I I . I I FILE COP Y (BCM] BCM Engineers Engineers, Planners , Sc ientists and Laboratory Services One Plymouth Meet ing • Plymouth Meeting, PA 19462 • (215) 825·3800 March 23, 1990 Ms. Lynne Fratus Rhode Island Superfund Sect ion U.S. Environmental Protect ion Agency Region 1 John F. Kennedy Federal Building (Mail Code HSV CAN3) Boston, Massachusettes 02203-2211 Subject: Western Sand and Gravel Site Groundwater Feasibility Study BCM Project No. 00-4907-27 Dear Ms. Fratus: On behalf of our client, Olin Corporation, please find enclosed for your review and approval the alternative screening results and 1ist of alter - natives for detailed review for the above subject site. Very truly yours, Roy C. Peterson, P. E. Project Manager /cs 05800 Enclosures cc: W. Angell, Rhode Island R. McCaleb, Olin S. Helbig , BCM ----------Int egrity and Qual ity si nce 1 890----------
11
Embed
March 23, 1990 Ms. Lynne Fratus Rhode Island Superfund ... · Boston, Massachusettes 02203-2211 . Subject: Western Sand and Gravel Site Groundwater Feasibility Study BCM Project No.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
One Plymouth Meeting • Plymouth Meeting, PA 19462 • (215) 825·3800
March 23, 1990
Ms. Lynne Fratus Rhode Island Superfund Sect ion U.S. Environmental Protect ion AgencyRegion 1 John F. Kennedy Federal Building(Mail Code HSV CAN3)Boston, Massachusettes 02203-2211
Subject: Western Sand and Gravel Site Groundwater Feasibility StudyBCM Project No. 00-4907-27
Dear Ms. Fratus:
On behalf of our client, Olin Corporation, please find enclosed for yourreview and approval the alternative screening results and 1ist of alter natives for detailed review for the above subject site.
Very truly yours,
Roy C. Peterson, P. E. Project Manager
/cs 05800 Enclosures cc: W. Angell, Rhode Island
R. McCaleb, Olin S. Helbig, BCM
----------Integrity and Quality since 1890---------
I II I
cf
(E30V1) OLIN WESTERN SAND AND GRAVEL SITE
FEASIBILITY STUDY ALTERNATIVES FOR DETAILED ANALYSIS
1. No further action. groundwater monitoring.
2. Use restrictions for future residences. groundwater monitoring.
3. A 1 ternate water supp1y for future residences. groundwater monitoring.
4. Groundwater collection <extraction wells>. onsite treatment <solids removal/precipitaton. biological. stripping. carbon adsorption>. discharge to local surface water. groundwater monitoring. use restrictions/alternate water supply.
5. Groundwater collection <extraction wells>. onsite treatment (solids removal/precipitation. biological. stripping. carbon adsorption).. discharge to groundwater <injection wells>. groundwater monitoring. use restrictions/alternate water supply.
6. Groundwater collection <extraction wells>. ons1te treatment (solids removal/precipitation. biological. stripping. carbon adsorption>. discharge to local POTH. groundwater
·monitoring. use restrictions/alternate water supply.
7. Groundwater collection <extraction wells>. offsite treatment (local POTH), groundwater monitoring. use restrictions/alternative water supply.