MALDIVES ASPIRE ACCELERATING SUSTAINABLE PRIVATE INVESTMENTS IN RENEWABLE ENERGY USING A SREP GRANT AND A WORLD BANK GUARANTEE TO SPUR RENEWABLE DEVELOPMENT CIF conference, July 20 th 2018
10

MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

Jul 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

MALDIVES ASPIREACCELERATING SUSTAINABLE PRIVATE INVESTMENTS IN RENEWABLE ENERGYUSING A SREP GRANT AND A WORLD BANK GUARANTEE TO SPUR RENEWABLE DEVELOPMENT

CIF conference, July 20th 2018

Page 2: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

FINANCIAL STRUCTURING AND GUARANTEES TO SUPPORT PRIVATE INVESTMENT GLOBALLY

1

Financing mobilized with guarantees

Map of World Bank Guarantees operations

✓ $7.4 billion of guarantees issued ✓ 74 operations ✓ 43 countries

Maldives – ASPIRE solar rooftop (SREP & IDA guarantees)

India – Partial Risk Sharing Facility for Energy Efficiency

(CTF & GEF)

Vietnam – Risk Sharing Facility (GCF) - ongoing

Argentina –Renewable

program (IBRD guarantees)

Sub-Saharan Africa – Scaling

Solar (IDA guarantees)

Page 3: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

MALDIVES CONTEXT

2

• Wide archipelago (#1200 islands, 200 inhabited)

• Land area scarce - only 300 km2 of land area

• High dependence on diesel and vulnerability to

price volatility & climate change

• Limited private sector participation in energy

Page 4: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

SIGNIFICANT SOLAR POTENTIAL TO DISPLACE DIESEL

3

280 – 300 sunny days

per year on average

Daily Average Global

Irradiation in Maldives is

4.5-6 kWh/m2/day

No sharp seasonal

changes in solar

resources

Solar insolation and

variation at Malé

Source: GAISMA, derived from http://www.gaisma.com/en/location/male.html

Installation of solar PV

can displace diesel

generation & defer

capacity augmentation

PV potential

Page 5: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

INTRODUCING ASPIRE - ACCELERATING SUSTAINABLE PRIVATE INVESTMENTS IN RENEWABLE ENERGY

4

▪ Maldives SREP Investment Plan adopted in October 2012

▪ ASPIRE aims to scale up solar PV up to 20MW

▪ Key focus to attract private sector participation

▪ World Bank approved in 2014 a series of IDA guarantees for US$16 million and a SREP grant for US$11.7 million

▪ For 20 MW, estimated savings of US$28-84 million (depending on diesel price) and US$42 million of private investments mobilized

▪ Initial project of up to 4 MW tendered in two lots in 2015-2016. First 1.5MW project operational in 2018

Other donors also promote renewable in Maldives. E.g:

- ADB-led POISED also uses SREP and targets installations of

10 MW solar diesel hybrid systems

- JICA through its JPY 1billion Project for Clean Energy

Promotion installed 740kW in 2014 (led by Japanese solar

panel company, Kyocera).

Page 6: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

ASPIRE STRUCTURE & IMPACT OF CONCESSIONAL FUNDING ON THE PROJECT

5

1 – Technical Assistance Support to GoM (US$1.75 million)• Project management and implementation support• Pipeline development• Capacity building and knowledge sharing• Enabling private investment in PV (e.g. regulations)

Increase ability to plan and prepare renewable projects

3 – Security Package (US$19.9 million). US$3.9 million of SREP + US$16 million of IDA guarantees to (i) backstop payment delays under PPAs & (ii) termination caused by GoM. Mitigate payment risk – a key risk identified under the market sounding exercise

2 – Structuring and Delivery of Tariff Buy Down for subprojects (US$6.0 million) Reduce tariffs and ease renewable inclusion

Page 7: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

ASPIRE PROGRAM FEATURES

6

▪ Private investors to Design-Build-Finance-Own-Operate-Transfer grid solar rooftop PV plant

▪ Bidder identified via competitive process/lowest tariff. 20 year PPA. Roofs provided by GoM

▪ SREP and IDA guarantee to address critical investment risk issues for investors

Page 8: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

RISKS, MITIGANTS, AND OUTCOME

7

Risk/Issue Mitigant Outcome

Limited GoM experience

with PPPs

GoM engaged financial, technical

and legal advisors

Advisors helped a lot but sometimes slow

pace with limited dedicated staff in GoM

Delay in some decisions by GoM

Scarcity of land Solar rooftop but adequate

rooftops limited

Technical advisors identified the sites –

details were included in the RfP

Small market size and

remoteness

Aggregation of several

opportunities

First package of 4MW with two lots.

Same process/docs for whole program

Lack of adequate project

documents

Advisors/GoM/WB developed

internationally bankable project

documents

Documents and knowledge now available

Capacity built

Investors’ concerns about

risk of non-payment,

political risk and currency

convertibility issues

▪ Investors’ outreach. Comments

during bid

▪ Six-month escrow account

using a SREP grant

▪ IDA guarantee for termination.

Historically, projects with WB

guarantees do not have default

▪ Fair/attractive risk allocation

▪ 25 firms, mostly international,

purchased the bid documents

▪ Four bids (two more late/disqualified)

▪ 1st package (1.5 MW) awarded to

Chinese-Swiss consortium. Tariff of 21

USc/kWh – comparable with India’s 18

USc/kWh at same time.

▪ 2nd package (2.5MW) – to be rebid –

bidders did not meet technical criteria

Page 9: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

PROJECT STATUS / CONCLUSION

8

▪ First 1.5MW Hulhumalé solar rooftop project built and operational. Displacing diesel and reducing CO2 emissions.

▪ Innovative SREP + IDA guarantee structure helped attract private investors.

▪ Delays in Government’s decisions slowed down progress but new rounds of biddings in preparation for additional 4MW.

▪ Technical assistance has built significant capacity and spread knowledge about renewable including on renewable mapping, planning, integration, net metering, and PPPs.

▪ Maldives’ experience shared with other countries/islands with limited land area that can also benefit from such schemes and use of climate finance.

Page 10: MALDIVES ASPIRE - World Bankpubdocs.worldbank.org/en/996711532398157071/072018... · MALDIVES CONTEXT 2 • Wide archipelago (#1200 islands, 200 inhabited) • Land area scarce -

THANKS

Arnaud BraudSenior Infrastructure Finance Specialist

Tel: +1 (202) 473 1028

[email protected]