    Alain Prioul

    Flexibility / Adaptability

  • 8/13/2019 man pwr

    2/26

    2

    Definitions

    Flexibility

    Ability to follow

    customer demandat different Takt Time

    Ability to quickly changefrom one part number to

    another one

    Adaptability

  • 8/13/2019 man pwr

    3/26

    3

    Flexibility

  • 8/13/2019 man pwr

    4/26

    4

    To reduce WIP + surface + handling + CAPEX

    Key condition for high TRS

    Key condition for levelling

    To reduce lead time

    Flexibility : Why ?

  • 8/13/2019 man pwr

    5/26

  • 8/13/2019 man pwr

    6/26

    6

    t

    Q

    Average stockSafety stock

    t

    QA B C A B C A B C A B C A B C A B C A B C A B C

    Stock level A

    Production (batch size 2h)

    12 h

    Reduce inventories

  • 8/13/2019 man pwr

    7/26

    7

    Safety stock t

    Q

    t

    QA B C A B C A B C A B C A B C A B C A B C A B C

    Stock level A

    Production (batch size 2h)

    12 h

    Average stock

    Reduce inventories

  • 8/13/2019 man pwr

    8/26

    9

    100%

    75%

    18h

    1h

    5h

    A

    9h

    B

    9h

    5h

    P1

    C

    D

    5h

    P2

    E

    F

    P3

    G

    H

    P4 P(x)

    TRS Increase

  • 8/13/2019 man pwr

    9/26

    10

    9h

    9h

    5h

    P1

    2h

    2h

    5h

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    P2 P3 P4 P5 P6

    x2 x9

    TRS Increase

  • 8/13/2019 man pwr

    10/26

    11

    5h

    9h

    9h

    5h

    P1 P2 P3 P4 P5 P6

    x2

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    x9

    TRS Increase

  • 8/13/2019 man pwr

    11/26

    12

    9h

    9h

    5h

    2h

    2h

    P1

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    P2 P3 P4 P5 P6

    x2 x9

    2h

    2h

    TRS Increase

  • 8/13/2019 man pwr

    12/26

    13

    9h

    9h

    5h

    2h

    2h

    P1

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    P2 P3 P4 P5 P6

    2h

    2h

    x2 x9

    TRS Increase

  • 8/13/2019 man pwr

    13/26

    14

    9h

    9h

    5h

    2h

    2h

    P1

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    P2 P3 P4 P5 P6

    2h

    2h

    x2 x9

    TRS Increase

  • 8/13/2019 man pwr

    14/26

    15

    9h

    9h

    5h

    2h

    2h

    P1

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    P2 P3 P4 P5 P6

    2h

    2h

    x2 x9

    TRS Increase

  • 8/13/2019 man pwr

    15/26

    16

    9h

    9h

    5h

    2h

    2h

    P1

    2h

    2h

    2h

    2h

    2h

    2h

    2h

    P2 P3 P4 P5 P6

    2h

    2h

    x2 x9

    TRS Increase

  • 8/13/2019 man pwr

    16/26

    17

    To reduce WIP + surface + handling + CAPEX

    Key condition for high TRS

    Key condition for levelling

    To reduce lead time

    Flexibility : Why ?

  • 8/13/2019 man pwr

    17/26

    18

    Ideal condition:

    Producing all products in parallel at TAKT TIME

    (rhythm of customer demand of each part number)

    Target : respect the TAKT TIME & full loading of the

    equipment:

    Producing all products in small batches close to TAKT TIME

    Levelling

  • 8/13/2019 man pwr

    18/26

    19

    Customer demand

    Production = Large batches

    Lead Time reduction

    Production = small batches

    Lead time

    Lead time

  • 8/13/2019 man pwr

    19/26

    20

    Adaptability :

    Flexible Manpower Line

  • 8/13/2019 man pwr

    20/26

    21

    Flexible Man Power Line : why ?

    Work Contentchange

    Customer demand change

    n => n - 1

    Takt Timechange

    Result of Kaizen action

    Work content mix

    Work Content

    Number of Operators =Takt Time

  • 8/13/2019 man pwr

    21/26

  • 8/13/2019 man pwr

    22/26

    23

    Flexible man power line : Layout

    U cell Linear (fixe)Unflexible

    man power line

    A

    B C

    D

  • 8/13/2019 man pwr

    23/26

    24

    Flexible Manpower Line : Fundamentals

    Linear lineconfiguration or U shapeline No barrierto operator movement

    Line

    Operator

    Operators work insidethe cell

    Operator loaded to takt time

    Operation start and finish at the same point

    One piece product flowby hand

    Process

    Standard in process stock Multi-process handling

    Several Standard Workfor varying demand

    Flexible working hours

  • 8/13/2019 man pwr

    24/26

    25

    Flexible Manpower Line : Iso-productivity !

    6 operators

    PPH is constant

  • 8/13/2019 man pwr

    25/26

    26

    - avoid overproduction => less WIP , space , handling

    - smooth production => better usage of capacity

    - smooth material flow => control lead time

    - create standard conditions

    - make kaizen possible

    Flexible Manpower Line

    Flexible Manpower Line

  • 8/13/2019 man pwr