PSG COLLEGE OF TECHNOLOGY (Autonomous Institution) COIMBATORE – 641 004 REPORT ON MALL SECURITY AND MANAGEMENT Bona fide record of work done by BATCH 4 DINESH KUMAR .P (13L215) KARTHEKEIYAN.N (13L223) KUMARAN.S.G (13L225) Dissertation submitted in partial fulfillment of the requirements for the degree of 1
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PSG COLLEGE OF TECHNOLOGY(Autonomous Institution)
COIMBATORE – 641 004
REPORT ON
MALL SECURITY AND MANAGEMENT
Bona fide record of work done by
BATCH 4
DINESH KUMAR .P (13L215)
KARTHEKEIYAN.N (13L223)
KUMARAN.S.G (13L225)
Dissertation submitted in partial fulfillment of the requirements for the degree of
BACHELOR OF ENGINEERING
Branch: ELECTRONIC AND COMMUNICATION ENGINEERING Of Anna University
AUGUST – 2015
…………..………………. ...……………………… Mr.K.Rajasekar Dr. S. Subha Rani
Faculty guide Head of the Department
1
ACKNOWLEDGEMENT
We would like to express my sincere thanks to Dr. R. Rudramoorthy, the Principal, PSG College of Technology, for providing various infrastructure without which this report would not have been successful.
We are indebted to Dr. S. Subha Rani, Professor and Head of the Department of Electronics and Communication Engineering, PSG College of Technology, for her continued support and motivation.
We would like to express our sincere gratitude to our technical report guide Dr. D.Sivaraj and, Mr.K.Rajasekar Assistant Professor, ECE Department, for him constant motivation, direction and guidance throughout the entire course of this report.
We also extend heartfelt thanks to the class advisor Dr. P. Visalakshi, Professor, ECE Department for her continuous support.
We would like to thank the student friends who contributed in their own special way for the betterment of this report.
Last but not the least we thank our family members, the Almighty who have been a guiding light in all our endeavors.
2
MALL SECURITY AND MANAGEMENT
NEED FOR PROBLEM:
Safety is the most important measure which is always concerned first. This project deals with mall management and security which is always need for the
security of the mall. The basic need is that the visitor should have an enjoyable
shopping experience .security concern also has an impact on shopping behaviour. Preventive measures in case of emergency so that people could evacuate easily.
PROPOSED ACTIVITIES:
The systems can be intended around an AT89S52 IC, a low-priced 8-bit 8052 based micro-controller and completely software controlled.
• All control programs could be created by employing the assembly language.
• Lastly, the mall security and management can be verified under various
situations to estimate its performance.
OBJECTIVE OF THE PROJECT:
• The main objective of this project is to provide a complete security for the
customers so that they could have a safe shopping experience.
• Keeps in track of the number of persons in the mall.
3
• Provides safety against hazardous materials.
• It gives safety alarm in case of fire or emergency.
BLOCK DIAGRAM AND ITS EXPLANATION:
Block diagram shows the working of the mall security and management.
Upon entry into the mall, count in the seven segment gets incremented and when
someone goes out the count gets decremented accordingly.
And when someone enters the mall with hazardous substance one led blinks
to indicate danger. When there is emergency in the mall as in case of fire or
4
something all the led blinks to indicate danger. And the count gets decremented
according to the exit.
CIRCUIT DIAGRAM AND ITS EXPLANATION:
In the circuit four switches are assigned to P3.0, P3.1, P3.2, and P3.6. a single Led
for metal detection is provided in the port P0.0, when someone enters the mall the
count gets incremented when switch 1 is pressed and displayed in a multiplexed
seven segment display, Which the ones and tens are assigned in P3.4, P3.5 and
when a person leaves the count value decreases by one which is given in switch 2.
In case of emergency interrupt service routine is provided and gets executed when
switch 3 is pressed. The last switch 4 is provided for metal detection.