Managing Light Rail … at Light Speed! Wendy Kaszycki, CCM PE Director of Project Management Exposition Metro Line Construction Authority
45
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Managing light rail at light speed ppt

Managing Light Rail … at Light Speed!

Wendy Kaszycki, CCM PE Director of Project Management

Exposition Metro Line Construction Authority

Page 2: Managing light rail at light speed ppt

Overview

• Setting the Context

• Previous Process

• Document Upload Interface

• Results in Contract Management

• Results in SharePoint

• Conclusions

2

Page 3: Managing light rail at light speed ppt

SETTING THE CONTEXT

3

Photos courtesy of EMLCA

Page 4: Managing light rail at light speed ppt

About Expo

• Exposition Metro Line Construction Authority

• Created in 2003 by SB 504

• Design and build Expo Light Rail

• Rail will be operated by Metro LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

4

Page 5: Managing light rail at light speed ppt

Expo LRT Project

Connecting the Beach to downtown LA!

5

PHASE 1 PHASE 2

Page 6: Managing light rail at light speed ppt

Project Stats

Phase 1 Phase 2

STATIONS 12 7

DAILY RIDERSHIP 27,000 64,000

COST $930 million $1.5 billion

OPENING DATE 2012 2015

6

Page 7: Managing light rail at light speed ppt

Phase 1 Process • Paper

– EMAIL PDF’S OR CD’S TO DOCUMENT CONTROL

• Excel Logs – INCOMING – OUTGOING

• Routing Sheets – LEAD IDENTIFIES DISTRIBUTION – DOCUMENTS DISTRIBUTED TO SELECTED USERS

• Databases – ACCESS FOR COST PROPOSALS AND CHANGE ORDERS – METRO DATABASE FOR RFIS AND SUBMITTALS

7

Page 8: Managing light rail at light speed ppt

Phase 2 Project Controls

• Contract Management (PCM) – CONTRACT DOCUMENTS – BUDGETING AND FORECASTING

• SharePoint – DOCUMENT STORAGE/FILES – LINKS TO PCM

• FIS – METRO’S FINANCIAL SYSTEM – CAPTURES ACTUAL EXPENDITURES

• P6 – SCHEDULING

8

Page 9: Managing light rail at light speed ppt

Customized Components

• Web Interface – ALLOWS COLLABORATION – CONTRACTORS UPLOAD TO PCM AND SHAREPOINT

• SharePoint “smart folders” – CUSTOMIZED AUTO-ROUTING

• “Actual Cost Mapping” – REPORTS BUDGET, COMMITMENTS & ACTUALS TOGETHER

• EAC Upload/Export – ALLOWS WAREHOUSING OF ESTIMATE AT COMPLETIONS – FACILITATES REPORTING AND COMPARISONS

9

Page 10: Managing light rail at light speed ppt

DOCUMENT UPLOAD INTERFACE

10

Photos courtesy of EMLCA

Page 11: Managing light rail at light speed ppt

Web-Based DUI

• Mandatory – MAJOR CONTRACTORS UPLOAD

• Parameters for Upload – CONTRACT – DOCUMENT TYPE

• Features – CHANGE DOCUMENTS LINKED TO RELATED DOCUMENTS – SUBMITTALS LINK TO UPLOADED SUBMITTAL LOG

11

Page 12: Managing light rail at light speed ppt

Defining the DUI

12

1

• Reviewed Contracts

• Developed Process Flow

• Define Document Types, Screens, Modules

2

• Provided Mapping Specs for Data

• Default basic information (contract, to/from) • Defined numbering convention for documents

3 • Wrote “hover over” Tool Tips

Page 13: Managing light rail at light speed ppt

RFI Process Flow

13

2-Page Process flow for RFI Process

Page 14: Managing light rail at light speed ppt

CO Process Flow

14

2-Page Process flow for Change Process

Page 15: Managing light rail at light speed ppt

Sample Mapping Spec

15

Screen content maps to PCM data fields

Page 16: Managing light rail at light speed ppt

DUI – What Users See • User PCM Access and

Security determine – PROJECT LIST – DOCUMENT TYPES

16

Page 17: Managing light rail at light speed ppt

DUI – RFI’s • Add New RFI

• Revise RFI – SELECT FROM PREVIOUSLY ONE

• Design-Bid-Build Projects – A/E PROPOSED SOLUTIONS

17

Page 18: Managing light rail at light speed ppt

DUI – New RFI’s • Features

– DEFAULT TO/FROM – TOOL TIPS – CAPTURES CONTRACTOR’S

DOC #

• Completeness Check – REQUIRED FIELDS

HIGHLIGHTED IF BLANK WHEN “SUBMIT”

• Attachments – REQUIRED FOR ALL DOCS

18

Page 19: Managing light rail at light speed ppt

Sample Tool Tips Spec

19

Minimal Training due to Tool Tips for all fields

Page 20: Managing light rail at light speed ppt

DUI –Proposals • Proposals link to related documents

Page 21: Managing light rail at light speed ppt

DUI – Other Correspondence

• Other Correspondence – MAPS TO CORRESPONDENCE REC’D

• Document Type – CUSTOM FIELD – DYNAMIC DROPDOWN TO

DICTIONARY IN PCM – SEPARATE SHAREPOINT FOLDERS BY

DOCUMENT TYPE

21

Page 22: Managing light rail at light speed ppt

Upon Submitting Document

• Content Integrity – ERRORS IF NOT ACCEPTABLE TO BOTH PCM AND SHAREPOINT

• Capacity – ACCEPTS MULTIPLE ATTACHMENTS – UP TO 100 MB TOTAL

• Automates Some Document Control Functions – LOGS APPROPRIATE INFO IN PCM; CLOSES RELATED DOCUMENT – USES PCM “VERSIONS” – FILES IN SHAREPOINT FOLDER

