67.55 259.05 sq.m 726.85 2787.40ii) G.I. sheet facing on both sides. ditto 74.30 290.20 ditto 799.45 3122.55

12 First class deodar wood wrought joinery work in wire 26.8 to i) This also includes the cost ofgauze doors and windows, with 22 SWG G.I. wire gauze, 26.10 wood required for extra thickness12x12 meshes per square inches (5x5 per cm2) including of chowkat.iron fittings etc. complete:-

ii) If 24 SWG wire gauze is useda) deodar wood framing 1¾" (45 mm) thick with wire the composite rate shall be

gauze fixed in position:- reduced by Rs.4.70 per sft orRs.50.60 per sq.m.

i) without springs or spring hinges. Per Sft. 72.05 456.15 sq.m 775.25 4908.15ii) with springs or spring hinges. ditto 72.05 460.30 ditto 775.25 4952.85

b) deodar wood framing 1½" (40 mm) thick, with wiregauze fixed in position:-i) without springs or spring hinges Per Sft. 72.05 425.90 sq.m 775.25 4582.70ii) with springs or spring hinges ditto 72.05 428.60 ditto 775.25 4611.75

c) G.I. wire gauze 22 SWG, 12x12 meshes per squareinch, (5x5 in cm2) fixed to chowkat, with ¾" Per Sft. 54.05 162.90 sq.m 581.60 1752.80('20 mm) thick deodar wood strip and screws.

d) G.I. wire gauze 22 SWG 12x12 meshes per squareinch, (5x5 meshes in cm2) fixed to chowkat, with ½" Per Sft. 81.05 400.55 sq.m 872.10 4309.90(13 mm) strip on separate frame of deodar wood 2" x2" (50 mm x 50 mm).

13 Making and fixing trellis doors and windows of deodar Per Sft. 120.10 470.45 sq.m 1292.30 5062.05 26.1wood, complete. 26.2

14 Providing and fixing mild steel chowkat of doors, windows,C.window, etc. including holdfast, making and threadingholes for hinges, etc. complete:-

a) M.S. angle iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 28.80 154.65 sq.m 309.90 1664.05with M.S. flat 2"x ¼" (50 mm x 6 mm)

Page 78: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 78

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

b) M.S. tee iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 28.80 118.90 sq.m 309.90 1279.35with M.S. flat 2"x ¼" (50 mm x 6 mm)

15 Providing and fixing M.S. sheet hollow pressed frame ofdoors, windows, C. windows, etc. (chowkat only) of 20SWG welded with M.S. flat 6"x 1¼" x 1/8" (150mmx30mmx3mm) M.S. holdfast 9"x1"x1/8"(225mmx25mmx3mm) welded/screwed 4" (100 mm) longiron hinges, including filling chowkat with cement sandmortar 1:8 and embedding holdfast in cement concrete1:2:4, complete in all respects:

a) single rebate Per Sft. 44.50 138.25 sq.m 478.80 1487.55b) double rebate ditto 52.20 159.65 ditto 561.65 1717.85

16 Extra for providing and fixing iron double spring hinges, Per Sft. 4.10 32.20 sq.m 44.10 346.45 26.2with brass fittings (it shall include brass finger plate, 6" door area door area(150 mm) tower bolt).

17 Providing and fixing brass spring hinges to wire gauzed Each 86.45 238.85 Each 86.45 238.85doors.

18 Providing and fixing sliding bolt to doors:-

i) iron sliding bolt, 10" (250 mm) long Each 81.05 143.45 Each 81.05 143.45ii) iron sliding bolt, 12" (300 mm) long ditto 81.05 185.45 ditto 81.05 185.45iii) brass sliding bolt, 10" (250 mm) long ditto 81.05 184.25 ditto 81.05 184.25iv) brass sliding bolt, 12" (300 mm) long ditto 81.05 341.45 ditto 81.05 341.45

19 Extra for brass fittings to doors and windows, except forhinges, which shall be of iron:-

i) deodar wood panelled or panelled and Per Sft. 2.45 12.75 sq.m 26.35 137.20glazed or fully glazed.

ii) deodar wood wire gauzed shutters. ditto 2.45 10.30 ditto 26.35 110.85

20 Extra for providing and fixing approved quality rim lock Each 259.40 470.60 Each 259.40 470.60adjustable over the style surface.

21 Providing and fixing, approved quality mortice lock. Each 360.25 551.05 Each 360.25 551.05

22 Providing and fixing, expended metal ½" to ¾" (13 mm to20 mm) mesh 16 gauge.

a) fixed to chowkat with 1" (25 mm) thick deodar wood Per Sft. 54.05 238.70 sq.m 581.60 2568.40strip and screws, etc.

b) fixed with 1" (25 mm) cover moulding and screws, ditto 54.05 328.30 ditto 581.60 3532.50including deodar wood frame 2"x2" (50 x 50 mm)

Page 79: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 79

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

23 a) Providing and fixing deodar wood almirah 9" to 12" For hollow frame shutter with(225 mm to 300 mm) depth, including boxing with Per Sft. 172.90 1481.75 sq.m 1860.60 15943.40 commercial ply on one side, theback, shelves, shutter and brass fittings, etc. composite rate shall be reduced bycomplete. Rs.54.00 per Sft;or Rs.580.00

per Sqm and for hollow frameshutter with commercial ply onboth sides, the composite rateshall be reduced by Rs.22.80 perSft. or Rs.245.00 per Sq. metre.

b) Providing and fixing deodar wood almirah 9" to 12"(225 mm to 300 mm)depth with shelves, shutters, Per Sft. 129.70 535.30 sq.m 1395.45 5759.70brass fittings, etc., without boxing and back,complete.

24 Providing and fixng class room almirah consiting of 1" (25 Per Sft. 103.25 382.25 Sq.m 1111.00 4113.15mm) thick solid flush shutter with deodar wood lipping ¼" (6 mm) thick all around (Approved Factory Manufactured) fixed in deodarwood frame 3"x1" (75mm x 25mm) including full hinges C.P. fittings with RCC (1:1½:3) shelves 1½" (40 mm) thickincluding 3 coats of painting.

25 Providing and fixing wooden box type wardrobe 22" (550 If hollow flush door leaves 1" thickmm) deep including ¾" (20 mm) thick boxing and shelves, (25 mm) with commercial plyhanger rods, hard board back drawers, brass fittings, 3 ply) on both sides of deodarlocking arrangements, handles, internal bolts, shoe rods, wood frame and partal woodetc. including three coats of enamel paint:- bracing and deodar wood lipping is

used, the composite rate will bei) Partal wood boxing and deodar wood reduced by Rs.13.00 per Sft. or

shelves and leaves, etc. Per Sft. 199.50 741.80 sq.m 2146.85 7981.90 Rs.140.00 per Sq. metre.

ii) Deodar wood boxing, and deodar wood ditto 193.00 897.85 ditto 2076.50 9660.85shelves and leaves, etc.

26 Providing and fixing wardrobe 22" (550 mm) deepconsisting of RCC shelves 1½" (40 mm) thick including ½"thick vinboard boxing and back (one side ply) vinboard Per Sft. 77.40 609.65 Sq.m 832.85 6559.90shutter ¾" (20 mm) thick including deodar wood lipping ¼"(6 mm) on all edges, fixes including deodar wood frame3"x1" (75mm x 25mm) with hanger rod in centre positiondrawers at bottom and openable shutter on upper portionincluding full hinges C.P. fitting and painting 3 coatscomplete.

27 Providing and fixing chowkat for doors, windows and C.windows, including holdfast, etc.

a) Teak wood Per Sft. 38.45 531.85 Sq.m 413.45 5722.70b) Deodar wood ditto 24.00 338.35 ditto 258.40 3640.40

Page 80: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 80

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

c) Shisham wood ditto 28.80 188.00 ditto 310.10 2023.05

28 Making and fixing deodar wood planking in eave boards, 26.1etc. planed on both sides, rebated and fixed including 26.2nails and screws, bolts and brackets:-

a) 1" (25 mm) thick Sft. 43.25 294.35 sq.m 465.15 3167.10b) ¾" (20 mm) thick ditto 43.25 231.50 ditto 465.15 2491.05c) ½" (13 mm) thick ditto 43.25 168.95 ditto 465.15 1817.80

29 Making and fixing deodar wood shelves, including dittobrackets:-

i) 1" (25 mm) thick Sft. 43.25 294.35 sq.m 465.15 3167.10ii) 1½" (40 mm) thick ditto 43.25 419.75 ditto 465.15 4516.40iii) 2" (50 mm) thick ditto 43.25 545.15 ditto 465.15 5865.75

30 a) Making and fixing cleats for doors and windows, Each 51.90 128.55 Each 51.90 128.55 26.1 andincluding hinges and screws. 26.2

b) Making and fixing cleats with brass hooks for roof Each 69.15 108.35 Each 69.15 108.35ventilators.

c) Providing and fixing door stops of 1½" (40 mm) dia Each 7.20 60.30 Each 7.20 60.30rubber block.

d) Providing and fixing G.I. hook with clamps for doors. Each 2.30 11.20 Each 2.30 11.20

31 Hard wood railing of any shape and design, including dittobends and corners, fixed in position, including polishingcomplete as directed.

a) Shisham wood Per Rft. 195.55 353.70 Metre 641.40 1160.15b) Teak wood ditto 145.75 745.90 ditto 478.05 2446.65

32 Deodar wood dado or picture rail 3"x1½" (75x40 mm) as Per Rft. 72.85 235.05 Metre 239.00 771.05 26.1per approved design including moulding and fixed in place, 26.2cost of screws, nails, plugs, and painting complete.

33 Sawing wood by hand:-

a) Soft wood (deodar, kail or chir). 100Sft. 864.60 - sq.m 93.05 -b) Hard wood (shisham, kikar, teak or ditto 1152.80 - ditto 124.05 -

sahl).

34 Sawing wood by machine:

a) Soft wood 100Sft. 510.11 - sq.m 54.90 -b) Hard wood ditto 766.60 - ditto 82.50 -

Page 81: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 81

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

35 Making and fixing sun-shade of deodar wood including Per Sft. 60.50 361.60 sq.m 651.20 3890.60 26.1fixing brackets.

36 Making and fixing 1" (25 mm) thick kail or chir wooden dittonotice board with frame. Per Sft. 72.05 205.15 sq.m 775.25 2207.40

37 Making deodar punkha pole 10'x6"x6" Each 259.40 6912.20 Each 259.40 6912.20 ditto(3.0 m x 150 mm x 150 mm)

38 Dismantling and refixing eave boards. Per Rft. 18.55 -- Metre 60.80 --

39 Making wooden stair-cases complete 2' to 3' (600 to 900 Per Rft. 285.80 2241.70 Metre 937.35 7352.80 26.1mm) wide frame 1½" (40 mm) thick planks of deodarwood, including hand rails.

40 Providing and fixing partition, including frame work:-

a) Sheets on one side of framework:-

i) Hard board 100Sft. 1350.95 12059.25 sq.m 145.35 1297.60ii) Ply wood ¼" (6 mm) thick ditto 1350.95 13571.25 ditto 145.35 1460.25iii) Masonite ditto 1350.95 13823.25 ditto 145.35 1487.40

b) Sheets on both sides of frame work:-

i) Hard board 100Sft. 1621.15 13745.65 sq.m 174.45 1479.05ii) Ply wood ¼" (6 mm) thick ditto 1621.15 24087.00 ditto 174.45 2591.75iii) Masonite ditto 1621.15 17273.65 ditto 174.45 1858.65

41 Providing and fixing ceiling, including frame work:-

i) Hard board 100Sft. 2648.25 10232.10 sq.m 284.95 1101.00ii) Chip board ditto 2648.25 12872.10 ditto 284.95 1385.05iii) Ply wood ¼" (6 mm) thick ditto 2648.25 12752.10 ditto 284.95 1372.15iv) Masonite ditto 2648.25 12152.10 ditto 284.95 1307.55

42 Providing and fixing thermopore false ceiling, including In case of acousticwooden frame panelling, cost of M.S. clamps, making Thermopore sheet, theholes in walls and repairing damaged surface, complete in composite rate will beall respects:- increased by Rs.9.00 per Sft.

a) Deodar wood frame panelling:

i) ¾" (20 mm) thick 100Sft. 2966.35 9729.75 sq.m 319.20 1046.90ii) 1" (25 mm) thick ditto 2966.35 9802.95 ditto 319.20 1054.80

b) Partal wood frame panelling:

Page 82: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 82

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

i) ¾" (20 mm) thick 100Sft. 2966.35 7307.25 sq.m 319.20 786.25ii) 1" (25 mm) thick ditto 2966.35 7433.25 ditto 319.20 799.80

43 a) Fixing door, including chowkats. Each 406.55 - Each 406.55 -

b) Fixing windows, including chowkats. ditto 203.30 - ditto 203.30 -44 a) Glazing with panes (16 oz. to 18 oz.,) Per Sft. 30.90 65.00 sq.m 332.25 699.30 26.12

including cost of putty.

b) Glazing with panes (16 oz. to 18 oz.) Per Sft. 38.90 96.25 sq.m 418.65 1035.65using deodar wooden fillets and putty.

45 Glazing with panes (24 oz. to 26 oz.), using Per Sft. 57.90 114.85 sq.m 623.00 1235.90 26.12putty and deodar wooden fillets.

46 a) Cutting to required size and fixing glass Per Sft. 21.60 22.75 sq.m 232.60 244.55panes with putty

b) Cutting to required size and fixing glass panes with Per Sft. 32.40 49.90 sq.m 348.85 536.90wooden fillets and putty.

47 Glazing with plate glass 1/4" (6 mm) thick including the costof deodar wood fillets and putty:-

a) Glazing upto 8 sft (0.75 sq.m) Per Sft. 49.70 114.35 sq.m 534.95 1230.55

b) Glazing exceeding 8 Sft (0.75 sq.m) but not exceeding 24 sft Per Sft. 49.70 114.55 sq.m 534.95 1232.65(2.25 sq.m).

48 Providing and fixing 1½" (40 mm) thick deodar woodpanelled or panelled and glazed, doors and windows, withmild steel chowkat (frame), etc. complete in all respects(excluding sliding bolt or lock) with:-

i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 184.75 693.25 sq.m 1988.10 7459.60i) (40 mmx 40 mmx 6mm) with M.S. flat

2"x¼" (50 mm x 6 mm)ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 184.75 645.80 sq.m 1988.10 6948.60

(40 mmx40 mmx 6mm) with M.S. flat½"x¼" (13 mm x 6 mm)

49 Providing and fixing 1½" (40 mm) thick hollow flush doors Teak ply would be used under theand windows with commercial ply (3 ply) on both faces of written permission of thedeodar wood shutter frame 1¼" (30 mm) thick and partal superintending Engineer, and thewood braces at about 3" (75 mm) apart and deodar wood composite rate of using teak plylipping 1½"x3/8" (40 mmx10 mm) fixed with M.S. chowkat will be increased by Rs.20.00 per(frame) including chromium plated fittings, etc. complete Sft. ( 216.00 per Sq.m)in all respects (without sliding bolt or lock):-

i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 128.10 573.30 sq.m 1378.25 6168.70(40 mmx40 mmx 6mm) with M.S. flat2"x¼" (50 mm x 6 mm)

Page 83: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 83

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 128.10 537.55 sq.m 1378.25 5784.00(40 mmx40 mmx 6mm) with M.S. flat½"x¼" (13 mm x 6 mm)

50 Providing and fixing 1½" (40mm) thick solid flush door shutter It C.P. Finger plate and kick plate(Approved Factory Manufactured) with commercial ply (5 mm thick) are not provided/fixed theon both sides double pressed and deodar wood lipping Per Sft. 70.60 363.10 sq.m 759.45 3907.05 composite rate will be reduced by1½"x3/8" (40mm x 10mm) around shutter including Rs.15.20 per Sft.chromium plated fitting, iron hinges with aluminium kick Reduce composite rate by Rs.20.00 plate 22 SWG on both sides & finger plate complete in all per. Sq/ft or Rs.215 per sq.meter ifrespect. 3-mm commmercial ply is used

51 Providing and fixing panelled door of M.S. sheet, with Per Sft. 120.75 381.95 sq.m 1299.35 4109.80forged door leaves of M.S. sheet 22 SWG fitted in hollowframe chowkat 3"x4½" (75 mmx113 mm) made of M.S.sheet 18 SWG filled with plain cement concrete 1:3:6 etc.complete with all fittings and hammer painting, includingcarriage to site and fixing in position.

52 Providing and laying 24 SWG aluminum kick plate 4" (100 Per Rft. 25.95 39.70 Metre 85.10 130.25mm) high, fixed with screws 4" (100 mm) centre to centre,on bottom rail of flush doors only of commercial ply.

53 Providing and fitting curtain railing to doors and windows, Per Rft. 10.80 125.80 Metre 35.45 412.55comprising of TOSO-elite Japan made superior type ofrailing or equivalent, fixed over 4"x¾" (100mmx20mm)deodar wood strip, including painting.

54 Providing and fixing M.S. flat ½"x1/8" (13mm x 3mm) grill Per Sft. 61.60 198.95 sq.m 662.95 2140.85including ¾" x 1/8" (20 mmx3 mm) M.S. flat frame, inwindows of approved design, including painting threecoats, complete in all respects.

55 Providing and fixing G.I. wire gauze 22 SWG, 12x12 Per Sft. 22.00 67.15 sq.m 236.80 722.75 It 24 SWG wire gauze is used, themeshes per square inch, (5x5 meshes in cm2) fixed to composite rate shall be reduced bysteel window, complete with flat iron patti ½"x 1/8" (13 Rs.4.70 per Sft. or Rs.50.60 P.SQMmmx3 mm) and machine made screws.

56 Providing and fixing wooden moulding stopper 2½"x5/8"(63 x 16 mm) on door frame fitted with ply of approvedquality complete in all respects.

a) Teak wood moulding Per Sft. 27.00 120.55 sq.m 290.70 1297.15b) Deodar wood moulding ditto 27.00 66.70 ditto 290.70 717.50

57 Providing and fixing deodar wood dolly frame having Rate shall be paid as per surface 1½"x1½" (40 x 40 mm) vertical and horizontal double post area of dolly frame with 1½"x1½" (40 x 40 mm) full width of james braces at e-g 0.75' x (3.5' + (2 x 7))12" (300 mm) including filling of the spaces in between

Page 84: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-12(Wood Work) Page 84

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

braces with 1:3:6 PCC fixing ply of approved qualityincluding holdfasts complete in all respects.

a) Teak wood ply Per Sft. 66.50 323.05 sq.m 715.60 3476.10b) With commercial ply ditto 66.50 316.90 ditto 715.60 3409.85

58 Providing and fixing ornamental wooden architrave 3" x (1½" tapered to ¼") all along the door frame complete in allrespect.

a) Teak wood architrave Per Sft. 12.15 74.75 sq.m 130.60 804.15b) Deodar wood architrave ditto 12.15 38.20 ditto 130.60 411.00

59 Providing and fixing Vin board cabinet 3/4" thick with

drawers 3"deep in 'Kitchen including termite proofing and polishing with synthetic enamel as specified, with handles hinges,screws etc., complete in all respects.

i) 1-1/2' deep,without back Per Sft 140.55 556.10 sq.m 1512.40 5983.50ii) 1-1/2' deep,with back Per Sft 140.55 607.70 sq.m 1512.40 6538.75iii) 2' deep,without back Per Sft 140.55 606.40 sq.m 1512.40 6524.85iv) 2' deep,with back Per Sft 140.55 658.00 sq.m 1512.40 7080.05

Page 85: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-13(Painting & Var) Page 85

1 The rates include charges for scaffolding and other arrangements.

2 The rates for all finished works include the removal of surplus debris, unused material and by products

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 a) Cleaning painted wood work with oil and water. 100 Sft. 152.35 186.70 sq.m 16.40 20.10

b) Oiling woodwork with boiled linseed oil. 100 Sft. 101.55 149.45 sq.m 10.95 16.10 27.7

2 Brushing and scraping blisters of old paints from 100 Sft. 304.65 -- sq.m 32.80 - 27.3woodwork.

3 Scraping, brushing and removing old paint from metal 100 Sft. 1218.60 -- sq.m 131.10 - 27.9surface.

4 Painting old surfaces:- 27.127.3 &

a) Painting corrugated surfaces, patent roofing, etc. with 27.9oil paint.

i) first coat 100 Sft. 357.75 535.50 sq.m 38.50 57.60ii) each subsequent coat ditto 271.05 361.80 ditto 29.15 38.95

b) Painting sashes, fanlights, glazed or gauzed doorsand windows:-

i) first coat 100 Sft. 216.85 311.30 sq.m 23.35 33.50ii) each subsequent coat ditto 184.30 261.40 ditto 19.85 28.15

c) Painting doors and windows, any type:

i) first coat 100 Sft. 357.75 539.25 sq.m 38.50 58.05ii) each subsequent coat ditto 271.05 409.05 ditto 29.15 44.00

d) Painting guard bars, gates of iron bars, gratings,railing (including standards, braces etc.) and similaropen work:-i) first coat 100 Sft. 216.85 311.30 sq.m 23.35 33.50ii) each subsequent coat ditto 184.30 261.40 ditto 19.85 28.15

e) Painting fillets, framings, skirtings, pipes, gutters andsimilar linear work not exceeding 6" in girth:-

i) first coat 100 Lft. 184.30 278.80 Metre 6.05 9.15ii) each subsequent coat ditto 130.10 207.20 ditto 4.25 6.80

f) Painting small detached articles, not exceeding onesquare foot (Sq.m) of painted surface:-

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

13. PAINTING AND VARNISHING

Page 86: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-13(Painting & Var) Page 86

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

i) first coat 100 Nos. 527.50 705.25 100 Nos. 527.50 705.25ii) each subsequent coat ditto 479.35 573.85 ditto 479.35 573.85

g) Painting small detached articles, exceeding onesquare foot (Sq.m) but not exceeding three squarefeet (Sq.m) of painted surface:-

i) first coat 100 Nos 1205.75 1735.20 100 Nos 1205.75 1735.20ii) each subsequent coat ditto 711.65 976.40 ditto 711.65 976.40

5 Painting new surface:- 27.127.2 &

a) Preparing surface and painting corrugated surface, 27.9patent roofing, etc.

i) priming coat. 100 Sft. 523.70 754.40 sq.m 56.35 81.15ii) each subsequent coat of paint. ditto 184.70 405.95 ditto 19.90 43.70

b) Preparing surface and painting sashes, fan light,glazed or gauzed doors and windows etc. any type(including edges):-

i) priming coat. 100 Sft. 221.65 381.40 sq.m 23.85 41.05ii) each subsequent coat of paint. ditto 156.10 281.65 ditto 16.80 30.30

c) Preparing surface and painting of doors and windowsany type (including edges):-

i) priming coat. 100 Sft. 523.70 750.65 sq.m 56.35 80.75ii) each subsequent coat of paint. ditto 184.75 406.00 ditto 19.90 43.70

d) Preparing surface and painting guard bars, gates ofiron bars, gratings, railing (including standards,braces, etc.) and in similar open work:-i) priming coat. 100 Sft. 345.65 483.30 sq.m 37.20 52.00ii) each subsequent coat of paint. ditto 156.10 281.65 ditto 16.80 30.30

e) Preparing surface and painting of fillets, framing,skirtings, pipes, gutters, and similar linear work notexceeding 6" (150 mm) girth:-

i) priming coat. 100 Lft. 276.45 380.65 Metre 9.05 12.50ii) each subsequent coat of paint. ditto 104.10 207.25 ditto 3.40 6.80

f) Preparing surface and painting of small detachedarticles, not exceeding one sq. ft. (Sq.m) of paintedsurface:-

i) priming coat. 100 Nos. 813.1 1364.35 100 Nos. 813.1 1364.35ii) each subsequent coat of paint. ditto 398.10 836.85 ditto 398.10 836.85

Page 87: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-13(Painting & Var) Page 87

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

g) Preparing surface and painting of small detachedarticles, exceeding one Sft. but not exceeding 3 Sft.(Sq.m) of painted surface:-

i) priming coat. 100 Nos. 2274.70 3175.00 100 Nos. 2274.70 3175.00ii) each subsequent coat of paint. ditto 686.20 1472.90 ditto 686.20 1472.90

h) Extra for knotting and stopping to 100 Sft. 34.60 50.25 sq.m 3.70 5.40priming coat on new surface of wood.

6 Applying Khanki Mixture hot to barrage 27.10gates:-

i) first coat 100 Sft. 271.05 476.20 sq.m 29.15 51.25ii) second coat ditto 219.15 350.60 ditto 23.60 37.75

7 French polishing complete:- 27.6

a) on new work 100 Sft. 2658.50 2726.70 sq.m 286.05 293.40b) on old work ditto 1423.35 1459.85 ditto 153.15 157.10

8 Varnishing wood work, including cleaning and preparingsurface.

a) first coat 100 Sft. 216.85 350.30 sq.m 23.35 37.70b) second coat ditto 81.30 182.45 ditto 8.75 19.65c) third coat ditto 81.30 161.50 ditto 8.75 17.40

9 Bitumen coating to plastered or cement concrete surface:-

i) 20 lbs. per 100 Sft. (9.07 Kg per Sq.m) 100 Sft. 253.90 1021.30 sq.m 27.30 109.90ii) 14 lbs. per 100 Sft. (6.35 Kg per Sq.m) ditto 243.75 636.35 ditto 26.25 68.45iii) 10 lbs. per 100 Sft. (4.54 Kg per Sq.m) ditto 201.05 593.70 ditto 21.65 63.90

10 Writing letters or figures, per letter, per inch (25 mm) Per No. 10.85 11.50 Per No. 10.85 11.50 27.1

height.

11 Writing letters or figures at any surface with reflective paint Per Letter 10.85 11.20 Per Letter 10.85 11.20 27.1of approved quality and colour per letter per inch height. per inch per 25 mm

height height

12 Writing letters of figures on any surface with reflective tape ditto 12.45 13.35 ditto 12.45 13.35 dittoof approved quality and colour per letter per inch (25 mm)height.

