Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1
24

Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Dec 16, 2015

Download

Documents

Quentin Skinner
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Manpower and space requirements for ILD

2015/1/13

Y. Sugimoto

@SiD meeting at SLAC

1

Page 2: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

MANPOWER REQUIREMENT (+MEXT REVIEW)

2

Page 3: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Survey in ILD• In ILD, we have been surveying resource requirements

– In each phase : preparation (4 years), construction, operation– In each sub-system– In each area (for human resource) : home institutes, main campus, IP

campus

• This survey has two-fold purposes– Input to a LCB subcommittee on governance and management (Chair:

B.Foster) through ILC Infrastructure and Planning WG (Chair: S.Yamada)• Number of people on-site• Requirements on campus / facilities

– Input to the MEXT TDR validation WG• Budget and human resource needed for preparation (R&D), construction, and

operation• These numbers for detectors will not be shown in 5 min presentation in the next

WG meeting on Jan 26th (these numbers for Acc and CFS will be reported), but we might be asked to show these numbers at any time

3

Page 4: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

WG under LCB

4

LCBChirr: S.Komamiya

LCCDirector: L.Evance

AcceleratorDep.Director: M.Harison

CLICDep.Director: S.Stapnes

Physics/DetectorDep.Director: H.Yamamoto

Infra/Planning WGChair: S.Yamada

Gov./manage. WGChair: B.Foster

Page 5: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Committee under MEXTILC Task Force in

MEXT

Academic experts committee

Particle-Nuclear physics WGMembers are physicists from;HEP(6), Nuclear physics, Cosmic-ray, Astronomy, Accelerator(2), Particle theory, Nuclear theory, Cosmology, Science communication

TDR validation WGMembers are accelerator physicists from;KEK(3), JAERI, Riken(2), NIRS, HiSOR, JASRI/Spring8, CROSS-Tokai

http://www.mext.go.jp/b_menu/shingi/chousa/shinkou/038/index.htm

We need information from detector groups 5

Page 6: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

What MEXT wants to know

• Investment • Profit

Accelerator cost

Detector cost Physics

Running cost

Physics WGTDR validation WG

Upgrade cost

Academic Experts Committee

Page 7: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Status of the survey in ILD• Each sub-system group (including physics analysis) has been

asked to show their estimate on budget and human resource requirements in each phase / area

• In the construction period, timeline of the human resource requirement was made according to an assumption of the construction schedule (next slide)

• Still temporary numbers are given for several sub-systems– Magnet (Yoke and coil)– Common engineering– SET/ETD– FCAL– Resource requirements in preparation (R&D) phase

• Not estimated yet– Global DAQ– Running cost (Y10)

7

Page 8: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Assumption of ILD construction• Timeline

– A tentative time line was drawn based on the schedule in TDR (Figure 14.10. in Vol.3-II) and recent CFS study

– Assembly hall is assumed to be built in 2 years from ground breaking

8

Sub-detectorQ1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Detector HallAssembly HallVTX InsSIT InsFTD InsTPC InsFCALECAL (Barrel)ECAL (End cap)HCAL (Barrel)HCAL (End cap)Coil InsIron YokeMuon detDAQComputingPhysics/software

Ins: InstallFM: Field mapping

Extention

Modules construction off site

Install

Install

Ass. On siteAss. On site

Ass. On siteInstall

TDR SimulationSimulation

TDR

TDR

TDR Bid

Dete

ctor

low

erin

g

InsAssembly on siteConstruction off site

Modules construction off site Modules construction off site/ring assembly on site

TDRTDRTDR

Bid

TDR

TDR Bid

Excavation/Utilities

Ass. On site Install

Construction

TDR Construction off site

TDR

TDR

Modules const. off site/assembly on site

Read

y fo

r phy

sics

run

Dete

ctor

com

mis

sion

ing

Acce

lera

tor c

omm

issi

onin

g

Delivery on site OperationAssembly on site Commissioning Operation

Construction off siteTDR

FM

InstallAss. On siteTDR Construction off siteTDR

Y1 Y2 Y9 Y10Y3 Y4 Y5 Y6 Y7 Y8

Analysis

ILD assembly timeline for Hybrid option (CMS style assembly))

Assembly on siteAssembly on siteAssembly on site

Construction off siteConstruction off siteConstruction off site

Construction off site Assembly on site

Construction off siteConstruction off site

Construction off site

Y-3 Y-2 Y-1

Page 9: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

FTE from external institutes

9

0

100

200

300

400

500

600

Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10

FTE from external institutes/universities

VTX SIT+FTD SET+ETD TPC

FCAL ECAL HCAL Coil

Yoke MUON Engineering DAQ

Computing/software Physics

(Students are not included)

Very preliminary

Page 10: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

FTE from ILC Lab.