22

Page 23: Managing light rail at light speed ppt

1. Sends receipt email to user

2. cc: to Expo gmail account (by project) ALSO IMPORTED TO PCM CORRESPONDENCE RECEIVED

Auto-Distribution

23

1: SAMPLE EMAIL TO USER

2: SAMPLES TO EXPO GMAIL AND PCM

Page 24: Managing light rail at light speed ppt

RESULTS IN PCM

24

Photos courtesy of EMLCA

Page 25: Managing light rail at light speed ppt

PCM - Proposals

Links Attachment to SharePoint

Logs

Contractor’s

Doc #

Creates

CM Doc

Page 26: Managing light rail at light speed ppt

PCM - PROPOSALS

Creates Version

Page 27: Managing light rail at light speed ppt

PCM – PROPOSALS • PCM logs

– Contain DUI assigned & Contractor’s document numbers

– Can be exported to Excel and sorted

Page 28: Managing light rail at light speed ppt

PCM – PROPOSALS

Change Management

Writes Referenced Document Info Uploads Contract Number to Custom Field

Assigns CM Doc # with prefix for Contractor

Page 29: Managing light rail at light speed ppt

PCM – PROPOSALS Change Management

Sort by Change Management Number

Custom Contract Number – Written by DUI – Used in layouts

Page 30: Managing light rail at light speed ppt

PCM – PROPOSALS Related RFI

Change Management Number written to related document

Page 31: Managing light rail at light speed ppt

RESULTS IN SHAREPOINT

31

Photos courtesy of EMLCA

Page 32: Managing light rail at light speed ppt

SharePoint - Upload

• Document Properties

• Date and Time stamped

• “Versions” if same document file is uploaded to same SharePoint folder

Page 33: Managing light rail at light speed ppt

SharePoint – File Structure

• Elements – PHASE – PROJECT – CONTRACT – DOCUMENT DIRECTION – DOCUMENT TYPE – SPEC SECTION (RFI’S & SUBMITTALS)

Page 34: Managing light rail at light speed ppt

SharePoint – Folder Properties • Customized Solution

– AUTO-ROUTING BY DOCUMENT TYPE

• Defined Parameters – INCOMING VS. OUTGOING:

• Info used in email message

Page 35: Managing light rail at light speed ppt

Incoming Message • Identifies Lead and other Reviewers

• Indicates Due Dates

• Links directly to Document in SharePoint

35

Page 36: Managing light rail at light speed ppt

Outgoing Message • Emails to Contractor

• cc’s to Expo Staff

• Links directly to Document in SharePoint

36

Page 37: Managing light rail at light speed ppt

System Coding • Long-term relationship with Partners Consulting

• Previous Projects – INTEGRATED EXPEDITION WITH JDE’S AND AN IN-HOUSE

FINANCIAL SYSTEM – CONVERTED EXPEDITION 8.5 TO PCM12 – AUTOMATED P5/P6 BASELINING

• Proven Record of Success

37

Page 38: Managing light rail at light speed ppt

Integration Methodology • Needs analysis based on experience and best practices

• Develop integrations

• Rollout & refine

38

Page 39: Managing light rail at light speed ppt

CONCLUSIONS

39

Photos courtesy of EMLCA

Page 40: Managing light rail at light speed ppt

Challenges

• Diverse Users/Computers – DIFFERENT WEB BROWSERS – OUTSIDE USERS OWN IT CONSTRAINTS/LIMITATIONS

• Large Files – ESPECIALLY DRAWING SUBMITTALS

• User Reluctance – LOG IN TO GET DOCUMENTS VS PDF ATTACHMENTS

40

Page 41: Managing light rail at light speed ppt

W I I F M

41

Page 42: Managing light rail at light speed ppt

W I I F M What’s In It For Me

42

Page 43: Managing light rail at light speed ppt

WIIFM • Streamlined Processes

– PAPERLESS COMMUNICATIONS – MINIMIZES USER ENTRY & ELIMINATES USER ERROR – REDUCES DUPLICATION (SINGLE POINT OF DATA ENTRY)

• User Access to Documents from Any Location

• Project Performance – QUICKER RESPONSE AND BETTER COMMUNICATION – BETTER DOCUMENTATION FOR CLAIMS AVOIDANCE – EFFICIENT MANAGEMENT OF RESOURCES – CREDIBLE REPORTING

• Proactive vs. Reactive Problem Resolution – TEAM FREE TO ANALYZE, CONTROL AND CORRECT

43

Page 44: Managing light rail at light speed ppt

Keys to Success

44

• Prior use of Expedition/PCM

• Extensive definition of policies and processes

• Specifications & Documentation

• Testing, Testing, Testing

• Dedicated Resources to Integration Team

• Operations Team Participation

Page 45: Managing light rail at light speed ppt

QUESTIONS?