Chapter 9 Design for Supply Chain Management

Page 2: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -2

The Manufacturing Environment

• Rapid Changes– New products rapidly introduced– Short, unknown product life cycles

• High Variety of Products

• Long Production Lead Times

• Increasing storage and transportation costs

• Difficult to forecast demand

Page 3: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -3

The Goals of the Manufacturing Organization

• Responsiveness

• Competitive pricing

• Efficiency

• Customer service

Page 4: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -4

Why Do These Goals Conflict?

• Forces for keeping low inventory– inventory expensive– low salvage values

• Forces for keeping high inventory– long lead times – customer service is important– demand is hard to predict– reduction in transportation quantity

Page 5: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -5

Design For Logistics

• Product and process design key cost drivers of product cost

• Design for Manufacturing used design to decrease manufacturing costs

• Major supply chain costs include transportation costs, inventory costs, distribution costs

Page 6: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -6

Design For Logistics

• Design for Logistics uses product design to address logistics costs

• Key Concepts of Design for Logistics– Economic packaging and transportation– Concurrent/Parallel Processing– Standardization

Page 7: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -7

Economic Transportation and Storage

• Design products so that they can be efficiently packed and stored

• Design packaging so that products can be consolidated at cross docking points

• Design products to efficiently utilize retail space

Page 8: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -8

Examples

• Ikea – World’s largest furniture retailer– 131 stores in 21 countries– Large stores, centralized manufacturing,

compactly and efficiently packed products

• Rubbermaid– Clear Classic food containers - designed to fit

14x14” Wal-Mart shelves

Page 9: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -9

Concurrent/ Parallel Processing

• Objective is to minimize lead times• Achieved by redesigning products so that

several manufacturing steps can take place in parallel

• Modularity/Decoupling is key to implementation

• Enables different inventory levels for different parts

Page 10: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -10

The Network Printer Example

Stage 1(Europe) Stage 2 +

Integration (Far East)

Customer(Europe)

Board Printer

Stage 1(Europe)

Integration (Europe)

Customer(Europe)

Board

Printer

Plastics, motors, etc.

Stage 2(Far East)

Page 11: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -11

Standardization

• Shortening lead times is not always possible

• How else can inventory levels be reduced and forecast accuracy improved?

• Standardization of products and processes– Product commonality– Process commonality

Page 12: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -12

Modularity in Product and Process

• Modular Product:– Can be made by appropriately combining the different

modules– It entails providing customers a number of options for

each module

• Modular Process: – Each product undergo a discrete set of operations

making it possible to store inventory in semi-finished form

– Products differ from each other in terms of the subset of operations that are performed on them

Page 13: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -13

Modularity in Product and Process

• Semiconductor wafer fabrication is modular since the type of chip produced depends on the unique set of operations performed

• Oil refining is not modular since it is continuous and inventory storage of semi-finished product is difficult

Page 14: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -14

Modularity in Product and Process

• Are modular products always made from modular processes?

Page 15: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -15

Modularity in Product and Process

• Modular products are not always made from modular processes– Bio-tech and pharmaceutical industries make

modular products but use non-modular processes; many products are made by varying the mix of a small number of ingredients

Page 16: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -16

Types of Standardization

• Part Standardization– Common parts are used across many processes

– Product redesign might be necessary

• Process Standardization– Standardizing as much of the process as possible,

making a generic or family product

– Delaying differentiation

– Called “Delayed differentiation”, “Postponement”

Page 17: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -17

Postponement: Example

• Demand for black t-shirts– 50% probability 100– 50% probability 200

• Same for white t-shirts• Production alternatives

Produce 150 of each color ahead of timeProduce 300 which can be dyed after demand is

observed

Page 18: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -18

Postponement: Example

First Alternative– 25% probability -- short 50 of each

– 25% probability -- extra 50 of each

– 50% probability -- short 50 of one, extra 50 of the other

Second Alternative– 25% probability -- short 50 of each

– 25% probability -- extra 50 of each

– 50% probability -- no shortage or extra

Page 19: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -19

Postponement: Key Concepts

• Delay differentiation of products in the same family as late as possible

• Enables the use of aggregate forecasts• Enables the delay of detailed forecasts• Reduces scrapped or obsolete inventory,

