DN UP UP DN DN DN 87654321 12 11 10 9 8 7 6 5 4 3 2 1 DN 6 5 4 3 2 14 13 12 11 10 9 8 7 19 18 17 16 15 8 7 6 5 4 3 2 17 16 15 14 13 12 11 109 3 2 1 3 2 1 321 GROUND LEVEL 0 GROUND FLOOR PLAN 400 BASEMENT FLOOR PLAN -3000 FIRST FLOOR PLAN 4500 SECOND FLOOR PLAN 7695 THIRD FLOOR PLAN 11500 ROOF PLAN 15000 B C TOP OF ROOF ACCESS 17500 NAME: MARK THORNTON CLASS: DESIGN AND DETAIL 3 DATE: DRAWING NO. SCALE: CHECKED BY: ARCHITECTURAL TECHNOLOGY YEAR 3 1 : 100 KEY SECTION CURTAIN WALL CURTAIN WALL CONSTRUCTED FROM 50mm X 150mm ALUMINIUM MULLIONS @ 2000mm C/C WITH TRIPLE GLAZED GLASS PANELS WITH ARGON GAS IN CENTRE TO GET DESIRED U VALUE TO COMPLY WITH TGD PART L 600mm SPANDREL PANELS FIXED AT FLOOR INTERVALS WITH LAMATHERM FIRE STOP 1000mm X 2000mm WINDOW OPENINGS LOCATED AT EACH FLOOR TO PROVIDE VENTILATION AMBULANT DISABLES STAIRS PRE CAST CONCRETE STAIRS 1500mm WIDE WITH 300mm GOING AND 180mm RISERS STAIRS FIXED TO STRUCTURAL CONCRETE WALL WITH STEEL AND GLASS HANDRAIL BOLTED TO STAIRS STAIRS TO COMPLY WITH TGD M COLUMNS 400mm x 400mm STEEL REINFORCED CAST -INSITU CONCRETE COLUMNS AS PER STRUCTURAL ENGINEERS SPECIFICATIONS ROOF AND PARAPET 300MM CAST IN-SITU CONCRETE WITH DPM LAID UNDER 100 MM TAPERED RIGID BOARD INSULATION WITH 2 LAYERS OF TORCHED ON BITUM 2 70MM C SECTION CHANNELS WITH 400MM STEEL SHEETS FIXED EITHER SIDE FOR PARAPET WITH 100MMRIGID BOARD INSULATION WRAPPEDAROUND PARAPET DPM TO BE WRAPPED INSULATION AND OVERLAP 100MM WITH INSULATION ON THE CONCRETE WALL PARAPET FINISHED WITH ALUMINIUM CAPPING SUSPENDED CEILING SUSPENDED CEILING FIXED TO UNDERSIDE OF 300MM REINFORCED CAST IN SITU CONCRETE SLAB WITH WIRES 600X600MM CEILING TILES PLACED INTO GRID RAISED ACCESS FLOOR 192MM PEDESTALS FIXED TO 300MM REINFORCED WITH 600X600X38MM PANELS FIXED PEDESTALS TO ALLOW ACCESS CLADDING 100MM RIGID BOARD INSULATION FOR DESIRED U-VALUE TO COMPLY WITH TGD L STEEL BRACKETS FIXED TO CONCRETE WALL AND VERTICAL RAILS FIXED TO BRACKETS AND HORIZONTAL KINGSPAN BENCHMARK CARRIER RAIL FIXED TO VERTICAL RAILS 980MM AND 480MM LONG FIBRE CEMENT CLADDING FIXED TO CARRIER RAIL WITH BENCHMARK BRACKET NTS 10/03/2014 ISO Building Corner Section Detail