Top Banner
Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16, 2005
22

Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

Dec 15, 2015

Download

Documents

Franklin Goldey
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

Making WAP/Utility Partnerships

Smoother and More Substantial

Jack Laverty

NiSource/Columbia Gas of Ohio

NLIEC 2005 Conference

Phoenix, Arizona

June 16, 2005

Page 2: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 2

Creating/Maintaining the PartnershipThe Strategic Triangle

Page 3: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 3

Creating/Maintaining the Partnership

• Political Management– Does a partnership currently exist?

– What are relationships like between the WAP group(s) and the utility?

• Are there any existing interfaces? Personal connections?

– What is the regulatory and political climate?• What is the state PUC’s view of Wx?

– What is the public and private reputation of the state (or local provider) WAP?

Page 4: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 4

Creating/Maintaining the Partnership

• Political Management– Relationships with the Media– Relations with stakeholders including locally-

elected officials (Senate and House), PUC, Consumer’s Counsel, county commsioners, etc.

• Open Houses and other organized media events

– Representation in regulatory proceedings• Be at the table; everyone else is

Page 5: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 5

Creating/Maintaining the Partnership

• Capacity– What is the public

and private perception of the state (or local) WAP as a potential partner?

– What is the capacity of the network to deliver services?

• Capacity Issues– History of Expertise– Training– Management/Operations– Data collection/evaluation– Quality Assurance– Standards– Customer Service/Marketing– Program Performance Metrics– Technology– Program Design

• The right ECMs

Page 6: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 6

Creating/Maintaining the Partnership

• Value– What value

would a partnership create for both the Utility and the service provider and other stakeholders?

• Value– Create Win-Win for all

parties• Benefits to all ratepayers

• Serve low income customers/constituents of Utility, Agency, Local Officials

– Save customers energy/$

• Reduce arrearages

• Reduce bad debt expenses

• PR opportunities various stakeholders

• Allow Utility to recover costs of program

Page 7: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 7

• “Friendly” regulatory/political environment• COH

– Mandated to provide RCS audits in 1984, partnered with WAP CBOs

– Moved to Low-Cost program in 1986– WarmChoice developed collaboratively in 1987

• WAP CBOs– History of successful program operations since 1979– Ohio was aggressive in all aspects of WAP development; staff who

had been involved in energy crisis programs since 1975– Engaged in political process– Large funding base, get 15%$ LIHEAP, active PIPP program– Willingness to change and evolve– Entrepreneurial focus

Case History

Page 8: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 8

COH Energy Assistance/Management Programs

• Low-Income Weatherization program

– Largest Gas Utility weatherization program in Ohio ($5,500,000/year)

Page 9: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 9

• Eligible Customers– 150% poverty level, HEAP/PIPP eligible– Rental properties require landlord (LL) contributions for

heating system replacements if LL not income eligible• Priority customers

– High usage– High arrearage

• NOT an emergency response program• Detailed inspection performed• Prescriptive list of WAP Retro-Tech/NEAT generated energy

conservation measures (ECMs) validated by independent HWAP and COH evaluations

Page 10: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 10

• Energy Conservation Measures (ECMs)– Attic and Sidewall Insulation

Page 11: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 11

• Energy Conservation Measures (ECMs), cont.– Floor, duct and water heater insulation

– Instrumented air and duct sealing (using a blower door)

Page 12: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 12

• Energy Conservation Measures (ECMs), cont.– Replacement (high efficiency) heating and water

heating systems for defective units

Page 13: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 13

• Energy Conservation Measures (ECMs)– Some repairs– Customer Education on energy use, payment

programs, arrearage forgiveness, health and safety issues

– Frequently partner with Ohio HWAP, EPP, HTF, CHIP, USDA Rural Development

– Use HWAP standards (WPS)• Enables consistency and ease of coordination

between HWAP and WarmChoice

Page 14: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 14

• Performance Metrics from Evaluations– Historical customers served

• 45,000

– Average investment per household• $3500 COH funds, can be higher when cost-shared

with HWAP

– Yearly ccfs saved (average per household)• 429 (30% reduction in use)

– $ saved• Varies with cost of gas; 1997 savings were

$200/year

Page 15: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 15

• Performance Metrics from 13 Evaluations– Impact arrearages, varies with cost of gas - $60

to $147– Persistence study

• Energy savings do not decline over time

– Non-energy benefits not counted, but:• Helps with homelessness prevention• Environmental (CO2)• Improved health and safety• Housing durability• Other

Page 16: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 16

• What makes it smooth(er)?• Existing, proven CBO network willing to work together and

with Utility to provide meaningful services

• Mostly the same customer eligibility criteria– WAP Prioritization issue – regulatory: High Use, High Arrears