13 Coaltar painting: 27.8to

a) first coat, laid hot 100 Sft. 228.25 827.80 sq.m 24.55 89.05 27.11b) second coat, laid hot ditto 138.35 519.90 ditto 14.90 55.95

Page 88: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-13(Painting & Var) Page 88

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

14 Solignum painting:- 27.8

a) one coat, applied hot 100 Sft. 190.20 217.40 sq.m 20.45 23.40b) two coats, applied hot ditto 288.20 331.65 ditto 31.00 35.70

15 Creosote painting:- ditto

a) one coat, applied hot 100 Sft. 228.25 346.15 sq.m 24.55 37.25b) two coats, applied hot ditto 345.85 543.50 ditto 37.20 58.50

16 Burning off or rubbing down with pumice stone, old paint 100 Sft. 844.00 859.60 sq.m 90.80 92.50 27.3from wood work.

17 Removing with caustic soda, old paint from wood work. 100 Sft. 304.65 312.40 sq.m 32.80 33.60 ditto

18 Painting distance marks for white ground and black Each 54.20 61.10 Each 54.20 61.10 27.1lettering on both sides.

19 Painting two feet wide gauges, reading to 10th of a foot Per Rft. 108.40 121.75 per Metre 355.60 399.40 ditto(metre).

20 Painting sounding rods and other gauges, reading to 10th Per Lft. 54.20 58.35 per Metre 177.80 191.45 27.1of a foot (metre)

21 Painting leveling staves. Per Lft. 166.05 172.75 per Metre 544.65 566.55

22 a) Painting and lettering mile/Km stones, dittoon both sides:

i) one coat Each 116.15 164.00 Each 116.15 164.00ii) two coats ditto 203.30 280.15 ditto 203.30 280.15

b) Painting and lettering Furlong/½ Km 27.1stones, on both sides:-

i) one coat Each 15.50 21.15 Each 15.50 21.15ii) two coats ditto 27.10 37.00 ditto 27.10 37.00

c) Painting and lettering Sign posts:-

i) one coat Each 130.10 161.15 Each 130.10 161.15ii) two coats ditto 214.65 267.55 ditto 214.65 267.55

23 Removing paint or varnish from wall. 100 Sft. 609.30 - sq.m 65.55 - 27.12

24 Scraping from hydraulic gates:- 27.1

a) Khanki paint 100 Sft. 1218.60 - sq.m 131.10 -b) Aluminium paint ditto 1218.60 - ditto 131.10 -

Page 89: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-13(Painting & Var) Page 89

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

25 Painting letters with shade. per letter 17.35 17.35 per letter 17.35 17.35 27.1per inch per 25 mmheight height

26 Scraping rust from old rail or girders. 100 Sft. 913.95 955.95 sq.m 98.35 102.85 27.927.10

27 Chiselling old paint from brick work. 100 Sft. 1218.60 1251.00 sq.m 131.10 134.60 27.12

28 Cleaning glasses with chalk and spirit, etc. 100 Sft. 1015.50 1033.50 sq.m 109.25 111.20

29 Cleaning and oiling rafter or rolled steel 100 Sft. 304.65 334.80 sq.m 32.80 36.05 27.9beams.

30 Cleaning and painting punkha poles, including fixing Each 216.15 224.25 Each 216.15 224.25 27.3hooks.

31 Preparing surface and painting with emulsion paint:- 27.12

a) first coat 100 Sft. 264.80 452.05 sq.m 28.50 48.65b) 2nd and each subsequent coat ditto 203.40 350.70 ditto 21.90 37.75

32 Preparing surface and painting with water proof coloured 27.12cement finish, like duracem, buxcem or other finishes withsimilar specifications, on walls, etc.

a) new surface:

i) 1st coat 100 Sft. 264.80 353.30 sq.m 28.50 38.00ii) 2nd and subsequent coat ditto 203.40 280.75 ditto 21.90 30.20

b) old surface:

i) 1st coat 100 Sft. 264.80 301.85 sq.m 28.50 32.50ii) 2nd and subsequent coat ditto 203.40 239.75 ditto 21.90 25.80

32A Providing and applying weather shield paint of approvedquality on external surface of building including preparation ofsurface, application of primer complete in all respect:

a) new surface:

i) 1st coat %sft 955.15 1430.15 sq.m 102.75 153.90ii) 2nd coat %sft 520.80 727.85 sq.m 56.05 78.30

b) old surface: %sft 520.80 727.85 sq.m 56.05 78.30

33 Painting traffic lane 5" (125 mm) wide, with road marking Per Rft. 1.65 2.55 Metre 5.35 8.30enamel.

Page 90: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-13(Painting & Var) Page 90

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

34 Painting traffic lane 5" (125 mm) wide with reflective Per Rft. 3.80 12.05 Metre 12.45 39.50 AASHTO Rates shall be reduced by Rs.0.50clorinated rubber (CR) paint including glass beads comlpete M248-91 P.Rft or Rs.1.65 P.Mtr. in all respect. (2000) If glass beads are not used.

35 Repainting of ceiling fan (all sizes and types), including Per Job 61.75 95.35 Job 61.75 95.35painting of blades, canopy, suspension rod and regulator,with suitable enamel paint.

36 Repainting of iron poles with cross arms, with bitumen or Per Job 144.10 264.70 Job 144.10 264.70 other approved paint.

37 Repainting of pipes and specials of G.I., M.S. or conduit,etc., fixed for on surface electric wiring, with approvedpaint:

i) upto 40 mm (1½") dia Per Rft. 1.30 4.30 Metre 4.30 8.15ii) above 40 mm (1½") to 50 mm (2") dia ditto 2.65 4.65 ditto 8.65 15.20iii) above 50 mm (2") to 100 mm (4") dia ditto 4.40 7.40 ditto 14.40 24.20

38 Repainting main switches and branch distribution boards Per Job 28.55 76.80 Job 28.55 76.80of all sizes and types, with approved paint (complete set).

39 Extra labour for painting, varnishing, etc. from 20' (6.10 m) 100 Sft. 97.50 - sq.m 10.50 - The height will be taken from theheight and above, for every additional 10' (3.05 m) height, per coat floor, roof or ground underneath, asor part thereof, requiring scaffolding. the case may be on the side

towards which the work is to bedone.

Page 91: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-14(Lining of canal) Page 91

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 The rates also include curing for specified period wherever necessary.3 Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Formation, dressing and preparing sub-grade:- 28.1 to 28.3

a) in bed 100Sft. 678.25 - sq.m 73.00 -b) on slope ditto 926.10 - ditto 99.65 -

2 Stabilized layer of cement, sand ratio 1:30, 2" (50 mm) 100Sft. 1576.60 2166.40 sq.m 169.65 233.10 dittothick on slope.

3 Cement plaster ½" (13 mm) thick ratio 1:10. ditto

a) in bed 100Sft. 1154.35 1430.00 sq.m 124.20 153.85b) on slope ditto 1424.30 1699.90 ditto 153.25 182.90

4 Cement plaster 3/8" (10 mm) thick ratio 1:3. ditto

a) in bed 100Sft. 1154.35 1625.95 sq.m 124.20 174.95b) on slope ditto 1424.30 1895.90 ditto 153.25 204.00

5 Cement plaster 1½" (40 mm) thick ratio 1:6. ditto

a) in bed 100Sft. 1424.30 2570.90 sq.m 153.25 276.65b) on slope ditto 1749.55 2896.15 ditto 188.25 311.60

6 Tile lining 12"x6"x2" (300x 150x50 mm) in 1:6 cement, 28.2 to 28.3 The rates are only for laying tilessand mortar:- over 1/8" (3 mm) thick layer of 1:6

mortar. Items 1 to 5 above area) in bed 100Cft. 6563.70 16578.55 cu.m 2318.30 5855.55 payable separately.b) on slope ditto 7541.50 17556.35 ditto 2663.65 6200.90

7 Tile lining 12"x6"x2" (300x150x50 mm) in 28.2 to 28.3 The rates are only for laying tiles1:3 cement, sand mortar:- over 1/8" (3 mm) thick layer of 1:3

mortar. Items 1 to 5 above area) in bed 100Cft. 6563.70 18110.70 cu.m 2318.30 6396.70 payable separately.

b) on slope ditto 7541.50 19088.50 ditto 2663.65 6742.05

8 Brick lining 9"x4½"x3" (225x113x75 mm) in 1:6 cement, 28.2 The rates are only for laying brickssand mortar:- over 1/8" (3 mm) thick layer of 1:6

mortar. Items 1 to 5 above area) in bed 100Cft. 6563.70 20430.55 cu.m 2318.30 7216.05 payable separately.b) on slope ditto 7541.50 21408.35 ditto 2663.65 7561.40

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

14. LINING OF CANALS

Page 92: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-14(Lining of canal) Page 92

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

9 Brick lining 9"x4½"x3" (225x113x75 mm), in 1:3 cement, ditto The rates are only for layingsand mortar:- bricks over 1/8" (3 mm) thick

layer of 1:3 mortar. Items 1 toa) in bed 100Cft. 6563.70 21962.70 cu.m 2318.30 7757.25 5 above are payableb) on slope ditto 7541.50 22940.50 ditto 2663.65 8102.60 separately.

10 Cement concrete lining, using washed screened and 20.1, 28.1graded stone aggregate:- & 28.3

a) in bed:-

i) ratio 1:2:4 100Cft. 5909.65 21485.65 cu.m 2087.30 7588.75ii) ratio 1:3:6 ditto 5909.65 18856.45 ditto 2087.30 6660.10iii) ratio 1:4:8 ditto 5909.65 16968.85 ditto 2087.30 5993.40

b) on slope:-

i) ratio 1:2:4 100Cft. 6808.25 22384.25 cu.m 2404.65 7906.10 ii) ratio 1:3:6 ditto 6808.25 19755.05 ditto 2404.65 6977.50iii) ratio 1:4:8 ditto 6808.25 17867.45 ditto 2404.65 6310.80

Page 93: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-15(Sheet piling) Page 93

Rates for all finished works include the removal of surplus debris, unused material and by products.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Cutting Ransome and Larson piles. Per 172.90 - Per 172.90 - 29.1-cut cut 29.3

2 Cutting universal piles. Per cut 255.90 - Per cut 255.90 - ditto

3 Driving steel piles, 25' to 30'. (7.5 to 9.0 m) 100Sft. 4158.25 - sq.m 447.45 - ditto 1) The rate includes laying andremoving of track and also carriageof piles to machine, averagedistance of 3 chains (90 metre).

2) The rates are for the tacklegangs only supplied by thecontractor, Mechanical staffon-machines will be supplied byGovernment.

3) T-piles and adjustable junctionpiles will be counted as two piles.

4 Driving steel piles,more than 15' (4.6 m) and less than 25' 100Sft. 3985.35 - sq.m 428.80 - ditto ditto(7.5 m).

5 Driving steel piles, 15' (4.5 m) and under. 100Sft. 2947.80 - sq.m 317.20 - ditto ditto

6 Dolleying piles. Each 260.20 - Each 260.20 - ditto Upto 5' (1.5 m) dolleying.

7 Drilling holes in piles by hand. Each 23.80 - Each 23.80 - ditto

8 Raising and lowering machine. Per Ft. 3897.50 - Metre 12783.85 - ditto

9 Turning Machine, 90o . Per 5813.30 - Per 5813.30 - 29.1 toJob Job 29.3

10 Turning Machine, 135o . Per 7196.65 - Per 7196.65 - dittoJob Job

11 Turning Machine, 180o . Per 9798.60 - Per 9798.60 - 29.1 toJob Job 29.3

12 Travelling machine (light). Per 11577.20 - 30 M. 11577.20 - dittoChain

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

15. SHEET PILING

Page 94: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-15(Sheet piling) Page 94

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

13 Loading and unloading piles. Ton 225.45 - Tonne 221.90 - ditto To be done by hand carts orramps, including cost of ropes.

14 Dismantling piling machine. Each 23720.85 - Each 23720.85 - ditto

15 Erecting piling machine. Each 27370.20 - Each 27370.20 - ditto

16 Carriage of piling machine under different conditions. per 4705.80 - 30 M 4705.80 - dittochain

Page 95: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 95

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage

of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport isadopted. The supply and carriage to site of work of all other material required in the item, is included in thecomposite rates.

3 The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reductionfactor) of the stone, boulders, shingle or spawl carried.

4 Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/or labour only; or where such stone product is supplied, carried or handled by the contractor in which no laying is required,the actual stack measurement (without any reduction factor) shall from the basis of payment of supply orcarriage of the stone, boulder or spawl, etc. The quantity of finished and completed item of work shall form thebasis of laying.

5 In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. withinone mile (1.6 Km.)

i) the cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafterfrom the point of supply.

ii) if the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collectedand measured at site of work and no extra carriage would be admissible in such cases.

iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the pointof supply will be fixed carefully by the Engineer-in-charge in such a way that the carriage charges wouldbe arrived at, most economically. Extra carriage will be admissible from the place of supply of thematerial which will be considered its starting point. The demarcation of the place of supply will bepre-determined before calling the tenders.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Cutting pilchi frash or sarkanda inlcuidng carriage within 100Cft. 1157.70 cu.m 408.85one mile.

2 Weaving matresses. 100Cft. 2193.50 cu.m 774.65

3 a) Supplying and filling jute bags 1.25 (o.o35 cum) Cft., Per 34.25 49.15 Per Baq 34.25 49.15 The rate does not include supply ofcapacity, with sand or earth, sewing and stacking, in Bag sand or earth for filling bags, whichdry. will be paid extra.

b) Supply and filling jute bags 1.25 (0.35 ccum) Cft. ditto 53.30 68.20 Per Baq 53.30 68.2 -ditto-capacity, with sand or earth, sewing and laying inposition, under water.

4 a) Supplying and filling jute bags 4 to 5 cft Per 82.00 135.45 Per 82.00 135.45 The rate does not include supply of(0.11 to 0.14 cum) capacity, with sand or earth, Bag Bag sand or earth for filling bags, whichsewing and stacking, in dry. will be paid extra.

b) Supply and filling new jute bags 4 to 5 cft (0.11 to ditto 117.20 170.60 ditto 117.20 170.60 -ditto-0.14 cu.m) capacity, with sand or earth, sewing and

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

16. PROTECTION & DIVERSION WORKS

Page 96: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 96

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

laying in position, under water.

5 Carriage of jute bags 1.25 Cft. (0.035 cu m) capacity, filledwith sand or earth:-

a) 1st chain (30 m) 100 Nos 304.65 % Nos 304.65

b) 2nd to 4th chain (30 m to 120 m) Per chain 109.70 Per 30 m 109.70per 100 Per 100 Nos/

Nos

c) 5th and subsequent chains ditto 42.65 ditto 42.65(150 m and subsequent every 30 m)

6 Carriage of new jute bags 4 to 5 Cft.(0.11 to 0.14 cu.m) capacity, filled with sand or earth:-

a) 1st chain (Ist 30 metre) 100 Nos 1218.60 % Nos 1218.60

b) 2nd to 4th chain (60 m to 120 m) per chain 426.50 Per 30 m 426.50per 100Nos per %Nos

c) 5th and subsequent chains (150 m and ditto 164.50 ditto 164.50subsequent every 30 m)

7 Rolling matresses to river edge and floating,after unroling:-

a) area of matress upto 2,000 Sft. 100Sft. 685.50 sq.m 73.75( 186 sq.m)

b) area of matress 2,000 to 2,500 Sft. 100Sft. 1142.45 sq.m 122.95

(186 sq.m to 232 sq.m)

c) area of matress over 2,500 Sft. ditto 1332.85 ditto 143.40(232 sq.m)

8 Sewing empty cement bags in sheets. 100 Nos 1066.30 1102.10 % Nos 1066.30 1102.1

9 Making compact round pilchi, frash or sarkanda round 100Cft. 1485.20 1588.40 cu.m 524.55 561 Measured in the shape of compactbundles of specified size for the work. round bundles and of size specified

for the work, before filling at site.

10 Launching the above and placing in position. 100Cft. 731.15 cu.m 258.20

Page 97: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 97

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

11 Supply within 5 chains (150 m):-

a) Boulders 9" (225 mm) and above 100Cft. 2205.70 cu.m 778.95

b) Over size shingle 3" to 9"(75 to 225 mm) ditto 1474.55 ditto 520.75

c) Mixed graded shingle ditto 1748.75 ditto 617.55

12 Supplying Munj or Patha Trungers 6" (150 mm) mesh to hold Each 95.20 140.10 Each 95.20 140.13 Cft. (0.085 cu.m)

13 Providing and weaving G.I. wire netting for wire crates, withG.I. wire of approved size (including siding and partition tomake crate):-

a) 6" (150 mm) mesh

i) 15 SWG wire 100Sft. 1138.35 1471.00 sq.m 122.50 158.30ii) 10 SWG wire ditto 1219.70 2299.70 ditto 131.25 247.45iii) 8 SWG wire ditto 1219.70 2913.10 ditto 131.25 313.45

b) 4" (100 mm) mesh

i) 15 SWG wire 100Sft. 1463.60 1963.65 sq.m 157.50 211.3ii) 10 SWG wire ditto 1626.25 3243.00 ditto 175.00 348.95iii) 8 SWG wire ditto 1626.25 4161.00 ditto 175.00 447.70

14 Providing and laying shingle on top of bund, including 100Cft. 761.65 1223.65 cu.m 268.95 432.15handling of materials within three chains.

15 Supply and dumping at site, without boat, includinghandling of materials within three chains (90 m)

a) stone or boulder 100Cft. 1332.85 1794.85 cu.m 470.70 633.85 The rate includes supply of brickb) shingle or spawl ditto 1332.85 1794.85 ditto 470.70 633.85 bats to site of work.c) brick bats ditto 1028.20 1886.20 ditto 363.15 666.20

16 Supply and dumping by boat, including loading into boat The rate includes supply of brickwithin three chains (90 m) lead, and hire charges of boat and bats to site of work.boatman.

a) stone or boulder 100Cft. 2387.90 2849.90 cu.m 843.40 1006.6b) shingle or spawl ditto 2387.90 2849.90 ditto 843.40 1006.60c) brick bats ditto 2083.20 2941.20 ditto 735.80 1038.85

17 Providing and filling brick bats in crates 100Cft. 1854.75 2712.75 cu.m 655.10 958.15 The rate includes supply of brick(excluding cost of crates). bats to site of work.

18 Supplying and filling bricks in crates and hand packing 100Cft. 2235.55 14835.55 cu.m 789.60 5239.9 The rate includes supply of bricks(excluding cost of crates). to site of work.

19 Supply and filling in wire crates, including sewing crates(excluding cost of crates):-

Page 98: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 98

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

i) stone or boulder 100Cft. 2540.20 3002.20 cu.m 897.20 1060.40ii) shingle or spawl ditto 2540.20 3002.20 ditto 897.20 1060.40

20 Extra for anchoring boat, for dumping by boats or tipping 100Cft. 268.10 - cu.m 94.70 -crates.

21 Extra for tipping crates (in addition to anchoring boats). 100Cft. 1340.50 - cu.m 473.45 -

22 Pilchi reventment, including carriage upto one mile 100Sft. 761.65 1271.65 sq.m 81.95 136.85 30.1(1.6 km.)

23 Surface protection with pilchi matresses, carriage upto 100Sft. 1904.10 1955.10 sq.m 204.90 210.35 dittoone mile (1.6 Km).

24 Pilchi, sarkanda or frash pitching on slopes, including The cost of placing earth betweensupply of pilchi, sarkanda or frash within one mile, (1.6 km) 100Sft. 4557.60 5667.15 sq.m 490.40 609.80 rolls shall be paid separately, asalso supply and driving of pegs 1½' (460 mm) long earthwork.sharpened at one end and, tying with wire or Munj Ban(excluding cost of placing earth between rolls).

25 Constructing Groynes upto 5' (1.5 m) height, with single 100Sft. 1496.55 1599.75 sq.m 161.05 172.15 Measurement to be made of therow of wooden vertical stakes 7" to 12" (175 to 300 mm) area of elevation on one face only.dia, 1' (300 mm) apart, average lead one mile (1.6 km.)

26 Construction Groynes upto 10' (3.0 m) height, with double 100Sft. 2560.80 2683.20 sq.m 275.55 288.7row of wooden vertical stakes 7" to 12" (175 to 300 mm)dia, 2' (600 mm) apart, average lead one mile (1.6 Km).

27 Providing and laying stone pitching/filling, dry hand 100Cft. 1626.25 2517.25 cu.m 574.40 889.1packed, as filling behind retaining walls or in pitching andaprons.

28 Providing and laying stone pitching with hammer dressed 100Cft. 4230.25 5022.25 cu.m 1494.15 1773.85stones on surface, laid in courses.

29 Providing and laying stone pitching, for top layer only:-

a) one slope 100Cft. 3581.80 4373.80 cu.m 1265.10 1544.85b) on level ditto 3201.00 3993.00 ditto 1130.60 1410.35

30 Providing and laying stone or spawl filling:-

a) on level 100Cft. 977.80 1397.80 cu.m 345.35 493.70

b) on slope ditto 1176.65 1596.65 ditto 415.60 563.95

Page 99: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 99

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

31 Providing and laying stone pitching, hand packed, withsurface levelled off to the correct section and voids filled in1:8 cement, sand mortar, in floors of bridges along banksand in appons etc.

i) top layer on slope 100Cft. 4674.85 7547.30 cu.m 1651.15 2665.70ii) top layer on level ditto 4294.05 7166.50 ditto 1516.65 2531.20iii) stone pitching/filling on slope or on level ditto 2516.25 5487.70 ditto 888.75 1938.25

(other than top layer).

32 Grouting stone pitching or apron, etc. in:-

a) cement, sand mortar 1:3 100Sft. 1650.90 5706.80 sq.m 177.65 614.05b) cement, sand mortar 1:8 ditto 1391.95 3472.40 ditto 149.75 373.65

33 Sand grouting in stone apron, with high 100Sft. 553.75 1333.75 sq.m 59.60 143.50pressure hose.

34 Grouting stone filling or pitching, with bajri. 100Cft. 952.05 2320.05 cu.m 336.25 819.45

35 Removing stone and repitching hand packed, on slopes or 100Cft. 3383.35 - cu.m 1195.00 -level after making good damaged slope/portion.

36 Collecting and stacking boulders from nullah beds or loose 100Cft. 1218.60 - cu.m 430.40 -shale, or from any other site, within 3 chains (90 m) lead.

37 Levelling and dressing stone filling under blocks and 100Cft. 977.80 2345.80 cu.m 345.35 828.55grouting with shingle.

38 Grouting jharies between blocks with bajri. 100Cft. 977.80 1889.80 cu.m 345.35 667.45

39 Breaking stone into spawls and stacking 100Cft. 913.95 - cu.m 322.80 -

Canal and Roads

40 Fixing floating spurs, with material from canal plantationwithin one mile (1.6 Km) lead:-

a) upto 2.0' (600 mm) F.S. depth Each 31.10 - Each 31.10 -

b) above 2.0' to 3.0' (600 to 900 mm) F.S. depth ditto 35.00 - ditto 35.00 -

c) above 3.0' to 4.0' F.S. (900 mm to 1200mm) depth Each 46.65 - ditto 46.65 -

d) above 4.0' (1200 mm) F.S. depth ditto 116.65 - ditto 116.65 -

41 Staking and bushing from canal plantation, royalty to bepaid to Forest Department or cost to private owner, if andwhen required:-

Page 100: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 100

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

a) i) Cutting and supply unsharpened pegs 3.5' (1.07 100 Nos 1523.30 1555.85 % Nos 1523.30 1555.85m) long, 3" to 6" (75 to 150 mm) dia, within one mile(1.6 Km) lead.

ii) Sharpening one end of 3.5' (1.07 m) long pegs, 3" 100 Nos 650.50 - 100 Nos 650.50 -to 6" (75 to 150 mm) dia.

iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150 100 Nos 968.35 - 100 Nos 968.35 -mm) dia (driven 1.0' (300 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per Chain 76.15 107.35 Per 30 76.15 107.35incuding tying around the pegs). of One Metre

Row of one row

v) Cutting and supplying brush wood from canal ditto 1050.70 1225.55 ditto 1050.70 1225.55plantation or private owners, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

b) i) Cutting and supplying unsharpened pegs 4.0' 100 Nos 86.85 123.85 100 Nos 86.85 123.85(1.20 m) long, 3" to 6" (75 to 150 mm) dia, from canalplantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 4' (1.20 M) long pegs, 3" 100 Nos 650.50 - 100 Nos 650.50 -to 6" (75 to 150 mm) dia.

iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150 100 Nos 1136.50 - 100 Nos 1136.50 -mm) dia (driven 1.0' (300 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per 76.15 Per 76.15 incuding tying around the pegs). Chain of 30 M of

one row one row

v) Cutting and supplying brush wood from canal ditto 2768.70 ditto 2768.70 plantation or private source, lead within one mile(1.6 Km). and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

c) i) Cutting and supplying unsharpened pegs 5.0' (1.5 100 Nos 108.60 154.95 100 Nos 108.60 154.95m) long, 3" to 6" (75 to 150 mm) dia, from canalplantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 5' (1.5 m) long pegs, 3" to 100 Nos 685.10 - 100 Nos 685.10 -6" (75 to 150 mm) dia.

Page 101: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 101

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150 100 Nos 1301.00 - 100 Nos 1301.00 -mm) dia (driven 1.5' (450 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per 76.15 107.35 Per 76.15 107.35incuding tying around the pegs). Chain of 30 M

one row of one row

v) Cutting and supplying brush wood from canal Per chain 1296.90 1541.50 Per 30 M 1296.90 1541.50plantation or private source, lead within one mile of one row of one row(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

d) i) Cutting and supplying unsharpened 100 Nos 3046.55 3102.15 100 Nos 3046.55 3102.15pegs 6.0' (1.8 m) long, 3" to 6" (75 to150 mm) dia, from canal plantation, leadwithin one mile (1.6 Km).

ii) Sharpening one end of 6' (1.8 m) long pegs, 3" to 100 Nos 815.20 - 100 Nos 815.20 -6" (75 to 150 mm) dia.

iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150 100 Nos 1561.20 - 100 Nos 1561.20 -mm) dia (driven 1.75' (530 mm) below the availablebed or ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per Per Chainincuding tying around the pegs). Chain of 76.15 107.35 of one row 76.15 107.35

one row

v) Cutting and supplying brush wood from canal ditto 3149.50 3446.55 ditto 3149.50 3446.55plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

e) i) Cutting and supplying unsharpened pegs 6'-1" to 100 Nos 2284.90 2400.25 100 Nos 2284.90 2400.258.0' long (1.85 to 2.45 m), 4" to 8" (100 to 200 mm)dia, from canal plantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 6'-1" to 8.0' (1.85 to 2.45m) 100 Nos 1040.80 - 100 Nos 1040.80 -long pegs, 4" to 8" (100 to 200 mm) dia.

iii) Driving pegs 6'-1" to 8.0' (1.85 to 2.45 m) long, 3" 100 Nos 1721.75 - 100 Nos 1721.75 -to 6" (75 to 150 mm) dia driven 2' (600 mm) belowthe available bed or ground (average).

Page 102: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 102

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

iv) Tying pegs with Munj, Patha ban (one line, Per chain 76.15 93.45 Per 30 M 76.15 93.45incuding tying around the pegs). of one row of one row

v) Cutting and supplying brush wood from canal Per 3581.80 3931.25 Per 30 M 3581.80 3931.25plantation or private source, lead within one mile Chain of of one row(1.6 Km) and wattling between stakes and intertwining one row(thickness of wattled brushwood 1.0' (300 mm)average).

42 Staking with Bamboo from market and bushing from canalplantation or private source (royalty of brushwood to bepaid to Forest Department or cost to private owner, if andwhen required):-

a) i) Supplying Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 7200.00 - 100 Nos 7200.00 -long, 2½" to 5" (63 m to 125 mm) dia.

ii) Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5 100 Nos 910.70 - 100 Nos 910.70 -m) long Bomboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 1886.45 - 100 Nos 1886.45 -long 2½" to 5" (63 to 125 mm) dia, driven 2.5' (750mm) below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Per 30 MMunj, Patha Ban, two lines, including tying around Chain of 114.25 163.20 of one 114.25 163.20the Bamboos. one row Row

v) Cutting and supplying brushwood from canal ditto 4394.95 4848.80 ditto 4394.95 4848.80plantation or private source, lead within one mile(1.6 Km), and wattling between stakes andintertwining (thickness of wattled brushwood 1.0' (300 mm) average).

b) i) Supplying Bamboos 10'-1" to 12.0' (3.07 to 3.66 100 Nos - 10800.00 100 Nos - 10800m) long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 10'-1" to 12.0' 100 Nos 1040.80 - 100 Nos 1040.80 -(3.07 to 3.66 m) long Bamboos, 2½" to5" (63 to 125 mm) dia.

iii) Driving Bamboos 10'-1" to 12.0' (3.07 to 3.66 m) 100 Nos 2047.00 - 100 Nos 2047.00 -long 2½" to 5" (63 to 125 mm) dia, driven 2.75' (840 mm) below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 380.80 1253.20 of one Row 380.80 1253.20the Bamboos and third tie around the top end only. row

Page 103: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 103

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

v) Cutting and supplying brushwood from canal ditto 5372.75 5949.35 ditto 5372.75 5949.35plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' ( 300 mm)average).

c) i) Supplying Bamboos 12'-1" to 14.0' (3.68 to 4.27 100 Nos - 11400.00 100 Nos - 11400.00m) long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 12'-1" to 14.0' (3.68 to 4.27 100 Nos 1170.90 - 100 Nos 1170.90 -m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 12'-1" to 14.0' (3.68 to 4.27 m) 100 Nos 2341.80 - 100 Nos 2341.80 -long 2½" to 5" dia, driven 3.5' (1.07 mm) below theavailable bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one row 380.80 1253.20 of one row 380.80 1253.20the Bamboos and third tie around the top end only.

v) Cutting and supplying brushwood from canal ditto 6350.50 7014.55 ditto 6350.50 7014.55plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

d) i) Supplying Bamboos 14'-1" to 16.0' (4.30 to 4.90 m) 100 Nos - 12600.00 100 Nos - 12600.00long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 14'-1" to 16.0' (4.30 to 100 Nos 1301.00 - 100 Nos 1301.00 -4.90 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 14'-1" to 16.0' long (4.30 to 4.90m) 100 Nos 2602.00 - 100 Nos 2602.00 -2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)below the available bed or ground (average).iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 380.80 1253.20 of one 380.80 1253.20the Bamboos and third tie around the top end only. Row Row

v) Cutting and supplying brushwood from canal ditto 7315.95 8084.75 ditto 7315.95 8084.75plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

e) i) Supplying Bamboos 16'-1" to 20' (4.9 to 6.10 m) 100 Nos - 13200.00 100 Nos - 13200.00long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 16'-1" to 20' (4.9 to 100 Nos 1561.20 - 100 Nos 1561.20 -6.10 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

Page 104: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-16(Protec & Div) Page 104

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

iii) Driving Bamboos 16'-1" to 20' long (4.9 to 6.10 m) 100 Nos 3122.40 - 100 Nos 3122.40 -2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 380.80 1253.20 of one 380.80 1253.20the Bamboos and third tie around the top end only. row row

v) Cutting and supplying brushwood from canal ditto 9170.70 10149.05 ditto 9170.70 10149.05plantation or private source, lead within one mile (1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm) average).

