EFFICIENCY FUEL FLEXIBILITY ENVIRONMENTAL
SOLUTIONS
LE
AD
ER
IN
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
MARINE SOLUTIONS
SERVICES
18,800
THIS IS WÄRTSILÄ
Marine Solutions
35% (34)
Energy Solutions
20% (22)
Services
46% (43)
NET SALES
BY BUSINESS
2016
LISTED IN HELSINKI
5,0 BILLION € TURNOVER
2,6% OR 132M€ IN R&D
200
PROFESSIONALS
LOCATIONS
70 COUNTRIES
ENERGY SOLUTIONS
© Wärtsilä @Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
A GLOBAL SYSTEM INTEGRATOR FOR GREENER
AND MORE EFFICIENT ENERGY SYSTEMS
© Wärtsilä
Medium Scale LNG Terminals Small Scale LNG Terminals &
Liquefaction plants
Re-gas-systems, Engines and other
gas handling systems for FSRU:s
Complete Power and LNG tank
systems for ships
Fuel gas systems for Ships &
Power Plants
Gas Power Plant with LNG
Terminal
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
THESE ARE SOME OF THE THINGS WÄRTSILÄ DOES IN LNG TODAY
© Wärtsilä
• Project management
• Process engineering
• System design
• Procurement
• Package management
• Provide process guarantee
• Provide dynamic simulator integrated with control system
• Construction management
• Mechanical designs
• Safety studies
• Pipe stress analysis
• Civil design and foundation
• Control logic
• Buildings
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
TYPICAL SCOPE IN WÄRTSILÄ LNG PROJECTS
© Wärtsilä
Manga LNG terminal project in Tornio , Finland
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
MANGA LNG TERMINAL BACKGROUND
- Manga LNG Oy shareholders:Outokumpu 45%
SSAB 25%
Skangas 25%
EPV Energia 5%
MANGA LNG TERMINAL IN TORNIO, FINLAND
- Manga Terminal Oy is subsidiary of Manga LNG Oy
- Manga Terminal Oy is the investor of LNG terminal in Tornio
- Customers:- Outokumpu in own production in Tornio
- SSAB in own production in Raahe
- EPV Energia for energy production in Tornio
- Skangas is reselling to market in Finland and Sweden
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
LNG MARKET IN FINLAND/NORDICS
- Natural gas network limited in Finland (and Sweden)
- In EU 24% of primary energy production by natural gas
- Finland 8%
- Sweden 2%
- Emission controlling in Baltic Sea area is increasing the demand of LNG
- Emission control in industry
MANGA LNG TERMINAL IN TORNIO, FINLAND
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
Preparation and execution
- Basic engineering 2012
- EPCM quotations 12/2012
- EPC quotations 2013- 13 RFQ’s
- Agreement with Wärtsilä 12/2013
Main benefits- EPC Contractor’s competence in power plant
and gas processes
- Resourcing and scheduling of project
Main challenges- General challenges of EPC type contract
- Possibility to influence on technical solutions
MANGA LNG TERMINAL IN TORNIO, FINLAND
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
Commissioning and Operations
- Long term LNG purchase agreements
- New vessel under construction
- Coral Energice 18 000 m3
- 24/7 operations at terminal:
- Re-gasification
- LNG loading processes
- 2 shifts + remote control
MANGA LNG TERMINAL IN TORNIO, FINLAND
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
December 2013 – Contract signing
On 31 December, 2013 Wärtsilä signed a turnkey contract with Manga LNG Oy to build a liquefied natural gas receiving terminal in Tornio, Finland.
Construction work started a year later.
MANGA LNG TERMINAL IN TORNIO, FINLAND
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
Scope of work
MANGA LNG TERMINAL IN TORNIO, FINLAND
The turnkey delivery of the import terminal, supplied by Wärtsilä, includes
• EPC scope
• LNG storage tank
• BOG handling equipment
• Regasification plant
• Pressure control station
• Metering station
• Control system
• Flare
• Loading arms
• All piping and electrical works
• Civil works
• Buildings
• Installation
• Maintenance
• Facilitating finance
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
Main data
MANGA LNG TERMINAL IN TORNIO, FINLAND
LNG storage tank
Net volume 50 000 m3
Tank height 48.5 m
Tank diameter 43.6 m
Outer tank Concrete
Inner tank 9% Ni steel
Functionalities
Gas send-out 39 t/h
Outlet gas pressure 6.0 barg
Truck loading 75 m3/h
Ship bunkering 300 m3/h
Ship unloading rate 3 000 m3/h
Ship unloading time 12 hours
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
Project schedule
MANGA LNG TERMINAL IN TORNIO, FINLAND
Tornio ManGa LNG Terminal
Tue 31.12.2013 – Thu Q3.2018
START Tue 31.12.2013 Signing of LNG terminal CONTRACT2014
2015
2016
2017
2018
April 2014 Building permit design LNG terminal READY
Dec 2014 Occurrence of COMMENCEMENT DATE
July 2015 Completion of LNG tank PILING
Nov 2016 Completion of LNG tank INNER TANK CONSTRUCTION
Q3 2017 Mechanical completion of LNG terminal
Q2 2018 Successful completion of PERFORMANCE TEST
Q3 12.7.2018 DELIVERY OF THE CONTRACT OBJECT
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
Manga, Tornio, Finland – Project site
MANGA LNG TERMINAL IN TORNIO, FINLAND
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
MANGA LNG TERMINAL IN TORNIO, FINLAND
August 2015The groundbreaking ceremony on 26 August 2015 gathered representatives from all companies investing in the project.
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
MANGA LNG TERMINAL IN TORNIO, FINLAND
The 50,000m3 Tank
• Slip-forming height 42 m
• Wall thickness 0,6 m
• Diameter of the tank (CL) 43 m
• Reinforcement 320 ton
• Ducts for post tensioning 5000 m
• Concrete 3990 m3
• Labor in 2 shifts, totally 100+ workers
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
© Wärtsilä
MANGA LNG TERMINAL IN TORNIO, FINLAND
October 2015 – LNG tank covered with roof dome
The 1250-ton mobile crane, largest in Scandinavia, lifting the dome structure on top of the tank.
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen
MANGA LNG TERMINAL IN TORNIO, FINLAND
October 2016 – Process equipment and pipework to start.Expected to receive first commissioning LNG shipment in November 2017