Jan 28, 2016
SR.NO
YEAR DESCRIPTION OF MEASURE SAVING PER YEAR
NET SAVING IN RUPEES PER
YEAR
1. 2012-13 REPLACEMENT OF EXHAUST FANS WITH POWERLESS VENTILATOR. 72727 UNITS 4,00,000
2. 2012-13 DM TRANSFER PUMP:-PUMP STOPPAGE AND USING PRINCIPLE OF GRAVITY
AND VACCUM FOR WATER TRANSFERING. 14000 UNITS 77000
3. 2012-13 POWER SAVING SCHEME IN CPP- BOILER FEED WATER PUMP OUTLET LINE
HEADER PRESSURE CONTROLLING BY BFP RPM WITH PID.
73440 UNITS 4,03,920
4. 2012-13 REDUCTION IN AUXILIARY BY OPTIMIZATION IN CPP-I CEP DISCHARGE
PRESSURE.
118404 UNITS 6,51,222
5. 2012-13 POWER SAVING SCHEME IN CPP- COMPRESSOR BY REDUCING RUNNING
HOURS OF COMPRESSOR.
371250 UNITS 20,41,875
6. 2012-13 REDUCTION IN AUXILIARY POWER BY STOPPING RAW WATER PUMP (5.5 KW.)
9974 UNITS 54,860
7. 2012-13 REDUCTION IN AUXILIARY BY OPTIMIZATION IN CPP-II CEP DISCHARGE
PRESSURE.
158400 UNITS 8,71,200
8. 2012-13 POWER SAVING SCHEME IN CPP TURBINE EXHAUST TEMPERATURE
CONTROLLING BY ACC FAN RPM WITH APPLYING PID AUTOMATION.
190444 UNITS 10,47,440
SR.NO YEAR DESCRIPTION OF MEASURE SAVING PER YEAR
NET SAVING IN RUPEES PER YEAR
09. 2013-14 CPP I & II:-REPLACEMENT OF AERODYNAMIC DESIGN FRP BLADE WITH
HUB (POWER SAVING 20 % AS PER COMMITMENT) (7 FANS-110 KW, 3 FANS-
15 KW).
1290000 UNITS 7095000
10. 2013-14 CPP-I:- UTILIZE TURBINE FIRST EXTRACTION STEAM FOR AUXILIARY
STEAM REQUIREMENT AT 20 kg/cm2 IN PLCE OF 86 kg/cm2
STEAM COST
REDUCTION FROM Rs
600 TO Rs 400 PER TON 792000
11. 2013-14
CPP-II:- UTILIZE TURBINE FIRST EXTRACTION STEAM FOR AUXILIARY
STEAM REQUIREMENT AT 20 kg/cm2 IN PLCE OF 86 kg/cm2
STEAM COST
REDUCTION FROM Rs
600 TO Rs 400 PER TON
792000
12. 2013-14 POWER SAVING SCHEME IN CPP1 BOILER FEED WATER OULET LINE
HEADER PRESSURE CONTROLLING BY BFP RPM WITH APPLYING PID
AUTOMATION.
467280 UNITS 25,70,040
13. 2013-14 COAL BELT CONVEYOR 5 NOS. BELT CONVEYOR BELT STOPPED
PERMANENTLY BY PROVIDING COAL CHUTE. 19454 UNITS 107000
14. 2013-14 POWER SAVING SCHEME IN CPP- INSTRUMENT COMPRESSOR BY
REDUCING RUNNING HOURS OF COMPRESSORS BY INSERTING ONE
MORE RECEIVER TANK & MODIFY MOTOR STOP TIME. BY DOING SO
MOTOR’S CONTACTOR LIFE ALSO INCREASE.