43 Cutting and supplying brushwood from canal plantation or 100Cft. 380.80 450.55 cu.m 134.50 159.15 Royalty to be paid to the Forestfrom any other source, within one mile (1.6 Km). Department or cost to the private

owner, if and when required.

44 Filling brush wood only, thoroughly packed. 100Cft. 304.65 - cu.m 107.60 - Measured in compacted andpacked shape before filling.

45 Covering road 10' to 12' (3.00 to 3.65 m) wide, with 3" Per 731.15 - Per 731.15 -(75 mm) sarkanda or jungle upto one chain lead (30 m). Chain 30 M

46 a) Gachi pitching 1' (300 mm) thick. 100Sft. 3960.55 - Sq.m 426.15 -b) Gachi pitching done with silt clearance 100Sft. 3351.20 - Sq.m 360.60 -

and berm dressing.

Page 105: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-17(Outlet) Page 105

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Earthwork for outlets, excavation refilling, ramming and 17.1 Includes consolidation of earth afterpuddling:- to refilling.

17.5a) channels, discharge upto 50 cusecs. Job 1269.40 - Job 1269.40 -

b) channels, discharge from 51 to 100 cusecs. Job 1675.60 - Job 1675.60 -

c) channels, discharge from 101 to 200 cusecs. Job 2538.80 - Job 2538.80 -

d) channels, discharge from 201 to 350 cusecs. Job 3427.40 - Job 3427.40 -

e) channels, discharge over 350 cusecs. Job 5077.60 - Job 5077.60 -

2 Dismantling outlets:- 18.1 These rates are for totaldismantlement and removal

a) old types, such as K.G.O's orifices, etc. Each 1269.40 - Each 1269.40 - of material. The rates do notinclude earth work for which

b) A.P.M. or O.F., "H" upto 2.0 ft. (600 mm) ditto 1904.10 - ditto 1904.10 - rates are given in item 1,above.

c) A.P.M. or O.F., "H" from 2.1 ft. to 3.0'. ditto 2538.80 - ditto 2538.80 -(630 mm to 900 mm)

d) A.P.M. or O.F., "H" above 3.0'. ditto 3173.50 - ditto 3173.50 -(900 mm)

e) Tail cluster bifurcation ditto 1904.10 - ditto 1904.10 -

f) Tail cluster trifurcation ditto 2538.80 - ditto 2538.80 -

g) Tail cluster quardification ditto 3173.50 - ditto 3173.50 -

3 Making temporary A.P.M. bricks block and fixing at site. Each 536.65 874.75 Each 536.65 874.75 21.1 & 21.2

4 Dismantling walls, taking out temporary Job 1128.05 - Job 1128.05 - 18.1, 21.1A.P.M. brick block, fixing iron block and & 21.2rebuilding dismantled walls.

5 Dismantling walls and fitting iron block of O.F. outlet. Each 1128.05 - Each 1128.05 - 18.1, 21.1

& 21.2

6 Constructing, watching and removing bund for outlet built 17.1in running water:- to

17.2

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

17. OUTLETS

Page 106: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-17(Outlet) Page 106

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

a) upto 3.0' (0.300 m) depth Each 3046.55 - Each 3046.55 -b) above 3.0' (0.300 m) depth ditto 4112.85 - ditto 4112.85 -

7 Adjusting "B" of tail cluster by dismantling and rebuilding Each 611.40 1080.00 Each 611.40 1080.00 18.1, 21.1throat walls. & 21.2

8 Adjusting "Y" of an A.P.M. outlet, including dismantling Each 1193.95 1954.15 Each 1193.95 1954.15 ditto

and rebuilding.

9 Extra labour in fixing A.P.M. and O.F. outlet blocks, 21.1 & 21.2 Rates to be Rs. 4.00 less in caseincluding dressing of bricks:- of O.F. outlets, where there is no

O.F. iron block.a) for channel depth of 5.0'. (1.5 m) Each 1301.00 1440.20 Each 1301.00 1440.20b) for channel depth of 4.0'. (1.2 m) ditto 975.75 1114.95 ditto 975.75 1114.95c) for channel depth of 3.0'. (900 mm) ditto 780.60 919.80 ditto 780.60 919.80d) for channel depth of 2.0'. (600 mm) ditto 650.50 758.80 ditto 650.50 758.80e) for channel depth of less than 2.0'. (600 mm) ditto 520.40 597.80 ditto 520.40 597.80

10 Repairing damaged reducing collar of Hume pipe outlets. Each 536.65 752.35 Each 536.65 752.35

11 Laying iron pipes for outlets. Per Lft. 26.00 - Metre 85.35 - 21.1, 21.2& 17.1 to

17.5

12 Water allowance for constructing outlets or culverts, when Each 619.45 Each 619.45 At the discretion of thecanal water is not flowing. to to Engineer-in-charge depending upon

1269.40 1269.40 the distance and source of supply.

13 Hoisting and placing R.C. slab or stone in position on Each 445.30 - Each 445.30 -outlets or W.C. culverts.

14 Fixing pipe outlet, including back filling of earth and 17.1 to 17.5puddling:- & 21.1 to

21.2a) portion under bank. Rft. 115.95 125.25 Metre 380.45 410.9 b) portion under road, beyond bank. ditto 49.60 58.90 ditto 162.75 193.2

15 Removing pipe outlet, refilling earth and puddling. 17.1to

a) portion under bank. Rft. 101.55 - Metre 333.20 - 17.5b) portion under road, beyond bank. ditto 38.10 - ditto 124.95 -

16 Changing pipe outlets by removing one pipe and replacingit at the same site with another pipe complete with earthand puddling.

a) portion under bank. Rft. 138.45 147.75 Metre 454.30 484.75b) portion under road, beyond bank. ditto 69.25 78.50 ditto 227.15 257.6

Page 107: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-18(R & Road Struc) Page 107

1 Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 1971".2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.3 The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.4 Subsequent carriage of crushed stone aggregate and bajri will be paid according to the following:

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Sub-base & base construction

1 Providing and laying sub-base course of brick on edge 100Cft. 3595.75 15698.95 cu.m 1270.00 5544.85 521-1 The nominal thickness of bricks 4½" (113 mm) thick, including compaction to required to shall be taken for the purpose ofcamber and grade. 521-6 measurement and payment.

2 Providing and laying sub-base course of brick aggregate, 100Cft. 2722.20 4267.80 cu.m 961.50 1507.40 501-1 To be used only when brickincluding compaction of sub-base course material to to aggregate is cheaper than stonerequired depth, camber, grade & density. 501-6 aggregate.

3 a) Providing and laying sub-base course of stone product dittoof approved quality and grade, including placing, mixing,spreading and compaction of sub-base material torequired depth, camber, grade to achieve 100%maximum modified AASHO dry density, includingcarriage of all material to site of work except gravel and.aggregate.

i) Pit run or bed run gravel. 100Cft. 2722.20 3190.20 cu.m 961.50 1126.8ii) Crushed stone aggregate. 100Cft. 2722.20 3874.20 cu.m 961.50 1368.35

(b) Subsequent carriage of gravel and crushed stone 100Cft. of 1) The carriage of the whole distanceaggregate consoli- to the site of work shall be

dated calculated on the basis of the ratessub-base of the actual means of transport

used in carriage, i.e. road and/or rail,as the case may be.

2) It shall be payable from thenearest approved quarry.3) The quantity of pit run or bed run gravel and crushed stone aggregate for payment of carriage be taken as per actual loose volume not more than 120 Cft.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

18. ROAD & ROAD STRUCTURE

a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.b) It shall be payable from the nearest approved quarry fom sit of work.

Page 108: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-18(R & Road Struc) Page 108

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

4 a) Providing and laying base course of crushed stone 100Cft. 3154.50 5781.45 cu.m 1114.15 2042.00 501-1aggregate of approved quality and grade, and supply and tospreading of stone screening, including placing, mixing, 501-6spreading and compaction of base course material torequired depth, camber and grade to achieve 100%maximum modified AASHO dry density, includingcarriage of all materials to site of work except gravel and.aggregate.

b) Subsequent carriage of crushed stone aggregate. 100Cft. of 1) The carriage for the wholeconsole- distance to the site of work shall bedated calculated on the basis of the ratesbase of the actual means of transport

used in carriage, i.e. road and/orrail, as the case may be.

2) It shall be payable from thenearest approved quarry.

5 Providing and laying road edging of 3" (75 mm) wide and Per Rft. 8.65 32.85 Metre 28.35 107.75 552-1 to9" (225 mm) deep brick on end, complete in all respects. 552-5

Bituminous Work & Resurfacing.

6 Providing and laying bituminous priming coat, using 10 100Sft. 152.35 851.70 sq.m 16.40 91.65 601-1 tolbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg 601-6kerosene and 0.5 Kg binder per square metre.

7 Providing and laying bituminous tack coat, using 10 lbs. of 100Sft. 152.35 512.20 sq.m 16.40 55.10 611-1 tobitumen per 100 Sft (0.49 Kg of bitumen per sq.m.) 611-5

8 a) Providing surface treatment to roads, including supply 612-1 to

of bitumen and bajri/crushed stone aggregate of 612-6approved quality, including cleaning of road surface,heating and spraying bitumen, spreading bajri and rollingwith road roller (including its operation cost, fuel andhire charges, etc.) etc. complete including carriage of allmaterials to site of work except bajjri/crushed stone aggregate.

1) 1st coat:-

3) The quantity of crushed stoneaggregate for payment of carriageshall be taken as per actual loosevolume but not more than 122 Cft.

Page 109: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-18(R & Road Struc) Page 109

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25 100Sft. 133.20 2019.85 Sq.m 14.35 217.35mm) per 100 sq. feet or 1.96 Kg bitumen and 0.017cu.metre bajri per square metre..

ii) 35 lbs. bitumen, and 4.0 Cft. bajri of nominal size ¾" 100Sft. 133.20 1750.75 Sq.m 14.35 188.40(20 mm) per %Sft. or 1.72 Kg bitumen and 0.013 cu.metrebajri per sq.metre.

2) 2nd coat:-

i) 25 lbs. bitumen, and 2.75 Cft. bajri of nominal size ½" 100Sft. 102.45 1253.30 Sq.m 11.00 134.85(13 mm) per %sft or 1.23 Kg bitumen and 0.008 cu. metre bajri persq.metre.

ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 102.45 932.00 Sq.m 11.00 100.30(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metrebajri per sq. metre.

3) 3rd coat:-

14 lbs. bitumen, and 1.5 Cft. bajri of nominal size ¼" (6 100Sft. 70.10 712.65 sq.m 7.55 76.70mm) per %sft or 0.69 Kg bitumen and 0.005 cubic metre bajjri per sq.metre.

b) Subsequent carriage of crushed stone aggregate/bajri, 100Cft. cu.m 1) The carriage for the wholedistance to the site of work shall becalculated on the basis of the ratesof the actual means of transportused in carriage, i.e. road and/or rail,as the case may be.

2) It shal be payable from thenearest approved quarry.

9 a) Resurfacing of road, including supply of bitumen and 612-1bajri/crushed stone aggregate of approved quality, toincluding cleaning of road surface, heating and spraying 612-6of bitumen, and spreading bajri/crushed stoneaggregate and rolling with road roller (including itsoperation cost, fuel and hire charges, etc.) complete,including carriage of all materials to site of work.

Page 110: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-18(R & Road Struc) Page 110

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

i) 22 lbs. bitumen, and 2.5 Cft. bajri of nominal size ½" 100Sft. 88.80 1104.75 sq.m 9.55 118.85(13 mm) per %Sft. or 1.07 Kg bitumen and bajjri 0.007 cu.mper sq.m.

ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 88.80 1000.05 sq.m 9.55 107.60(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006cu.metre bajri per sq.metre.

b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. cu.m Same remarks as againstitem 8(b) above.

10 a) Providing and laying plant premixed bituminous carpet, per inch per 25mm 641-1 toincluding compaction and finishing to required camber, grade thickness thickness 642-6and density. per 100Sft. per Sq.m (i) 3% Bitumen -do- 942.20 2766.65 -do- 101.40 297.80(ii) 3.5% Bitumen -do- 942.20 2986.60 -do- 101.40 321.50(iii) 4% Bitumen -do- 942.20 3206.55 -do- 101.40 345.15(iv) 4.5% Bitumen -do- 942.20 3426.50 -do- 101.40 368.85(v) 5% Bitumen -do- 942.20 3646.35 -do- 101.40 392.50(vi) 5.5% Bitumen -do- 942.20 3866.45 -do- 101.40 416.20(vii) 6% Bitumen -do- 942.20 4086.40 -do- 101.40 439.85b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. cu.m Same remarks as against item 8(b)

above.11 Scarifying old road surface including removal of debris within 100Sft. 253.90 - Sq.m 27.30 -

1 chain (30 m).

Incidental Construction

12 Providing R.C.C. railing on bridges, as per standard drawing. Per Rft. 133.85 936.30 Metre 439.15 3071.85 901-1 The rate includes cost of steel, itsto fabrication, laying in position and

901-4 fastening, including cost of bindingwire and removal of rust from thebars, etc.

13 Providing and fixing G.I. pipe railing, as per Per Rft. of 104.90 742.95 Metre 344.20 2437.55 dittostandard drawing. 3 rows of

Pipes

14 Providing and fixing steel bearings of standard quality and Each Set - 2400.00 Each set - 2400.00 911-1 totype at site of work. of one of one 911-6

end end

15 Providing and fixing rubber bearing pad at site Per - 18.00 cu.cm - 1.10 dittoof work. Cu. Inch

16 Providing and laying expansion joint of neoprine strip 4"x¼" Per Rft. 86.45 193.75 Metre 283.65 635.75 921-1 to(100 mmx 6 mm) and plastic bitumen. 921-4

Page 111: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-18(R & Road Struc) Page 111

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

17 Providing and fixing rain water outlet of A.C. pipe. Each 43.25 347.60 Each 43.25 347.60 931-1 to933-4

18 Providing and erection at site of work:- 941-1 to The rate is for complete item of941-5 work according to Standard design

i) R.C.C. mile/Km. stone Each 2572.35 4846.00 Each 2572.35 4846.00 including cement concreteii) R.C.C. furlong/½ Km. stone Each 125.40 349.55 Each 125.40 349.55 foundation block and paintingiii) R.C.C. boundary pillar. Each 242.50 598.75 Each 242.50 598.75 letters etc.iv) Sign post of M.S. plate 1/8" thick (3 mm)

a) Mandatory. Each 818.65 4546.60 Each 818.65 4546.60b) Warning/Direction/Informatory. Each 792.60 4279.20 Each 792.60 4279.20

19 Providing and laying dry brick pavement/soling in streets or 100Cft. 3264.75 15367.95 cu.m 1153.10 5427.95 The nominal thickness of bricks roads, etc. sand grounted, laid in proper camber, including ( 9" x 4-3/8"x 2-11/16") shall be taken preparation, watering, compaction of bed to proper camber, for the purpose of measurement and sand cushion. and payment.

Page 112: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-19(PSI & GF) Page 112

1 Rates for all finished works include the removal of surplus debris, unused material & by products.2 The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of

Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,Vol II, 1966 (Public Health Works).

3 The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Providing and fitting glazed earthen ware water closetEuropean type, excluding seat and cover:-

i) white Each 432.30 2,170.10 Each 432.30 2,170.10 ii) coloured Each 432.30 2,356.10 Each 432.30 2,356.10

2 Providing and fixing, double seat and cover only.

i) bakelite Each 4.50 334.50 Each 4.50 334.50 ii) plastic Each 4.50 232.50 Each 4.50 232.50

3 Providing and fitting glazed earthen ware water closet,squatter type (Orisa pattern), combined with foot rest.

i) white Each 311.35 1,225.20 Each 311.35 1,225.20 ii) coloured Each 311.35 1,429.20 Each 311.35 1,429.20

4 Providing and fitting white glazed earthen ware water closet, Each 311.35 2,063.35 Each 311.35 2,063.35 squartter type, with separate foot rest.

5 Providing and fitting water closet, squatter type of terrazzo Each 311.35 649.20 Each 311.35 649.20 concrete.

6 Providing and fitting glazed earthen ware wash hand basin56x40 cm (22"x16") including bracket set, waste pipe andwaste coupling, etc.i) white, with pedestal Each 406.55 2,512.55 Each 406.55 2,512.55 ii) coloured, with pedestal Each 406.55 2,698.55 Each 406.55 2,698.55 iii) white, without pedestal Each 358.95 1,762.95 Each 358.95 1,762.95 iv) coloured, without pedestal Each 358.95 1,810.95 Each 358.95 1,810.95

7 Providing and fixing stainless steel sink with drain board, size Each 358.95 4,450.15 Each 358.95 4,450.15 120x60 cm (48"x24") including bracket set, waste pipe andwaste coupling.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

19. PLUMBING, SANITARY INSTALLATION & GAS FITTINGS

Page 113: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-19(PSI & GF) Page 113

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

8 Providing and fitting terrazzo concrete sink 60x45 cm (24"x18") Each 358.95 1,149.95 Each 358.95 1,149.95 with drain board of mosaic, including bracket set, waste pipeand waste coupling.

9 Providing and fixing glazed earthen ware sink, includingbracket set, waste pipe and waste coupling:-

i) 60x45 cm (24"x18") Each 358.95 1,727.15 Each 358.95 1,727.15 ii) 37.5x45 cm (15"x18") Each 358.95 1,547.15 Each 358.95 1,547.15

10 Providing and fixing glazed earthen ware flat back urinal. Each 216.15 919.00 Each 216.15 919.00

11 Providing and fitting glazed earthen ware low down flushingcistern 13.63 litres (3 gallons) capacity, including bracketset, copper connection, etc.

i) white Each 358.95 1,358.05 Each 358.95 1,358.05 ii) coloured Each 358.95 1,436.05 Each 358.95 1,436.05

12 Providing and fitting plastic made low down flushing cistern13.63 litre (3 gallons) capacity, including bracket set, copperconnection, etc. complete.

i) white Each 358.95 1,196.05 Each 358.95 1,196.05 If rubber connection is used, theii) coloured Each 358.95 1,196.05 Each 358.95 1,196.05 composite rate will be reduced by

Rs. 12.50

13 Providing and fixing white enameled cast iron low down flushing Each 358.95 1,383.20 Each 358.95 1,383.20 cistern 13.63 litres (3 gallons) capacity, including bracketset, copper connection, etc.

14 Providing and fixing cast iron high level flushing cisternincluding cost of bracket set, copper connection, etc.

i) 13.63 litres (3 gallons) capacity Each 380.55 2,502.80 Each 380.55 2,502.80 ii) 4.55 litres (1 gallon) capacity Each 380.55 1,662.80 Each 380.55 1,662.80

15 Providing and fixing, chromium plated soap dish. Each 21.60 193.70 Each 21.60 193.70

16 Providing and fitting, glazed earthen ware soap dish.

i) white Each 21.60 481.70 Each 21.60 481.70 ii) coloured Each 21.60 229.70 Each 21.60 229.70

17 Providing and fixing, chromium plated toilet paper holder. Each 28.80 414.00 Each 28.80 414.00

Page 114: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-19(PSI & GF) Page 114

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

18 Providing and fixing, chromium plated towel rail:-

i) 60 cm (24") long, and 2 cm (¾") dia. Each 28.80 358.90 Each 28.80 358.90 ii) 50 cm (20") long, and 1.5 cm (½") dia. Each 28.80 298.90 Each 28.80 298.90

19 Providing and fixing looking glass 55x40 cm (22"x16") size, Each 54.05 386.15 Each 54.05 386.15and 5 mm thick, first quality.

20 Providing and fixing glass shelf 60x13 cm (24"x5"), with5mm thick glass:-

i) with chromium plated brackets and railing. Each 67.55 390.30 Each 67.55 390.30 ii) glass shelf only, without chromium plated brackets Each 43.25 88.85 Each 43.25 88.85

and railing.

21 Providing and fitting glazed earthen ware shelf 60x13 cm (24"x5"), with chromium plated bracket and railing:-

i) White Each 67.55 944.70 Each 67.55 944.70 ii) Coloured Each 67.55 1,076.70 Each 67.55 1,076.70

22 Providing and fitting:-

i) plastic soap dish Each 21.60 161.25 Each 21.60 161.25 ii) plastic toilet paper holder Each 28.80 226.80 Each 28.80 226.80 iii) plastic towel rail Each 28.80 250.80 Each 28.80 250.80 iv) plastic shelf 60x13 cm (24"x5") with bracket and railing. Each 28.80 432.45 Each 28.80 432.45

23 Providing and fixing chromium plated pillar-cock, heavy:-

i) 2 cm (¾") Each 28.80 700.80 Each 28.80 700.80 ii) 1.5 cm (½") Each 28.80 544.80 Each 28.80 544.80

24 Providing and fixing chromium plated stop cock, heavy:-

i) 2 cm (¾") Each 28.80 280.80 Each 28.80 280.80 ii) 1.5 cm (½") Each 28.80 184.80 Each 28.80 184.80

25 Providing and fixing underground stop cock 13 mm (½"), Each 42.35 496.10 Each 42.35 496.10 with chromium plated cover.

26 Providing and fixing chromium plated bib cock:-i) 2 cm (¾") Each 28.80 352.80 Each 28.80 352.80 ii) 1.5 cm (½") Each 28.80 334.80 Each 28.80 334.80

Page 115: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-19(PSI & GF) Page 115

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

27 Providing and fixing chromium plated tee stop cock Each 28.80 454.80 Each 28.80 454.80 15mm (½").

28 Providing and fixing chromium plated shower rose:-

i) 1.5x10 cm (½"x4") Each 28.80 334.80 Each 28.80 334.80 ii) 2x15 cm (¾"x6") Each 28.80 412.80 Each 28.80 412.80

29 Providing and fixing, chromium plated mixing valve, for wash Each 36.05 1,560.05 Each 36.05 1,560.05 hand basin, sink or shower.

30 Providing and fixing gun metal peet/gate valve (screwed):- For brass peet/gate valve (screwed),the composite rates of items (i) to (v)

i) 30 mm (1¼") dia Each 43.25 445.25 Each 43.25 445.25 will be reduced by Rs. 66, 77, 95, 107ii) 40 mm(1½") dia Each 43.25 595.25 Each 43.25 595.25 and 120 respectively.iii) 50 mm(2") dia Each 43.25 823.25 Each 43.25 823.25 iv) 65 mm(2½") dia Each 43.25 1,291.25 Each 43.25 1,291.25 v) 80 mm(3") dia Each 43.25 1,903.25 Each 43.25 1,903.25

31 Providing and fitting, chromium plated or brass oxidised,swan neck cock 15 mm (½") dia.

i) single way Each 28.80 376.80 Each 28.80 376.80 ii) two way Each 43.25 643.25 Each 43.25 643.25 iii) three way Each 57.65 783.65 Each 57.65 783.65

32 Providing and fixing, union brass cock.

i) 13 mm (½") dia Each 28.80 148.80 Each 28.80 148.80 ii) 20 mm (¾") dia Each 28.80 232.80 Each 28.80 232.80

33 Providing and fixing, floor trap of cast iron, including concrete

chamber all round, and C.I. grating:-

i) 10x5 cm (4"x2") Each 86.45 407.25 Each 86.45 407.25 ii) 10x7.5 cm (4"x3") Each 86.45 407.25 Each 86.45 407.25

34 Providing and fitting "P" trap:-

i) 10 cm (4") of cast iron. Each 72.05 470.25 Each 72.05 470.25 ii) 10 cm (4") glazed. Each 72.05 140.25 Each 72.05 140.25

35 Providing and fitting 10 cm (4") gully trap, including cement Each 108.10 685.30 Each 108.10 685.30

concrete, cost of PVC grating 15x15 cm (6"x6") andmasonry chamber 30x30 cm (12"x12").

Page 116: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-19(PSI & GF) Page 116

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

36 Providing and fitting, cast iron soil pipe with:-

i) lead caulked, yarn joint:-

a) 10 cm (4") i/d Per foot 36.40 233.60 Metre 119.40 766.15 b) 5 cm (2") i/d Per foot 14.55 99.00 Metre 47.75 324.65

ii) cement caulked joint:-

a) 10 cm (4") i/d Per foot 8.05 148.95 Metre 26.40 488.55 b) 5 cm (2") i/d Per foot 3.20 81.90 Metre 10.55 268.65

37 Providing and fitting, A.C. soil pipe with cement caulkedjoint, including all specials:-

i) 60 (2¼)" mm i/d Per foot 6.45 31.05 Metre 21.10 101.85 ii) 80 (3") mm i/d Per foot 7.15 72.00 Metre 23.45 236.20 iii) 100 (4") mm i/d Per foot 8.05 106.95 Metre 26.40 350.85 iv) 150 (6") mm i/d Per foot 10.70 133.15 Metre 35.15 436.75

38 Providing and fitting cast iron specials, such as tee bend, In case of plug type, the compositecollar, cross, etc. plain type:- rate shall be increased by Rs.2 per kg.

i) lead caulked joint Kg 29.65 157.90 Kg 29.65 157.90 ii) cement caulked joint Kg 18.05 116.85 Kg 18.05 116.85

39 Supply and fitting of cast iron manhole coverwith frame, etc. complete.

i) 30 cm (12") dia Each 43.25 199.25 Each 43.25 199.25 ii) 45 cm (18") dia Each 43.25 871.25 Each 43.25 871.25 iii) 60 cm (24") dia Each 70.35 1,474.35 Each 70.35 1,474.35

40 Providing and fitting R.C.C. pipe 10 cm (4") dia, including Per foot 18.20 66.20 Metre 59.70 217.15 laying and jointing in trenches.