increases customer service• May require new processes or product

design with associated costs

Page 20: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -20

Postponement Considerations

• Tradeoff increased product cost with decreased inventory

• Need to decide where to postpone - the push-pull boundary

• Position in product lifecycle is factor in postponement strategies

• Inventory value may increase• Consider tariffs and duties

Page 21: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -21

Hewlett-Packard: LaserJets

• LaserJets are manufactured in Japan

• Previously, the printers had two different power supplies (110, 220 volts)

• Differentiation had to happen immediately

• An improved design enables a single power supply to work for both voltages.

• 5% Cost Savings

Page 22: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -22

Hewlett-Packard Disk DrivesManufacturing Process Redesign

• HP’s disk drive division supplied several customers

Customer 1

Customer 2

Customer 3

PCB Insertion

tests

Customer 1

Customer 2

Customer 3

PCB Insertion

tests

CouponInsertion

common tests

PCB insertion postponed

Page 23: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -23

Benetton Background

• A world leader in knitwear• Massive volume, many stores• Logistics

– Large, flexible production network

– Many independent subcontractors

– Subcontractors responsible for product movement

• Retailers– Many, small stores with limited storage

Page 24: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -24

Benetton Supply Cycle

• Primary collection in stores in January– Final designs in March of previous year– Store owners place firm orders through July – Production starts in July based on first 10% of orders– August - December stores adjust orders (colors)– 80%-90% of items in store for January sales

• Mini collection based on customer requests designed in January for Spring sales

• To refill hot selling items– Late orders as items sell out– Delivery promised in less than five weeks

Page 25: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -25

Benetton Flexibility

• Business goals– Increase sales of fashion items

– Continue to expand sales network

– Minimize costs

• Flexibility important in achieving these goals– Hard to predict what items, colors, etc. will sell

– Customers make requests once items are in stores

– Small stores may need frequent replenishments

Page 26: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -26

It is hard to be flexible when...

• Lead times are long

• Retailers are committed to purchasing early orders

• Purchasing plans for raw materials are based upon extrapolating from 10% of the orders

Page 27: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -27

BenettonOld Manufacturing Process

Spin or Purchase Yarn

Dye Yarn

Finish Yarn

Manufacture Garment Parts

Join Parts

Page 28: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -28

BenettonNew Manufacturing Process

Spin or Purchase Yarn

Manufacture Garment Parts

Join Parts

Dye Garment

Finish Garment

This step is postponed

Page 29: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -29

Benetton Postponement

• Why the change?– The change enables Benetton to start manufacturing before color

choices are made• What does the change result in?

– Delayed forecasts of specific colors– Still use aggregate forecasts to start manufacturing early– React to customer demand and suggestions

• Issues with postponement– Costs are 10% higher for manufacturing– New processes had to be developed– New equipment had to be purchased

Page 30: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -30

Procurement Standardization

• Consider a large semiconductor manufacturer– The wafer fabrication facility produces highly customized

integrated circuits– Processing equipment that manufactures these wafers are

very expensive with long lead time and are made to order– Although there is a degree of variety at the final product

level, each wafer has to undergo a common set of operations

– The firm reduces risk of investing in the wrong equipment by pooling demand across a variety of products

Page 31: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -31

Product Standardization

• Downward Substitution– Produce only a subset of products (because

producing each one incurs high setup cost)– Guide customers to existing products– Substitute products with higher feature set for

those with lower feature set– Which products to offer, how much to keep,

how to optimally substitute ?

Page 32: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -32

A Framework for Standardization

Modular

Non-Modular

Non-Modular Modular

Leverage equipment and partcommonality across products

Carry a limited number of products in inventory

Maximize component commonality across products

Delay customization as late as possible

Page 33: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -33

HP DeskJet Case: Background

• High volume, high speed manufacturing in Vancouver• Many different models, all completed in Vancouver• Three distribution centers

– North American– Asian– European

• Manufacturing time one week• Transportation lead times:

– Europe: 4-5 weeks– US

• At distribution centers, simple standardized process

Page 34: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -34

HP DeskJet Case: Analysis

• Problems– High inventory levels– Inventory imbalance in Europe

• Causes– Uncertainty about correct inventory levels– Many geographic options (localization)– Long lead times– Uncertain market– Difficulty at getting divisions to work together

• What are HP’s options?

