Top Banner
MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE
24

MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

Mar 30, 2015

Download

Documents

Phillip Holyoke
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

MANHATTAN FIRE PROTECTION DISTRICT

INVESTMENT FOR THE PRESENT AND THE FUTURE

Page 2: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

STATION 1

• ADDITION WAS BUILT IN 1996• FIREHOUSE WAS STAFFED WITH 2 PEOPLE FOR

24 HOURS A DAY 365 DAYS A YEAR• CURRENTLY WE HAVE A MINIMUM OF 5 GUYS

ON SHIFT EVERY DAY OF THE YEAR, OFTEN TIMES MORE WITH CANIDATES AND RIDERS

Page 3: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

OVERVIEW

• AS THE DEPARTMENT GROWS, THE NEEDS OF THE EMPLOYEES GROW AS WELL

• OUR EMPLOYEES SPEND 24 HOURS A DAY (1/3 OF THEIR LIVES) AT WORK AND CALL THE FIREHOUSE THEIR SECOND HOME.

Page 4: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

OVERVIEW

• OVER THE YEARS WEAR AND TEAR ON THE FIREHOUSE HAS LED TO OUR LIVING QUARTERS BECOMING RUN DOWN

• KNOWING THAT WE ARE GOING TO BE AT THIS FIREHOUSE FOR THE DURATION OF OUR CAREERS WE WOULD LIKE THIS OPPORTUNITY TO PRESENT A REMODEL OF OUR LIVING QUARTERS

Page 5: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

OVERVIEW

• WE HAVE FORMED A COMMITTEE AND GATHERED SUGGESTIONS FROM ALL THREE SHIFTS IN ORDER TO PUT TOGETHER THIS PROPOSAL ON THE REMODEL OF OUR LIVING QUARTERS

Page 6: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

KITCHEN/DAYROOMALONG WITH THE DUTY CREW WE HAVE OTHER “GUESTS “ THAT CALL OUR LIVING QUARTERS HOMESEVERAL ATTEMPTS HAVE BEEN MADE TO CAPTURE THESE MICE THEY HAVE BORED ELABORATE TUNNELS THROUGHOUT OUR KITCHEN AND IT HAS BECOME A DAILY HOUSE DUTY TO CLEAN UP AFTER OUR FURY FRIENDS

Page 7: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

WINDOWS• WINDOWS DO NOT

OPEN• NO VENTILATION ON

ENTIRE SECOND STORY• CULINARY MISHAPS

BECOME A PROBLEM • BLOWN SEALS

Page 8: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

FLOORSATTEMPS TO BUFF FLOORS HAVE BEEN MADETILES ARE CRACKED

CARPET TEARSSTAINSWEAR AND TEAR FROM 3 SHIFTS AND YEARS OF USE

Page 9: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

TORN CARPET

Page 10: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

KITCHEN APPLIANCES

FRIDGE• 1 MED. SIZE FRIDGE IS

INADEQUATE FOR THE AMOUNT OF FOOD EACH SEPARATE SHIFT BRINGS IN

• PERSONNEL ARE TRYING TO EAT HEALTHY AND BRING IN MEALS AND OFTEN TIMES LEAVE LEFTOVER FOR FUTURE MEALS TO SAVE MONEY

DISHWASHER• HAVE BROKEN DOWN • BEEN REPAIRED BY SHIFT

PERSONNEL• MAKES LOUD UNKNOWN

NOISES

Page 11: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

KITCHEN APPLIANCES CONT.

• WE CURRENTLY REPLACED OUR OLD STOVE WITH A USED ONE

• STOVE ONLY HAD TWO OPERATING BURNERS• COOKING FOR 5-10 MEN/WOMEN AT A TIME

REQUIRES A LARGER COOKING AREA

STOVE

Page 12: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

CABINETS

• CURRENTLY OUR CABINET SPACE FOR AN ENTIRE SHIFT IS ONE OF THESE SMALL CABINETS

• SAVING LEFTOVERS/ BUYING ITEMS ON SALE HELP THE PERSONNEL SAVE MONEY ON MEALS

Page 13: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

HALLWAY/EMS/BUNKROOM

• HOLES IN THE WALLS HAVE BEEN FILLED WITH SPRAY INSULATION TO TRY AND KEEP THE MICE OUT

Page 14: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

UTILITY CLOSET

Page 15: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

BUNKROOM

• NO VENTILATION • UP TO 8 PEOPLE IN AN

INCLOSED ROOM WITH NO WINDOWS

• AIRBORNE ILLNESSES• HORRIBLE SMELLS• BEDS ARE OLD AND

NEED TO BE REPLACED

Page 16: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

WASHER/DRYER

• CURRENTLY WE WASH OUR GEAR AND OUR CLOTHES/BEDDING IN THE SAME WASHER AND DRYER

• STUDIES HAVE SHOWN THAT INFECTIOUS DISEASE AND CANCER CAUSING AGENTS ARE SPREAD BY USING THIS PRACTICE

Page 17: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

WASHER/DRYER

• TO HELP PROTECT OUR PERSONNEL WE WOULD LIKE TO PURCHASE A SEPERATE WASHER AND DRYER USED SOLEY FOR OUR CLOTHES, BEDDING, AND KITCHEN TOWELS.

Page 18: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

OUR FIRE HOUSE IS NOT UP TO CODE

LOCATED ABOVE THE BUNKROOM

Page 19: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

BATHROOMS

TILE IS WORN AND STAINEDLARGER EMPLOYEES WOULD LIKE ELONGATED TOLIETS

Page 20: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

BATHROOMS

NO VENTILATION• CAUSING MOSITURE WHICH

LEADS TO MOLD• PICTURE WAS TAKEN WITH

SHOWERS NOT IN USE

Page 21: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

BATHROOMS

WATER DAMAGE• A LEAK FROM THE

SHOWERS IS CAUSING WATER DAMAGE TO THE FIRST FLOOR

• CONTRACTOR STATED PROBLEM IS FROM PIPES IN THE WALL

Page 22: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

BATHROOM

MOLDY SINKS BROKEN LIGHTS

Page 23: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

ALWAYS IN THE PUBLIC EYE

• MANHATTAN FIREMEN ARE ALWAYS IN THE PUBLIC’S EYE.

• STATION TOURS, FAMILY VISITS, CITIZENS ARE ALWAYS IN THE STATION AND WE FEEL THAT WE NEED TO BE PRESENTABLE TO THE COMMUNITY WE SERVE

Page 24: MANHATTAN FIRE PROTECTION DISTRICT INVESTMENT FOR THE PRESENT AND THE FUTURE.

THANK YOU FROM ALL OF US!