41 Providing and fitting chromium plated or oxidised, gas cock 6'mm (¼"):-

i) single way Each 28.80 202.80 Each 28.80 202.80 ii) two way Each 43.25 307.25 Each 43.25 307.25 iii) three way Each 57.65 501.65 Each 57.65 501.65

42 Providing and fitting nipple or bush, 6 mm to Each 21.60 52.50 Each 21.60 52.50 10 mm (¼" to 3/8") i/d.

Page 117: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-19(PSI & GF) Page 117

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

43 Providing and fixing, brass gas cock:-

a) 15 mm (½") dia Each 4.50 94.50 Each 4.50 94.50 b) 20 mm (¾") dia Each 163.75 106.50 Each 163.75 106.50

44 Providing and fixing brass stop cock/bib cock:-

a) 15 mm (½") dia Each 7.20 85.20 Each 7.20 85.20 b) 20 mm (¾") dia Each 7.20 127.20 Each 7.20 127.20

45 Hoisting and placing in position, precast R.C. latrine seats. Each 432.30 - Each 432.30 -

Replacement

1 Providing and fixing, chromium plated waste coupling:-

i) 3 cm (1¼") Each 43.25 127.25 Each 43.25 127.25 ii) 4 cm (1½") Each 43.25 133.25 Each 43.25 133.25

2 Providing and fixing rubber plug with chain:-

i) 3 cm (1¼") Each 1.75 48.55 Each 1.75 48.55 ii) 4 cm (1½") Each 1.75 55.75 Each 1.75 55.75

3 Providing and fixing, waste pipe of PVC:-

i) 3 cm (1¼") Each 21.60 48.00 Each 21.60 48.00 ii) 4 cm (1½") Each 21.60 54.00 Each 21.60 54.00

4 Providing and fixing, flushing bend of PVC.

i) 3 cm (1¼") Each 19.20 45.60 Each 19.20 45.60 ii) 4 cm (1½") Each 19.20 51.60 Each 19.20 51.60

5 Providing and fixing chromium plated bottle trap with wastepipe, etc. complete:-

i) 3 cm (1¼") i/d Each 43.25 559.25 Each 43.25 559.25 ii) 4 cm (1½") Each 43.25 679.25 Each 43.25 679.25

6 Providing and fixing, angle iron brackets for:-

i) wash hand basin and cistern Each 43.25 172.85 Each 43.25 172.85 ii) sinks Each 43.25 189.65 Each 43.25 189.65

Page 118: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-19(PSI & GF) Page 118

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

7 Providing and fixing 1.5 cm (½") dia connection, includingcheck nuts, etc.:-

i) plastic rubber connection Each 17.30 49.70 Each 17.30 49.70 ii) copper connection Each 17.30 88.10 Each 17.30 88.10

8 Providing and fixing brass ball float valve:-

i) 1.5 cm (½") dia Each 36.05 240.05 Each 36.05 240.05 ii) 2.0 cm (¾") dia Each 36.05 306.05 Each 36.05 306.05 iii) 2.5 cm (1") dia Each 36.05 366.05 Each 36.05 366.05 iv) 3 cm (1¼") dia Each 36.05 396.05 Each 36.05 396.05 v) 4.0 cm (1½") dia Each 36.05 552.05 Each 36.05 552.05 vi) 5 cm (2") dia Each 36.05 930.05 Each 36.05 930.05

Page 119: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-20(Surface Drainage) Page 118

1. Specification No. correspond to Book of Specification (B & R Department ) Vol. 11, 1966 (public Health Works).

2. Rates for all finished works include the removal of surplus debris, unused material and by products.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Tega formed of pacca bricks on end, laid in and over 17.1cement sand mortar projecting to a height of not morethan 6" (150 mm) top of drain along the property sidewhere required, laid to lines, grades, slopes and shapeaccording to the Engineer's drawing:-

a) 3" thick (75 mm)

i) ratio 1:3 100Rft 1,231.15 4,058.35 Metre 40.40 133.10 ii) ratio 1:5 ditto 1,231.15 3,873.05 ditto 40.40 127.05

B) 4½" thick (113 mm)

i) ratio 1:3 100Rft 1,846.40 5,915.15 ditto 60.55 194.00 ii) ratio 1:5 ditto 1,846.40 5,632.50 ditto 60.55 184.75

2 Pacca flat brick 3" (75 mm ) thick, laid in reimbursement, 17.1in cement, sand mortar, on sides of drains and in otherworks where required. All joints to be completely filledand struck flush:-

a) ratio 1:3 100Sft. 1,814.75 5,769.10 Sqm. 195.25 620.75 b) ratio 1:5 ditto 1,814.75 5,470.25 ditto 195.25 588.60 c) ratio 1:6 ditto 1,814.75 5,386.05 ditto 195.25 579.55

3 Pacca brick on edge, laid in reimbursement, in cement, 17.1sand mortar, on sides of drains and on other works whererequired. All joints to be completely filled and struckflush:-

a) ratio 1:3 100Sft. 2,572.95 8,537.70 Sqm. 276.85 918.65 b) ratio 1:5 ditto 2,572.95 8,058.15 ditto 276.85 867.05 c) ratio 1:6 ditto 2,572.95 7,938.90 ditto 276.85 854.25

4 Pacca flat brick, Herring bond pitching in cement, sand 17.2mortar, laid to lines, grades, shapes and slopes as perEngineer's drawing:-

a) ratio 1:3 100Sft. 1,749.55 5,703.90 Sqm. 188.25 613.75 b) ratio 1:5 ditto 1749.55 5405.05 ditto 188.25 581.6 c) ratio 1:6 ditto 1749.55 5320.85 ditto 188.25 572.5

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

20. SURFACE DRAINAGE

Page 120: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-20(Surface Drainage) Page 119

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

5 Pacca brick on edge, Herring bond pitching in cement, 17.2sand mortar, laid to lines, grades, shapes and slopes asper Engineer's drawing:-

a) ratio 1:3 100Sft. 2,714.55 8,679.35 Sqm. 292.10 933.90 b) ratio 1:5 ditto 2,714.55 8,199.75 ditto 292.10 882.30 c) ratio 1:6 ditto 2,714.55 8,080.50 ditto 292.10 869.45

6 Constructing Punjab Standard Drains. of cement concrete1:2 ½ :5, with cement concrete bedding ratio 1:6:12, 17.1complete, laid to lines, grades, slopes and shapes,rendering exposed surface of concrete with 1:1 cement,sand mortar, ¼" (6 mm) thick, as per Engineer's drawing(excluding excavation):-

a) Type I Per Rft 41.75 102.35 Metre 136.95 335.65 b) Type II ditto 83.50 188.00 ditto 273.95 616.65 c) Type III ditto 110.25 245.25 ditto 361.60 804.50 d) Type IV ditto 131.45 292.30 ditto 431.10 958.80 e) Type V ditto 173.85 397.75 ditto 570.30 1,304.70 f) Type VI ditto 200.05 455.80 ditto 656.15 1,495.05 g) Type VII ditto 221.75 502.00 ditto 727.25 1,646.60 h) Type VIII ditto 247.65 562.85 ditto 812.25 1,846.20 i) Type IX ditto 332.55 796.80 ditto 1,090.75 2,613.50 j) Type X ditto 365.20 873.30 ditto 1,197.90 2,864.45 k) Type XI ditto 407.95 971.50 ditto 1,338.15 3,186.45 l) Type XII ditto 434.90 1,030.60 ditto 1,426.55 3,380.40

7 Laying R.C.C hume pipes in position, including jointing:-a) 6" to 12" (150 mm to 300 mm ) dia Per Lft. 78.20 81.70 Metre 256.55 267.95 b) 12" to 24" (300 mm to 600 mm) dia ditto 123.90 130.85 ditto 406.45 429.20 c) 24" to 36" (600 mm to 900 mm) dia ditto 156.45 166.90 ditto 513.15 547.40

Page 121: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-21(Sewerage) Page 120

1 Specification No. correspond to Book of Specification of B&R Department Vol. II, 1966 (Public Health Works).2 Rate for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Providing and laying R.C.C. pipe, moulded with cement Chapter - 8concrete 1:1½:3, with spigot socket or collar joint, etc. including cost of reinforcement, conforming to B.S. 5911:Part I: 1981, Class "L" including carriage of pipe fromfactory to site of work, lowering in trenches to correctalignment and grade, jointing, cutting pipes wherenecessary, finishing and testing, etc., complete.i) 100 mm (4") i/d Rft. 20.65 88.80 Metre 67.75 291.25ii) 150 mm (6") i/d Rft. 24.90 133.25 Metre 81.65 437.05iii) 225 mm (9:) i/d Rft. 48.30 352.20 Metre 158.40 1155.20

2 Providing and laying non-reinforced concrete pipe, dittomoulded with cement concrete 1:1½:3, conforming toASTM Specification C-14-73, Class 2, including carriageof pipe from factory to site of work, lowering in trenches tocorrect alignment and grade, jointing, cutting pipe wherenecessary, finishing and testing, etc. complete.i) 100 mm (4") i/d Rft. 15.50 55.70 Metre 50.85 182.70ii) 150 mm (6") i/d Rft. 18.70 74.70 Metre 61.35 245.00iii) 200 mm (8") i/d Rft. 30.00 101.75 Metre 98.40 333.75iv) 225 mm (9:) i/d wall thickness 1 inch (25 mm) Rft. 32.20 121.15 Metre 105.60 397.35v) 250 mm (10") i/d Rft. 32.65 132.55 Metre 107.10 434.75

3 Providing and laying R.C.C. pipe sewers, moulded with dittocement concrete 1:1½:3 conforming to ASTMSpecification C-76-79, Class II. Wall B, including carriageof pipe from factory to site of work, lowering in trenches tocorrect alignment and grade, jointing with rubber ring,cutting pipes where necessary, testing, etc., complete.

i) 310 mm (12") i/d Rft. 49.10 413.85 Metre 161.05 1357.45ii) 380 mm (15") i/d Rft. 61.65 508.15 Metre 202.20 1666.75iii) 460 mm (18") i/d Rft. 74.15 555.50 Metre 243.20 1822.05iv) 530 mm (21":) i/d Rft. 92.80 710.05 Metre 304.40 2328.95v) 610 mm (24") i/d Rft. 106.75 847.60 Metre 350.15 2780.15vi) 690 mm (27") i/d Rft. 158.70 1174.50 Metre 520.55 3852.35vii) 760 mm (30") i/d Rft. 190.35 1262.60 Metre 624.35 4141.35viii) 840 mm (33") i/d Rft. 237.15 1476.95 Metre 777.85 4844.40ix) 910 mm (36") i/d Rft. 291.85 1973.95 Metre 957.25 6474.55x) 1070 mm (42") i/d Rft. 379.65 2559.6 Metre 1245.25 8395.5xi) 1220 mm (48") i/d Rft. 717.05 3444.8 Metre 2351.9 11298.95xii 1370 mm (54") i/d Rft. 992.45 4331.85 Metre 3255.25 14208.45xiii) 1520 mm (60") i/d Rft. 1260.1 4970.5 Metre 4133.15 16303.25

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

21. SEWERAGE

Page 122: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-21(Sewerage) Page 121

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

xiv) 1680 mm (66") i/d Rft. 1981.05 6062.5 Metre 6497.85 19885xv) 1830 mm (72") i/d Rft. 2461.20 6913.70 Metre 8072.75 22676.95

4 Providing and laying R.C.C. pipe sewers, moulded with Chapter-8cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class III, Wall B, including carriage of pipes fromfactory to site of work, lowering in trenches to correctalignment and grade, jointing with rubber ring, cutting pipeswhere necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 49.10 510.40 Metre 161.10 1674.10ii) 380 mm (15") i/d Rft. 61.65 632.30 Metre 202.20 2073.95iii) 460 mm (18") i/d Rft. 74.15 783.90 Metre 243.30 2571.20iv) 530 mm (21":) i/d Rft. 92.80 953.45 Metre 304.30 3127.30v) 610 mm (24") i/d Rft. 106.75 1112.40 Metre 350.15 3648.65vi) 690 mm (27") i/d Rft. 158.70 1333.10 Metre 520.50 4372.55vii) 760 mm (30") i/d Rft. 190.35 1592.85 Metre 624.30 5224.55viii) 840 mm (33") i/d Rft. 237.15 1841.40 Metre 777.90 6039.80ix) 910 mm (36") i/d Rft. 291.85 2328.65 Metre 957.20 7637.95x) 1070 mm (42") i/d Rft. 379.65 3015.20 Metre 1245.25 9889.85xi) 1220 mm (48") i/d Rft. 728.15 3831.80 Metre 2388.40 12568.30xii 1370 mm (54") i/d Rft. 1008.05 4829.10 Metre 3306.40 15839.45xiii) 1520 mm (60") i/d Rft. 1279.60 5829.90 Metre 4197.05 19122.05xiv) 1680 mm (66") i/d Rft. 2012.20 7648.00 Metre 6600.05 25085.45xv) 1830 mm (72") i/d Rft. 2500.15 9470.80 Metre 8200.55 31064.20

5 Providing and laying R.C.C. pipe sewers, moulded with Chapter - 8cement concrete 1:1½:3 conforming to ASTMSpecification C-76-79, Class IV, Wall B, including carriageof pipes from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring,cutting pipes where necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 49.10 619.50 Metre 161.10 2032.00ii) 380 mm (15") i/d Rft. 61.65 774.95 Metre 202.20 2541.85iii) 460 mm (18") i/d Rft. 74.15 930.40 Metre 243.30 3051.75iv) 530 mm (21":) i/d Rft. 92.80 1090.65 Metre 304.30 3577.35v) 610 mm (24") i/d Rft. 106.75 1254.90 Metre 350.15 4116.00vi) 690 mm (27") i/d Rft. 158.70 1618.05 Metre 520.50 5307.20vii) 760 mm (30") i/d Rft. 190.35 1865.85 Metre 624.30 6120.20viii) 840 mm (33") i/d Rft. 237.15 2155.00 Metre 777.90 7068.40ix) 910 mm (36") i/d Rft. 291.85 2874.80 Metre 957.20 9429.40x) 1070 mm (42") i/d Rft. 379.65 3525.70 Metre 1245.25 11564.35xi) 1220 mm (48") i/d Rft. 728.15 4449.10 Metre 2388.15 14593.05xii) 1370 mm (54") i/d Rft. 1008.05 5773.00 Metre 3306.60 18935.40xiii) 1520 mm (60") i/d Rft. 1279.60 7266.55 Metre 4197.05 23834.20xiv) 1680 mm (66") i/d Rft. 2012.20 9607.05 Metre 6600.05 31511.05xv) 1830 mm (72") i/d Rft. 2500.15 11429.80 Metre 8200.55 37489.75

Page 123: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-21(Sewerage) Page 122

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

6 Lowering of sub-soil water table, by installation of tubewells 1) This rate shall be payable, inalong sewer line and pumping out water, for excavation in addition to the item of excavationopen cutting below sub-soil water level, concreting, curing, below SSWL for sewers andlaying and jointing pipes, filling haunches, etc. till the manholes under Chapter,completion of sewer line, including disposal of pumped out EARTHWORKwater:- 2) The grant of these rates shall be

Rft of Metre of subject to Superintending Engineer's1) 0-1 ft. (0 to 310 mm) below SSWL laid sewer - 305.55 laid sewer - 1002.15 approval.2) 0-2 ft. (0 to 610 mm) below SSWL ditto - 567.60 ditto - 1861.753) 0-3 ft. (0 to 910 mm) below SSWL ditto - 983.15 ditto - 3224.65 3) The rate includes cost of4) 0-4 ft. (0 to 1220 mm) below SSWL ditto - 1429.55 ditto - 4688.95 providing pumps, POL and all5) 0-5 ft. (0 to 1520 mm) below SSWL ditto - 2011.05 ditto - 6596.20 operation charges at the site6) 0-6 ft. (0 to 1830 mm) below SSWL ditto - 2486.40 ditto - 8155.45 of work, etc.7) 0-7 ft. (0 to 2170 mm) below SSWL ditto - 2973.80 ditto - 9754.158) 0-8 ft. (0 to 2480 mm) below SSWL ditto - 3414.25 ditto - 11198.709) 0-9 ft. (0 to 2790 mm) below SSWL ditto - 3675.30 ditto - 12055.0510) 0-10 ft. (0 to 3100 mm) below SSWL ditto - 4244.10 ditto - 13920.7511) 0-11 ft. (0 to 3410 mm) below SSWL ditto - 4728.35 ditto - 15508.9512) 0-12 ft. (0 to 3720 mm) below SSWL ditto - 5248.40 ditto - 17214.70

7 Constructing gully grating chamber, 12"x12", ( 300x300 16.2 Pipe connection to be paidmm) complete in all respects: separately.

a) with C.I. gully trap, weighing 81 lbs. (36.75 Kg.) frame Each 871.20 3073.00 Each 871.20 3073.00

hinged safety type.

b) concrete Gully trap. ditto 871.20 2848.00 ditto 871.20 2848.00

8 Constructing standard gully grating chamber, 3'x2½' Each 2620.60 8742.30 Each 2620.60 8742.30 ditto Pipe connection to be paid(900x750 mm), with chinaware trap as per PHED Drawing separately.STD/PD No. 3 of 1977, complete in all respects.

9 Extra for making and finishing benching floor work in 100Sft. 1078.70 1591.65 Sq.m 116.05 171.25 14.4manhole chamber, with 1/8" (3 mm) thick cement finish.

10 Restoration of brick pavement on edge, over laid service 100Sft. 1577.40 3307.90 Sq.m 169.75 355.95 13.1line, with 2" (50 mm) sand cushion under soling.

11 Restoration of flat brick pavement sand grouted, over 2" 100Sft. 956.65 2200.00 Sq.m 102.95 236.70 13.1(50 mm) thick dry sand cushion, under soling on laidservice line.

12 Restoration of metalled road, on laid service line, including 13.1compaction:-

a) Carpetted road, with 2" (50 mm) carpet and 10" (250 100Sft. 2633.05 7730.35 Sq.m 283.30 831.80mm) depth of stone metal for sub-base and base.

Page 124: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-21(Sewerage) Page 123

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

b) Carpeted road, with 1½" (38 mm) carpet and 6" (150 100Sft. 1867.95 5672.55 Sq.m 201.00 610.35mm) depth of stone metal, for sub-base and base.

c) Black Topped Road with two coats of surfacing & 10" 100Sft. 991.85 3827.90 Sq.m 106.70 411.90(250 mm) depth of stone metal, for sub base & base.

13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle 14.7iron step, in manhole chambers, including carriage and Each 88.55 251.35 Each 88.55 251.35setting the same in work to correct lines and levels.

14 Fixing manhole frame and cover in R.C.C. slab including Per 239.15 - Per 239.15 - dittocarriage to site. set set

15 Providing and fixing 3" (75 mm) thick R.C.C. manhole Per 154.65 5789.85 Per 154.65 5789.85 dittocover, 22" (550 mm) dia, with tee shaped C.I. frame of 20" set set(500 mm) clear i/d (frame weighing 37.324 Kg. or onemaund) as per Standard Drawing STD/PD No. 5, of 1977,complete in all respects.

15-A Providing and fixing 6" thick R.C.C. manhole Per 339.55 7166.15 Per 339.55 7166.15cover with tee shaped C.I. frame of 22" I/d (frame set setweighing 37.324 Kg. or one maund as per StandardDrawing STD/PD No. 6, of 1977, complete in all respect.

16 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 303.55 2678.20 Per 303.55 2678.20 dittocover for 22" as per standard drawing STD/PD No. 6 of set set1977, complete in all respects.

17 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 251.35 4147.75 Per 251.35 4147.75 dittocover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" set set(550 mm) i/d as per standard drawing STD/PD No. 7 of1977, complete in all respects.

18 Desilting of disposal work collecting tank, including 100Cft. 870.45 924.75 cum 307.45 326.60 16.2removal of sludge within 3 chains (90 metre).

19 Providing and installing, C.I. ventilating shaft painted with 14.6bituminous paint with foundation bolts, as per PHEDStandard Drawing STD/PD No. 4 of 1977, complete in allrespects (except concrete foundation block):-

a) 6" (150 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 244.45 6363.55 %kg 481.20 12526.70ii) 24 ft. (7.30 metre) long ditto 271.60 6399.10 ditto 534.65 12596.65iii) 30 ft. (9.15 metre) long ditto 293.35 6416.70 ditto 577.45 12631.35iv) 36 ft. (11 metre) long ditto 306.95 6431.85 ditto 604.20 12661.10

Page 125: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-21(Sewerage) Page 124

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

b) 9" (225 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 217.40 6333.05 %kg 427.90 12466.70ii) 24 ft. (7.30 metre) long ditto 234.25 6349.30 ditto 461.10 12498.60iii) 30 ft. (9.15 metre) long ditto 250.80 6365.65 ditto 493.75 12530.85iv) 36 ft. (11 metre) long ditto 301.90 6416.60 ditto 594.30 12631.10

c) 12" (300 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 193.25 6309.70 %kg 380.45 12420.65ii) 24 ft. (7.30 metre) long ditto 248.50 6361.40 ditto 489.15 12522.45iii) 30 ft. (9.15 metre) long ditto 289.90 6402.30 ditto 570.70 12603.00

20 Silt clearing 10' (3.00 m) dia wells, andremoval of slush outside the compound:-

a) upto 10' (3.00 m) depth of slush Per well 6782.80 - Per well 6782.80 -b) beyond 10' (3.00 m) depth of slush Per well 13462.70 - Per well 13462.70 -

Page 126: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-22(Sinking of Wells) Page 125

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 Well curbs to be laid at spring level or as deep as possible.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Excavation of well in dry upto 20'(6 metre) below groundlevel, and disposal of soil within one chain (30 metre)

a) in ordinary soil or sand :- 1000 Cft. cu.m

i) from 0' to 5' (o to 1.5 m) depth ditto 4527.20 - ditto 159.90 -ii) from 5.1' to 10' (1.5 to 3.0 metre) depth ditto 4728.25 - ditto 167.00 -iii) from 10.1' to 15' (3.0 to 4.5 metre) depth ditto 5319.30 - ditto 187.90 -iv) from 15.1' to 20' (4.5 metre to 6.0 metre) depth ditto 6105.30 - ditto 215.65 -

b) in hard soil

i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 5514.25 - cu.m 194.75 -ii) from 5.1' to 10'(1.5 to 3.0 metre) depth ditto 5764.10 - ditto 203.60 -iii) from 10.1' to 15'(3.0 to 4.5 metre) depth ditto 6300.30 - ditto 222.55 -iv) from 15.1' to 20'(4.5 to 6.0 metre) depth ditto 7086.30 - ditto 250.30 -

c) in hard strata, such as shingle, gravel, etc.

i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 11893.75 - cu.m 420.10 -ii) from 5.1' to 10'(1.5 to 3.0 metre) depth ditto 12320.30 - ditto 435.15 -iii) from 10.1' to 15'(3.0 to 4.5 metre) depth ditto 12844.30 - ditto 453.65 -iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth ditto 13788.75 - ditto 487.00 -

2 Dry sinking of well, including loading, and removingexcavated material within one chain (30 m):-

a) in ordinary soil :-

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 24372.50 - cu.m 860.85ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 30465.60 - ditto 1076.05iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 36558.70 - ditto 1291.25iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 42651.85 - ditto 1506.45v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 48744.95 - ditto 1721.65vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 54838.10 - ditto 1936.90vii) from 40.1'to 45'(12.0 to 13.5 m) depth ditto 60931.20 - ditto 2152.10viii) from 45'(13.5 Sm) to any depth ditto 67024.30 - ditto 2367.30

b) in hard soil :-

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 33512.15 - cu.m 1183.65 -ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 39605.30 - ditto 1398.85 -iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 45698.40 - ditto 1614.05 -iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 51791.50 - ditto 1829.30 -

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

22. SINKING OF WELLS

Page 127: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-22(Sinking of Wells) Page 126

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 57884.65 - ditto 2044.50 -vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 63977.75 - ditto 2259.70 -vii) from 40.1' to 45'(12.0 to 13.5 m) depth ditto 70070.90 - ditto 2474.90 -viii) from 45'(13.5 m) to any depth ditto 76164.00 - ditto 2690.10 -

c) in hard strata, such as shingle, gravel, etc.

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 45698.40 - cu.m 1614.05 -ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 51791.50 - ditto 1829.30 -iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 57884.65 - ditto 2044.50 -iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 58646.30 - ditto 2071.40 -v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 70070.90 - ditto 2474.90 -vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 76164.00 - ditto 2690.10 -vii)from 40.1' to 45'(12.0 to 13.5 m) depth ditto 82257.10 - ditto 2905.30 -viii) from 45'-1" (13.5 m) to any depth ditto 88350.25 - ditto 3120.55 -

3 Wet sinking of well in ordinary soil (value of C upto 5), for *841-1 The outer dimensions of the curbdepths below spring level, including charges of machinery, to shall form basis of payment.shoring, kentledge and removal of excavated spoil within 841-9one chain (30 m):-

i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. 37053.20 - cu.m 1308.70 -ii) above 10' to 20'(3.0 to 6.0 m) depth ditto 78738.00 - ditto 2781.05 -iii) above 20' to 30'(6.0 to 9.0 m) depth ditto 96908.30 - ditto 3422.80 -iv) above 30' to 40'(9.0 to 12.0 m) depth ditto 125980.80 - ditto 4449.65 -v) above 40' to 50'(12.0 to 15.0 m) depth ditto 139978.65 - ditto 4944.05 -vi) above 50' to 60'(15.0 to 18.0 m) depth ditto 157476.00 - ditto 5562.05 -vii) above 60' to 70'(18.0 to 21.0 m) depth ditto 161513.85 - ditto 5704.65 -viii) above 70' to 80'(21.0 to 24.0 m) depth ditto 165764.20 - ditto 5854.80 -ix) above 80'(24.0 m) to any depth ditto 179972.55 - ditto 6356.65 -

4 Wet sinking of well in cohesive soil (value of Cmore than *841-1 The outer dimensions of the curb5), for depths below spring level, including charges of to shall form basis of payment.machinery shoring, kentledge and removal of excavated 841-9spoil within one chain (30 m):-

i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 50328.10 cu.m - 1777.60ii) above 10' to 20'(3.0 to 6.0 m) depth ditto - 62910.15 ditto - 2222.00iii) above 20' to 30'(6.0 to 9.0 m) depth ditto - 75492.15 ditto - 2666.40iv) above 30' to 40'(9.0 to 12.0 m) depth ditto - 100656.25 ditto - 3555.20v) above 40' to 50'(12.0 to 15.0 m) depth ditto - 116141.80 ditto - 4102.15vi) above 50' to 60'(15.0 to 18.0 m) depth ditto - 125820.30 ditto - 4443.95vii) above 60' to 70'(18.0 to 21.0 m) depth ditto - 137258.50 ditto - 4847.95viii) above 70' to 80'(21.0 to 24.0 m) depth ditto - 142438.05 ditto - 5030.90ix) above 80'(24.0 m) to any depth ditto - 150984.35 ditto - 5332.75

Page 128: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-22(Sinking of Wells) Page 127

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

5 Wet sinking of well in shingle, or gravel, etc, for depths *841-1 The outer dimensions of the curbbelow spring level, including charges of machinery, to shall form basis of payment.shoring, kentledge and removal of excavated spoil within 841-9one chain (30 m) :-i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 68629.25 cu.m - 2424.00ii) above 10' to 20'(3.0 to 6.0 m) depth ditto - 83880.20 ditto - 2962.65iii) above 20' to 30'(6.0 to 9.0 m) depth ditto - 100656.25 ditto - 3555.20iv) above 30' to 40'(9.0 to 12.0 m) depth ditto - 137258.50 ditto - 4847.95v) above 40' to 50'(12.0 to 15.0 m) depth ditto - 150984.35 ditto - 5332.75vi) above 50' to 60'(15.0 to 18.0 m) depth ditto - 167760.40 ditto - 5925.30vii) above 60' to 70'(18.0 to 21.0 m) depth ditto - 175563.20 ditto - 6200.90viii) above 70' to 80'(21.0 to 24.0 m) depth ditto - 179743.25 ditto - 6348.55ix) above 80'(24.0 m) to any depth ditto - 198663.60 ditto - 7016.80

6 Making and fixing in position, kiker wood well curb. Per Cft. 1040.05 2746.35 cu.m 36734.90 97000.45

7 Laying well curb in position only. Each 345.85 - Each 345.85 -

8 Providing, making and laying R.C.C. well curb in position, *841-1 1) If concrete mixer is supplied byusing coarse sand, including all kinds of form, moulds, to Government, all charges includingcuring, shuttering, rendering and finishing the exposed 841-9 depreciation will be recovered fromsurface, (including screening and washing of aggregate :- the contractor.

2) The rate does not include cost ofa) Ratio 1:1½:3 Per Cft. 226.55 444.15 cu.m 8000.85 15687.65 steel reinforcement and its labour forb) ratio 1:2:4 ditto 226.55 416.30 ditto 8000.85 14702.90 bending, which is payable, separately.

