Top Banner
MAREC 1 10-03-2014 MAREC provides instruments and concepts for sustainable mining through the entire mining life cycle. 2 Reference projects Mining 10-03-2014
18

MAREC references mining 10-03-14 [Compatibiliteitsmodus] · Executed by MAREC partner: Witteveen+Bos Associated partners: IC Consulenten ZT, S&E Consulting engineers Client: UNDP

Jul 07, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • MAREC

    110-03-2014

    MAREC provides instruments and concepts for sustainable mining through the entire mining life cycle.

    2

    Reference projects Mining

    10-03-2014

  • 3

    Mine Closure ENCI Pit Maastricht Nl

    Executed by MAREC partner: Witteveen+Bos

    Client: Heidelberg Cement - ENCI

    Description:

    • Closure of 130 hectares open chalk pit mine

    • Transformation into natural area, leisure and innovative business park

    Services provided:

    • Project management and financial planning

    • Stakeholder participation

    • Post closure landscaping and ecological design

    4

    Portuario – Puerto Busch project

    (PVPMMPB) Bolivia

    Executed by MAREC partner: Witteveen+Bos

    Associated parties: DHV

    Client: Bolivian Ministry of Public Works, Services and Housing

    Description:

    • Transport study between Mutun- iron ore area and existing infrastructure

    • Tender documentation for selected transport means

    • Assessment of environmental feasible solutions

    Services provided:

    • Advice on feasibility study, ecological and hydrological situation

    • Design review, review environmental impact assessment

  • Executed by MAREC partner: Witteveen+Bos

    Client: Solidaridad – Aqua4All

    Description:

    • Study on the possible negative impacts of the Marlin Gold Mine in Guatemala

    Services provided:

    • Desk study on hydrological and environmental aspects

    • Desk study on dam stability

    5

    Environmental aspects Marlin Mine

    Guatemala

    Executed by MAREC partner: Witteveen+Bos

    Associated parties: Fichtner FME (De)

    Client: Kazakhmys Services Ltd.

    Description:

    • Feasibility study on re-opening the abandoned Konraud Copper mine

    Services provided:

    • Review of mining plan

    • Field assessment

    • Financial study (cost price assessment, risk assessment, multi variable analyses)

    6

    Re-opening Konraud mine Kazakhstan

  • Executed by MAREC partner: Witteveen+Bos

    Client: Fundacja Greenpeace Poland

    Description:

    • Study on the hydrological effects of closing the Tomislawice lignitemine near lake Lubstwoski Poland (Nature 2000 area)

    Services provided:

    • Hydrologeological review and assessment, including water balance and development of surface water (SOBEK) and groundwater modeling (MODFLOW)

    • Recommendations for closing

    7

    Tomislawace Lignite Mine Poland

    Executed by MAREC partner: Witteveen+Bos

    Associated partners: AEA/CE-Delft (European study), Fugro/Arcadis Dutch study

    Client: European Union, Ministry Economic affairs

    Description:

    • Study on the effects of shale and coal gas production

    Services provided:

    • Geological, geohydrological, geomechanical assessment

    • Effect studies on seismic activity, noise, ecology etc.

    • Assessment of legal aspects

    8

    Impact studies on shale and coal gas

    production

  • Executed by MAREC partner: Witteveen+Bos

    Associated partners: IC Consulenten ZT, S&E Consulting engineers

    Client: UNDP

    Description:

    • Assessment of 26 hot spot areas

    • Half of the sites involved (former) mining sites, including Rehove copper mine, Perrenjas, Bulquize mine, Guri Kuq tailing dam and Elbasan and Burel ferrochrome smelters

    Services provided:

    • Site investigation, risk assessment

    • Development of prioritising tool, prioritising

    • Assessment of remedial options

    9

    Albanian Hot Spot Study

    10

    Rehabilitation of 3 Serbian sites

    Executed by MAREC partner: Witteveen+Bos

    Associated partners: NIRAS, REC

    Client: EU agency for Reconstruction

    Description:

    • Assessment and ranking of hot spots in Savah river area, including Cupper Mines of Bor, Majdanpek and Rudnik

    • Preparation of remedial action plans for three sites including the Bor mining area

