B-107, 1 st floor, The Great Eastern Chambers, Plot no. 28, Sector 11, CBD Belapur, Navi Mumbai- 400614. India. Telephone: + 91 22 67938365 Fax: +91 22 67938366 email : [email protected]web: www.greenshiptech.com Always with you for excellence “Marine & Offshore Engineering Consultancy Services” Details of projects completed
27
Embed
“Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
B-107, 1st floor, The Great Eastern Chambers, Plot no. 28, Sector 11,
We have carried out the project for Heli Deck modification as given below.
Analysis for new Helicopter landing requirements
Linear static analysis is concerned with the linear behaviour of the structure
under prescribed boundary conditions and statically applied loads.
This includes the calculation of displacements and stresses.
In general, the applied loads include prescribed forces and pressures
Helideck complying CAP437
HELIDECK DESIGN & ANALYSIS
A)
Ship: Mahesh 1
Client: M/s. Punj Lloyd Ltd
Class: ABS / IRS
Work : Installation of New Generators and modification in Single Line
Diagram
Year: 2013
Scope of work:
We have carried out the project for New generator Installations.
Electrical Load Analysis
Modification in Single Line Diagram
Class Approvals
Installation coordination
ELECTRICAL MODIFICATIONS
HATCH COVER DESIGN/ANALYSIS
A)
Ship : M/V Shiv Shakti”
Client : Proactive ship management
Work : Design and analysis of hatch cover
CLASS : IRS
YEAR : 2015
Scope of work:
We have provided consultation for design of hatch cover, structural
analysis and production drawings for river sea vessels operating in
Indian waterways.
o Structural analysis for hatch cover
o Structural analysis for hatch coaming
o Production drawings
o Design calculation
UPGRADATIONS:
Following vessels are upgraded for SPS Code compliance with minimum Modifications.
The vessels was technically reviewed and found satisfactory DNV /ABS/IRS class. Has been successfully operating in various parts of the globe. .
A. Ship : Olympic CanyonClient : M/s. Canyon Offshore International CorpCLASS : DNVYEAR : 2014Work : Carried out SPS and MODU compliance studies and approvals obtained with
minimum modifications on the vessel.
B. Ship : DSV Seamec-1 Client : SEAMEC Ltd. CLASS : IRS/DNVYEAR : 2014Work : Carried out SPS compliance studies and approvals obtained with
minimum modifications on the vessel.
C. Ship : M. V. SAGA Client : ABS Marine Services Pvt. Ltd. CLASS : IRSYEAR : 2013Work : Carried out SPS compliance studies and approvals obtained with
minimum modifications on the vessel.
SPS / MODU COMPLIANCES:
A. Ship : “Madhwa”
Client : Punj Lloyd Ltd.
Details : Mooring Analysis as per Noble Denton
guidelines for project under Saudi Aramco.
B. Ship : M/V “SEAMEC PRINCESS”
Client : Seamec Ltd.
Details : Feasibility of design of New Mooring installations
C. Ship : Malaviya 3
Client : Great Offshore Ltd.
D. Ship : Scanlay-1
Client : Great Waters Maritime L. L. C
SCOPE OF WORK :
Mooring Analysis of All Offshore Support vessels as per applicable codes
Codes:
API RP2 SK (American Petroleum Institute - Recommended Practices for
Design and Analysis of Station Keeping Systems for Floating Structures
MOORING ANALYSIS
A)
Ship : C/ S TELIRI
Client: M/s IMPAC Offshore Engineering, Germany
Scope of work:
Static Analysis for Cable lay operation required for 12 nos ONGC platforms in
western offshore, India.
The Objective of the analysis & report is to define an appropriate layback range
for all segments in which normal cable laying safely take place using Cable Lay
Vessel TELIRI.
CABLE LAY ANALYSIS
FINITE ELEMENT ANALYSIS/CRANE FOUNDATION DESIGN/ PRODUCTION
DRAWING
We undertake complete structural design and FEM Analysis for all Marine and
offshore structures.
Scope of work:
A. Ship: DSV Seamec-I
Client: Seamec ltd
Work -Pedestal crane foundation analysis
-Capstan foundation analysis
-Boom rest design analysis
-Tugger winch foundation analysis
FINITE ELEMENT ANALYSIS
B. Ship : Barge “MADHWA”
Client : Punj Lloyd, Mumbai
Work : 500 T heavy lifting cane foundation design
Boom rest Foundation Analysis
FINITE ELEMENT ANALYSIS……Contd.
C. Ship: M. V. Seamec Princess
Client: SEAMEC Ltd.
Work: Capstan foundation Analysis
D. Ship: Malaviya 29
Client: Great Offshore Ltd.
Work: Deck strength analysis for ROV Platform
. E. Ship: M/v Malavika-3
Client: Great Offshore LTD.
Work: Pedestal crane foundation Analysis
FINITE ELEMENT ANALYSIS……Cont.
DAVIT ANALYSIS/ FOUNDATION DESIGN/ STABILITY ANALYSIS/
PRODUCTION DRAWING
We have undertaken the complete feasibility study, FEM analysis, and production
drawing of foundations for DAVITS and ROV installation.
A. Ship : Mahesh 1
Client : Punj Lloyd Ltd.
Work : Rescue boat davit installation
B. Ship : Dona Paula 2
Client : Amba Shipping & Logistics Pvt. Ltd.
Work : Davit Study
C. Client : Cargo Gear Services Pvt ltd.
Work : Davit Analysis
Scope of work:
Pedestal strength verification
Detail drawing of pedestal and slewing arrangement
Detail drawing of davit boom and column
DAVIT ANALYSIS/ FOUNDATION DESIGN
Ship: Seamec-I
Client: SEAMEC LTD.
Class DNV/IRS
Scope of work:
We have undertaken the analysis of Ship motion response amplitude operators.
Which is a functions that give the amplitude of oscillating motion of the ship in a
regular way of unit amplitude..
Response amplitude operator (RAO) that give the amplitude of oscillating motion