9 Providing and fixing structural steel for cutting 100Kg 813.10 11298.35 100Kg 813.10 11298.35 841-1 toedge. 841-9

10 Making and removing false masonry on well. 100Cft. 7366.50 20189.70 cu.m 2601.85 7131.00 21.1 to The rate includes dismantling of false21.5 & 18.1 masonry, scraping bricks obtained

from dismantling and credit ofbyproducts.

* Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".

Page 129: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 128

1 Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Boring for tubewell in all types of soil except shingle and Chap. 2rock, from ground level to 100 ft. (30 m) depth, includingsinking and withdrawing of casing pipe, complete:-

a) 3" (75 mm) i/d Per Rft. 64.45 Per Metre 211.40b) 4" (100 mm) i/d of bore 87.75 of bore 287.75c) 5" (125 mm) i/d ditto 159.50 ditto 523.20d) 6" (150 mm) i/d ditto 242.15 ditto 794.25e) 8" (200 mm) i/d ditto 315.70 ditto 1035.50f) 10" (250 mm) i/d ditto 399.55 ditto 1310.60g) 12" (300 mm) i/d ditto 433.10 ditto 1420.55h) 15" (375 mm) i/d ditto 654.75 ditto 2147.55i) 18" (450 mm) i/d ditto 694.45 ditto 2277.85

2 Boring for tubewell in all types of soil except shingle, dittogravel & rock, from a depth of 100.1 ft. to 200 ft.(30 to 60 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-

a) 5" (125 mm) i/d Per Rft. 268.15 Per Metre 879.60b) 6" (150 mm) i/d of bore 377.25 of bore 1237.40c) 8" (200 mm) i/d ditto 428.20 ditto 1404.45d) 10" (250 mm) i/d ditto 489.85 ditto 1606.65e) 12" (300 mm) i/d ditto 531.05 ditto 1741.85f) 15" (375 mm) i/d ditto 768.55 ditto 2520.85g) 18" (450 mm) i/d ditto 808.30 ditto 2651.20

3 Boring for tubewell in all types of soil except shingle, dittogravel & rock, from a depth of 200.1 ft. to 300 ft. (60to 90 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-a) 5" (125 mm) i/d Per Rft. 374.80 Per Metre 1229.30b) 6" (150 mm) i/d of bore 483.25 of bore 1585.05c) 8" (200 mm) i/d ditto 540.05 ditto 1771.35d) 10" (250 mm) i/d ditto 609.30 ditto 1998.55e) 12" (300 mm) i/d ditto 644.10 ditto 2112.60

f) 15" (375 mm) i/d ditto 844.50 ditto 2769.95g) 18" (450 mm) i/d ditto 885.45 ditto 2904.30

4 Boring for tubewell in all types of soil except shingle, Chap. 2gravel & rock, from a depth of 300.1 ft. to 400 ft.(90 to 120 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

23. TUBEWELL AND WATER SUPPLY

Page 130: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 129

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

a) 8" (200 mm) i/d Rft of bore 652.50 Per Metre 2140.25b) 10" (250 mm) i/d ditto 729.40 of bore 2392.50c) 12" (300 mm) i/d ditto 766.05 ditto 2512.60d) 15" (375 mm) i/d ditto 1033.45 ditto 3389.70e) 18" (450 mm) i/d ditto 1037.15 ditto 3401.90

5 Direct Rotary/Reverse Rotary drilling of bore for tubewells, dittoin all types of soil except shingle, gravel and rock:-

a) from ground level to 250 ft. (75 m) below ground level:-

Per Rft. Per Metrei) 15" to 18" (375 to 450 mm) i/d of bore 489.60 of bore 1605.80 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 704.10 ditto 2309.40 Above 2 cusec discharge

b) exceeding 250 ft. (75 m) depth below ground level:-

Rft Per Metrei) 15" to 18" (375 to 450 mm) i/d of bore 489.60 of bore 1605.80 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 704.10 ditto 2309.40 Above 2 cusec discharge

6 Boring for tubewell in shingle, gravel and rock, including ditto Location and depth of shingle,sinking and withdrawing of casing pipe:- gravel or rock is to be determined

from the bore log.a) from ground level to 200 ft. (60 m) below ground level:-

Per Rft. Per Metre

i) 12" to 18" (300 to 450 mm) i/d of bore 1104.15 of bore 3621.60 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 1493.30 ditto 4898.05 Above 2 cusec discharge

b) exceeding 200 ft. (60 m) depth belowground level:-

i) 12" to 18" (300 to 450 mm) i/d ditto 1104.15 ditto 3621.60 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 1493.30 ditto 4898.05 Above 2 cusec discharge

7 Providing strong substantially built box of deodar wood Job for 772.60 11008.60 Job for 772.60 11008.60 ditto4'x2½'x9" (1200x750x225 mm), with compartments, lock compl- compl-and locking arrangement, for preserving samples of strata ete bore ete borefrom bore hole.

8 Furnishing sample of water from bore hole. Per Set 118.80 170.70 Per Set 118.80 170.70 Chap. 2

of 2 of 2bottles bottles

9 Providing and installing, brass strainer in tubewell bore ditto Cost/labour of jointing both ends ishole, including sockets, special sockets, studs, etc. included in the rate.complete:-

a) 2" i/d, 5/32" (50 mm i/d 4 mm) thick Per Rft. 31.10 854.30 Per Metre 102.00 2802.05b) 3" i/d, 5/32" (75 mm i/d 4 mm) thick Per Rft. 31.10 1274.30 Per Metre 101.95 4179.65

Page 131: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 130

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

c) 4" i/d, 3/16" (100 mm i/d 5 mm) thick Per Rft. 41.45 1536.65 Per Metre 135.95 5040.20d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 47.05 1962.25 Per Metre 154.35 6436.20e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 51.80 2204.30 Per Metre 169.95 7230.15f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 60.95 2659.70 Per Metre 199.85 8723.75g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 74.60 3140.60 Per Metre 244.75 10301.25h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 74.60 3266.60 Per Metre 244.75 10714.50i) 10" i/d, 3/16" (250 mm i/d 5 mm) thick Per Rft. 84.40 3601.90 Per Metre 276.85 11814.25j) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 84.40 4590.20 Per Metre 276.85 15055.90k) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 85.65 5225.40 Per Metre 280.90 17139.25l) 15" i/d, ¼" (375 mm i/d 6 mm) thick Per Rft. 98.65 6438.05 Per Metre 323.65 21116.80m) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 98.65 7317.40 Per Metre 323.65 24001.15n) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 116.90 8082.50 Per Metre 383.50 26510.55o) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 118.15 9282.05 Per Metre 387.55 30445.05

10 Providing and installing M.S. Bail plug in tubewell bore In the case of increase or decreasehole: in the length of Bail plug, the rates

will be increased or decreased asa) 2" i/d, 1.5 ft. (50 mm i/d 450 mm) long. Each 145.65 638.50 Each 145.65 638.50 per rates given in serial No. 14 ofb) 3" i/d, 1.5 ft. (75 mm i/d 450 mm) long. Each 145.65 837.45 Each 145.65 837.45 this chapter for the respectivec) 4" i/d, 2 ft. (100 mm i/d 600 mm) long. Each 243.10 1579.05 Each 243.10 1579.05 diameter.d) 5" i/d, 2 ft. (125 mm i/d 600 mm) long. Each 243.10 1974.90 Each 243.10 1974.90e) 6" i/d, 2 ft. (150 mm i/d 600 mm) long. Each 328.10 2493.55 Each 328.10 2493.55f) 7" i/d, 2 ft. (175 mm i/d 600 mm) long. Each 328.10 2882.35 Each 328.10 2882.35g) 8" i/d, 2 ft. (200 mm i/d 600 mm) long Each 404.50 3204.75 Each 404.50 3204.75h) 9" i/d, 2 ft. (225 mm i/d 600 mm) long Each 404.50 3548.65 Each 404.50 3548.65i) 10" i/d, 2 ft. (250 mm i/d 600 mm) long Each 404.50 4499.60 Each 404.50 4499.60j) 12" i/d, 2 ft. (300 mm i/d 600 mm) long Each 485.50 5407.90 Each 485.50 5407.90k) 15" i/d, 2 ft. (375 mm i/d 600 mm) long Each 485.50 6639.00 Each 485.50 6639.00l) 18" i/d, 2 ft. (450 mm i/d 600 mm) long Each 583.75 7583.10 Each 583.75 7583.10m) 20" i/d, 2 ft. (500 mm i/d 600 mm) long Each 635.00 8409.85 Each 635.00 8409.85n) 22" i/d, 2 ft. (550 mm i/d 600 mm) long Each 635.00 9240.45 Each 635.00 9240.45

11 Providing and installing, P.V.C. strainer B.S.S. Class 'B', Chap. 2in tubewell bore hole, including sockets and solvents, etc.complete:-

a) 3" i/d (75 mm) Per Rft. 22.80 123.60 Per Metre 74.70 405.35b) 4" i/d (100 mm) Per Rft. 25.95 180.75 Per Metre 85.15 592.90c) 5" i/d (125 mm) Per Rft. 27.50 243.50 Per Metre 90.15 798.60d) 6" i/d (150 mm) Per Rft. 32.20 320.20 Per Metre 105.55 1050.20e) 8" i/d (200 mm) Per Rft. 44.00 764.00 Per Metre 144.35 2505.95f) 10" i/d (250 mm) Per Rft. 45.00 1137.00 Per Metre 147.65 3729.40g) 12" i/d (300 mm) Per Rft. 45.00 1521.00 Per Metre 147.65 4988.95

12 Providing and installing P.V.C. strainer B.S.S. Class `D' ,in tubewell bore hole, including sockets and solvent, etc.complete:-

a) 1¼" i/d (30 mm) Per Rft. 15.90 55.50 Per Metre 52.15 182.05

Page 132: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 131

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

b) 1½" i/d (40 mm) Per Rft. 16.25 61.85 Per Metre 53.35 202.9c) 2" i/d (50 mm) Per Rft. 16.40 93.20 Per Metre 53.85 305.75d) 3" i/d (75 mm) Per Rft. 22.80 188.40 Per Metre 74.75 617.95e) 4" i/d (100 mm) Per Rft. 25.90 294.70 Per Metre 84.95 966.6f) 5" i/d (125 mm) Per Rft. 27.45 429.45 Per Metre 90.10 1408.65g) 6" i/d (150 mm) Per Rft. 49.20 619.20 Per Metre 161.35 2030.95

13 Providing and installing P.V.C. Bail/End plug, in tubewellbore hole:-

i) B.S.S. Class `B'

a) 3" i/d (75 mm) Each 11.05 63.85 Each 11.05 63.85b) 4" i/d (100 mm) Each 12.40 84.40 Each 12.40 84.40c) 5" i/d (125 mm) Each 13.55 125.15 Each 13.55 125.15d) 6" i/d (150 mm) Each 17.60 182.00 Each 17.60 182.00e) 8" i/d (200 mm) Each 20.95 354.55 Each 20.95 354.55f) 10" i/d (250 mm) Each 22.15 490.15 Each 22.15 490.15g) 12" i/d (300 mm) Each 25.75 661.75 Each 25.75 661.75h) 14" i/d (350 mm) Each 25.75 685.75 Each 25.75 685.75

ii) B.S.S. Class `D'

a) 1¼" i/d (30 mm) Each 7.50 35.10 Each 7.50 35.10b) 1½" i/d (40 mm) Each 7.95 48.75 Each 7.95 48.75c) 2" i/d (50 mm) Each 8.20 68.20 Each 8.20 68.20d) 3" i/d (75 mm) Each 11.05 91.45 Each 11.05 91.45e) 4" i/d (100 mm) Each 12.45 119.25 Each 12.45 119.25f) 5" i/d (125 mm) Each 13.55 167.15 Each 13.55 167.15g) 6" i/d (150 mm) Each 17.65 218.05 Each 17.65 218.05

14 Providing and installing M.S. blind pipe socketed/welded Chap.joint, M.S. reducer (where necessary), in tubewell bore 2hole, including jointing/welding with strainer, etc.complete:-

a) 2" i/d, 1/8" (50 mm i/d 3 mm) thick Per Rft. 87.10 274.30 Per Metre 285.70 899.70b) 3" i/d, 1/8" (75 mm i/d 3 mm) thick Per Rft. 87.10 354.70 Per Metre 285.70 1163.40c) 4" i/d, 1/8" (100 mm i/d 3 mm) thick Per Rft. 108.95 465.35 Per Metre 357.35 1526.35d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 108.95 818.15 Per Metre 357.35 2683.55e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 155.50 993.10 Per Metre 510.05 3257.35f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 155.50 1133.50 Per Metre 510.05 3717.90g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 181.45 1358.85 Per Metre 595.15 4457.10h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 181.45 1532.65 Per Metre 595.15 5027.10i) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 181.45 1953.85 Per Metre 595.15 6408.65j) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 217.75 2302.75 Per Metre 714.20 7553.00k) 15" i/d, ¼" (375 mm i/d 6 mm) thick Per Rft. 217.75 2824.00 Per Metre 714.20 9262.70l) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 266.90 3507.25 Per Metre 875.45 11503.75m) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 287.50 3887.90 Per Metre 943.00 12752.25n) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 287.50 4247.90 Per Metre 943.00 13933.15

Page 133: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 132

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

15 Providing and installing P.V.C. blind pipe, B.S.S. Class ditto`B', in tubewell bore hole, including sockets and solventsand jointing with strainer, etc. complete.

a) 3" i/d (75 mm) Per Rft. 30.25 130.15 Per Metre 99.15 426.85b) 4" i/d (100 mm) Per Rft. 34.20 184.95 Per Metre 112.20 606.70c) 5" i/d (125 mm) Per Rft. 35.75 245.45 Per Metre 117.20 805.05d) 6" i/d (150 mm) Per Rft. 42.80 336.20 Per Metre 138.85 1101.20e) 8" i/d (200 mm) Per Rft. 57.15 508.95 Per Metre 187.40 1669.30f) 10" i/d (250 mm) Per Rft. 59.50 761.50 Per Metre 195.15 2497.75g) 12" i/d (300 mm) Per Rft. 71.20 1050.40 Per Metre 233.45 3445.25h) 14" i/d (350 mm) Per Rft. 68.10 1239.90 Per Metre 223.35 4066.85

16 Providing and installing P.V.C. blind pipe, B.S.S. Class`D', in tubewell bore hole, including sockets and solventsand jointing with strainer, etc. complete.

a) 1¼" i/d (30 mm) Per Rft. 18.95 54.05 Per Metre 62.10 177.25b) 1½" i/d (40 mm) Per Rft. 19.30 65.20 Per Metre 63.25 213.80c) 2" i/d (50 mm) Per Rft. 20.50 90.70 Per Metre 67.20 297.45d) 3" i/d (75 mm) Per Rft. 25.90 180.70 Per Metre 85.00 592.75e) 4" i/d (100 mm) Per Rft. 34.20 291.60 Per Metre 112.20 956.50f) 5" i/d (125 mm) Per Rft. 35.75 421.85 Per Metre 117.20 1383.65g) 6" i/d (150 mm) Per Rft. 43.55 599.75 Per Metre 142.90 1967.20

17 Testing and developing of tubewell of size 6" (150 mm) Compressor, accessories along withi/d and above continuously. working staff, to be supplied by

Government.i) upto 1.5 cs. discharge Per 958.30 Per 958.30

Hour Hourii) above 1.5 cs. discharge ditto 1159.95 ditto 1159.95

18 Shrouding with graded pea gravel 3/8" to 1/8" (10 to 3 Per Cft. 36.20 91.65 cu.m 1278.55 3237.05 The rate includes wastage, etc.mm), around tubewell in bore hole.

19 Laying cutting, jointing, testing and disinfecting cast iron Chap. 1) Pipes to be supplied bypipe line in trenches, with spigot and socket caulked lead 2 Government.joints, including cost of materials, such as lead, yarn, etc. 2) Providing and installing specialscomplete in all respects:- and valves is not included in the

rate, which is payable separately.

a) 3" (75 mm) i/d Per Rft. 58.45 Per Metre 191.70b) 4" (100 mm) i/d Per Rft. 72.35 Per Metre 237.35c) 5" (125 mm) i/d Per Rft. 91.05 Per Metre 298.65d) 6" (150 mm) i/d Per Rft. 107.20 Per Metre 351.55e) 8" (200 mm) i/d Per Rft. 128.15 Per Metre 420.25f) 10" (250 mm) i/d Per Rft. 194.70 Per Metre 638.55g) 12" (300 mm) i/d Per Rft. 228.65 Per Metre 750.05h) 15" (375 mm) i/d Per Rft. 294.65 Per Metre 966.45

Page 134: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 133

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

i) 18" (450 mm) i/d Per Rft. 387.20 Per Metre 1270.05

20 Laying, cutting, jointing, testing and disinfecting cast iron ditto 1) Pipes to be supplied bypipe line in trenches, with flanged and flanged joints, Government.complete in all respects:- 2) Providing and installing specials

and valves is not included in thea) 3" (75 mm) i/d Per Rft. 26.70 Per Metre 87.50 rate, which is payable separately.b) 4" (100 mm) i/d Per Rft. 29.50 Per Metre 96.70c) 5" (125 mm) i/d Per Rft. 41.40 Per Metre 135.75d) 6" (150 mm) i/d Per Rft. 45.60 Per Metre 149.65e) 8" (200 mm) i/d Per Rft. 53.55 Per Metre 175.60f) 10" (250 mm) i/d Per Rft. 74.05 Per Metre 242.90g) 12" (300 mm) i/d Per Rft. 87.00 Per Metre 285.30h) 15" (375 mm) i/d Per Rft. 120.30 Per Metre 394.45i) 18" (450 mm) i/d Per Rft. 154.15 Per Metre 505.65

21 Laying, cutting, jointing, testing and disinfecting cast iron Chap. 2 1) Pipes to be supplied bypipe line in trenches with Tyton joints, complete in all Government.respects:- 2) Providing and installing specials

and valves is not included in thea) 3" (75 mm) i/d Per Rft. 12.75 Per Metre 41.75 rate, which is payable separately.b) 4" (100 mm) i/d Per Rft. 14.40 Per Metre 47.25c) 5" (125 mm) i/d Per Rft. 18.60 Per Metre 61.05d) 6" (150 mm) i/d Per Rft. 20.85 Per Metre 68.30e) 8" (200 mm) i/d Per Rft. 28.35 Per Metre 93.05f) 10" (250 mm) i/d Per Rft. 35.90 Per Metre 117.80g) 12" (300 mm) i/d Per Rft. 42.65 Per Metre 139.90h) 15" (375 mm) i/d Per Rft. 60.20 Per Metre 197.45i) 18" (450 mm) i/d Per Rft. 72.05 Per Metre 236.35

22 Providing, laying, cutting, jointing, testing and disinfecting Chap. Cost of sockets, tees, elbows,G.I. pipeline in trenches, with socket joints, using G.I. 2 bends, valves, crosses, unions andpipes of B.S.S. 1387-1967 complete in all respects, with plugs, etc. is included in the rates.specials and valves.

i) Light Quality

a) ½" i/d (15 mm) 2mm thick Per Rft. 10.35 63.40 Per Metre 34.00 207.90b) ¾" i/d (20 mm) 2.35mm thick Per Rft. 11.30 87.90 Per Metre 37.15 288.30c) 1" i/d (25 mm) 2.65mm thick Per Rft. 12.80 122.60 Per Metre 42.00 402.05d) 1¼" i/d (32 mm) 2.65mm thick Per Rft. 12.90 154.25 Per Metre 42.30 505.95e) 1½" i/d (40 mm) 2.9mm thick Per Rft. 13.00 189.70 Per Metre 42.65 622.20f) 2" i/d (50 mm) 2.9mm thick Per Rft. 14.55 236.40 Per Metre 47.70 775.30g) 2"½ i/d (65 mm) 3.25mm thick Per Rft. 15.15 329.25 Per Metre 49.60 1079.90h) 3" i/d (75 mm) 3.25mm thick Per Rft. 17.40 380.60 Per Metre 57.10 1248.35i) 4" i/d (100 mm) 3.65mm thick Per Rft. 18.75 547.15 Per Metre 61.45 1794.55 ii) Medium Quality i. Cost of sockets, tees, elbow,

bends, valves, crosses, unions and a) ½" i/d (15 mm) 2.65mm thick Per Rft. 10.35 76.95 Per Metre 34.00 252.40 plugs etc is included in the rates b) ¾" i/d (20 mm) 2.65mm thick Per Rft. 11.30 97.05 Per Metre 37.15 318.40 except for internal G.I piping (1"dia,

Page 135: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 134

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

c) 1" i/d (25 mm) 3.25mm thick Per Rft. 12.8 141.5 Per Metre 42 464.2 3/4"dia & 1/2"dia) for Bath rooms/ d) 1¼" i/d (32 mm) 3.25mm thick Per Rft. 12.90 179.55 Per Metre 42.30 588.95 Levorotary.e) 1½" i/d (40 mm) 3.25mm thick Per Rft. 13.20 205.60 Per Metre 43.35 674.40f) 2" i/d (50 mm) 3.65mm thick Per Rft. 14.55 283.55 Per Metre 47.70 930.00 ii. For internal G.I piping (1"dia, 3/4"dia & g) 2"½ i/d (65 mm) 3.65mm thick Per Rft. 15.15 360.20 Per Metre 49.60 1181.50 Bath room(s)/ Levorotary of rate h) 3" i/d (75 mm) 4.05mm thick Per Rft. 17.40 462.35 Per Metre 57.10 1516.50 (composite) shall be reduced by 8%i) 4" i/d (100 mm) 4.5mm thick Per Rft. 18.75 659.35 Per Metre 61.45 2162.60 and specials mentioned above may j) 5" i/d (150 mm) 4.85mm thick Per Rft. 21.70 887.05 Per Metre 71.15 2909.55 be paid at the rates placed onk) 6" i/d (200 mm) 4.85mm thick Per Rft. 22.00 1031.10 Per Metre 72.15 3382.00 Website as per actual quantity used.

iii) Heavy Quality

a) ½" i/d (15 mm) 3.25mm thick Per Rft. 10.35 102.30 Per Metre 34.05 335.55b) ¾" i/d (20 mm) 3.25mm thick Per Rft. 11.30 132.45 Per Metre 37.15 434.45c) 1" i/d (25 mm) 4.05mm thick Per Rft. 12.80 197.45 Per Metre 42.00 647.70d) 1¼" i/d (32 mm) 4.05mm thick Per Rft. 12.90 251.10 Per Metre 42.30 823.60e) 1½" i/d (40 mm) 4.05mm thick Per Rft. 13.20 295.30 Per Metre 43.35 968.65f) 2" i/d (50 mm) 4.5mm thick Per Rft. 14.55 396.50 Per Metre 47.70 1300.55g) 2"½ i/d (65 mm) 4.5mm thick Per Rft. 15.15 502.95 Per Metre 49.60 1649.70h) 3" i/d (75 mm) 4.85mm thick Per Rft. 17.40 639.40 Per Metre 57.10 2097.15i) 4" i/d (100 mm) 5.4mm thick Per Rft. 18.75 904.15 Per Metre 61.45 2965.65j) 5" i/d (125 mm) 5.4mm thick Per Rft. 21.70 1132.50 Per Metre 71.15 3714.55k) 6" i/d (150 mm) 5.4mm thick Per Rft. 22.00 1341.35 Per Metre 72.15 4399.55

23 Providing, laying, cutting, jointing, testing and disinfectingAsbestos Cement / Fibre Cement pipe line in trenches, with PS 428 & Providing and installing specialscomet joint and rubber ring, complete in all respects:- ISO 160 and valves is not included in the

rate, which is payable separately.B Class Working Pressurea) 3" i/d (75 mm) Per Rft. 14.85 221.80 Per Metre 48.65 727.45b) 4" i/d (100 mm) Per Rft. 15.70 288.80 Per Metre 51.45 947.20c) 6" i/d (150 mm) Per Rft. 21.50 456.20 Per Metre 70.50 1496.40d) 8" i/d (200 mm) Per Rft. 29.65 763.15 Per Metre 97.20 2503.10e) 10" i/d (250 mm) Per Rft. 38.60 1039.05 Per Metre 126.55 3408.05f) 12" i/d (300 mm) Per Rft. 49.15 1372.90 Per Metre 161.20 4503.05g) 14" i/d (350 mm) Per Rft. 56.80 1976.80 Per Metre 186.25 6483.90h) 16" i/d (400 mm) Per Rft. 64.10 2509.40 Per Metre 210.25 8230.80i) 18" i/d (450 mm) Per Rft. 75.60 3125.85 Per Metre 248.00 10252.75j) 20" i/d (500 mm) Per Rft. 88.85 3844.20 Per Metre 291.45 12608.95k) 24" i/d (600 mm) Per Rft. 106.05 5302.15 Per Metre 347.85 17391.15l) 28" i/d (700 mm) Per Rft. 112.65 8498.65 Per Metre 369.45 27875.55m) 32" i/d (800 mm) Per Rft. 122.15 9723.70 Per Metre 400.65 31893.80n) 40" i/d 1000 mm) Per Rft. 134.20 15008.95 Per Metre 440.25 49229.30

24 C Class Working Pressure PS 428 &a) 3" i/d (75 mm) Per Rft. 14.85 221.80 Per Metre 48.65 727.45 ISO 160b) 4" i/d (100 mm) Per Rft. 15.70 316.95 Per Metre 51.45 1039.55c) 6" i/d (150 mm) Per Rft. 21.50 545.55 Per Metre 70.50 1789.45d) 8" i/d (200 mm) Per Rft. 29.65 861.05 Per Metre 97.20 2824.30e) 10" i/d (250 mm) Per Rft. 38.60 1200.60 Per Metre 126.55 3938.00f) 12" i/d (300 mm) Per Rft. 49.15 1670.30 Per Metre 161.20 5478.65g) 14" i/d (350 mm) Per Rft. 56.80 2876.45 Per Metre 186.25 9434.75

Page 136: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 135

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

h) 16" i/d (400 mm) Per Rft. 64.10 3673.40 Per Metre 210.25 12048.80i) 18" i/d (450 mm) Per Rft. 75.60 4506.50 Per Metre 248.00 14781.35j) 20" i/d (500 mm) Per Rft. 88.85 5361.95 Per Metre 291.45 17587.20k) 24" i/d (600 mm) Per Rft. 107.45 7545.95 Per Metre 352.45 24750.70

25 D Class Working Pressure PS 428 &a) 3" i/d (75 mm) Per Rft. 14.85 221.80 Per Metre 48.65 727.45 ISO 160b) 4" i/d (100 mm) Per Rft. 15.70 359.75 Per Metre 51.45 1180.05c) 6" i/d (150 mm) Per Rft. 21.50 653.30 Per Metre 70.50 2142.75d) 8" i/d (200 mm) Per Rft. 29.65 1152.40 Per Metre 97.20 3779.80e) 10" i/d (250 mm) Per Rft. 38.60 1700.00 Per Metre 126.55 5576.00f) 12" i/d (300 mm) Per Rft. 49.15 2478.15 Per Metre 161.20 8128.35g) 14" i/d (350 mm) Per Rft. 56.80 4143.30 Per Metre 186.25 13589.95h) 16" i/d (400 mm) Per Rft. 64.10 5350.30 Per Metre 210.25 17549.00i) 18" i/d (450 mm) Per Rft. 75.60 6440.45 Per Metre 248.00 21124.60j) 20" i/d (500 mm) Per Rft. 88.85 7858.90 Per Metre 291.45 25777.20

26 Providing, laying, cutting, jointing, testing and disinfecting PS 3051 Providing and installing specialsP.V.C. pipe line with `B' Class working pressure BS 3505 and valves is not included in thepipe, in trenches, complete in all respects:- rate, which is payable separately.