Page 35: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -35

HP DeskJet Case: Options

• Short Term– Rationalize safety stock

• Long Term– Air shipment– European factory– More inventory– Better forecasting– DC localization

Page 36: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -36

Safety Stock Rationalization:Example Europe AB

• Recall: Safety Stock = z STD * LT

Mean Weekly Demand 3656 Monthly / 4.33Std. Dev 2703 Monthly/(4.33).5

Lead Time 5

Std. Dev of DemandPeriod

6044 2703*(5).5

Safety Factor 1.9 98% serviceSafety Stock 11483 1.9*6044

Page 37: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -37

Evaluating Alternatives

• Air Shipment – Expensive

• European Factory – Not sufficient volume

• Better Forecasting– How?

• More Inventory– More problems

• DC Localization– What will savings be?

Page 38: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -38

Evaluating DC Localization

• In DC localization, risk pooling can be used to reduce total inventory while maintaining service levels

• To evaluate inventory, compare total safety stock held if individual localized units are held in inventory or if generic units are held

• Other costs must also be evaluated

Page 39: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -39

Evaluating DC Localization

AVG STD SafetyStock

Weeksof SS

A 42 32 66 6.75

AA 420 204 416 4.25

AB 15830 5625 11,484 3.11

AQ 2301 1169 2395 4.48

AU 4208 2205 4517 4.62

AY 307 103 211 2.96

Total 23109 19089 3.55

Generic 23109 6244 12792 2.38

Page 40: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -40

DC Localization

• Safety Stock Reduction– Current 19,089 units (3.55 weeks)– With localization 12,792 units (2.4 weeks)

• Other benefits– Lower value of transit inventory– Freight reductions– Local presence of “manufacturing”– Customs implications– Local procurement of localization materials

• But there are costs– Product redesign– DC modifications

Page 41: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -41

Implementation

• R&D Support– “The product is working, so why bother?”

• DC Support– “Not our core competency”

• New packaging

• Capital investment

Page 42: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -42

Results

• Successful implementation

• Millions saved

• Service levels increased

• Packaging won awards

• Best practice spread to other HP divisions

Page 43: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -43

Supplier Integration

• Competitive forces are driving firms to integrate suppliers into product development

• Spectrum of Supplier Integration– None

– White Box – Informal integration

– Grey Box – Formal integration, with collaborative teams

– Black Box – Interface requirements are given, product is returned

Page 44: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -44

Supplier Integration

• What approach is appropriate?– Determine internal competencies– Determine product development needs– Identify external development and manufacturing needs

• If future products have components that require external expertise and can be separated from other components, a black box approach makes sense.

• If components cannot be separated, a grey box approach makes sense.

• If some expertise can be found in house, a white box approach might make sense.

Page 45: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -45

The “Bookshelf” Approach

• Monitor the development of new technologies• Follow suppliers that have developed expertise• When appropriate, integrate these new

technologies• This balances the advantages and disadvantages of

being on the cutting edge:– No need to gain experience with the technology,

because suppliers are doing this for you.– Can introduce the technologies when needed.

Page 46: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -46

Mass Customization

• The delivery of a wide variety of customized goods at low cost

• The key is modular products and processes, so that customer requests can be met

• According to Pine, companies need to evolve towards “modular companies”, with managers ensuring that modules are compatible.

• Consider National Bicycle

Page 47: Manufacture Garment Parts

Dr. Chen, The Trends of the Information Systems Technology TM -47

Mass Customization and Supply Chain Management

• An advanced supply chain is essential• This is particularly true when “modules”

extend beyond a single company.• Consider

– Postponement for regional customization– The value of strategic partnerships and supplier

integration– Dell