Jul 06, 2015
Experience the verve of living by the banks and driftthrough the historic and scenic beauty of Pasig River.
Project lot area composed of 14,000 square meterswith 62 percent of the area allotted for roads,landscaped areas and amenities such asplayground, swimming pool , and water-featuredlandscapes.
Comprised of 9 buildings ranging from 10 – 20 floors.
LOCATION MAP
• Along the historic and scenic banks of Pasig River in Sta.
Ana, Manila
• Surrounded by the nation’s busiest economic centers of
Makati, San Juan, Mandaluyong and Manila
• Close to school areas
• Accessible to public transportation
LOCATION
SITE DEVELOPMENT
SITE DEVELOPMENT
PROPOSED SITE DEVELOPMENT @REAR PORTION OF YANGTZE BUILDING
FRONTING PASIG RIVER
AMENITIES2 Storey Grand Pavilion
MRR’S PAVILION INTERIOR SHOTS :AMENITIES
AMENITIES
Water features
AMENITIESSwimming Pool and Kiddie Pool
AMENITIES
Aerial Shot of Pool and Amenity Area
AMENITIES
Landscaped walkway leading to Children’s Play Area
AMENITIES
Children’s Play Area
SITE FEATURES
Proposed environment friendly features:
• Solar Panel
• Rain water catch basin
• Waste segregation
• Landscaped Park
• Pavillion
• Water featured landscaping
AMAZON AND RHINE BUILDING
YANGTZE BUILDING
KUMAGAWA BUILDING
BUILDING FEATURES
• Elevator
• 1.5 meter-wide corridors
• Roof deck with landing area
• Service stairs
• Overhead tanks with water pump
• Standby generator for common areas
TYPICAL FLOORPLAN
YANGTZE BUILDING
TYPICAL FLOORPLAN
YANGTZE BUILDING
TYPICAL FLOORPLAN
YANGTZE BUILDING
UNIT FINISHES
• RESIDENTIAL AREA
A. Floor Finishes
Living, Dining & Kitchen Vinyl Planks
Bedrooms Vinyl Planks
Toilet Unglazed ceramic tiles
Utility Area Plain cement finish
B. Wall Finishes No partition walls for bedroom/s
Interior walls 1-coat paint on concrete walls
Toilet 1-coat plain cement finish above tile
UNIT FINISHES
C. Ceiling Finishes
Living, Dining & Kitchen 1-coat paint on plain cement finish
Bedrooms 1-coat paint on plain cement finish
Toilet 1-coat paint on ficem board finish
D. KitchenKitchen counter top with sink & faucet. Under counter cabinet door & overhead cabinet are not included.
E. Door Entrance &
Bedroom door Solid finger jointed wood with sheet
laminated and solid wood core door
jambs plus casing
F. Windows Aluminum windows
UNIT FINISHES
G. Finishing Hardware Cylindrical lockset for main
Privacy lockset for T & B door.
H. Toilet & Kitchen Fixtures
Water and Closet Lavatory Complete set of water closet and
lavatory with fittings & accessories.
Shower faucet Complete set of shower with faucet
and fittings.
I. Electricity Complete outlet and lighting devices
with circuit breaker.
UNIT FINISHES
TYPICAL UNIT FLOOR PLAN
TYPICAL UNIT FLOOR PLAN
TYPICAL UNIT FLOOR PLAN
TYPICAL UNIT FLOOR PLAN
TYPICAL UNIT FLOOR PLAN
AFFORDABILITY
• As low as PHP 1.1M for a studio unit
• As low as PHP 4,400 per month
• Flexible payment scheme (down payment –
payable up to 24 months; balance – payable up
to 30 years through Pag-IBIG)
• Available financing through in-house, bank or
Pag-IBIG
CERTIFICATE & PERMIT
Construction
Updates
RHINE’S ACCOMPLISHMENT PHOTOS:
TO DATE
9TH
8TH
2ND
7TH
3RD
4TH
6TH
5TH
14TH
15TH
12TH
11TH
10TH
16TH
17TH
18TH
19TH
20TH
21ST
ROOFDECK
3rd Floor slab preparation
AMAZON’S ACCOMPLISHMENT PHOTOS:
PREVIOUS
TO DATE
LANDSCAPED AREA:Palms & Trees @
Amenity area
Euphrates’ Play area
MRR’S PHASE I