a) 3" i/d (75 mm) Per Rft. 4.30 106.20 Per Metre 14.05 348.25 b) 4" i/d (100 mm) Per Rft. 5.50 159.25 Per Metre 17.95 522.30 c) 5" i/d (125 mm) Per Rft. 6.70 220.60 Per Metre 21.90 723.50 d) 6" i/d (150 mm) Per Rft. 7.00 306.25 Per Metre 23.00 1004.55e) 8" i/d (200 mm) Per Rft. 9.95 470.75 Per Metre 32.60 1544.15f) 10" i/d (250 mm) Per Rft. 13.20 729.25 Per Metre 43.30 2391.90h) 12" i/d (300 mm) Per Rft. 16.35 1015.15 Per Metre 53.70 3329.70g) 14" i/d (350 mm) Per Rft. 21.15 1216.40 Per Metre 69.45 3989.80

27 Providing, laying, cutting, jointing, testing and disinfecting Chap Providing and installing specialspipe line in trenches with P.V.C. pipes of B.S.S. with `D' 2 and valves is not included in theClass working pressure complete in all respects:- rate, which is payable separately.a) 2" i/d (50 mm) Per Rft. 3.45 75.10 Per Metre 11.40 246.25 b) 3" i/d (75 mm) Per Rft. 4.25 162.10 Per Metre 13.85 531.75 c) 4" i/d (100 mm) Per Rft. 5.40 267.95 Per Metre 17.75 878.95 d) 5" i/d (125 mm) Per Rft. 6.60 400.40 Per Metre 21.65 1313.40 e) 6" i/d (150 mm) Per Rft. 6.90 574.25 Per Metre 22.70 1883.50

28 Providing and fixing cast iron special of B.S.S. Class `B' 9.1 i) Labour rates include the cost of(such as bend, tee cross collar, reducer, tail piece, jointing material & labour.flanged spigot, cap, flanged socket, taper, angle branch,plug etc.) for cast iron pipe line , complete:- ii) The internal dia of the pipe, from

which the branch is taken out willa) C.I.S.S. Specials, with spigot. and be considered the internal dia for

socket joint:- the purpose of payments ofi) 3" to 6" (75 to 150 mm) i/d Per Kg. 23.60 122.15 Per Kg 23.60 122.15 specials.ii) 8" to 12" (200 to 300 mm) i/d Per Kg. 12.90 111.45 Per Kg 12.90 111.45iii) 15" to 18" (375 to 450 mm) i/d Per Kg. 9.85 108.40 Per Kg 9.85 108.40

Page 137: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 136

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

b) C.I. flanged specials, with flanged andflanged joints:-

i) 3" to 6" (75 to 150 mm) i/d Per Kg 9.55 108.10 Per Kg 9.55 108.10ii) 8" to 12" (200 to 300 mm) i/d Per Kg 2.35 100.90 Per Kg 2.35 100.90iii) 15" to 18" (375 to 450 mm) i/d Per Kg 4.20 100.90 Per Kg 4.20 100.90

c) C.I. Specials, with tyton joints:-

i) 3" to 6" (75 to 150 mm) i/d Per Kg 13.55 112.10 Per Kg 13.55 112.10ii) 8" to 12" (200 to 300 mm) i/d Per Kg 13.55 112.10 Per Kg 13.55 112.10iii) 15" to 18" (375 to 450 mm) i/d Per Kg 13.55 112.10 Per Kg 13.55 112.10

29 Providing and fixing cast iron specials of B.S.S. Class 'B' 9.1 1) Labour rates include the cost of(such as bend, tee, cross collar, reducer, tail piece, jointing material and labour.flanged socket, flanged spigot, cap, taper, angle branch,plug, etc) for Asbestos cement pipe line, with comet joint 2) The internal dia of the pipe, fromand rubber ring, complete. which the branch is taken out, willi) 3" to 6" (75 to 150 mm) i/d Per Kg 12.45 111.00 Per Kg 12.45 111.00 be considered the internal dia forii) 8" to 18" (200 to 450 mm) i/d Per Kg 6.40 104.95 Per Kg 6.40 104.95 the purpose of payment.iii) 20" to 24" (500 to 600 mm) i/d Per Kg 5.10 103.65 Per Kg 5.10 103.65

30 Providing and fixing sluice valve of B.S.S. quality and 9.1 Labour rates include cost of jointingweight, Class `B', for cast iron pipe line, and Asbestos material and labour.cement pipe line (including cost of jointing material):-a) 3" i/d (75 mm) Each 881.90 6785.90 Each 881.90 6785.90b) 4" i/d (100 mm) Each 959.70 7979.70 Each 959.70 7979.70c) 5" i/d (125 mm) Each 1727.45 9887.45 Each 1727.45 9887.45d) 6" i/d (150 mm) Each 1841.60 13241.60 Each 1841.60 13241.60e) 8" i/d (200 mm) Each 2150.25 23030.25 Each 2150.25 23030.25f) 10" i/d (250 mm) Each 3660.10 29820.10 Each 3660.10 29820.10g) 12" i/d (300 mm) Each 4112.95 38492.95 Each 4112.95 38492.95h) 16" i/d (400 mm) Each 5455.15 59455.15 Each 5455.15 59455.15i) 18" i/d (450 mm) Each 6278.55 120278.55 Each 6278.55 120278.55

31 Providing and fixing, sluice valve of B.S.S. quality and Labour rates include cost of jointingweight, for Asbestos cement pipe line, with comet joint 9.1 material and labour.and rubber ring, complete (including cost of jointingmaterials):-a) 3" i/d (75 mm) Each 452.95 5492.95 Each 452.95 5492.95b) 4" i/d (100 mm) Each 546.85 6306.85 Each 546.85 6306.85c) 6" i/d (150 mm) Each 678.05 10638.05 Each 678.05 10638.05d) 8" i/d (200 mm) Each 1092.10 19092.10 Each 1092.10 19092.10e) 10" i/d (250 mm) Each 1395.45 24075.45 Each 1395.45 24075.45f) 12" i/d (300 mm) Each 1665.30 29865.30 Each 1665.30 29865.30g) 16" i/d (400 mm) Each 1962.45 57162.45 Each 1962.45 57162.45h) 18" i/d (450 mm) Each 2308.80 101908.80 Each 2308.80 101908.80

32 Providing and fixing, fire hydrants B.S.S. quality and Each 60.65 4740.65 Each 60.65 4740.65 9.1 1) Labour rates include cost ofweight of 2½" (65 mm) dia (including cost of jointing jointing material and labour.material).

2) Connecting pipes and specials,

Page 138: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 137

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

if used, will be paid extra.

33 Providing and fixing, air valve 2½ (65mm) dia of B.S.S. dittoquality and weight (complete with jointing material).

a) single Each 128.55 3368.55 Each 128.55 3368.55

b) double Each 128.55 7628.55 Each 128.55 7628.55

34 Providing and fitting C.I. flanges on pipes, includingturning, threading, facing and fitting, etc. complete in all dittorespects:-

a) 3" to 6" (75 to 150 mm) i/d Per Kg 37.90 114.90 Per Kg 37.90 114.90

b) 8" to 12" (200 to 300 mm) i/d Per Kg 23.80 100.80 Per Kg 23.80 100.80

c) 15" to 18" (375 to 450 mm) i/d Per Kg 20.25 97.25 Per Kg 20.25 97.25

35 Cutting C.I. pipe, and welding spigot or socket, flanged ortyton end, after finishing ends of pipes:

Per Inch Per cm i/d a) 3" to 6" (75 to 150 mm) i/d i/d of pipe 60.35 of pipe 24.15b) 8" to 12" (200 to 300 mm) i/d ditto 76.00 ditto 30.40c) 15" to 18" (375 to 450 mm) i/d ditto 69.75 ditto 27.90

36 Providing, laying, cutting, jointing, testing and disinfecting Cost of sockets, tees, elbows,G.I. pipe line in trenches, with flanged joints, using G.I. bends, valves, crosses, unions andpipe of B.S.S. 1387-1967 complete in all respects, plugs, etc. is included in the rates.including specials and valves:-

i) G.I. flanged joints (Heavy Quality)

a) 1½" i/d (40 mm) Per Rft. 18.95 301.00 Per Metre 62.10 987.25b) 2" i/d (50 mm) Per Rft. 18.95 401.35 Per Metre 62.10 1316.35c) 2½" i/d (65 mm) Per Rft. 20.10 508.25 Per Metre 65.90 1667.05d) 3" i/d (75 mm) Per Rft. 20.20 642.15 Per Metre 66.20 2106.25e) 4" i/d (100 mm) Per Rft. 23.60 909.00 Per Metre 77.35 2981.55f) 6" i/d (150 mm) Per Rft. 26.95 1137.75 Per Metre 88.35 3731.75g) 8" i/d (200 mm) Per Rft. 26.95 1346.30 Per Metre 88.50 4415.85

ii) C.I. flanged joints (Medium Quality)

a) 1½" i/d (40 mm) Per Rft. 21.75 222.00 Per Metre 71.25 728.15b) 2" i/d (50 mm) Per Rft. 20.35 299.05 Per Metre 66.80 980.80c) 2½" i/d (65 mm) Per Rft. 22.80 380.50 Per Metre 74.85 1247.95d) 3" i/d (75 mm) Per Rft. 22.85 483.95 Per Metre 75.00 1587.35e) 4" i/d (100 mm) Per Rft. 26.50 688.70 Per Metre 86.95 2258.90f) 6" i/d (150 mm) Per Rft. 30.10 925.00 Per Metre 98.75 3033.95g) 8" i/d (200 mm) Per Rft. 30.30 1086.05 Per Metre 99.30 3562.20

Page 139: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 138

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

37 Providing and installing P.V.C. bends, of B.S.S.

i) Class `B' working pressure:-a) 3" i/d (75 mm) Each 99.25 225.25 Each 99.25 225.25b) 4" i/d (100 mm) Each 112.05 382.05 Each 112.05 382.05c) 5" i/d (125 mm) Each 140.05 668.05 Each 140.05 668.05d) 6" i/d (150 mm) Each 144.20 913.40 Each 144.20 913.40

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 67.65 101.25 Each 67.65 101.25b) 1½" i/d (40 mm) Each 71.95 107.95 Each 71.95 107.95c) 2" i/d (50 mm) Each 76.90 148.90 Each 76.90 148.90d) 3" i/d (75 mm) Each 99.25 286.45 Each 99.25 286.45e) 4" i/d (100 mm) Each 112.05 547.65 Each 112.05 547.65f) 5" i/d (125 mm) Each 140.05 1136.05 Each 140.05 1136.05g) 6" i/d (150 mm) Each 144.20 1560.20 Each 144.20 1560.20

38 Providing and installing P.V.C. tees, of B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (80 mm) Each 148.85 628.85 Each 148.85 628.85b) 4" i/d (100 mm) Each 170.00 1106.00 Each 170.00 1106.00c) 5" i/d (125 mm) Each 207.30 2079.30 Each 207.30 2079.30d) 6" i/d (150 mm) Each 216.30 2172.30 Each 216.30 2172.30

ii) Class `D' working pressure:-

a) 1¼" i/d (30 mm) Each 103.00 235.00 Each 103.00 235.00b) 1½" i/d (40 mm) Each 108.25 267.85 Each 108.25 267.85c) 2" i/d (50 mm) Each 114.90 324.90 Each 114.90 324.90d) 3" i/d (75 mm) Each 148.85 610.85 Each 148.85 610.85e) 4" i/d (100 mm) Each 170.00 1106.00 Each 170.00 1106.00f) 5" i/d (125 mm) Each 207.30 2067.30 Each 207.30 2067.30g) 6" i/d (150 mm) Each 216.30 2136.30 Each 216.30 2136.30

39 Providing and installing P.V.C. sockets, B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (75 mm) Each 67.95 151.95 Each 67.95 151.95b) 4" i/d (100 mm) Each 80.75 230.75 Each 80.75 230.75c) 5" i/d (125 mm) Each 100.95 310.95 Each 100.95 310.95d) 6" i/d (150 mm) Each 105.05 393.05 Each 105.05 393.05e) 8" i/d (200 mm) Each 151.05 799.05 Each 151.05 799.05f) 10" i/d (250 mm) Each 175.80 1915.80 Each 175.80 1915.80g) 12" i/d (300 mm) Each 203.85 4283.85 Each 203.85 4283.85h) 14" i/d (350 mm) Each 227.40 3467.40 Each 227.40 3467.40

Page 140: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 139

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 41.55 64.35 Each 41.55 64.35b) 1½" i/d (40 mm) Each 45.85 77.05 Each 45.85 77.05c) 2" i/d (50 mm) Each 50.80 101.20 Each 50.80 101.20d) 3" i/d (75 mm) Each 67.95 222.75 Each 67.95 222.75e) 4" i/d (100 mm) Each 80.75 366.35 Each 80.75 366.35f) 5" i/d (125 mm) Each 100.95 628.95 Each 100.95 628.95g) 6" i/d (150 mm) Each 105.05 1029.05 Each 105.05 1029.05

40 Providing and installing P.V.C. Tapered core, B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (75 mm) Each 99.25 141.25 Each 99.25 141.25b) 4" i/d (100 mm) Each 112.05 166.05 Each 112.05 166.05c) 5" i/d (125 mm) Each 140.05 208.45 Each 140.05 208.45d) 6" i/d (150 mm) Each 144.20 225.80 Each 144.20 225.80e) 8" i/d (200 mm) Each 203.25 338.85 Each 203.25 338.85f) 10" i/d (250 mm) Each 227.95 401.95 Each 227.95 401.95g) 12" i/d (300 mm) Each 266.50 480.10 Each 266.50 480.10h) 14" i/d (350 mm) Each 290.05 557.65 Each 290.05 557.65

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 67.65 88.05 Each 67.65 88.05b) 1½" i/d (40 mm) Each 71.95 99.55 Each 71.95 99.55c) 2" i/d (50 mm) Each 76.90 111.70 Each 76.90 111.70

41 Making connection for new watersupply lines with the The rate includes the component ofrunning main, including excavation of trench and refilling, bailing out water from the trenchcomplete, but excluding cost of pipe and specials, etc. and cutting of existing pipe line.

Diameter of running main:Per Per

i) upto 6" i/d (150 mm) Connection 1739.45 Connection 1739.45ii) upto 8" i/d (200 mm) ditto 2196.40 ditto 2196.40iii) upto 10" i/d (250 mm) ction 3098.05 ction 3098.05iv) upto 12" i/d (300 mm) ditto 4240.50 ditto 4240.50v) upto 16" i/d (400 mm) ditto 5199.25 ditto 5199.25vi) upto 20" i/d (500 mm) ditto 6741.55 ditto 6741.55vii) upto 24" i/d (600 mm) ditto 8100.20 ditto 8100.20

42 Providing, laying, cutting, jointing, testing and disinfectingHigh Density Polyethylene Pipe (HDPE-100) working presure pipe in trenches. complete in all respects:-

a) PN-8 (SDR-21)i) 3" (90mm) P.Rft 5.75 125.55 18.90 411.95 ii) 4" (110mm) P.Rft 9.05 167.05 29.60 548.15 iii) 5" (125mm) P.Rft 9.95 212.80 32.60 698.15 iv) 6" (160mm) P.Rft 10.85 344.00 35.55 1,128.65 v) 8" (200mm) P.Rft 13.10 532.75 43.05 1,747.95

Page 141: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-23(Tubewell) Page 140

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

vi) 10" (250mm) P.Rft 33.90 840.55 111.25 2,757.75 vii) 12" (315mm) P.Rft 39.95 1,336.00 131.10 4,383.40 viii) 14" (355mm) P.Rft 44.25 1,689.55 145.15 5,543.45

b) PN-10 (SDR-17)i) 3" (90mm) P.Rft 5.75 138.90 18.85 455.70 ii) 4" (110mm) P.Rft 9.80 203.85 32.20 668.90 iii) 5" (125mm) P.Rft 10.90 257.85 35.70 846.00 iv) 6" (160mm) P.Rft 11.90 417.55 39.10 1,369.95 v) 8" (200mm) P.Rft 14.65 649.95 48.00 2,132.55 vi) 10" (250mm) P.Rft 36.45 1,024.90 119.65 3,362.70 vii) 12" (315mm) P.Rft 43.70 1,636.55 143.45 5,369.45 viii) 14" (355mm) P.Rft 48.95 2,076.00 160.60 6,811.40

c) PN-12.5 (SDR-13.6)i) 3" (90mm) P.Rft 5.75 166.35 18.85 545.70 ii) 4" (110mm) P.Rft 9.80 236.20 32.20 775.00 iii) 5" (125mm) P.Rft 10.90 312.95 35.70 1,026.75 iv) 6" (160mm) P.Rft 11.90 507.30 39.10 1,664.45 v) 8" (200mm) P.Rft 14.65 786.75 48.00 2,581.30 vi) 10" (250mm) P.Rft 36.45 1,245.25 119.65 4,085.75 vii) 12" (315mm) P.Rft 43.70 1,986.20 143.40 6,516.80 viii) 14" (355mm) P.Rft 48.95 2,511.65 160.55 8,240.65

d) PN-16 (SDR-11)i) 3" (90mm) P.Rft 6.20 200.60 20.30 658.10 ii) 4" (110mm) P.Rft 10.15 293.55 33.25 963.05 iii) 5" (125mm) P.Rft 11.30 377.80 37.05 1,239.60 iv) 6" (160mm) P.Rft 12.45 613.30 40.75 2,012.25 v) 8" (200mm) P.Rft 15.45 952.20 50.75 3,124.20 vi) 10" (250mm) P.Rft 39.55 1,501.25 129.75 4,925.60 vii) 12" (315mm) P.Rft 48.40 2,391.25 158.80 7,845.65 viii) 14" (355mm) P.Rft 63.05 3,036.85 206.80 9,964.00

Page 142: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 141

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Supply and erection of G.I. pipes for wiring purposes, includingpull boxes, inspection boxes, bends, tees, etc. complete withall specials.

a) on surface, including clamps, etc. 38.4

i) 15 mm i/d Per Rft. 21.10 70.30 Per Metre 69.15 230.60 ii) 20 mm i/d Per Rft. 21.10 85.55 Per Metre 69.15 280.55 iii) 25 mm i/d Per Rft. 21.10 109.85 Per Metre 69.15 360.35 iv) 32 mm i/d Per Rft. 26.35 141.50 Per Metre 86.45 464.10 v) 40 mm i/d Per Rft. 26.35 170.40 Per Metre 86.45 558.95 vi) 50 mm i/d Per Rft. 31.40 210.90 Per Metre 102.95 691.80 vii) 80 mm i/d Per Rft. 39.95 327.85 Per Metre 131.00 1,075.35

b) recessed in walls, including hooks, cutting jharries andrepairing surface: 38.3

i) 15 mm i/d Per Rft. 31.65 78.10 Per Metre 103.75 256.15 ii) 20 mm i/d Per Rft. 31.65 94.75 Per Metre 103.75 310.70 iii) 25 mm i/d Per Rft. 32.95 120.85 Per Metre 108.10 396.35 iv) 32 mm i/d Per Rft. 32.95 147.30 Per Metre 108.10 483.20 v) 40 mm i/d Per Rft. 35.95 178.55 Per Metre 117.90 585.55 vi) 50 mm i/d Per Rft. 49.45 228.10 Per Metre 162.10 748.20 vii) 80 mm i/d Per Rft. 79.10 367.00 Per Metre 259.40 1,203.75

2 Supply and erection of M.S. conduit pipes for wiring, including 38.4 & 38.6pull boxes, inspection boxes, bends, tees, etc. complete with all specials.

a) on surface, including clamps, etc.

i) 16 mm i/d Per Rft. 14.65 35.80 Per Metre 48.05 117.35 ii) 20 mm i/d Per Rft. 14.65 41.30 Per Metre 48.05 135.40 iii) 25 mm i/d Per Rft. 14.65 46.70 Per Metre 48.05 153.10 iv) 32 mm i/d Per Rft. 14.65 51.25 Per Metre 48.05 168.20 v) 40 mm i/d Per Rft. 16.50 64.45 Per Metre 54.05 211.35 vi) 50 mm i/d Per Rft. 20.30 78.75 Per Metre 66.50 258.25

b) recessed in walls, including cutting jharries, cost of 38.3 &hooks and repairing surface etc. 38.7

i) 16 mm i/d Per Rft. 28.25 50.45 Per Metre 92.65 165.45 ii) 20 mm i/d Per Rft. 28.25 55.40 Per Metre 92.65 181.70 iii) 25 mm i/d Per Rft. 31.65 63.35 Per Metre 103.75 207.80 iv) 32 mm i/d Per Rft. 32.95 69.55 Per Metre 108.10 228.15

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

24. ELECTRIC INSTALLATION

Page 143: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 142

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

v) 40 mm i/d Per Rft. 34.40 81.30 Per Metre 112.75 266.60 vi) 50 mm i/d Per Rft. 35.95 95.00 Per Metre 117.90 311.55

3 Supply and erection of PVC pipe for wiring recessed in walls, 38.3 &including inspection boxes, pull boxes, hooks, cutting jharries, 38.5and repairing surface, etc., complete with all specials.

i) 12 mm i/d Per Rft. 25.50 36.10 Per Metre 83.65 118.50 ii) 20 mm i/d Per Rft. 26.35 39.50 Per Metre 86.45 129.60 iii) 25 mm i/d Per Rft. 29.30 46.60 Per Metre 96.05 152.85 iv) 32 mm i/d Per Rft. 31.65 55.20 Per Metre 103.75 181.00 v) 40 mm i/d Per Rft. 32.95 65.10 Per Metre 108.10 213.50 vi) 50 mm i/d Per Rft. 34.40 78.35 Per Metre 112.75 256.95

4 Supply and erection of PVC pipe for wiring on surfaceincluding clamps inspection boxes, pull boxes, bends, tees, repairing surface, etc., complete with all specials:-

i) 12 mm i/d Per Rft. 6.60 17.90 Per Metre 21.60 58.75 ii) 20 mm i/d Per Rft. 6.60 20.35 Per Metre 21.60 66.75 iii) 25 mm i/d Per Rft. 6.60 25.75 Per Metre 21.60 84.45 iv) 32 mm i/d Per Rft. 7.55 34.10 Per Metre 24.70 111.80 v) 40 mm i/d Per Rft. 7.55 44.10 Per Metre 24.70 144.70 vi) 50 mm i/d Per Rft. 9.10 61.25 Per Metre 29.80 200.85

5 Supply and erection of G.I. flexible pipe for wiring, including 38.4welding of sockets, nipples and check nuts, etc. complete:-

i) 12 mm i/d Per Rft. 17.25 62.35 Per Metre 56.60 204.60 ii) 20 mm i/d Per Rft. 18.40 79.35 Per Metre 60.35 260.25 iii) 25 mm i/d Per Rft. 19.05 104.50 Per Metre 62.45 342.70 iv) 32 mm i/d Per Rft. 23.00 127.65 Per Metre 75.45 418.75 v) 40 mm i/d Per Rft. 25.10 144.05 Per Metre 82.30 472.55 vi) 50 mm i/d Per Rft. 27.60 186.15 Per Metre 90.55 610.55 vii) 80 mm i/d Per Rft. 36.80 354.50 Per Metre 120.70 1,162.80

6 Supply and erection PVC pipe for recessed wiring (main and 38.2 &sub-main) purpose, including bends, specials, etc. in floor, 38.3wall or trenches:-

i) 50 mm i/d Per Rft. 34.40 80.05 Per Metre 112.75 262.50 ii) 80 mm i/d Per Rft. 39.55 101.90 Per Metre 129.70 334.30 iii) 100 mm i/d Per Rft. 39.55 127.60 Per Metre 129.70 418.50

7 Supply and erection of PVC pipe for surface wiring (main andsub-main) including clamps, inspection boxes, pull boxesbends etc., complete with all specials:-

i) 50 mm i/d Per Rft. 9.10 56.00 Per Metre 29.80 183.65

Page 144: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 143

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

ii) 80 mm i/d Per Rft. 13.20 92.30 Per Metre 43.25 302.80 iii) 100 mm i/d Per Rft. 15.05 116.40 Per Metre 49.40 381.75

8 Supply and erection of wooden strip batten for wiring Per Rft. 2.65 4.95 Per Metre 8.65 16.20 38.8 Additional width required to

purposes, including clips, insulation cleats, etc. accommodate wires will be providedby erection of additional strips.

9 Supply and erection of Sahl wood casing and capping for Per Rft. 2.65 14.20 Per Metre 8.65 46.55 38.8wiring purposes, including insulation cleats, screws, etc. complete.

10 Supply and erection of single core PVC insulated copper 38.1conductor cables, in prelaid PVC pipe/M.S. conduit/G.Ipipe/wooden strip batten/wooden casing an capping/G.I.wire/trenches (rate for cables only):-

a) 250/440 volts, PVC insulated:

i) 3/0.74 mm (3/0.029") Per Rft. 5.25 11.70 Per Metre 17.30 38.35 ii) 3/0.91 mm (3/0.036") Per Rft. 5.25 12.10 Per Metre 17.30 39.75 iii) 7/0.74 mm (7/0.029") Per Rft. 5.25 15.95 Per Metre 17.30 52.40 iv) 7/0.91 mm (7/0.036") Per Rft. 5.85 22.95 Per Metre 19.20 75.35 v) 7/1.12 mm (7/0.044") Per Rft. 6.60 32.25 Per Metre 21.60 105.85 vi) 7/1.63 mm (7/0.064") Per Rft. 8.10 75.70 Per Metre 26.60 248.35 vii) 19/1.32 mm (19/0.052") Per Rft. 18.85 124.35 Per Metre 61.75 407.85 viii) 19/1.63 mm (19/0.064") Per Rft. 21.95 169.00 Per Metre 72.05 554.35

b) 250/440 volts, PVC insulated cotton braided andcompounded cables:-

i) 3/0.74 mm (3/0.029") Per Rft. 5.85 12.30 Per Metre 19.20 40.25 ii) 3/0.91 mm (3/0.036") Per Rft. 5.85 12.70 Per Metre 19.20 41.65 iii) 7/0.74 mm (7/0.029") Per Rft. 5.85 16.55 Per Metre 19.20 54.30 iv) 7/0.91 mm (7/0.036") Per Rft. 6.20 23.30 Per Metre 20.35 76.50 v) 7/1.12 mm (7/0.044") Per Rft. 6.95 32.60 Per Metre 22.75 106.95 vi) 7/1.63 mm (7/0.064") Per Rft. 8.00 75.60 Per Metre 26.20 247.95

11 Supply and erection of single core PVC insulated, PVCsheathed copper conductor, 250/440 volts grade cable(BSS-2004), in prelaid PVC pipes/M.S. conduit/G.I.pipe/wooden strip batten/wooden casing andcapping/trenches, etc. (rate for cable only):-

i) 3/0.74 mm (3/0.029") Per Rft. 5.25 11.25 Per Metre 17.30 36.95 ii) 3/0.91 mm (3/0.036") Per Rft. 5.25 14.25 Per Metre 17.30 46.75 iii) 7/0.74 mm (7/0.029") Per Rft. 5.25 18.55 Per Metre 17.30 60.80 iv) 7/0.91 mm (7/0.036") Per Rft. 5.85 25.95 Per Metre 19.20 85.20 v) 7/1.12 mm (7/0.044") Per Rft. 6.60 36.10 Per Metre 21.60 118.45 vi) 7/1.63 mm (7/0.064") Per Rft. 8.10 69.30 Per Metre 26.60 227.30

Page 145: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 144

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

12 Supply and erection of single core PVC insulated, PVCsheathed copper conductor, 660/1100 volts grade cable, in 38.1 toprelaid G.I. pipe/M.S. conduits/PVC pipe/G.I. wire/trenches, 38.7etc (rate for cable only):-

i) 7/1.63 mm (7/0.064") Per Rft. 8.00 77.90 Per Metre 26.20 255.55 ii) 19/1.32 mm (19/0.052") Per Rft. 8.80 129.55 Per Metre 28.80 424.95 iii) 19/1.63 mm (19/0.064") Per Rft. 9.60 174.45 Per Metre 31.45 572.15 iv) 19/2.11 mm (19/0.083") Per Rft. 10.55 330.50 Per Metre 34.60 1,084.00 v) 37//1.83 mm (37/0.072") Per Rft. 18.20 460.15 Per Metre 59.65 1,509.35 vi) 37/2.11 mm (37/0.083") Per Rft. 21.95 577.10 Per Metre 72.05 1,892.90 vii) 37/2.62 mm (37/0.103") Per Rft. 31.00 884.45 Per Metre 101.70 2,901.05

13 Supply and erection of copper conductor cables for service dittoconnection, in prelaid pipe/G.I. wire/trenches, etc. (rate forcable only):-

a) PVC insulated, PVC sheathed twin core, 250/440 volts.

i) 3/0.74 mm (3/0.029") Per Rft. 5.85 19.10 Per Metre 19.20 62.70 ii) 3/0.91 mm (3/0.036") Per Rft. 5.85 25.95 Per Metre 19.20 85.20 iii) 7/0.74 mm (7/0.029") Per Rft. 5.85 34.55 Per Metre 19.20 113.25 iv) 7/0.91 mm (7/0.036") Per Rft. 6.20 49.40 Per Metre 20.35 162.10 v) 7/1.12 mm (7/0.044") Per Rft. 6.95 69.40 Per Metre 22.75 227.65 vi) 7/1.63 mm (7/0.064") Per Rft. 8.00 135.95 Per Metre 26.20 445.95

b) PVC insulated, PVC sheathed 3 core,660/1100 volt cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 6.20 27.60 Per Metre 20.35 90.50 ii) 3/0.91 mm (3/0.036") Per Rft. 6.20 38.30 Per Metre 20.35 125.60 iii) 7/0.74 mm (7/0.029") Per Rft. 6.20 51.15 Per Metre 20.35 167.70 iv) 7/0.91 mm (7/0.036") Per Rft. 6.95 73.90 Per Metre 22.75 242.35 v) 7/1.12 mm (7/0.044") Per Rft. 7.30 104.35 Per Metre 24.00 342.30 vi) 7/1.63 mm (7/0.064") Per Rft. 8.35 208.80 Per Metre 27.45 684.90

c) PVC insulated, PVC sheathed 4 core,660/1100 volt non armoured cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 6.60 34.85 Per Metre 21.60 114.25 ii) 3/0.91 mm (3/0.036") Per Rft. 6.60 47.65 Per Metre 21.60 156.35 iii) 7/0.74 mm (7/0.029") Per Rft. 6.95 64.55 Per Metre 22.75 211.80 iv) 7/0.91 mm (7/0.036") Per Rft. 6.95 94.25 Per Metre 22.75 309.10 v) 7/1.12 mm (7/0.044") Per Rft. 7.30 134.45 Per Metre 24.00 441.00 vi) 7/1.63 mm (7/0.064") Per Rft. 8.35 271.10 Per Metre 27.45 889.20 vii) 19/1.32 mm (19/0.052") Per Rft. 11.70 504.55 Per Metre 38.45 1,654.95

d) PVC insulated, PVC sheathed 4 core 660/1100 volt grade cable, Cost of trenches where necessaryarmoured with G.I. wire 16 SWG. is included in the rates.