• Moved to same wx. standards, same ECMs allowed

• Simple fee for service payment system based on collaboratively developed price list

• Move from Stand-Alone only to Stand-Alone and Cost-Share program

• CBOs experienced with data collection and reporting

• Utility staff hired from WAP network

Page 17: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 17

• What makes it smooth(er)?• Shared WAP/Utility customer service goals (2 for 1)

– Stand-alone and cost-share jobs

• Fee for service

– Prices list for HVAC/Wx/Repair measures

– Management and Operations Fees (overhead)

• Formalized training/certification process (OWTC) in place since 1980

• WAP allows sharing of equipment on cost-share jobs

• WAP allows integrated inventory system with monthly reimbursement for materials used in Utility program

– Need to ensure hours are not charged to both programs

Page 18: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 18

• What makes it smooth(er)?• Marriage of WAP prioritization and Commission

mandated eligibility criteria

• Flexibility: COH allowed HVAC and DHW replacements before WAP

• COH QA approach– Look for success

– Look for opportunities to improve product and customer service

• Advance and special purchase funds

Page 19: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 19

• What makes it more substantial?– CBOs engage in the evaluation process– CBOs technically proficient and open to new ideas

• HVAC installation and testing and blower door diagnostics mandated before WAP

• House Pressure/Duct Diagnostics, Infrared

– PR and relationships• CBOs hold open houses for elected and other officials• Customer ed can improve awareness of company actions• COH/CBO Quarterly and annual meetings

– Open communications, willing to listen to each other’s needs

– Flexibility – exceptions for unusual situations

Page 20: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 20

• What makes it more substantial?– Large % of Utility HVAC replacements lower

WAP H&S costs, allowing more units to be served via WAP or H&S to be available to customers using other fuel sources

– Synergistic relationship between WAP/Utility Programs

• Allows for dealing with high cost jobs, but still have to “manage your portfolio”

– Won Governor’s Award for Excellence in Energy Efficiency

Page 21: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 21

COH Low-Income Program MatrixProgram/Service Funding

SourcesFunding Amount

Services Provided Estimated Households

Served

Administrator Provider Benefits

Weatherization COH Base Rates ($.017/mcf)

$5,090,000 1300 Average benefits: Reduces PIPP Shortfall by $244 per customer; non PIPP customers see bills lowered by $244

COH Shareholder funds ($500K per year for 5 years starting 2004)

$500,000 150 Anticipated reduction of gas usage of 30%

Home Weatherization Assistance Program (HWAP)

US Departments of Energy/Health and Human Services

$7,187,682 HVAC Repair/Replace, Insulation, Air Sealing

1769 Ohio Department of Development

Community-based Organizations

Anticipated reduction of gas usage of 21% (1994 study)

Bill Payment Assistance and Reconnection Percentage of Income Payment Plan (PIPP)

Surcharge $.08.mcf

$15,152,700 Bill Payment Assistance

32,000 PUCO and Columbia Gas of Ohio

Columbia Gas Phone Centers and Community Action Agencies

Customer can maintain gas service by paying 10% of their gross income

COH Customer Donations

$258,200 Customers can maintain or establish gas service

COH Shareholder Contributions

$129,100 Reduces disconnect/reconnect cost for all ratepayers

COH Bad Debt Tracker

$137,500 688 COH

Special Emergency Assistance Program

COH Base Rates ($.0034/mcf)

$897,450 4,600 COH, Citizens Energy

Customers can maintain or establish gas service

HeatShare Fuel Funds Total

$1,284,750 6,800

Home Energy Assistance Program (HEAP)

US Department of Health and Human Services

$12,452,457 Bill payment assistance; reconnect funds

75,173 Ohio Department of Development

Community-based Organizations

Makes energy more affordable, allows customers to maintain service, reduces arrearage carrying costs for all ratepayers

EHEAP US Department of Health and Human Services

$2,789,850 25,701

Total Energy Assistance

$44,594,939 150,381 Units of assistance

Some customers get one or more services

Summary by Funding Source

Base Rates & Surcharge

$21,140,150

Customer Donations

$258,200

WarmChoice Weatherization Service

HVAC Repair/Replace, Insulation, Air Sealing

Columbia Gas of Ohio

Salvation Army

Community-based Organizations and private contractors

Funds for reconnection and bill assistance

2,200 COH

HeatShare - Bill Payment Assistance

Page 22: Making WAP/Utility Partnerships Smoother and More Substantial Jack Laverty NiSource/Columbia Gas of Ohio NLIEC 2005 Conference Phoenix, Arizona June 16,

19th Annual NLIEC ConferenceSlide 22

Wrap-Up

• Thanks for your participation!

• Questions?