    Services provided:

    • Site investigation, risk assessment,

    • Feasibility studies, remedial action plans, cost estimates

    • Stakeholder involvement

  • Executed by MAREC partner: Witteveen+Bos

    Associated partners: Medusa, Tauw, Fugro

    Client: Province of Brabant (ABdK)

    Description:

    • Assessment of 1,100 km of tailing ore (zinc) roads by using innovative investigation techniques

    • Based on results, risk assessment and cost estimates the various sites were ranked for remediation

    Services provided:

    • Site investigations, risk assessment

    • GIS-database

    • Development of remedial strategy

    11

    Zinc ash project Campina Region

    12

    Bor Serbia Rehabilitation project

    Executed by MAREC partner: Witteveen+Bos

    Associated partners: REC, Dvokut ECRO, Energoproject-hydroengineering

    Client: Ministry of Environment and Spatial Planning Serbia

    Description:

    • Rehabilitation of the Bor mining area (in total 4,000 ha.), including tailing ponds, tailing dams

    Services provided:

    • Various studies (environmental, geohydrological, geotechnical, etc) remedial plans, preparation of remedial tender documents

    • Landscaping

    • Permitting, stakeholder involvement, training etc.

  • 13

    Arsenic mine waste project Georgia

    Executed by MAREC partner: Witteveen+Bos

    Associated partners: CENN, Balast Nedam

    Client: Dutch gouvernament (EVD Netherlands, PSO environment)

    Description:

    • Former arsenic mining area, still containing large deposits and waste sites for toxic Arsenic. Waste materials must be isolated in order to protect humans and environment

    Services provided:

    • Site investigations, risk assessment

    • Design of containment options

    • Stakeholder involvement

    14

    Case study mining on Romang Island

    Indonesia

    Executed by MAREC partner: Witteveen+Bos

    Associated partners: Saxion highschool

    Client: Nuffic

    Description:

    • At Roman Island a program is currently under way to develop mining activities. Gold and other minerals are present

    Services provided:

    • Course on the use of GIS and remote sensing for sustainable mining development

  • Executed by MAREC partner: Eijkelkamp Agrisearch Equipment

    Client: Les Carrières du fond des vaulx

    Description:

    • Minimize effects of mining activities

    • Protection of nature

    Services provided:

    • Project management and installation of groundwater

    monitoring network (GPRS & webapplication)

    Groundwater monitoring network

    Belgium

    15

    16

    Monitoring equipment & services

    Botswana

    Executed by MAREC partner: Eijkelkamp’s distributor in Botswana

    Associated partners: Aridus Hydro Geotechnik

    Client: Jwaneng diamond mine

    Services provided:

    • Supply & installation of geotechnical instrumentation for monitoring & plant infrastructure

  • Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)

    Client: PT Weda Bay Nickel

    Description:

    • Grade control drilling for nickel in laterite and saprolite formation

    Services provided:

    • Sampling for construction materials such as e.g. gravels and sands

    • Drilling small diameter water wells for local municipalities

    Grade control drilling, Indonesia

    17

    Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)

    Client: Minatura Colombia

    Description:

    • Grade control drilling for gold in alluvial deposits, large diameter samples up to 45 meters in old tailings and virgin material

    Services provided:

    • Installation of monitoring pipes to measure ground water fluctuation

    Grade control drilling, Colombia

    18

  • Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)

    Client: Boskalis, Surinam

    Description:

    • Comprehensive training for grade control drilling for Bauxite deposits, sampling in hard and soft formations with 99 % recovery and high

    production per day

    Services provided:

    • Blast hole drilling and dewatering wells

    Bauxite deposits, Surinam

    19

    Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)

    Client: GEMM

    Description:

    • Grade control drilling for titanium sands

    • high production per day and 99 % recovery in saturated sands

    • Installation of water wells, monitoring wells

    Grade control drilling, India

    20

  • Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)

    Client: Guinea titanium

    Description:

    • Accurate sampling of off shore and ocean elements for grade control drilling

    • Soft sediment sampling with SSD patented AquaLock sampler up to 40

    meters deep. 100 % determination of mineral deposits instead of dredging itall

    River and off shore titanium sampling

    21

    Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)