Page 146: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 145

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

i) 19/1.32 mm (19/0.052") Per Rft. 11.70 562.20 Per Metre 38.45 1,843.95 ii) 19/1.63 mm (19/0.064") Per Rft. 12.55 750.30 Per Metre 41.15 2,461.05 iii) 19/1.83 mm (19/0.072") Per Rft. 13.20 1,014.95 Per Metre 43.25 3,329.05 iv) 19/2.11 mm (19/0.083") Per Rft. 14.25 1,419.00 Per Metre 46.75 4,654.40 v) 37//1.83 mm (37/0.072") Per Rft. 14.65 1,931.35 Per Metre 48.05 6,334.75 vi) 37/2.11 mm (37/0.083") Per Rft. 17.55 2,441.10 Per Metre 57.65 8,006.75 vii) 37/2.36 mm (37/0.093") Per Rft. 21.10 2,975.15 Per Metre 69.15 9,758.45 viii) 37/2.62 mm (37/0.103") Per Rft. 26.35 3,702.95 Per Metre 86.45 12,145.60

14 Supply and erection of M.S. sheet box of 16 SWG, 10 cm (4") 38.1deep, with 4.75 mm thick (3/16") bakelite sheet top, for torecessed wiring, including making holes for regulators, 38.7switches, plugs, etc.

i) 10 x 10 cm (4"x4") Each 86.45 156.30 Each 86.45 156.30 ii) 17.5 x 10 cm (7"x4") Each 108.10 220.60 Each 108.10 220.60 iii) 22.5 x 10 cm (9"x4") Each 144.10 282.40 Each 144.10 282.40 iv) 20 x 25 cm (8"x10") Each 172.90 417.90 Each 172.90 417.90 v) 25 x 30 cm (10"x12") Each 216.15 556.55 Each 216.15 556.55 vi) 30 x 35 cm (12"x14") Each 288.20 730.50 Each 288.20 730.50

15 Supply and erection of round block of Sahl wood, 10x4 cm Each 24.70 38.00 Each 24.70 38.00 38.1(4"x1½") thick.

16 Supply and erection of teak wood board, 4.5 cm (1¾") thick. 38.1

i) 17.5 x 10 cm (7"x4") Each 34.60 91.65 Each 34.60 91.65 ii) 22.5 x 10 cm (9"x4") Each 34.60 104.00 Each 34.60 104.00 iii) 20 x 25 cm (8"x10") Each 38.45 121.45 Each 38.45 121.45 iv) 25 x 30 cm (10"x12") Each 43.25 163.55 Each 43.25 163.55 v) 30 x 35 cm (12"x14") Each 49.40 220.40 Each 49.40 220.40

17 Supply and erection of Sahl wood board, 4.5 cm (1¾") thick.

i) 17.5 x 10 cm (7"x4") Each 34.60 71.25 Each 34.60 71.25 ii) 22.5 x 10 cm (9"x4") Each 34.60 89.80 Each 34.60 89.80 iii) 20 x 25 cm (8"x10") Each 38.45 105.40 Each 38.45 105.40 iv) 25 x 30 cm (10"x12") Each 43.25 126.25 Each 43.25 126.25 v) 30 x 35 cm (12"x14") Each 49.40 149.10 Each 49.40 149.10

18 Supply and erection of iron/aluminum clad, 500 volts main 38.1 When the base frame is alreadyswitches with kitkat fuses, on angle iron board with 3 mm installed, the labour and composite(1/8") thick M.S. sheet covering, including bonding to earth rates will be reduced as follows:- For with necessary flexible pipe and thimbles, etc. 15 to 35 Amps. by Rs. 21.20 and Rs.

145.50. For 60 to 65 Amps. by Rs.a) double pole: 38.80 and Rs. 252.60. For 100 Amps.

by Rs. 38.80 and Rs. 350.80.i) 15/20 Amp. Each 576.40 1,629.50 Each 576.40 1,629.50 ii) 30/35 Amp. Each 576.40 1,919.95 Each 576.40 1,919.95 iii) 60/65 Amp. Each 864.60 2,527.65 Each 864.60 2,527.65

Page 147: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 146

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

iv) 100 Amp. Each 864.60 3,083.85 Each 864.60 3,083.85

b) triple pole:i) 15/20 Amp. Each 864.60 2,245.20 Each 864.60 2,245.20 ii) 30/35 Amp. Each 576.40 2,389.60 Each 576.40 2,389.60

c) triple pole with neutral link:

i) 30/35 Amp. Each 576.40 2,562.65 Each 576.40 2,562.65 ii) 60/65 Amp. Each 864.60 3,272.05 Each 864.60 3,272.05 iii) 100 Amp. Each 1,132.65 4,053.00 Each 1,132.65 4,053.00

19 Supply and erection of iron/aluminum clad, 500 volts main When the base frame is alreadyswitches with triple pole and neutral link and HRC fuses, on 38.1 installed, the labour & compositeangle iron board with 3 mm (1/8") thick M.S. sheet covering, rates will be reduced as follows:-including bonding to earth with necessary flexible pipe andthimbles. i) For 60/65 Amp. by Rs. 21.20 and

Rs. 145.50.60/65 Amp Each 864.60 3,317.45 Each 864.60 3,317.45 ii) For 100 to 300 Amp. by Rs. 21.20100 Amp Each 1,132.65 4,623.70 Each 1,132.65 4,623.70 and Rs. 350.80150 Amp Each 1,132.65 6,188.50 Each 1,132.65 6,188.50 iii) For 400 to 500 Amp. by Rs. 42.20200 Amp Each 2,593.80 10,208.20 Each 2,593.80 10,208.20 and Rs. 526.20300 Amp Each 2,593.80 11,617.20 Each 2,593.80 11,617.20 400 Amp Each 3,674.55 15,702.05 Each 3,674.55 15,702.05 500 Amp Each 3,890.70 19,722.60 Each 3,890.70 19,722.60

20 Supply and erection of iron/aluminum clad, branch ditto When the base frame is alreadydistribution board, 250 volt, on angle iron frame of suitable installed the labour and compositesize with 3 mm (1/8") M.S. sheet covering: rates will be reduced by Rs. 19.50 &

Rs. 152.20 respectively.i) 2 way, 15 Amp per way Each 288.20 695.80 Each 288.20 695.80 ii) 3 way, 15 Amp per way Each 288.20 695.80 Each 288.20 695.80 iii) 4 way, 15 Amp per way Each 288.20 769.95 Each 288.20 769.95 iv) 5 way, 15 Amp per way Each 288.20 831.75 Each 288.20 831.75 v) 6 way, 15 Amp per way Each 288.20 875.00 Each 288.20 875.00 vi) 7 way, 15 Amp per way Each 288.20 930.65 Each 288.20 930.65 vii) 8 way, 15 Amp per way Each 288.20 980.05 Each 288.20 980.05 viii) 9 way, 15 Amp per way Each 288.20 1,035.70 Each 288.20 1,035.70 ix) 10 way, 15 Amp per way Each 288.20 1,116.05 Each 288.20 1,116.05 x) 11 way, 15 Amp per way Each 288.20 1,177.85 Each 288.20 1,177.85 xi) 12 way, 15 Amp per way Each 288.20 1,233.45 Each 288.20 1,233.45 xii) 2 way, 30 Amp per way Each 432.30 839.90 Each 432.30 839.90 xiii) 3 way, 30 Amp per way Each 432.30 846.05 Each 432.30 846.05 xiv) 4 way, 30 Amp per way Each 432.30 907.85 Each 432.30 907.85 xv) 5 way, 30 Amp per way Each 432.30 975.85 Each 432.30 975.85 xvi) 6 way, 30 Amp per way Each 432.30 1,019.10 Each 432.30 1,019.10 xvii) 7 way, 30 Amp per way Each 432.30 1,087.10 Each 432.30 1,087.10 xviii)8 way, 30 Amp per way Each 432.30 1,142.70 Each 432.30 1,142.70 xix) 9 way, 30 Amp per way Each 432.30 1,192.15 Each 432.30 1,192.15

Page 148: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 147

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

xx) 10 way, 30 Amp per way Each 432.30 1,278.65 Each 432.30 1,278.65

21 Supply and erection of bus bars, for 500 volts 3 phase A.C. When the base frame is alreadysupply with four copper bars, including glazed porcelain 38.1 installed the labour and compositebridges, on angle iron board, fixed with rag bolts and M.S. rates will be reduced by Rs. 21.20 andsheet box 1.5 mm thick, etc. complete:- Rs. 145.50 respectively.

i) 60 Amp. with 4 copper bars Each 1,029.25 3,135.15 Each 1,029.25 3,135.15 size 1½"x1/8" (40 x 3 mm)

ii) 100 Amp. with 4 copper bars Each 1,029.25 3,135.15 Each 1,029.25 3,135.15 size 1½"x1/8" (40 x 3 mm)

iii) 200 Amp with 4 copper bars Each 1,626.25 3,831.00 Each 1,626.25 3,831.00 size 2"x1/8" (50x 3 mm)

iv) 300 Amp with 4 copper bars Each 1,945.35 4,150.10 Each 1,945.35 4,150.10 size 2"x3/16" (50x 5 mm)

v) 500 Amp with 4 copper Each 1,245.40 4,057.35 Each 1,245.40 4,057.35 size 2"x1/4" (50x 6 mm)

22 i) Supply and erection of plain pendent lamp holder, Each 18.00 110.15 Each 18.00 110.15 38.1complete with bakelite lamp holder and flexible twin wire23/0.0076" upto 2 metre length (without bulb and shade).

ii) Extra for additional length of flexible wire, beyond Per Rft. -- 1.65 Per Metre -- 5.45 2 metres.

23 Supply and erection of counter weight pedent with porcelain Each 36.05 245.30 Each 36.05 245.30 38.1

counter weight, and fitting on bakelite lamp holder, withflexible twin wire 23/0.0076" complete (without bulb andshade).

24 Supply and erection of stiff pedent with brass/metal pipe 6.3 Each 54.20 413.20 Each 54.20 413.20 dittocm (2.5") long, and 15 mm (½") dia brass oxidised or painted,along with brass lamp holder with VIR/PVC cable 3/0.74 mm(3/0.029").

25 Supply and erection of 22.5 cm (9") long swan neck plain Each 56.10 119.75 Each 56.10 119.75 dittobrass/steel brass oxidised bracket lamp holder, complete.

26 Supply and erection of wall type/pole type bracket, with double Each 77.45 449.60 Each 77.45 449.60 dittocover water tight reflector, flexible wire and brass bolder.

27 Supply and erection of bakelite button holder shade, large Each 12.45 51.85 Each 12.45 51.85 dittosize.

28 Supply and erection of call bell 220/250 volts, fixed on teak Each 54.20 239.55 Each 54.20 239.55 38.1wood board 17.5x10 cm (7"x4").

29 Supply and erection of bell push or bed switch, with 5 metres Each 10.80 213.30 Each 10.80 213.30 38.1twin flexible wire 23/0.0076".

Page 149: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 148

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

30 Supply and erection of ceiling rose, bakelite. Each 18.00 38.05 Each 18.00 38.05 ditto

31 Supply and erection of switches 5 Amp.

i) open type Each 17.30 34.85 Each 17.30 34.85 dittoii) piano type Each 17.30 34.85 Each 17.30 34.85 iii) ring type, recessed Each 17.30 29.65 Each 17.30 29.65 iv) plate type, recessed Each 17.30 52.15 Each 17.30 52.15 v) double control, open type Each 24.00 53.15 Each 24.00 53.15 vi) double control, ring type recessed Each 24.00 47.00 Each 24.00 47.00 vii) double control, piano type Each 24.00 48.25 Each 24.00 48.25

32 Supply and erection of switches 10/15 Amp. ditto

i) open type Each 17.30 44.00 Each 17.30 44.00 ii) recessed type Each 17.30 53.90 Each 17.30 53.90

33 Supply and erection of wall socket with 3 pin 5 Amp, shoe. Each 17.30 81.10 Each 17.30 81.10 ditto

34 Supply and erection of 3 pin. 5 Amp wall socket. Each 17.30 56.35 Each 17.30 56.35 ditto

35 Supply and erection of 3 pin, 10/15 Amp. wall socket. ditto

i) open type Each 17.30 50.20 Each 17.30 50.20 ii) recessed type Each 17.30 87.25 Each 17.30 87.25

36 Supply and erection of 3 pin switch and plug combined, dittorecessed type.

i) 5 Amp Each 17.30 70.75 Each 17.30 70.75 ii) 10/15 Amp Each 17.30 96.45 Each 17.30 96.45

37 Supply and erection of 3 pin 10/15 Amp. wall socket with shoe, Each 17.30 149.05 Each 17.30 149.05 dittoopen type.

38 Supply and erection of cut out, bakelite. ditto

i) open type Each 9.60 36.35 Each 9.60 36.35 ii) recessed type Each 9.60 42.50 Each 9.60 42.50

39 Supply and erection of button holder. 38.1

i) bakelite large size Each 10.80 30.10 Each 10.80 30.10 ii) brass Each 10.80 42.45 Each 10.80 42.45

40 Supply and erection of brass bracket with holder. Each 14.40 46.05 Each 14.40 46.05 ditto

41 Supply and erection of bell push open/recessed type Each 9.60 30.15 Each 9.60 30.15 ditto(without flexible wire).

Page 150: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 149

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

42 Supply and erection of kitkat, 500 volt: ditto

i) 15/20 Amp Each 17.60 50.05 Each 17.60 50.05 ii) 30/35 Amp Each 19.20 51.65 Each 19.20 51.65 iii) 60/65 Amp Each 29.30 75.65 Each 29.30 75.65 iv) 100 Amp Each 32.95 122.60 Each 32.95 122.60 v) 200 Amp Each 37.70 164.35 Each 37.70 164.35 vi) 300 Amp Each 37.70 325.05 Each 37.70 325.05 vii) 400 Amp Each 49.80 405.15 Each 49.80 405.15 viii) 500 Amp Each 49.80 581.30 Each 49.80 581.30

43 Supply and erection of tube light, including rod, choke, starter 38.1with frame, flexible wire, including connection from ceilingrose, etc., complete.

i) double rod (80 watts) with two chokes and 2 starters. Per set 311.35 1,269.55 Per set 311.35 1,269.55

ii) single rod (40 watts) with one choke and one starter. ditto 249.10 688.15 ditto 249.10 688.15

iii) round tube, 32 watt, with one choke and one starter, Each 249.10 746.25 Each 249.10 746.25 without cover.

iv) round tube, 32 watt with one chock and one starter, with ditto 207.55 828.35 ditto 207.55 828.35 cover.

44 Providing and fixing M.S. iron box for housing main switches, dittomade of 1.5 mm (1/16") thick M.S. sheet, with lockingarrangement, including painting:-i) 60x35x15 cm (24"x14"x6") Each 649.75 2,424.50 Each 649.75 2,424.50 ii) 95x40x20 cm (38"x16"x8") Each 938.35 3,055.95 Each 938.35 3,055.95 iii) 105x52.5x22.5 cm (42"x21"x9") Each 1,427.00 4,251.60 Each 1,427.00 4,251.60 iv) 135x70x27.5 cm (54"x28"x11") Each 1,569.65 5,991.40 Each 1,569.65 5,991.40

45 Supply and erection of girder clamp hook, 16 mm (5/8") with Each 41.50 156.45 Each 41.50 156.45 38.1M.S. plate 25x6 mm (1"x¼"), with bolts and nuts for hanging &ceiling fans. 38.10

46 Supply and erection of girder strut, of M.S. tee section Each 54.20 1,015.60 Each 54.20 1,015.60 ditto40x40x6 mm (1½"1½"x ¼"), complete with clamp, bolts andnuts, etc., including fixing with cement concrete 1:3:6.

47 Supply and erection of roof suspension hook, 16 mm (5/8") Each 58.10 1,237.90 Each 58.10 1,237.90 38.1dia rod with 75x40x3 mm (3"x1½"x1/8") M.S. steel channel, with clamp, bolts and nuts, etc., including fixing with cementconcrete 1:3:6.

48 Supply and erection of roof suspension hook of M.S plate Each 77.45 522.20 Each 77.45 522.20 75x40x12.7mm (3"x1½"x½") with 16 mm (5/8") hook completewith bolts, nuts and fixing with cement concrete 1:3:6

Page 151: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 150

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

49 Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook, Each 22.15 39.45 Each 22.15 39.45 dittoplaced at the time of casting of slab.

50 Erection of circular L.T. pole in cement concrete 1:3:6 one Each 696.40 2,734.40 Each 696.40 2,734.40 38.12metre below ground level (excluding the cost of pole),including cement concrete collar (1:2:4) excavation offoundation, and finishing surface.

51 Supply and erection of bracket of M.S. channel 75x40x6 mm (3"x1½"x¼") section:-i) 0.60 metre (2') long for 2 lines. Each 154.40 601.05 Each 154.40 601.05 ii) 1.200 metre (4') long for 4 lines. Each 180.15 1,341.90 Each 180.15 1,341.90

52 Supply and erection of anchor rod Henley type for pole, Per Rft. 10.40 24.25 Per Metre 34.10 79.60 38.14including necessary clamps and 7/12" stay wire, strainingscrews, etc., erected in cement concrete 1:3:6 and collar ofcement concrete.

53 Supply and erection of stay for house service pipe, erected Per Rft. 15.05 37.75 Per Metre 49.40 123.80 dittowith straining screws and 7/14" stay wire, complete.

54 Supply and erection of house service pipe Henley (G.I. pipe Per Rft. 65.90 279.65 Per Metre 216.15 917.30 water quality) or pole type, 50 mm (2") dia, erected to instalinsulated overhead line,include shackle insulator for holdinginsulated wire and straining devices for bearer wire and otheraccessories etc., complete.

55 Supply and erection of house service pipe 50 mm (2") dia G.I. Per Rft. 60.65 272.25 Per Metre 199.00 892.95 pipe Henley or pole type for bare copper wire overhead line,including shackle insulator, straining devices and otheraccessories etc.

56 Supply and erection of lightning arrestor horn type, complete. Each 325.25 2,550.05 Each 325.25 2,550.05

57 Supply and erection of shackle insulator, medium size. Each 40.75 207.60 Each 40.75 207.60 38.12

58 Supply and erection of pin insulator, green medium size. Each 40.75 90.20 Each 40.75 90.20 ditto

59 Supply and erection of bare copper conductor wire No. 2 to Per Kg 21.20 1,104.90 Per Kg 21.20 1,104.90 38.1No. 10 SWG, including binding wire No. 16 SWG.

60 Supply and erection of G.I. wire of all sizes, including binding Per Kg 21.20 144.90 Per Kg 21.20 144.90 dittowire No. 16 SWG for support of rubber wire or earthing wire,pole to pole etc.

61 Wiring overhead line in 2 single core, PVC/weather proof 38.12cable, on G.I. wire No. 8 SWG bearer wire and in house service pipe, including connection through joint box.

Page 152: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 151

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

i) 3/0.74 mm (3/0.029") Per Rft. 5.50 13.60 Per Metre 18.05 44.65 ii) 7/0.74 mm (7/0.029") ditto 5.50 22.00 ditto 18.05 72.10 iii) 7/0.91 mm (7/0.036") ditto 5.50 28.65 ditto 18.05 93.90 iv) 7/1.12 mm (7/0.044") ditto 5.50 37.75 ditto 18.05 123.85

62 Supply and erection of all aluminum stranded hard drawn bare Per Rft. 10.15 23.45 Per Metre 33.25 76.85 38.1conductor, of size 7/3.099 mm (7/0.122").

63 Supply and erection of street light pole bracket 30 mm (1¼") Each 271.05 1,075.50 Each 271.05 1,075.50 G.I. pipe 2 metre long, complete with 2 No. pole clamp.

64 Supply and erection of pole mounted street light, holders, shade and glass, etc., for fitting 125/250 watts mercury vapourlamp (excluding cost of lamps):

i) G.E.C. design Each 542.10 2,964.65 Each 542.10 2,964.65 ii) Philips design ditto 542.10 3,347.80 ditto 542.10 3,347.80

65 Supply and fitting of mercury vapour lamp, complete with

choke set.i) 125 watt lamp Each 207.55 1,134.55 Each 207.55 1,134.55 ii) 250 watt lamp ditto 249.10 2,041.30 ditto 249.10 2,041.30

66 Manufacture and erection of angle iron lattice steel structure Each 9,114.75 25,811.65 Each 9,114.75 25,811.65 38.13 The composite rate will be reducedpole (36.0') 10,923 mm long 9348 mm (30.5') above ground or increased by Rs. 36.50 for eachlevel) 355 mm (14") square at base and 204 mm (8") square at (100 mm) of reduction or addition intop for electric distribution line, using 1¼"x1¼"x3/16" (30x30x5 the height of the pole above groundmm) angle iron legs and ¾"x¾"1/8" (20x20x3 mm) angle iron level.bracing 420 mm (17") long fixed between legs on all the foursides in diagonal position, and 1¾"x1¾"x3/16"(45x45x5 mm)angle iron on top and 4 bands of M.S. flat iron 2"x¼" (50x6 mm)305 mm (12") centre to centre, as per standard drawingincluding silver painting of pole 3 coats, excavation and refillingof foundation cement concrete 1:2:4. 6'-0"x1'-8"x1'-8"(1807x500x500 mm) for foundation, etc, complete in allrespects.

67 Manufacture and erection of galvanized angle iron lattice steel Each 8,825.15 38,070.45 Each 8,825.15 38,070.45 38.13 The composite rate will be reducedstructure pole 37 ft. (11.25 m) long 30 ft. (9 m) above ground or increased by Rs. 237.00 for eachlevel), 34" square (850 mm) at base, 13.75" (35 mm) square at foot (300 mm) of reduction ortop, for electric distribution line, using 2"x2"x5/32" addition in the height of the pole(50x50x4mm) high tensile steel angle iron legs, and 1-3/8"x above ground level.1-3/8"x1/8" (35x35x3 mm) M.S. angle iron bracings fixedbetween legs on all the four sides in diagonal position as perstandard drawing including silver painting of pole, excavationand refilling of foundation, one ft. (300 mm) thick cementconcrete 1:3:6 foundation of outer size 8'x3½'x3½'(2400x1050x1050 mm), etc. complete in all respects.

Page 153: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 152

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

68 Earthing of iron clad/aluminum switches, etc. with G.I. wire No. Job 1,193.95 4,566.60 Job 1,193.95 4,566.60 8 SWG in G.I. pipe 15 mm (½") dia, recessed or on surface ofwall and floor, complete with 1.5 metre long G.I. pipe, 50 mm(2") dia with reducing socket 4 to 5 metre below ground level,and 2 metre away from building plinth.

69 Earthing of Metallic cases, etc. with G.I. wire No. 8 SWG, in 38.1115 mm (½") dia G.I. pipe, best quality:-i) on surface, including clamps, etc. Per Rft. 12.40 60.50 Per Metre 40.65 198.50 ii) recessed in wall, including hooks, ditto 29.10 78.30 ditto 95.50 256.80

jharries and making good surface.

70 Bonding to earth with wire on surface, including cost of wire, dittoclamps, thimbles, etc.

a) G.I. wire:i) 8 SWG Per Rft. 5.25 12.15 Per Metre 17.30 39.80 ii) 16 SWG ditto 5.25 7.10 ditto 17.30 23.20

b) Copper wire:

i) 16 SWG Per Rft. 5.25 12.60 Per Metre 17.30 41.25 ii) 20 SWG ditto 5.25 8.10 ditto 17.30 26.55

71 Erection only, of lightning conductor of copper tape, including Per Rft. 19.85 24.45 Per Metre 65.05 80.20 38.11 Rate includes all materials requiredsupply of copper staple and copper nails and cement, sand in erection (excluding copper tapemortar. lightning conductor).

72 Supply and erection of 600x600x3 mm (2'x2'x1/8") copper Each 795.95 4,659.15 Each 795.95 4,659.15 dittoplate, including revitting to copper tape and placing in mixtureof salt and charcoal, etc.

73 Supply and erection of copper tape, including copper staple copper nails, cement, sand, etc.

i) tape 40x3 mm (1½"x1/8") Per Rft. 29.10 270.60 Per Metre 95.50 887.60 ii) tape 50x3 mm (2"x1/8") ditto 29.10 320.95 ditto 95.50 1,052.70

74 Supply and erection of 25 mm (1") dia and one metre long Job 542.10 2,878.10 Job 542.10 2,878.10 lightning conductor copper rod with 5 spikes on ball and base,etc. complete.

