ADDRESS A ctive D istribution network with full integration of D emand and distributed energy RES ource S. http://www.addressfp7.org. Marina Lombardi, Enel Distribuzione [email protected]. National Town Meeting on Demand Response and Smart Grids 13-14 July 2009. active demand. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ADDRESS Active Distribution network with full integration of Demand and distributed energy RESourceS
National Town Meeting on Demand Response and Smart Grids13-14 July 2009
active demand
http://www.addressfp7.org
2
National Town Meeting, Washington DC, 13-14 July 2009
The ADDRESS project
The project ADDRESS
A large-scale, EU 7° Framework Programme, Integrating Project
To enable the active participation of domestic & small commercial consumers to the power system markets and the provision of services to the different
participants
started on June 1st 2008
lasts 4 years (2008 – 2012)
total budget 16 M€, EC financing 9M€
ENEL DISTRIBUZIONE is the COORDINATOR
CONSORTIUM of 25 partners from 11 European countries
3
National Town Meeting, Washington DC, 13-14 July 2009
The ADDRESS project
The Consortium
A multidisciplinary group including: Research centres Distribution and Transmission Operators Energy supply and retail companies Electric equipment manufacturers Home appliances and white goods manufacturers Communication equipment and ICT solutions providers
Utilities30%
Manifacturers
30%Research and universities
40%
Experience Knowledge
Competence
4
National Town Meeting, Washington DC, 13-14 July 2009
The ADDRESS project
The Objectives
Develop technical solutions for consumers premises & for the power system
Propose recommendations and solutions to remove the possible barriers
Identify the potential benefits for the stakeholders
Develop appropriate markets and contractual mechanisms
Validate most promising solution in 3 complementary test sites
Conduct dedicated dissemination activities for the stakeholders
Study of accompanying measures to deal with societal, cultural, behavioural aspects
ENABLE ACTIVE DEMAND
EXPLOIT THE BENEFITS
VALIDATE THE RESEARCH
DISSEMINATE THE RESULTS
5
National Town Meeting, Washington DC, 13-14 July 2009
The ADDRESS project
MethodologyWP8 – ENEL DISTRProject Management
WP4 – ABBCommunication architecture for smart grids
with active demand
WP1 – EDFConcepts, Requirements and Scenarios
WP2 – IBEDROLAMetering, DSM, DER
flexibility management
WP3 – ENEL DISTRActive grid operation
WP6 – KEMAField testing for validation of most promising solutions and project outcomes assessment
WP5 –UNIMAN
Acceptance and benefits for the users
WP7 – CASSINODissemination and exploitation of the results
WP8 – ENEL DISTRProject Management
WP4 – ABBCommunication architecture for smart grids
with active demand
WP1 – EDFConcepts, Requirements and Scenarios
WP2 – IBEDROLAMetering, DSM, DER
flexibility management
WP3 – ENEL DISTRActive grid operation
WP4 – ABBCommunication architecture for smart grids
with active demand
WP1 – EDFConcepts, Requirements and Scenarios
WP2 – IBEDROLAMetering, DSM, DER
flexibility management
WP3 – ENEL DISTRActive grid operation
WP6 – KEMAField testing for validation of most promising solutions and project outcomes assessment
WP5 –UNIMAN
Acceptance and benefits for the users
WP7 – CASSINODissemination and exploitation of the results