Overall summary
2013 transformation 2014 implementation
made possible by YOU
Reconnaissance is
the start, the audit is
the end
18 processes
planned for
further
implementation
DMAIC method used
for implementation
2
March 18th the Management Foundation
Compliancy Report was presented to the NL
Board
Contents
MF Implementation
Implementation Strategy
Implementation structure
Define
Measure
Analyze
Improve
Control
Report
Next action
3
MF Implementation
Management Foundation
Compliancy
• 18 processes need further
implementation
• Implementation led by
appointed Coordinator
(Subject-matter expert)
• Facilitated by MF
Implementation team
• Process owner in charge
4
Process / Policy MF compliancy DeviationProces 1 0%
Proces 2 37%
Proces 3 45%
Proces 4 47%
Proces 5 49%
Proces 6 50%
Proces 7 52%
Proces 8 52%
Proces 9 54%
Proces 10 54%
Proces 11 54%
Proces 12 54%
Proces 13 54%
Proces 14 56%
Proces 15 56%
Proces 16 56%
Proces 17 56%
Proces 18 59%
Proces 19 66%
Proces 20 66%
Proces 21 66%
Proces 22 68%
Proces 23 81%
Proces 24 81%
Proces 25 82%
Proces 26 84%
Proces 27 91%
Proces 28 96%
Proces 29 96%
Implement
Audit
• Appointed coordinator executes implementation
• Coordinator and MF implementation team plan activities
• Coordinator reports to process owner
• After reporting the process is ready to be audited
• Every week a new process starts implementing
• On October 1st (week 40) all processes will be
implemented
Implementation strategy
5
Define Measure Analyze Improve Control Report Audit
Implementation structure
In order to make the implementation suitable and realistic, the following implementation structure is implemented
• The process owner (NL Board):
• Remains in charge
• Delegates to coordinator
• The implementation team:
• Starts up the implementation
• Facilitates where necessary
• The process coordinator:
• Is a subject-matter expert
• Executes the implementation
• Reports to the process owner
• The Auditor pool performs audits according to the implementation plan
6
Define the problem
• The most important phase of the DMAIC process is the description of
the problem
• We’ll use the interviews that were conducted amongst process owners
(NL Board members) to make a start.
• The Coordinator will be important in verifying the found issues. He/she
may even add new issues if necessary.
• A first definition document is created, wherein the process coordinator
states what should be improved
7
Measure main parameters
• Make measurable key parameters
• Knowledge is power if you know what you are measuring
• Making important parameters of a measurable process is not always
easy, but evident for reporting results
• The reported result is the difference between measured parameters at
the beginning and end of the improvement
• The Coordinator describes the parameters based on the Definition
document
• These parameters are measured over the complete period of the
project to assure a report with proven results.
8
Analyze the data
• The next step in the improvement process is the analysis of the data
• For this, simple statistical operations such as average can be used
• In the MF implementation project this might consist of the number of
verified documents, trained members, used templates, corrected
documents
• The Coordinator (and several functionals) analyze available
information in the process
• The available information is used to verify the definition document and
execute the measurement of parameters
• At the end of this phase, an action plan describes (roughly) how the
improvement will be implemented
9
Improve the process
• Here comes the improving of the process
• The analysis of data has probably helped in finding the right buttons
• In this phase, the expert opinion is very important
• If you only draw conclusions on the basis of measured data, there´s a
big chance causal connection with the performance won´t be found
• The Coordinator and functionals refine the improvement plan
• The process coordinator and functionals describe what actions are
taken, parameters are measured and when reports are delivered to
the process owner
• The process coordinator monitors the improvements and coordinates
activities of the functionals
10
Control the parameters(That influence the process)
• It is extremely important to close the loop and to keep checking
whether the process remains under control
• By continuing to monitor key parameters you will prevent the process
running out- of-control again
• Parameters are discussed with the process owner
• The process owner decides how parameters (measured in this
project) are embedded in daily operations
11
Report
• At CGI reporting lines follow accountability, therefor the Coordinator
reports to the process owner
• The Coordinator reports findings, improvements and measured results
to the process owner
• The process owner adopts responsibility for the continues monitoring
and improvement of the process
• After reporting, the Coordinator is relieved of his duties in the MF
Implementation project.
12
Next action
13
Plan assignment verification with Process owner,