58080 UNITS 3,19,440
12.04%11.22%
9.59%8.98%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
2010-11 2011-12 2012-13 2013-14
CPP AUX CONSUMPTION IN %
CPP AUX CONSUMPTION IN %
03 month Summary:-
Nov. -14 (from 14.11.14 to 30.11.14) saving w. r. t. RSEB= Rs. 26,03024
Dec.-14 (from 12.12.14 to 31.12.14) saving w. r. t. CPP= Rs. 32,55,164
CPP-Aux. Consumption=8.28%
CPP- Loading improvement =30%
CPP- Loading % achieved = 98.21%
Jan.-15 (up to 31.01.15) saving w. r. t. CPP= Rs. 82,92,122
CPP- Aux. Consumption=8.17%
CPP- Loading improvement =21.8%
CPP- Loading % achieved = 97.90%
Feb.-15 (up to 19.02.15) saving w. r. t. CPP= Rs. 49,72,419
CPP- Aux. Consumption=8.32%
CPP- Loading improvement =26.11%
CPP- Loading % achieved = 97.30%
98.21%
97.90%
97.30%
96.80%
97.00%
97.20%
97.40%
97.60%
97.80%
98.00%
98.20%
98.40%
Dec-14 Jan-15 Feb-15
PERCENTAGE AVERAGE CPP
LOADING
TILL 19th
95.8
114.2
170.8
169.7
116.3
148.4
0
20
40
60
80
100
120
140
160
180
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
WIND POWER FOR CAPTIVE USE IN
LACS KWH
LOW DUE TO CABLE
THEFT PROBLEM
(APR TO JAN)
6.20%
8.30%
11.50% 10.20%
7.60%
9.00%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
PERCENTAGE GREEN POWER
(WIND POWER)
UESD
LOW DUE TO
CABLE THEFT
PROBLEM
(APR TO JAN)
0 0
100473
173375
123895129816
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
PETCOKE CONSUMPTION IN TON
PETCOKE CONSUMPTION IN TON
(APR TO JAN)
16.90%18.10%
12.50%
10.20%10.50% 9.60%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
18.00%
20.00%
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
PETCOKE CONSUMPTION IN % OF CLINKER PRODUCTION
PETCOKE CONSUMPTION
IN % OF CLINKER PRODUCTION
(APR TO JAN)
85 % PETCOKE &
15 % INDIAN
COAL USED
57% PETCOKE &
43 % INDIAN
COAL USED
100% INDIAN
COAL USED
100% INDIAN
COAL USED
100% PETCOKE
USED
100% PETCOKE
USED
0.8284
0.8201
0.8071
0.7950
0.8000
0.8050
0.8100
0.8150
0.8200
0.8250
0.8300
2012-13 2013-14 2014-15
Reduction in CO2 Emission due to Unit -I Upgradation (Kg/Kg Clinker)
Reduction in CO2 Emission due to unit -I upgradation (Kg/Kg Clinker)
(APR TO JAN)
15.35%
26.05%27.47%
31.06%
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
BASE YEAR 2007-10 2012-13 2013-14 2014-15( APR TO JAN)
FLY ASH CONSUMPTION IN %
0.56
0.55
0.51
0.48
0.49
0.50
0.51
0.52
0.53
0.54
0.55
0.56
0.57
2012-13 2013-14 2014-15
Reduction in CO2 Emission after using higher quantity of fly ash in PPC Cement Production(Kg/Kg Cement)
Reduction in CO2 Emission after
using higher
quantity of fly ash in PPC Cement
Production(Kg/Kg
Cement)
(APR TO JAN)
16.14%
17.01%
10.80% 10.22%
13.45%10.39%
6.95%
6.22%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
18.00%
HIGH GRADE LIME STONE
CONSUMPTION IN
PERCENTAGE
HIGH DUE
TO INDIAN
COAL USED
85.94
85.61
82.55
78.23
80.59
78.97
74
76
78
80
82
84
86
88
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
kwh/ton of cement
kwh/ton of cement
(APR TO JAN)
797.39 793
773
741
710720730740750760770780790800810
BASE YEAR 2007-10 2012-13 2013-14 2014-15 (APR TO DEC)
Kcal/ kg of clinker
Kcal/ kg of clinker
1) UNIT-1 UP GRADATION WITH 6 STAGE PREHEATER & PRECALCINER EFFICIENT
CROSS-BAR COOLER VRM & VCM FOR
CAPACITY UPGRADATION FROM 1700 TPD TO 3000 TPD
INSTALLATION OF VVVFD (MV DRIVE) ABB MAKE FOR 1250 KW HT MOTOR FOR VRPM AT UNIT-1 CEMENT MILL.
AFTER INSTALLATION OF VVVFD THE SPEED OF THE VRPM GOT REDUCED, HENCE INCREASED THE OUTPUT OF
THE VRPM AND BALL MILL AND REDUCED SPECIFIC ENERGY CONSUMPTION KW PER TONE OF CEMENT FROM
30.2 TO 26.72 KWH/TONNE OF CEMENT.
Cement production This year = 533236 MT
SEC of Cement Mill Last year =30.06 units (2012-13)
SEC of Cement Mill this year =27.95 units (Apr-14 To Jan-15)
Total units saved = (30.06-27.95) x 533236 = 2.11 x 533236 = 11,251,127.96
= 1.13 Million Units
Saving in Rs @5.5 = 1.13 x 5.5 = Rs 6.19 Million