Managing Scope Creep in Development Projects
32

Managing Scope Creep in Development Projects

Apr 11, 2017

Download

Technology

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Managing Scope Creep in Development Projects

Managing Scope Creep in Development Projects

Page 2: Managing Scope Creep in Development Projects

About Me

Name Dhivya Arunagiri

Role Senior Business Analyst – Thoughtworks India

Email [email protected]

Page 3: Managing Scope Creep in Development Projects

Wiki says…. Scope creep occurs when the scope of a project is not properly

defined, documented, or controlled.

It is generally considered a negative occurrence and should be

avoided.

Scope Creep = A Disease ? NO!!!

Page 4: Managing Scope Creep in Development Projects

Scope Creep is a Symptom….. Inception : 150 points

Current status : 200 points

This story was a 2 pointer, but it turned

out to be much more complex

Oops, this flow

seems incomplete

My product owner is

adding new features

Page 5: Managing Scope Creep in Development Projects

In Practice….

Scope Creep refers to an increase in scope compared what

was originally agreed upon.

It is an indicator that the project may not be delivered on

time, with the current set of features with the original cost

agreed upon.

Scope Creep always points to a Deeper Issue

Page 6: Managing Scope Creep in Development Projects

For the next 45 minutes…..

Issues underlying Scope Creep

Visualizing from multiple perspectives

Using Scope creep to advantage

Page 7: Managing Scope Creep in Development Projects

The symptom shows up….

Integration Projects Due to the

Product Owner

Project Duration While playing a story

Page 8: Managing Scope Creep in Development Projects

The symptom shows up….

Integration Projects Due to the

Product Owner

Project Duration While playing a story

Page 9: Managing Scope Creep in Development Projects

While playing a story….

Late feedback

Re - design

Scope balloons up

Feedback not coming in during

development

Page 10: Managing Scope Creep in Development Projects

While playing a story….

New Technology - More Complex than

anticipated

Team is new to technology

Page 11: Managing Scope Creep in Development Projects

While playing a story….

Dependencies/NFRs identified after dev

work start

Page 12: Managing Scope Creep in Development Projects

The symptom shows up….

Integration Projects

Due to the Product Owner

Project Duration While playing a story

Page 13: Managing Scope Creep in Development Projects

Due to the Product Owner….

Pressure from Multiple Stakeholders

Page 14: Managing Scope Creep in Development Projects

Due to the Product Owner….

Issues with conceptualising the

product

Page 15: Managing Scope Creep in Development Projects

Due to the Product Owner….

Functionality vs Frills

Page 16: Managing Scope Creep in Development Projects

The symptom shows up….

Integration Projects

Due to the Product Owner

Project Duration While playing a story]

Page 17: Managing Scope Creep in Development Projects

Project Duration factor….

Project starts much later after Inception

Period between Releases is longer

Page 18: Managing Scope Creep in Development Projects

The symptom shows up….

Integration Projects

Due to the Product Owner

While playing a story

Project Duration

Page 19: Managing Scope Creep in Development Projects

Failure of Contract

Specifically in Data Intensive Projects

Page 20: Managing Scope Creep in Development Projects

Workarounds…

Saves time/cost but increase scope

Page 21: Managing Scope Creep in Development Projects

Integration delays….

Filler Stories add onto Scope

Page 22: Managing Scope Creep in Development Projects

Scope Creep – The indicator……

Page 23: Managing Scope Creep in Development Projects

Scope Creep tells me….

Conceptualisation of the Product is

wrong!!!!

Back to the Basics – What are we trying to

solve?

Page 24: Managing Scope Creep in Development Projects

Scope Creep tells me….

I am talking to the wrong set of

People!!!!

Go to the decision maker… NOW!!

Page 25: Managing Scope Creep in Development Projects

Scope Creep makes me think….

Can I Refine my client’s processes?

Let’s try a Quick win…..

Page 26: Managing Scope Creep in Development Projects

Scope Creep makes me think….

What is the business value of a story?

Cost vs Benefit trumpcard

Page 27: Managing Scope Creep in Development Projects

Scope Creep – Do not Manage it….

Page 28: Managing Scope Creep in Development Projects

The Vicious Circle

- Remove X,

- Add Y,

- Make sure X = Y

But Y grows…..

Attaining Steady state – NOT possible

every time

Page 29: Managing Scope Creep in Development Projects

Inception is NOT a complete analysis process ….

Release Plan (60 - 80% confidence)

Change in assumption Conversation with the client

Scope Management should not nip conversations

Page 30: Managing Scope Creep in Development Projects

Velocity/Points….

May not reflect the true status of the project

Client immersed in points focus shift from the project goal

Measurement Scales are not to be

considered alone

Page 31: Managing Scope Creep in Development Projects

Team Dynamics

Pace of the team α Complexity of

the Goal

Scope Creep -> Unsettling

-> Challenging

-> Triggers Innovation

Page 32: Managing Scope Creep in Development Projects

Q&A

Thank You