75 Supply and erection of electric energy meter, including meter 38.1testing fee, etc.

a) single phase:

i) 1x10 Amp, 250 volts Each 216.15 2,352.15 Each 216.15 2,352.15 ii) 1x30 Amp, 250 volts ditto 216.15 2,352.15 ditto 216.15 2,352.15

Page 154: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-24(Electric Installation) Page 153

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

b) three phase, 4 wires:

i) 3x15 Amp, 400 volts Each 432.30 6,187.50 Each 432.30 6,187.50 ii) 3x50 Amp, 400 volts ditto 622.70 6,377.90 ditto 622.70 6,377.90 iii) 3x80 Amp, 400 volts ditto 622.70 6,377.90 ditto 622.70 6,377.90

76 Rewinding of A.C. ceiling fan, capacitor type, including cost of The credit of out turn of dismantledwire, leatheride paper cotton tape, soldering, etc. material has been accounted for in

the rate.i) 1200 mm (48") sweep, 275-300 RPM. Each 419.45 990.50 Each 419.45 990.50 ii) 1400 mm (56") sweep, 250-275 RPM. ditto 467.05 1,138.80 ditto 467.05 1,138.80

77 Rewinding of A.C. exhaust fan, including cost of wire, The credit of out turn of dismantledleatheride paper, cotton tape, soldering, etc. material has been accounted for in

the rate.i) 375 mm (15") sweep, and 1300-1500 RPM Each 288.20 685.70 Each 288.20 685.70 ii) 450 mm (18") sweep, and 1300-1500 RPM ditto 288.20 761.65 ditto 288.20 761.65

78 Rewinding of pedestal fan 600 mm (24") sweep, and 900-950 Each 345.85 886.10 Each 345.85 886.10 The credit of out turn of dismantledRPM, including wire, leatheride paper, cotton, tape, etc. material has been accounted for in

the rate.79 Supply and fitting of regulator knob with shaft Each 54.05 115.85 Each 54.05 115.85 38.1

and plate of electric fan regulator.

80 Supply and fitting of capacitor 2.2 uF, for ceiling fans. Each 43.25 67.95 Each 43.25 67.95 ditto

81 Supply and fitting of ball bearing of size Each 54.05 177.65 Each 54.05 177.65 ditto6201, 6202 or 6203 for ceiling fans.

82 Rewinding regulator of ceiling fan 48"/56" (1200/1400 mm) Each 108.10 213.20 Each 108.10 213.20 The credit out turn of dismantledsweep, to control 3/4 speeds. material has been accounted for in

the rate.83 Erection of ceiling fan alongwith regulator (all sizes), including Each 207.35 245.50 Each 207.35 245.50

carriage from local Railway Station/Store to site of work,electric wire/cable for suspension rod and board connection,and cutting, threading on the rod, where necessary.

Page 155: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-25(Iron work) Page 154

The Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Railway Track, etc.

1 Laying, linking and packing tramway line. 100Lft. 1999.60 Metre 65.60

2 Dismantling tramway track. 100Lft. 663.10 Metre 21.75

3 Laying, linking of B.G. track, including packing, 100Lft. 5197.50 Metre 170.50straightening and leveling.

4 Linking points and crossings, complete with fastenings. Each 5022.60 Each 5022.60

5 Bending or strainghtening B.G. rail with Jim Each 553.75 Each 553.75Crow. Point Point

6 Fixing street lamp posts. Each 647.40 Each 647.40

7 Binding ends of sleepers and timber of all sizes and kinds, 100 Nos 6077.60 100 Nos 6077.60including spreading and restacking.

8 Opening stacks of sleepers and timber of all kinds and 100 Nos 764.35 100 Nos 764.35sizes, including spreading for inspection and restackingwithin one chain lead.

IRON WORK

9 Small iron work, such as gusset plates, knees, bends, Per Cwt 3201.00 8789.35 100 Kg 6301.20 17301.80stirrups, straps, rings, etc. including cutting, drilling,riveting, handling, assembling and fixing; but excludingerection in position.

10 Fabrication of heavy steel work, with angle, tees, flat iron Per Cwt 1145.10 6459.30 100 Kg 2254.15 12715.15round iron and sheet iron for making trusses, girders,tanks, etc., including cutting, drilling, revitting, handling,assembling and fixing, but excluding erection in position.

11 Erection and fitting in position iron trusses, staging of Per Cwt 361.40 100 Kg 711.40water tanks, etc.

12 Fixing corrugated iron sheet, including revitting, etc. 100 Sft. 1301.00 sq.m 140.00

13 Erecting corrugated iron sheet tanks, upto 20' Per Cwt 629.10 100 Kg 1238.40(6 m) height.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

25. IRON WORK

Page 156: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-25(Iron work) Page 155

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

14 Erecting rolled steel beams or old rails, in roofs, etc., Per Cwt 382.55 100 Kg 753.00erection and fixing in position.

15 Erecting rolled steel beams or rails, erection for posts etc. Per Cwt 185.80 100 Kg 365.70(other than in roofs).

16 Making bolts and nuts of iron rods. Per Cwt 2462.15 8534.60 100 Kg 4846.70 16800.40

17 Cutting rails, rolled steel joists and beams, with hacksaw:-

a) upto 6" size (150 mm) Per Cut 243.95 Per Cut 243.95b) above 6" size (150 mm) Per Cut 359.85 Per Cut 359.85

18 Cutting rails or rolled steel beams of size below 6" Per 116.15 Per Cwt 116.15(150 mm), with jim. Cut Cut

19 Bending rolled steel beams or rails. Per 124.25 376.15 Per 124.25 376.15Bend Bend

20 Drilling holes, in plates upto ½" (13 mm) thick, per inch Per 48.90 Per 48.90dia, (25mm) or part thereof. Hole Hole

21 Extra for drilling holes in plates over ½" (13 mm) thick, per Per 27.20 Per 27.20inch dia, (25 mm) or part thereof. Hole Hole

22 Rivetting 1/8" dia (3 mm). 100 Nos 647.35 100 Nos 647.35

23 Cutting out Rivets, all sizes. 100 Nos 2070.75 100 Nos 2070.75

24 Fitting and erection of gutters of sheet iron. Per Lft. 81.25 Metre 266.55

25 Cutting and fixing iron bars, for barred windows. Per bar 46.45 Per bar 46.45

26 Cutting G.I. sheets. Each 25.50 Each 25.50Cut Cut

27 Notching web or foot of rail posts, for housing rail beams. Per 552.20 720.20 Per 552.20 720.20Notch Notch

28 Hoop iron netted trellis work fixed with nails. Per Sft. 32.55 sq.m 349.95

29 Fixing zinc iron or G.I. sheet on table tops. Per Sft. 19.15 sq.m 205.8530 Making and fixing steel grated doors, complete with Per Sft. 201.00 777.75 sq.m 2162.95 8368.85

locking arrangement, angle iron frame 2"x2"x3/8"(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)centre to centre.

31 Making and fixing steel grated door with 1/16" thick Per Sft. 208.75 905.55 sq.m 2246.00 9743.75(1.5mm) sheeting, including angle iron frame 2"x2"x3/8"(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)centre to centre, with locking arrangement.

Page 157: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-25(Iron work) Page 156

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

32 Making and fixing grating in opening, including fixing at Per Sft. 80.35 376.10 sq.m 864.35 4046.90site with flat iron 2"x3/8" (50x10 mm) and ¾" (19 mm)square bars, at 4" (100 mm) centre to centre.

33 Providing and fixing stair railing (all types and designs) of Per Rft. 390.85 892.00 Metre 1282.25 2926.50 The composite rate shall behard wood, including bends and corners, screwed to reduced or increased by Rs. 31.905/8"x5/8" (16x16 mm) M.S. square bars 2.75 ft. (838 mm) for each foot of reduction orhigh, at 5.5 inch (137 mm) inch centre to centre, fixed in addition in the height of the squaresteps of stairs, M.S. flat 1"x1/8" (25x3 mm) welded to bars.bars, painting/polishing 3 coats, etc. complete.

34 Providing/fixing stair railing consisting of M.S. Box section Per Rft. 201.35 591.40 Metre 660.55 1940.35size 1-1/2"x3" of 16 SWG welded with M.S. flat 1"x1/8"continuously and welded over M.S. square bars 5/8"x5/8"punched in M.S. flat 2 ¾' high @ 5½" c/c fixed in steps ofstair I/C painting 3 coats complete.

35 Providing and fixing terrace railing of 2" (50 mm) i/d Per Rft. 145.45 618.00 Metre 477.20 2027.56 -do-conduit pipe 16 SWG, welded with 5/8"x5/8" (16x16 mm)square bar 2.75 ft. (838 mm) high fixed at 5" (125 mm)centre to centre, in reinforced cement concrete slab withsuitable arrangement, complete in all respects, as perdesign and drawing.

36 Providing and fixing collapsible gate made of 2"x2"x"¼" Per Sft. 293.25 733.10 sq.m 3155.20 7888.05(50x50x6 mm) tee iron at top and bottom, channel ironverticals ¾"x¼"x¼"x1/8" (20x6x6x3 mm) at 3" (75 mm) to5" (125 mm) centre to centre (approximate) and flat ironcrosses 3"x3/16" (75x5 mm), and best quality rollers atbottom of 3" (75 mm) diameter including holdfasts,handles 12" (300 mm) long of ¾"x¼"x¼"x1/8" (20x6x6x3mm) channel iron, locking arrangement inside andoutside, painting 3 coats of black Japan enameled,complete in working order.

37 Providing and fixing 24 SWG G.I. sheet rolling shutter, Per Sft. 64.60 245.35 sq.m 695.25 2640.15consisting of steel frame of M.S. channel 2"x1¼"x1/8"(50x30x3 mm), angle iron 1½"x1½"x1/8" (40x40x3 mm),M.S. plate 1'x1'x1/8" (300x300x3 mm), G.I. pipe 1½" (37mm) dia, springs 2' (600 mm) centre to centre, rollers, 24SWG G.I. covering 1 ft. x 1 ft. (300x300 mm), handles,holdfast, and painting three coats, complete in allrespects.

38 Providing and fixing M.S. angle iron 1½"x1½"x¼" Per Rft. 30.50 151.50 Metre 100.10 497.10(40x40x6 mm) edge protector nozing of steps of stairs,having holdfast or 3/8" (10 mm) dia M.S. bars 8" (200 mm)long welded at 2' (600 mm) centre to centre andembedded in cement concrete on steps, complete in allrespects.

39 Providing and fixing stair railing of 2½" (63 mm) i/d G.I. Per Rft. 172.05 739.95 Metre 564.50 2427.60 The composite rate shall bepipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars reduced or increased by Rs. 31.90

Page 158: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-25(Iron work) Page 157

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

2'-9" (838 mm) high, fixed in each step, complete in all for each foot of reduction orrespects, including painting, polishing three coats. addition in the height of the square

bars.40 Providing and fixing G.I. wire gauze 24 SWG, 12x12 Per Sft. 28.80 68.70 sq.m 310.10 739.45

meshes per square inch, fixed to steel windows or doors,etc., complete in all respects.

41 Providing and fixing steel windows with openable glazedpanels, using beam section for frame 1½"x1"x5/8"x1/8" For fixed pannels, the composite(40x25x16x3 mm), Z-section for leaves ¾"x1"x¾"x1/8" rate will be reduced by Rs.30.00(20x25x20x3 mm), T-section sashes 1"x1"x1/8" (25x25x3 per Sft. or Rs. 305.00 per Sq. mm), glass panes, wooden screed for glazing embedded metre.over a thin layer of putty duly screwed with leaves, brassfittings, holdfast, duly painted, complete in all respects,including all cost of material and labour, etc. as perapproved design and as directed by theEngineer-in-charge:-

a) without wire gauze:

i) glass pane 2 mm thick Per Sft. 73.70 338.60 sq.m 793.20 3643.20ii) glass pane 2.5 mm thick ditto 73.70 341.05 ditto 793.20 3669.80iii) glass pane 3 mm thick ditto 73.70 344.75 ditto 793.20 3709.70iv) glass pane 4 mm thick ditto 73.70 350.95 ditto 793.20 3776.20v) glass pane 5 mm thick ditto 73.70 363.30 ditto 793.20 3909.20

b) fixed with wire gauze, 22 SWG

i) glass pane 2 mm thick Per Sft. 103.95 407.10 sq.m 1118.30 4380.60ii) glass pane 2.5 mm thick ditto 103.95 409.60 ditto 1118.30 4407.20iii) glass pane 3 mm thick ditto 103.95 413.30 ditto 1118.30 4447.10iv) glass pane 4 mm thick ditto 103.95 419.50 ditto 1118.30 4513.55v) glass pane 5 mm thick ditto 103.95 431.85 ditto 1118.30 4646.55

42 Providing and fixing steel windows using M.S. sheet (16SWG) moulded tubular pipe 1½"x1½" (40x40mm) forframe and 1¼"x1¼" (30x30mm) for leaves including M.S.square bars ¼"x¼" (6x6 mm) welded around each panelof frame, 5 mm thick glass panes fixed with double M.S.square tubular pipe 3/8"x3/8" (10x10mm) (22 SWG)beading with U' shaped rubber lining, brass fitting,holdfast, including painting three coats complete in allrespects.a) For openable panels fixed with wire Per Sft. 65.15 329.05 Sq.m 701.15 3540.80

gauze 24 SWG, 12x12 mesh and glasspanes ¼" (6 mm) thick.

b) For fixed panels without wire gauze. ditto 63.00 205.95 ditto 677.90 2216.00

43 Providing and fixing windows consisting of M.S. box Per Sft. 76.05 412.95 Sq.m 818.20 4443.20section frame 2"x1½" (50x40mm), leaves frame 1-½"x1"(40x25mm) box section frame for glazing 3/8"x3/8"

Page 159: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-25(Iron work) Page 158

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

(10x10mm) using 16 SWG sheet 'U' shaped rubbersupported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"(5 mm) thick glass panes M.S. box section ½"x½"(13x13mm) of 16 SWG for fixing 24 SWG wire gauze onouter side by means of ¾"x1/8" (20x3mm) M.S. flat andscrews I/C all C.P. fitting and painting 3 coats complete inall respect.

44 Providing and fixing windows consisting of M.S. box Per Sft. 95.70 481.45 Per Sft. 1029.85 5180.65section frame 2"x1½", (50x40mm) leaves frame 1½"x1"(40x25mm) box section frame for glazing 3/8"x3/8"(10x10mm) using 16 SWG sheet 'U' shaped rubbersupported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"(5 mm) thick glass panes M.S. box section ½"x½"(13x13mm) of 16 SWG for fixing 24 SWG wire gauze onouter side by means of ¾"x1/8" (20x3mm) M.S. flat andscrews including grill of M.S. flat ½"x1/8" (13x3mm) or¼"x¼" (6x6mm) square bar with independent frame of½"x½" (13x13mm) box section of 16 SWG i/c all C.P.fitting and painting 3 coats complete in all respect.

45 Flapping G.I. pipes for bath room drains. Each 648.45 688.00 Each 648.45 688.00

46 Supply and fixing iron grating for fire place. Per Sft. 124.55 229.60 sq.m 1340.05 2470.50

47 Fixing copper flashing, including cutting of sheets, Per Lft. 54.20 Metre 177.80grooving and rivetting.

48 Providing and fixing angle iron railing, using 2½"x2½"x3/8" Per Rft. 91.00 834.10 Metre 298.55 2736.60(63x63x10 mm) angle iron post 4½" (113 mm) long, 5' to6' (1500 to 1800 mm) apart, with 2½"x2½"x3/8" (63x63x10mm) angle iron top rail, and two rows of M.S. flat 2½"x¼"(63x6 mm) including fixing to side of Bridge/structure withU.bolt 1½' (450 mm) long ¾" (20 mm) dia, painting posts,etc. complete in all respects.

49 Providing and fixing barbed wire fencing on compound 100Rft. 1962.90 10566.75 Metre 64.40 346.70wall, consisting of 1½"x1½"x3/16" (40x40x5 mm), angleiron post 3¼ ft. (990 mm) long, 5 to 6 ft. (1500 to 1800mm) centre to centre, embedded in cement concrete1:4:8, base of size 9"x9"x12" (225x225x300 mm), andthree rows of barbed wire, painting posts, etc. complete inall respects.

50 Providing and fixing barbed wire fencing on compound 100Rft. 3234.70 13580.90 Metre 106.15 445.55wall, consisting of 1½"x1½"x3/16" (40x40x5mm) angleiron post 3' (900 mm) long, 4' (1200 mm) apart embeddedin cement concrete 1:4:8 base of size 6"x6"x9"(150x150x225 mm) and 4 rows of barbed wire, includingbinding wire, painting posts, etc. complete in all respects.

Page 160: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-25(Iron work) Page 159

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

51 Providing and fixing all types of partly fixed and partly (1) Increase rate by Rs. 40.00 per openable glazed anodised bronze colour aluminium Sft or Rs.430.50 per Sq-metre ifdoors, using delux section of M/s Al-Cop or Pakistan sections thickness is 2 mm.Cables, having chowkat frame of size 40 x 100 mm (1½" x (2) Reduce rate by Rs.20.00 per Sft4") and leaf frame of 60x40mm (2½"x1½") wide sections or Rs.215.20 per Sq-metre ifincluding the cost of ¼" (5 mm) thick imported tinted sections are of dull aluminimumglass with aluminium triangular gola and rubber gasket to Per Sft 105.65 543.30 sq. m 1136.80 5845.90 shade.support the glass and leaf edging, using approved (3) Reduce rate by Rs.20.00 perstandard fittings, locks, 3" (75 mm) wide long handles Sft or Rs.215.20 per Sq-metre ifetc., and hardware any required as approved by the local glass is used.engineer in-charge.

52 Providing and fitting all types of glazed aluminium Per Sft 152.65 447.95 sq. m 1642.50 4819.95 (1) Reduce rate by Rs.20.00 per Sftwindows of anodised bronze colour partly fixed and partly or Rs.215.20 per Sq-metre ifsliding using delux sections of approved manufacturer section thickness is 1.2 mm.having frame size of 100 x 20 mm (4"x¾") andleaf frame sections of 50 x 20 mm (2"x¾"), all of 1.6mm (2) Reduce rate by Rs.20.00 per Sftthickness including 5 mm thick imported tinted glass with or Rs.215.20 per Sq-metre ifrubber gasket using approved standard latches, hardware sections are of dull aluminiumetc., as approved by the Engineer in-charge. shade.

(3) Reduce rate by Rs.20.00 per Sftor Rs.215.20 per sq-metre if localglass is used.

53

a) 1.6 mm thick Per Sft 103.60 672.45 Sqm 1114.75 7235.55b) 2 mm thick Per Sft 103.60 758.85 Sqm 1114.75 8165.25

54 Per Sft 66.60 451.90 Sqm 716.35 4862.20 i. If Brass stays will be provided, rate of Rs.20/- P.Sft will be paid.ii. For fixed pannels without guaze, reduce rate of Rs.150/- P.Sft.Iii. If box sections of 18SWG used, reduce rate of Rs. 25/- P.Sft.

Providing and fixing all types of glazed aluminium windows ofanodized champagne colour partly fixed and party sliding usingdeluxe section of approved manufacturer having Frame of size100mm x 30mm using frame at bottom, at top and side leaf leafframe sections of 60mm x 23mm at top & bottom and size 45mm x25mm at center and size 45mm x 25mm at sides, Jali leaf frame size43mm x 13mm i/c fine quality aluminum jali, 5mm thick importedtinted glass with rubber gasket using approved standard latches,wheel, stopper, brush chennel angle joint and hardware etc. completein all respect.

P/F MS box section of 16 SWG, having frames of 2” x 1-1/2” , leaveframe of T-type box section of 2”x1”x1” , with ½”x1/2” box sectionusing, U shaped rubber for fixing 5 mm thick glass panes i/c thecostof fixing of 24 SWG wire guaze on inner side by means of ½”x1/8”MS flat patti, MS grill fitted within the window frame and screwsincluding hinges, brass handles and painting 3 coats. Complete in allrespect

Page 161: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-26( Misc) Page 161

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Notice board made of cement, sand mortar 1:3. Per Sft. 70.50 80.70 Per 758.65 868.45 The board is to be of cementsq.m plaster ½" (13 mm) thick, with 2"

(50 mm) wide and 1" (25 mm) thick beading.

2 Fixing handles to iron hammers. Each 90.05 - Each 90.05 -

3 Providing and fixing barbed wire fencing, with 4 horizontal 100Lft. 7,403.90 25,709.30 L.m. 242.90 843.50 Vertical bars in straining andand 2 number cross wires fixed with posts of R.C.C., 1:2:4 stiffening posts to be 4 No. each by(straining posts 7'x9"x9" (2.13 mx225x225 mm) at 100' ½" (13 mm) dia and for(30 m) centre to centre, stiffening posts 7'x6"x6" (2.13 intermediate posts to be 4 No. ofmx150x150 mm) at 50 ft. (15 m) interval and intermediate 3/8" (10 mm) dia Stirrups for allpost 7'x5"x5" (2.13 mx125x125 mm) at 8 ft.(2.4 m) centre posts to be ¼" (6 mm) dia. at 12"to centre), including cost of steel, its fabrication and (300 mm) centre to centre.placing of steel reinforcement, eye bolts, washers, etc.complete.

Surveying

4 Supplying Bamboo Jhandies 10' to 12' (3.00 to 3.65 m) with Each 43.80 173.60 Each 43.80 173.60 iron shoes, and flags 15" (375mm) square.

5 Supplying wooden pegs for levelling, 1½" (40 mm) dia, 6" 100Nos. 144.10 161.80 100Nos. 144.10 161.80 (150mm) long.

6 Supplying wooden pegs for alignment, 2" to 3" dia (50 to 100Nos. 345.85 549.80 100Nos. 345.85 549.80 75 mm), 9" (225 mm) long.

7 Fixing enamalled iron gauges flush with masonry, including Per Lft. 81.30 90.20 Per 266.75 295.95 cost of hooks. L.M.

8 Placing boundary pillars in position, including digging pits. Each 54.20 - Each 54.20 -

9 Fixing main line type distance mark in position, including Each 238.80 422.10 Each 238.80 422.10 Composite rate does not includemaking 1:3:6 cement concrete base block, size cost of iron distance marks.14"x10"x15" (350x250x375 mm).

Hand Pumps & Pressure Pipes

10 Cutting pipes, upto 2" (50 mm) dia. Per cut 54.20 - Per cut 54.20 -

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

26. MISCELLANEOUS

Page 162: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-26( Misc) Page 162

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

11 Cutting pipe, above 2" (50 mm) dia. Per cut 98.6 0 Per cut 98.6 0

12 Threading pipe ends, 1½" (40 mm) to 4" (100 mm) dia. Each 68.60 - Each 68.60 - End End

13 Assembling 1½" (40 mm) dia pressure pipe. 100Lft. 250.90 - Per Metre 8.25 -

14 Boring and fixing 1½" (40 mm) dia pressure pipe:

a) in ordinary soil Per Lft. 88.25 - Per Metre 289.55 - b) in clay Per Lft. 173.95 - Per Metre 570.70 - c) in shingle Per Lft. 259.63 - Per Metre 851.80 -

15 Repairs to hand pump, pulling out and refitting. Per Lft. 39.10 - Per Metre 128.30 -

16 Fixing hand pump (Machine only) Each 172.90 - Each 172.90 -

Rest House Furniture & Fuel, etc.

17 Washing Niwar of bed. Per bed 571.25 606.50 Per bed 571.25 606.50

18 Washing Durries. 100Sft. 761.65 845.65 sq.m 82.00 91.05

19 Recaning chairs:

i) office chairs, single caning seat only. Each 302.60 338.35 Each 302.60 338.35 ii) office chairs, double canning seat only. Each 389.05 439.50 Each 389.05 439.50 iii) office chairs, single caning back only. Each 216.15 218.40 Each 216.15 218.40 iv) office chairs, double caning back only. Each 345.85 365.15 Each 345.85 365.15 v) easy chairs, single caning seat only. Each 216.15 264.05 Each 216.15 264.05 vi) easy chairs, double caning seat only. Each 605.20 676.65 Each 605.20 676.65 vii) easy chairs, single caning only, back and seat in one Each 864.60 1,158.75 Each 864.60 1,158.75

piece.viii) easy chairs, double caning back & seat in one piece Each 1,296.90 2,011.30 Each 1,296.90 2,011.30

or couches with caned area about 16 Sft (1.5 Sqm).

20 Making and fixing Hat pegs ordinary. Each 155.65 519.00 Each 155.65 519.00

21 Weaving charpoy. Each 562.00 - Each 562.00 -

22 Sweeping chimney. Each 126.95 128.25 Each 126.95 128.25

23 Picture railing, including making, fixing and painting. Per Lft. 44.55 112.45 Per LM 146.10 369.00

24 Cutting fuel wood, from plantation. 100Kg 170.00 - 100Kg 170.00 -

25 Splitting fuel wood. 100Kg 356.10 - 100Kg 356.10 -

Page 163: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-26( Misc) Page 163

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

26 Burning charcoal, including loading, unloading and 100Kg of 575.85 - 100Kg of 575.85 - repairing kilns. Char- Char-

coal coal

27 Filling cement bags with coal and sewing (including cost 100Cft. 1,561.35 1,564.50 cu.m 551.45 552.60 of strings).

28 Supplying manure. Cart 190.40 326.35 Cart 190.40 326.35 Capacity of cart, 20 Cft. (0.57Load Load cu.m).

29 Washing punkha frills. Each 172.90 - Each 172.90 -

30 Washing:-

a) table cloth Each 43.25 - Each 43.25 - b) napkins, dusters, etc. Each 28.80 - Each 28.80 -

31 Hoisting and placing sleepers for centring, including Each 67.95 - Each 67.95 - carriage within one chain. No. No.

32 Dismantling sleepers from centring, including stacking Each 77.45 - Each 77.45 - within one chain. No. No.

33 Dredging Sumps. Per 2,856.15 - Per 2,856.15 - Not less than five gangmen to beShift Shift employed for each shift to ensure

effective dredging.

34 Fixing `U' bolt in masonry or concrete, including levelling Each 207.55 - Each 207.55 - and tying for fixing angle iron post.

35 Bailing out water:-

a) by hand 1000 Cft. 2,284.92 - cu.m 80.70 - Rate includes cost of providingb) by pump 1000 Cft. 254.10 444.20 ditto 9.00 15.70 pump, POL and operation charges,

etc.

36 Drilling holes in R.C. Trough. Per Nos. 135.50 - Per Nos. 135.50 -

37 Supplying and laying polythene sheet over D.P.C. under The rate includes overlaps.floors and on roofs, etc.

i) 300 gauge (.003" thick) Per Sft. 1.30 2.90 sq.m 13.95 31.10 ii) 500 gauge (.005" thick) Per Sft. 2.60 3.95 sq.m 27.90 42.25

38 Laying 2" (50 mm) thick sand and bitumen carpet, on top 100Sft. 1,502.95 5,756.95 sq.m 161.70 619.45 of foundation of oil tank.

39 Cutting hole 4"x6" (100x150 mm) in stone masonry or Per 232.30 - Per 232.30 - Same rate to be paid for other typebrick wall with chisel, repairing masonry and removing Hole Hole of masonry and R.C.C. work.debris within one chain lead.

Page 164: MARKET RATES SYSTEM (MRS) - Finance Departmentfinance.punjab.gov.pk/system/files/CHAKWAL-1-18.pdfMRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL Add 20%

chapter-26( Misc) Page 164

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRCT CHAKWAL

40 Making 1½"x1½" (40x40 mm) groove in wall of stone or Per 203.30 - Per 203.30 - brick masonry in cement for fixing planks upto 9" (225 Plank Plankmm) deep.

41 Drilling holes in stone or brick masonry upto 2" (50 mm) Per hole 76.15 Per hole 30.45 dia, per inch (25 mm) depth. per inch per c.m

depth depth

42 Spraying anti-termite liquid mixed with water in the ratio of 100Sft. of 86.45 224.80 sq.m of 9.30 24.20 1:40. each each

spray spray

43 Providing and fixing barbed wire fencing, with 4 horizontaland two cross wires, with R.C.C. 1:2:4 posts, 5.5'x6"x9"(1.68mx150mmx225 mm) at 8 ft. (2.45 m) centre tocentre, reinforced with 4 No. 3/8" (10 mm) dia vertical barsand 1/8" (3 mm) dia stirrups 12" (300 mm) centre tocentre, complete in all respects.

i) without cement concrete base. 100Rft. 8,788.30 26,130.90 Per Metre 288.25 857.10 ii) in cement concrete 1:4:8 base of size 12"x12"x21" 100Rft. 9,667.75 28,614.75 Per Metre 317.10 938.55

(300x300x525 mm).