10

0.0

5.0

10.0

15.0

20.0

25.0

30.0

Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10

FTE from ILC Labo

VTX SIT+FTD SET+ETD TPC

FCAL ECAL HCAL Coil

Yoke MUON Engineering DAQ

Computing/software Physics

Very preliminary

Page 11: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

FTE in each area on site

• Assumption– There are main campus near Shinkansen station and

satellite campus near (above) IP (IP campus)– In IP campus, there is a main building which includes

office rooms, laboratories, and clean rooms– ILD construction scenario:

• VTX, SIT, and FTD are installed into the inner support tube (L~8m) in a clean room, and installed into ILD as a “Inner Si tracker” in the detector hall

• TPC MPGD modules are installed into the end-plate in a clean room, and whole TPC is installed into ILD in the detector hall

• Calorimeter/Muon-detector modules are tested in a laboratory at IP campus, and installed into ILD in the assembly hall

11

Page 12: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

FTE of scientists on site

12

Very preliminary

0

50

100

150

200

250

300

Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10

FTE on site

VTX SIT+FTD SET+ETD TPC

FCAL ECAL HCAL Coil

Yoke MUON Engineering DAQ

Computing/software Physics

Very preliminary

Page 13: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

FTE in each area on site

13

0

50

100

150

200

250

Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10

FTE on site in each area

Main campus IP campus office/labo IP campus AH/DH

Very preliminary

Page 14: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

0

50

100

150

200

250

300

350

Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10

FTE on site in each area (including labor except for magnet)

Main campus IP office/labo (Scientists) IP office/labo (Labor) IP AH/DH (Scientists) IP AH/DH (Labor)

FTE in each area on site including “Labor” except for magnet

14

Very preliminary

Page 15: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Some issues

• Conversion of manpower to cost– In TDR, only “Labor” is converted to cost, and in-house

employees such as professors are not converted to cost– In accelerator, all scientists in-house is converted to cost– If we (physics/detector) do the similar way, the cost

becomes enormous– At present, we do not try to convert in-house manpower

into cost

15

ILD construction Person*Year MILCU

M&S 387

Labor (Temporary employee) 1400 130

In-house scientists 4200 550

Page 16: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

TDR validation WG meeting

• In next TDR validation WG meeting on Jan.26th, detector issues will be discussed

• But the allocated time is only 5 min.• We have prepared 3 page presentation (+

back-up slides), and sent it to MEXT on Jan. 6th

– Resource issues are not discussed in the slides except for the number of signatories in LOI

– But we should be ready to answer on these issues when asked

16

Page 17: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

SPACE REQUIREMENT

17

Page 18: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Space requirements of ILD

• We have not made this kind of survey in ILD yet• My tentative guess is as follows

– IP Campus building• Laboratory and clean room

– Sub-detector assembly & test before installation / maintenance– Control room– ~1/2 floor of 25mx60m building

• Office– Rooms for 70~140 persons– 3.5mx5.8m x35 rooms (2~4/room) ~1 floor

– Main Campus• Office:

– Rooms at least for 120 persons– 3.5mx5.8mx60 rooms (>2/room)– The site should have extra space (land) to build additional office building later

if necessary18

Page 19: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Laboratory space

• Because of difference in installation schedule, the same space can be used by different sub-detectors; – HCAL TPC– ECAL Si trackers– MUON FCAL, ETD

19

Electronics/DAQ

HCALTPC

MUONFCAL /ETD

Control roomECAL VTX SIT FTD

Si Trackers

5m 25m

60m

Page 20: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Office space

• It seems ~34 office rooms can be put in a floor with meeting rooms, rest rooms, elevators in common space

20

25m

60m

Common space

Page 21: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

SUMMARY

21

Page 22: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Summary• Our guess on the human resource requirement of ILD is;

– 20 – 25 FTE from ILC labo.– ~500 FTE from external labo./university– Among them, 70 (running period) – 140 (construction period)

FTE are working at IP campus, and >120 FTE are working at Main campus

– If students are taken into account, these numbers would increase

• Space requirement of ILD in IP campus building (25x60m2) would be;– ~35 office rooms and several meeting rooms (~1 floor) – ~0.5 floor for a control room and laboratory (clean room)

space • Each sub-detector group should study the process of construction

and maintenance in detail to get more reliable number (by when?) 22

Page 23: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

BACK-UP SLIDES

23

Page 24: Manpower and space requirements for ILD 2015/1/13 Y. Sugimoto @SiD meeting at SLAC 1.

Resource need in R&D phase

• Assumption in TDR validation WG– After approval of the ILC project, 4 years are necessary for the preparation to

get ready for construction

• We can expect larger amount of budget in this preparation period• We are requested to clarify budget and human resource needed in this

period– A rule of thumb; 10 – 20% of construction cost/manpower– But we should try to estimate by ourselves– Estimate of each sub-detector will not be disclosed: ILD R&D cost as a whole

• What happens on detectors in this period– R&D– Proposal– Technology choice– Detailed (construction ready) design– Industrialization– TDR of sub-detectors