Top Banner
Managing Urban Infrastructure Projects Arvind Shrivastava Secretary, UDD, Karnataka February 2012
17

Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

May 14, 2018

Download

Documents

doanque
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Urban Infrastructure Projects

Arvind Shrivastava

Secretary, UDD, Karnataka

February 2012

Page 2: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Issues

• Internal – Project team

– Time

– Money

– Contractors

– Consultants

• External(beyond Project Director’s administrative competence)

– Land

– Local bodies

– Other departments

Page 3: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Project Team

• Structuring Project

– Need for sufficient depth

– Effective delegation and clear accountability

– Clarifying role vis-à-vis local bodies

• Capacity building

– Technical

– Contract management

• Involvement

– Full technical responsibility

– Cross learning

– Open reviews

• Sustainability

– documentation

Page 4: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Time

• Robust information system – Status

– Capture issues that impinge on projects

– Pre-planning

• Reviews – Structured and Regular

– Inspections

• Project Design – Flexible to compensate for delays and failures

Page 5: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Time

0%

20%

40%

60%

80%

100%

-40

%

-20

%

0%

13

%

20

%

25

%

38

%

40

%

50

%

60

%

63

%

75

%

80

%

88

%

10

0%

12

0%

14

0%

16

0%

% o

f co

ntr

acts

aw

ard

ed

% of project time elapsed

Learning from past

NKUSIP 2nd tranche tenders awarded

NKUSIP 1st tranche tenders awarded

KUDCEMP Tenders awarded

NKUSIP overall (projected)

Page 6: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Money

• DPRs – High level intense technical review – Accountability

• Consultants penalize for unprofessional errors • Engineers

• Funding – Dovetailing schemes

• Bidding – Strong signals to discourage high premiums – Failure analysis and corrective action

• Effective cash management – Reduce surplus cash – Control time cycle for releases and payments

Page 7: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Money

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

Raichur UGD Haveri Water Raichur Water Hospet Water

1st call

2nd call

0%

20%

40%

60%

80%

100%

1st Tranche UGD

2nd Tranche UGD

1st Tranche Water

2nd Tranche Water

Tender premium

Tender amount

Page 8: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Contractors

• Fundamental part of project team – Involvement of contractors in the monthly review meetings.

– Strategic escalation of issues

• Predictability – Non-discretionary adherence to the contract conditions like work

plans, milestones and liquidity damages.

• Accountability – Highly segregated, clear and recorded responsibility matrix

• Transparency – Fixed time limit for every stage of bill clearance

– Web based on line procurement management system

– Direct payment to the contractor’s account through RTGS

Page 9: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Contractors

• Development of market – Contractors’ conference

– PQ conditions- UGD contracts and PSP contracts

• Encouraging performance – Inclusion of bonus clause (necessary safeguards needed)

• Contractors’ capacity – Labor intensive technology for sewerage works

– Ability to place technically qualified manpower in remote work locations

– Poor top management capabilities- information, detailing, supervision systems, cash flows.

Page 10: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Consultants

• Situation of scarcity – Frequent change of team leaders and other professionals – Inability to mobilize quality manpower at project places

• Poor systems of contract management – Weak hands-on professionals – Inadequate quality controls – High turn-around time

• Involvement – Starting point of any review – Encouraging supervisory levels to join reviews – Simplifying systems for bills clearances – Advance payment for deliverables pending verification – Penalty for non-professional errors and non-application

Page 11: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Consultants

Aver age t enur e of t eam l eader i n

NKUSIP i s 8. 5 mont hs and t hat of

deput y Team l eader i s 13. 5 mont hs.

Each change i s a begi nni ng

0%

20%

40%

60%

80%

100%

Haveri UGD

Nippani WS

Yadgir WS Hospet WS Raichur WS

Gangawati UD

Jamkhandi UGD

Comparison of delays

Delay due to contractor

Delay due to consultant

Page 12: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Land

• Requirement of land is assessed in all details before DPR stage and procurement process is initiated in parallel.

• Government lands are allotted before tender is called.

• Wherever private land is required, it is ensured that 6 (1) notification is issued before inviting the bids.

• Direct purchase of land has been permitted to hasten the process. All but one towns have gone for either direct purchase or consent award.

0%

20%

40%

60%

80%

100%

0 1 2 3 4 5 6 7 8 9

Land versus progress- KUDCEMP

% of land not acquired

% of works awarded

0%

20%

40%

60%

80%

100%

-2 -1 0 1 2 3

Land versus progress- NKUSIP

% of land not acquired

% of works awarded

Page 13: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing Local bodies

• Empowerment and insistence on ownership – The Commissioner, ULB has to

countersign the condition survey

– The council approves the concept report, STP/WTP technology and the DPR

– Commissioner is the employer; PIU works under him

• Transparency – Presentation on project status

in monthly council meeting – PMU officers to meet local

representatives in each visit

Ti me t aken f or appr oval of concept r epor t

was 147 days

Two t owns- Bi j apur and Bel gaum- have t aken 481

354 days r espect i vel y

Ot her s aver age 50 days

Local bodi es have t aken i ni t i at i ve t o meet

shor t age of f unds by pr ovi di ng

SFC and CMSMTDP

Il kal PSP based wat er suppl y pr oj ect appr oval

Took 167 days

6 ot her l ocal bodi es have come f or war d For PSP based O&M

Page 14: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Managing other departments

• Requirements of clearances from various departments is identified at DPR stage itself and advance action is taken to obtain the clearances from line agencies.

• Intensive follow-up

• Absence of any ownership by the other departments

• Lack of objective, time-bound and transparent systems for clearances

Page 15: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Transforming a Problematic Project- KMRP

• Lack of compensation for delays

• Lack of depth of PMU and weak field level supervision

• 54% of project is with agencies where there is a hierarchical conflict vis-à-vis Project Director

• Urban mapping component

BWSSB UGD component of KMRP-

Exper i ence of anal yzi ng f ai l ur es and

i nt ensi ve moni t or i ng

0%

10%

20%

30%

40%

50%

60%

2005 2006 2007 2008 2009 2010

Proportion of contracts awarded

Contracted Amount

No. of works awarded

No. of works awarded- MIC

Contracted amount-MIC

Ur ban Mappi ng component - syst emi c appr oach

25 r evi ew meet i ngs i n 30 mont hs

Techni cal advi sor y commi t t ee

Manual pr epar at i on

Page 16: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

PSP contracting

• Challenges – Ideological – Vested interests- threat to domain – Lack of correct risk perception

• Due to long period of contract • Understanding need for its clear allocation • Performance requirement

– Lack of standard bidding processes – Weak market of suppliers – Funding viability gap – Absence of regulator

Page 17: Managing Urban Infrastructure Projects - ICRIER Urban Infrastructure Projects Arvind Shrivastava ... Raichur UGD Haveri Water Raichur Water Hospet Water 1st call 0% 20% 40%

Thank You