    Client: BMP Indonesia

    Description:

    • Sampling of soft mineral sands in jungle

    • Low footprint rig to avoid damage to surroundings

    • Installation of water wells for local villages

    Soft mineral sands

    22

  • Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)

    Client: Ural Platinum

    Description:

    • Grade control drilling for platinum in the far East in arctic conditions

    • Accurate sampling to allow accurate land stripping instead of 100 %

    excavating

    Grade control drilling Russia

    23

    Executed by MAREC partner: Eijkelkamp Agrisearch

    Client: Ministry of Water

    Description:

    • Groundwater basic investigation with waterloggers in 162 cities in order to manage water

    Groundwater basic investigation Korea

    24

  • Environment-friendly cutter

    25

    Executed by MAREC partner: IHC

    Client: Government of Hungary

    Description:

    • Removal of a thin polluted silt layer in a lake in Hungary

    Services provided:

    • Design of an environment-friendly cutter, which can remove the polluted silt layer without polluting the lake

    Environment-friendly jig

    26

    Executed by MAREC partner: IHC

    Client: Dutch government

    Description:

    • Improving the cleaning of contaminated material by using special jigs

    Services provided:

    • Development of a new method of jigging for the cleaning of contaminated material

  • Dust prevention for coal transport

    27

    Executed by MAREC partner: IHC

    Client: Port of Rotterdam

    Description:

    • Development of alternative coal handling and transport methods, aimed at prevention of dust and sound pollution of coal transport by using slurry

    transport instead of a belt conveyer

    Services provided:

    • Conceptual development on the hydraulic transport of coal for harbor terminals

    Domingas Project

    28

    Executed by MAREC partner: IHC

    Client: Mineraçao Rio Novo

    Description:

    • Assessment of minimized-impact mining methods for a diamond and gold mine in Brazil

    Services provided:

    • Planning and control of the tailings

    • Development of a sustainable dredge mining method

    • Resulting in mitigating measures and efficient method

  • Mining of diatomite in Iceland

    29

    Executed by MAREC partner: IHC

    Client: Mining company in Iceland

    Description:

    • Feasibility study on the mining of diatomite with minimized impact of the top biolayer

    Services provided:

    • Environmental Impact Assessment of the potential mining operation

    • Study on how to minimize impact on the top most sediment layer

    • Extensive tests on laboratory scale

    Dredge mining of Chalk

    30

    Executed by MAREC partner: IHC

    Client: Holcim

    Description:

    • Evaluation of the possibilities to extend mine life of chalk quarry in Germany

    Services provided:

    • Study on the feasibility of using dredge mining equipment for the mining of chalk

    • Tests for the behavior of dredged chalk during transport

    • Providing a possible sustainable solution to prevent environmental impact

    on sensitive marshlands

  • Grensmaasproject

    31

    Executed by MAREC partner: IHC

    Client: RWS – directie Limburg

    Description:

    • Mining and processing of sand and gravel for the ‘grensmaasproject’, in a challenging environmental framework

    Services provided:

    • Study on different ways to mine and process the sand and gravel

    • Incorporation of environmental boundary conditions in the process design

    Dry to wet mining operation

    32

    Executed by MAREC partner: IHC

    Client: Millennium Inorganic Chemicals

    Description:

    • Changing a heavy minerals mine in Brazil from dry mining methods to a wet mining operation, increasing the lifetime of the mine with >10 years

    Services provided:

    • Evaluation of wet mining methods

    • Water management

    • Tailings management

    • Training of personnel

  • Rehandling of tin tailings

    33

    Executed by MAREC partner: IHC

    Client: Minsur SA

    Description:

    • Rehandling of tin tailings in Peru

    Services provided:

    • Study on the possibility of tailings rehandling with a dredge mining option

    Gold mining in Colombia

    34

    Executed by MAREC partner: IHC

    Client: Mineros de Antioquia

    Description:

    • Improvement of gold dredge mining process efficiency by the introduction of dedicated clay overburden stripping dredgers

    Services provided:

    • Evaluation of mining process optimisation

    • Design of an overburden dredger

    • Training of personnel

    • Study on the reclamation of the land

  • 35