1 MARDIGU WOWIEK PRASANTYO PROFILE
1
MARDIGU WOWIEK PRASANTYO
PROFILE
2
FORMAL EDUCATION• BachelordegreeSFSUSanFransiscoStateUniversity,
MasterAppliedPsychologyinCriminalmind&ForensicInvestigators
PROFESIONAL WORKING EXPERIENCE• PaninBank,TreasuryManager1990-1993
• PTMegasinoInvestama,Director1993-1999
• Interogatordaninvestigatorforextraordinarycrime(esp:teroris)2006-2011
• MengajardisekolahtinggiIntelegenNasional,Sandha,,BIN,BAIS–Present
• KEINPokjaenergy2015-Present
• StafahliAnstraKemenhan–2015-Present
BUSINESS EXPERIENCE• Owner&founderPTTitisSampurnaOil&Gascompany(sold)
• Owner&FounderPTLakselcompany
• Owner&FounderPTCiptalintangInvestmentcompany
• Owner&FounderPTNarapatihInspiratamaBusiness
• ConsultantCompany
MARDIGU WOWIEK PRASANTYO
3
COMPANY OvERvIEW
4
MAjOR ExPERIENCES IN GAS PIPELINESEast Java Gas Transmission System O&M (1997 – 2007)
• ActingasanOperationsandMaintenance(“O&M”)contractorforPERTAMINAfora440kmgaspipeline(28”onshore&offshore),fromPagerunganIslandtoGersikwith200MMSCFDGasFlowRate.
• Pipelinecapacity:600mmscfdwithSCADAcontrolsystem
5
Grissik - Duri Gas Transmission System O&M (1997 – 2003)
• InCooperationwithNovaTransCanadaPipelines,TitisSampurnaactingasanO&McontractorforPTPerusahaanGasNegara(PGN)for536km28”gaspipeline,fromGrissiktoDuri(CentralSumatera)with310MMSCFDGasFlowRate.
6
West Natuna to Singapore Gas Transmission System (2000)
Supervision,VerificationandCertificationofEPCandOffshorePipelineInstallationandTestingfor656Km28”,22”,16”and15”gaspipeline.ThePipelineisacross-borderbetweenIndonesiaandSingaporestartfromBlockB-Conoco,BlockA–Premier,BlockKakap–Gulf(Indonesia)toSakraIsland(Singapore).
West Natuna to Malaysia Gas Transmission System (2001)
Supervision,VerificationandCertificationofEPCandOffshorePipelineInstallationandTestingfor135Km
12”,14”,18”gaspipeline.ThePipelineisacross-borderbetweenIndonesiaandMalaysiastartfromKijingField-KeongField–HangtuahPlatform(Conoco-Indonesia)toDuyongCentralProcessingPlatform(Petronas-Malaysia)
7
KM 53 - Bontang Gas Transmission System (Start 2000), Own Investment
• Theproject(BOO)comprisesofa13km20”gaspipelineinBontang,EastKalimantanincludingsupportingfacilitieswith165–300MMSCFDgasflowrate.
• ThegasissuppliedbyPERTAMINAandconsumedbyMitsuiandMitsubishi(AmmoniaPlant).
• EPCweredonebyTitisSampurna
8
Sub-sea Control System Project Pagerungan Block C, ARCO (1995 – 1996)
• EngineeringDesign,Fabrication&InstallationoftheSub-seaControlSystemandassociatedequipmenttotheexistingPagerungan-CFacility,includingtheinterfaceswithexistingFacilities.
• TheWorkincludingtheonshoreandoffshoreequipmentsuchas:Sub-seaControlSystem,ChemicalInjectionSystem,Sub-seaServiceUmbilicals,Sub-seaVenturiMeter
MAjOR ExPERIENCES IN ENGINEERING & CONSTRUCTION
9
Poleng Gas Field Re-activation Project, East Java (1996 - 1999) • AnEPCandturnkeyprojectforre-activating
andenhancingoffiveoffshore’wellsnamePolengFieldofKODECOEnergy.
• ScopeofWork:DetailedEngineer,Fabricate,Install,Hook-upandpre
commissionthenewfacilities
Kamojang Geothermal Power Plant• FrontEndEngineeringDesign(FEED)2004
Lahendong Geothermal Power Plant• FrontEndEngineeringDesign(FEED)2005
• ProjectManagementConsultant2006
10
3 X 1500 HP Gas Compressors & Dehydration Unit
4 X 1500 HP Gas Compressors & Dehydration Unit
AIR SERDANG
LIMAU TIMUR
BERINGIN
Project Location
27.5 km 10” Gas Pipeline14 MMSCFD Flowrate
32.5 km 8” Gas Pipeline22 MMSCFD Flowrate
LPG Plant (200 MTD LPG, 1500BBLD Condensate) & CO2 Removal
PROjECT LOCATION
Prabumulih
11
south sumatera GAS UTILIZATIONGas Transmission System- 60 km
Gas Compressor Stations - 7 x 1500 hp
Gas Extraction Facility (36 MMSCFD Feed Natural Gas)
• CO2Removal
• LPGPlant(200MTDLPG,1500BBLDStabilizedCondensate)
12
LImau tImur LPG ExTRACTION PLANT + CO2 REMOvAL
13
BLORA
REMBANG
PATI
KUDUS
CEPU
SURABAYA
Semanggi Gas Field
1- 5 mmscfd
82 km from Mother Station
97 km from Mother Station
CNG Mother Station
DEMAK
120 km from Mother Station
SEMANGGI BLOCK, cEntRaL javaFlaredGasUtilizationForCNGBusiness
14
CNG FACILITIES, centraL java
15
GAS SUPPLY TO TAMBAK LOROK CCGT POWER PLANT centraL java
Investmentof140km20
gaspipelinewith6,000hp
compressorsfromgundiharea
totambaklorokpowerplant,
centraljava
16
GAS LOCATION
Proposed 20” 130km Gas Pipeline
Gas Compressor Station
Gas Delivery Point
Gas Receiving Station
PROjECT LOCATION
17
arra amanDaru hoteL cePu
18
arra LemBah PInus hoteL cILoto PuncaK
19
nusa PenIDa crYstaL BaY
20
area 247 KetaPanG BanYuWanGI
21
stay cOnnEctEd
fb.com/wowiek
mardiguwp
mardiguwp
23
WWW.cyROnIUM.cOM